Archaeological Survey Of India -ASI has published Restoration Of Fortification Wall And Strengthing Of Structures At Chinnakavandanur. Submission Date for this Tender is 02-02-2021. Wall construction Tenders in As per tender document Tamil Nadu. Bidders can get complete Tender details and download the document.
Name of Work: MW (Cons) to Restoration of Fortification wall and strengthening of structures at Chinnakavandanur. | |||||
---|---|---|---|---|---|
Item No | Description and specification of items of work to be executed | Item Code / Make | Specification / Quantities to be executed | Units | |
1 | 1.01 | Carefully removing the precariously standing fortification stone wall connecting to mandapa at Veerabadrasamy temple and stacking the stones safely for reuse, portions not fallen but threatening to fall at any time including cost of materials and labour charges. | item1 | 19.5 | 1m3 |
2 | 1.02 | Collecting the old stones of the fallen wall from surrounding the Veerabadra temple and stacking them for reuse by head 200mtrs including loading and unloading etc complete including cost of materials and labour charges. | item2 | 19.6 | 1m3 |
3 | 1.03 | Cleaning the fallen earth and debris in and around the foundation area and disposing waste outside the fortification wall including cost of materials and labour charges. | item3 | 58.4 | 1m3 |
4 | 1.04 | Earthwork excavation for foundation of Fortification wall including disposing of excavated earth outside the fortification wall etc complete including cost of materials and labour charges. | item4 | 25.43 | 1m3 |
5 | 1.05 | Providing PCC 1:3:6 by using 40mm stone jelly for base of Fallen fortification wall foundation and for providing drain near steps and entrance and for leading to temple (decayed PCC) etc complete including cost of materials and labour charges. | item5 | 19.58 | 1m3 |
6 | 1.06 | Packing and consolidating the rear side of the moat wall with 25% of new rough stones along with available old rough stones binding with 75% of gravel watering consolidating etc. complete for strengthening rear side of fallen fortification wall including cost of materials and labour charges. | item6 | 48.75 | 1m3 |
7 | 1.07 | Reconstruction of fallen fortification wall and remove precariously standing fortification wall by using 15% of new stones of same size and design shape (Since the wall had collapsed and the stone have fallen and unshaped material utilized for strengthening of rear side of fortification wall including cost of materials and labour charges. | item7 | 48.75 | 1m3 |
8 | 1.08 | Providing stone apron/flooring of 1.50m wide by using cut stones of not less than 23cm in thick over top of the fortification wall rampart to avoid water percolation and to restrict the hit of storm water including cost of materials and labour charges. | item8 | 36.4 | 1m3 |
9 | 1.09 | Pointing the stone joints of fortification wall and apron with lime surki mortar 1:1:1 including racking out masonry mortar etc complete including cost of materials and labour charges. | item9 | 239.5 | 1m2 |