Department Of Soil and Water Conservation has published Water Harvesting And Erosion Control Project At Milanbazar Barapeta Ultakhunda Dong , Barapeta Village Under Ridf-Xxv. Submission Date for this Tender is 22-01-2021. Water Harvesting Tenders in Baksa Assam. Bidders can get complete Tender details and download the document.
Name of Work: CONSTRUCTION OF WATER HARVESTING AND EROSION CONTROL PROJECT AT MILANBAZAR-BARAPETA ULTAKHUNDA DONG BARAPETA VILLAGE (BAKSA) UNDER RIDF XXV, During 2019-20 (PART-A) | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | CONSTRUCTION OF RCC CHECK DAM (PART-A) | itm1 | ||
2 | 2 | Site preparation | itm2 | 1 | L.S. |
3 | 3 | Earth work in excavation of foundation of structure as per drawing and technical specification. | itm3 | 921.936 | M3 |
4 | 4 | Plain Cement Concrete 1 : 3 : 6 nominal mix in foundation with crushed stone aggrete 40 mm nominal size mechanically mixed, placed in foundation & compacted by vibration including curing for 14 days. | itm4 | 17.57 | M3 |
5 | 5 | RCC Works in in sub structure complete as per drawing & technical specification. | itm5 | 166.71 | M3 |
6 | 6 | Cost of Reinforcement : Supplying, fitting & placing TMT CRS(Fe-500) bar reinforcement in substructure complete as per drawing & technical specifications. | itm6 | 100.03 | Qtl |
7 | 7 | Plastering with cement mortar (1:3)on brick work in sub-structure complete as per drawing and technical Specifications. | itm7 | 510.09 | M2 |
8 | 8 | Providing & laying filter media as specified | itm8 | 64.84 | M3 |
9 | 9 | Earthwork filling guide bund by head load upto lead of 60m as per drawing and technical specifications. | itm9 | 302.13 | M3 |
10 | 10 | Construction of peripheri bund with appproved material as specifed. | itm10 | 763.56 | M3 |
11 | 11 | Providing turfing as specified. | itm11 | 763.68 | M2 |
12 | 12 | Providing and laying boulder apron | itm12 | 111.89 | M3 |
13 | 13 | Providing and laying boulder apron with wire crate as specified. | itm13 | 240 | M3 |
14 | 14 | Foot bridge | itm14 | ||
15 | 15 | Reinforcement cement concrete works | itm15 | 19.264 | M3 |
16 | 16 | Supplying fitting and placing mild steel reinforcement complete as per drawing and technical specification. | itm16 | 14.448 | Qtl |
17 | 17 | Plastering with cement mortar (1:3)on brick work complete as per drawing and technical Specifications. | itm17 | 117.85 | M2 |
18 | 18 | Earthwork in excavation of diversion channel | itm18 | 201 | M3 |
19 | 19 | Earthwork in filling of diversion channel | itm19 | 201 | M3 |
20 | 20 | Temporary Camp Hut | itm20 | 32.25 | M2 |
21 | 21 | Instalation of Tube well | itm21 | 1 | No |
22 | 22 | CONSTRUCTION OF RCC CHECK DAM (PART-B) | itm22 | ||
23 | 23 | Site preparation | itm23 | 1 | L.S. |
24 | 24 | Construction of coffer dam as specified. | itm24 | 60 | M3 |
25 | 25 | Earth work in excavation of foundation of structure as per drawing and technical specification. | itm25 | 290.374 | M3 |
26 | 26 | Plain Cement Concrete 1 : 3 : 6 nominal mix in foundation with crushed stone aggrete 40 mm nominal size mechanically mixed, placed in foundation & compacted by vibration including curing for 14 days. | itm26 | 7.525 | M3 |
27 | 27 | RCC Works in in sub structure complete as per drawing & technical specification. | itm27 | 61.494 | M3 |
28 | 28 | Cost of Reinforcement : Supplying, fitting & placing TMT CRS(Fe-500) bar reinforcement in substructure complete as per drawing & technical specifications. | itm28 | 36.896 | Qtl |
29 | 29 | Plastering with cement mortar (1:3)on brick work in sub-structure complete as per drawing and technical Specifications. | itm29 | 239.51 | M2 |
30 | 30 | Providing & laying filter media as specified | itm30 | 16.635 | M3 |
31 | 31 | Earthwork filling guide bund by head load upto lead of 60m as per drawing and technical specifications. | itm31 | 129.86 | M3 |
32 | 32 | Construction of peripheri bund with appproved material as specifed. | itm32 | 370.71 | M3 |
33 | 33 | Providing turfing as specified. | itm33 | 373.35 | M2 |
34 | 34 | Providing and laying boulder apron | itm34 | 60.7 | Nos |
35 | 35 | Providing weep hole | itm35 | 10 | Nos |
36 | 36 | Foot bridge | itm36 | ||
37 | 37 | Reinforcement cement concrete works | itm37 | 7.645 | M3 |
38 | 38 | Supplying fitting and placing mild steel reinforcement complete as per drawing and technical specification. | itm38 | 5.734 | Qtl |
39 | 39 | Plastering with cement mortar (1:3)on brick work complete as per drawing and technical Specifications. | itm39 | 49.6 | M2 |
40 | 40 | Earthwork in excavation of diversion channel | itm40 | 189 | M3 |
41 | 41 | Earthwork in filling of diversion channel | itm41 | 189 | M3 |
42 | 42 | Temporary Camp Hut | itm42 | 32.25 | M2 |
43 | 43 | Instalation of Tube well | itm43 | 1 | No |