Shifting Of Ht/Lt Lines Along With Dtrs For Comprehensive Development Of Corridor From Nalgonda X Road-Saidabad-Is Sadan - Owaisi Junction Corridor As Conflict Free Corridor In Gr.Hyderabad Municipal Corporation (Ghmc Limits) Telangana State - Elevated , HYDERABAD-Telangana

Southern Power Distribution Company of Telangana Limited-TSSPDCL has published Shifting Of Ht/Lt Lines Along With Dtrs For Comprehensive Development Of Corridor From Nalgonda X Road-Saidabad-Is Sadan - Owaisi Junction Corridor As Conflict Free Corridor In Gr.Hyderabad Municipal Corporation (Ghmc Limits) Telangana State - Elevated . Submission Date for this Tender is 27-01-2021. Current Transformer Tenders in HYDERABAD Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

26616646
Shifting Of Ht/Lt Lines Along With Dtrs For Comprehensive Development Of Corridor From Nalgonda X Road-Saidabad-Is Sadan - Owaisi Junction Corridor As Conflict Free Corridor In Gr.Hyderabad Municipal Corporation (Ghmc Limits) Telangana State - Elevated
Open Tender
Indian
Telangana
HYDERABAD
27-01-2021

Tender Details

Shifting Of Ht/Lt Lines Along With Dtrs For Comprehensive Development Of Corridor From Nalgonda X Road-Saidabad-Is Sadan - Owaisi Junction Corridor As Conflict Free Corridor In Gr.Hyderabad Municipal Corporation (Ghmc Limits) Telangana State - Elevated Corridor And At-Grade Improvement From Nalgonda X Road To Owaisi Junction In Asmangadh Division, South Circle, Gr.Hyderabad Under Ghmc Works.

Key Value

Document Fees
Refer document
EMD
INR 143000.0 /-
Tender Value
INR 71.50 Lakhs /-

BOQ Items

S.No Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)
1 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 27.00 Each 1690.50 45643.50
Erection of Pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back fill ingwith earth and stones properly ramming including transport of materials from road side to location including pit excavation9.1 Mt Long PSCC Pole
2 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 20.00 Mtr 845.00 16900.00
Dismantle-9.1 M long PSCC pole
3 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 4.00 Each 2200.00 8800.00
Formation of Vertical Cut point for 11 KV line excluding pole erection and stays
4 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 0.03 Each 7469.00 246.48
ERECTION OF LINES : Paving out conductor, providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, rectification of poles, guys and jumpering etc., including transport of material from road side
5 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 14.58 LS 5788.00 84389.04
Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand and curing etc. Including the cost of cement
6 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 30.00 Each 99.00 2970.00
S-GI Bolts & Nuts,Washers etc.,
7 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 27.00 Each 364.00 9828.00
CIVIL WORKS : Excavation of pits in all soils except hard rock requiring blasting. 0.76 M x 0.76M x 1.52M (2.6" x 2.6" x 5.0\)
8 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 27.00 Mtr 1442.00 38934.00
Erection of 11 KV 200/400 A TT Type AB Switch with transportation and required bolts and nuts
9 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 27.00 Each 660.00 17820.00
Erection of 11 KV HG Fuse Set with transportation and required bolts and nuts
10 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 27.00 M3 1005.00 27135.00
Dismantling worksDismantling of 11 KV AB Switch and HG Fuse Set
11 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 27.00 Each 350.00 9450.00
Fix-Side/Cross Arm incl strut fr 11KV
12 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 27.00 Mtr 11.00 297.00
Paint-SC Nos on Poles Incl bkground
13 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 15.00 Mtr 10177.00 152655.00
Construction of Plinth new type with CC 1:3:6 for mounting 5 Way RMU (2Nos Plinths size 3\6"x2\9"x1\6"above GL and 3\6"x3\3"x1\6" below GL)
14 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 15.00 Each 1973.00 29595.00
Erection of 5-Way RMU
15 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 15.00 Mtr 4845.50 72682.50
Construction of Plinth new type with CC 1:3:6 for mounting 3Way RMU (1No Plinth size 3\6"x2\9"x1\6"above GL and 3\6"x3\3"x1\6" below GL) and plastering including cost of cement 1.784 cum @ 3430
16 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 15.00 RMT 1575.00 23625.00
Erection of 11KV 3 Way RMU
17 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 15.00 Each 822.00 12330.00
LOADING of 11KV 3 Way RMU
18 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 15.00 Each 822.00 12330.00
UNLOADING of 11KV 3 Way RMU
19 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 15.00 Each 1149.00 17235.00
LOADING of 11KV 5 Way RMU
20 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 15.00 Each 1149.00 17235.00
UNLOADING of 11KV 5 Way RMU
21 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 30.00 Each 1359.00 40770.00
ERECTION OF LINES : Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, sand & brick masonry on four sides of the earth pit and plastering to brick masonry work, running of earth wire etc., complete, exclud
22 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 30.00 Each 733.00 21990.00
Supply of GI eath pipe with 40 mm dia,3mm thcikness with 2.0 M Length
23 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 4480.00 SET 832.00 3727360.00
Laying of XLPE UG cable including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road cable, laying of cable, placing 40mm shabad Along the CC / BT multilayer road requiring compressor
24 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 480.00 Each 99.00 47520.00
900 mm deep from road level, filling with sand with upto 6 inch thickness, laying of cable, placing RCC protective covers,
25 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 7.00 Each 950.00 6650.00
Providing of earthing with excavation of earth pit (0.6x0.6x2.4 Mts) duly filling with bentonite, sand & brick masonary on four sides of the earth pit and plastering to brick masonary work, running of earth wire etc., complete, including cost of bentonite, cem earth wire, sand, bricks etc.,Including GI Pipe of size 50 mm and dia 2 Mtrs Length
26 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 20.00 Each 3176.00 63520.00
ERECTION OF LINES : UG Cables Jointing :Straight through joints11 KV XLPE UG Cable 3 x 185 Sqmm
27 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 195.00 Each 2021.00 394095.00
ERECTION OF LINES : UG Cables Jointing : Outdoor / Indoor end termination11 KV XLPE UG Cable 3 x 185 Sqmm
28 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 18.00 Each 2115.00 38070.00
Dismantle-Spun 12.5/12.9Mtrs PSCC
29 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 105.00 Each 396.00 41580.00
Dismantling of RS Joist pole
30 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 5.72 SET 3565.00 20391.80
Dismantling of 11kV 34/ 55 Sqmm SC
31 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 480.00 Each 740.00 355200.00
Supply of 4" B class GI pipe
32 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 44.00 Each 470.00 20680.00
Dismantle-8.0 m long PSCC pole
33 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 131.00 Each 979.00 128249.00
Erection of Pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back fill ingwith earth and stones properly ramming including transport of materials from road side to location including pit excavation 8.0 Mt Long PSCC Pole
34 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 27.00 Mtr 1575.00 42525.00
Dismantling worksDismantling of distribution transformer plinth
35 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 27.00 RMT 525.00 14175.00
Dismantling works Dismantling of LT Distribution box
36 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 27.00 Each 26872.00 725544.00
Column type DTR Plinth topslab 5\x5\x6"
37 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 27.00 Each 1242.00 33534.00
Erection of LT distribution box including laying of LT cable from distribution box to LT OH line and DTR to distribution box including earthing of distribution box and crimping of lugs connecting of jumpers etc
38 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 27.00 Each 200.00 5400.00
Dismantling of existing CT meter
39 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 27.00 SET 880.00 23760.00
Erection of CT Meters on LV Side of DTR?s including transportation and accessories like Lugs, clamps but excluding cable
40 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 168.00 SET 99.00 16632.00
S-GI Bolts & Nuts,Washers etc.,
41 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 108.00 Each 34.06 3678.48
Supply of PVC cleats
42 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 88.00 Each 937.65 82513.20
Formation of (Vertical / Horizontal) Cut point for LT line excluding pole erection and stays Single Circuit
43 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 27.00 Each 1611.00 43497.00
Dismantling worksDismantling of distribution transformers of all capacities including transportatin and unloading at stores
44 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 27.00 Each 1906.00 51462.00
Erection of 3 Phase distribution transformer including loading transporting from road side to location ,unloading, testing and commissioning including cost of bolts, nuts, including testing, erection & commissioning
45 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 1255.00 LS 44.00 55220.00
Removing and Reconnection of LT Services
46 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 131.00 Each 364.00 47684.00
CIVIL WORKS : Excavation of pits in all soils except hard rock requiring blasting. 0.76 M x 0.76M x 1.52M (2.6" x 2.6" x 5.0\)
47 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 81.00 LS 2563.00 207603.00
S-CI Pipe earthing 50mm dia 2m long
48 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 81.00 Each 1100.00 89100.00
ERECTION OF LINES : Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, sand & brick masonry on four sides of the earth pit and plastering to brick masonry work, running of earth wire etc., complete, exclud
49 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 540.00 Each 88.00 47520.00
S-Earthing GI flat 25x3 mm incl material
50 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 1350.00 Ton 11.00 14850.00
Running of GI eartn flat of size 25X3mm from all metallic parts of channels, AB Switch, HG fuse set, DTr neutral and LT Distribution box and inter, connection of earth pits etc complete
51 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 87.00 Each 396.00 34452.00
Dismantling of RS Joist pole
52 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 4.16 Each 4180.00 17388.80
Dismantle existing LT 3ph line
53 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 1.08 Each 7240.00 7819.20
Dismantle existing LT AB Cable
54 Shifting of HT LT lines along with DTRs for Comprehensive Development of corridor from Nalgonda X As per relevant standard specification 5.24 Each 15167.90 79479.80
Stringing of AB cable 3x70 + 1x16 + 1x50
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail