Comprehensive Maintenance Of Modernised Water Supply System Comprehensive Maintenance Of Modernised Water Supply System ( Scada ) Under Ge Dronachal, GE Dronachal-Madhya Pradesh

Military Engineer Services-MES has published Comprehensive Maintenance Of Modernised Water Supply System Comprehensive Maintenance Of Modernised Water Supply System ( Scada ) Under Ge Dronachal. Submission Date for this Tender is 27-01-2021. SCADA Tenders in GE Dronachal Madhya Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

26549525
Corrigendum : Comprehensive Maintenance Of Modernised Water Supply System Comprehensive Maintenance Of Modernised Water Supply System ( Scada ) Under Ge Dronachal
Open Tender
Indian
Madhya Pradesh
GE Dronachal
27-01-2021

Tender Details

Comprehensive Maintenance Of Modernised Water Supply System Comprehensive Maintenance Of Modernised Water Supply System ( Scada ) Under Ge Dronachal

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 20-Jan-2021 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 27-01-2021

Key Value

Document Fees
INR 500 /-
EMD
INR 50400.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Comprehensive Maintenance of modernised water supply system (SCADA) under GE Dronachal.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Operation and maintenance of SCADA based water supply system/management around the clock inclding Sunday and Holiday in three shift per day of 08 hours each (1st shift from 0600hrs to 1400hrs, 2nd shift from 1400hrs to 2200hrs and 3rd shift 2200hrs to 0600hrs) by deplying experience and qualified skilled one pump operator in each shift for operation of SCADA as installed at Dronachal Base. The contractor will be responsible for repairing maintenance and servicing of all PLC panels and all connected circuit/accessories required for motorised water supply system as described below :-\n 990 Per Shift
2 1.1 (a) One trained technician ITI qualified having three years experience in relevant field at SCADA room for attending monitoring the breakdown and preventative maintenance for PLC panels and all connected circuits/ accessories in general shift (upto 330 days) and one company trained technician once in one month (OEM of PLC Panel) and moterised valve for successful working system under GE Dronachal.\n(b) Servicing and maintenace /repair and replacement of defective components /spare parts with new one of the PLC based control panels including all accessories modem, antenna etc. installed at various places, OHT and Master control station, Mimic panel. \n(c) Repair/maintenance by disconnecting cleaning greasing for wear and tear complete servicing, refixing, lathing, installing and commissioning as directed by Engr-in Charge of all motorised and solenoid valve transmiter, Ultrasonic and magnatic level sensor.\n(d) Any changes to the programmable logic control (PLC) in ladder logic of programme changes in operation timing (limited to the scope of items covered under the contract).\n(e) Any changes to SCADA software eg. change in report format, changes in operational screen, operation of soft keys etc. (limited to the scope of items covered under the contract).\n(f) Attending breakdown maintenance within three hours of reporting time and replacement of new one as reqd at site complete as specified and directed by Engr-in-Charge.\n(g) One helper to assist the operator shall be deployed by Department/Govt. for three shift around the clock including Sunday/Holiday.\n(h) The work shall be carried out by authorised representative of PLC based company and proof for the same shall be submitted by the contractor before commencement of work.\n(j) The contractor shall quote the rate inclusive of all the charges pertains to communication one number BSNL Broadband connection with static IP at pump house and GPRS enable data card use in all PLC panel related to the scope of work.
3 2 Comprehensive maintenance for SCADA server system consisting of PC, printer, screen etc. as required at site including necessary updation suitable antivirus internet charges to upkeep the service for the entire period. 1 Job
4 3 Supply & Fix single phase Preventor Model 1 : VSP D2 complete all as specified and directed. \nMake : MINILEC or PHEONIX Cat No : 24708, KDAS "Kamal Drives & Automation Services" or its equivalent as approved by GE 6 Each
5 4 Supply & Fix Relay card single C/O 24 V DC complete all as specified and directed. \nMake : LEON/IDEC, CAT No RU4SD24, SY4S05D, KDAS "Kamal Drives & Automation Services" or Equivalent as approved by GE 60 Each
6 5 Supply & Fix Relay card with base 2 C/O 240V AC complete all as specified and directed. \nMake : LEON/IDEC, Cat No RU4SA 220, SY4SO5D, KDAS "Kamal Drives & Automation Services" or Equivalent as approved by GE 60 Each
7 6 Supply & Fix LED Indicator Colour/Red /yellow/Green/Blue. Make : ESBEE/TEKNIC/TELE MEACHNIQUE Cat No : Red XB7EV04MPM, Green-XB7EVO3MPN, KDAS "Kamal Drives & Automation Services" or equivalent as approved by GE, 40 Each
8 7 Supply & Fix PLC (Programmable Logic Controller) complete all as specified and directed. \nMake : MITUSHIBISHI, ABB, SIEMENS, PHEONIX CONTRACT, SCHNEIDER, M 218 SERIES, KDAS "Kamal Drives & Automation Services" 2 Each
9 8 Supply & Fix I/O module for Programmable Logic Controller. \nMake : MITUSHIBISHI, PHEONIX CONTRACT, SCHNEIDER or equivalent, CAT No : TM2 Series 4 Each
10 9 Supply & Fix HMI (Human Machine Interface) for Programmable Logic Controller. \nMake : MITUSHIBISHI, ABB, SIEMENS, PHEONIX CONTRACT, RENU, CAT No : RENU1745RP11, KDAS "Kamal Drives & Automation Services"\n 2 Each
11 10 Supply & Fix push button with LED Indicator - 240 V A.C. Colour Red /Green complete all as specified and directed. Make : ESBEE/SIEMENS/TEKNIC/TELE MEACHNIQUE or equivalent as approved by GE, CAT No : Red-XB5AW34B2N, Green-XB5AW33B1N 8 Each
12 11 Supply & Fix Buzzer - 240 V A.Ccomplete all as specified and directed. \nMAKE : C&S, MIMIC or equivalent as approved by GE 4 Each
13 12 Supply & Fix in repairs of Flow switch alongwith all necessary parts as required at site. \nMake : INDFOSS/ DANFOSS/SWITZER/RAPID CONTROL, CAT No : RC-61 (8481-80) 1 Each
14 13 Supply & Fix of Pressure switch (Make : INDFOSS/ DANFOSS or equivalent as approved by GE, CAT No RT-116 ) 2 Each
15 14 Supply & Fix Electric motor suitable for actuator of the following size complete all as specified and directed\nMake : RITETORK/UNIVERSAL SWITCH GEAR CO, KDAS "Kamal Drives & Automation Services" or equivalent as approved by GE.\n
16 14.1 (a) 50/80 mm dia Cat 4785 TORK 65 3 Each
17 14.2 (b) 100 mm dia Cat No 4785 TORK 59 2 Each
18 14.3 (c) 150 mm dia Cat No 4785 TORK 77 6 Each
19 14.4 (d) 200 mm dia Cat No 4785 TORK 95 4 Each
20 14.5 (e) 250 mm dia Cat No 4785 TORK 34 3 Each
21 15 Supply & Fix in repair for single phase moterised acuted butterfly valve for the following sizes \nMake : AUDCO/ VIRGO/L&T/HASEL/HOFNER, KDAS "Kamal Drives & Automation Services" or equivalent as approved by GE :- \n
22 15.1 (a) 50 mm dia Cat No IBFLPC50 2 Each
23 15.2 (b) 80 mm dia Cat No IBFLPC80 2 Each
24 15.3 (c) 100 mm dia Cat No IBFLPC100 1 Each
25 15.4 (d) 150 mm dia Cat No IBFLPC 150 5 Each
26 15.5 (e) 200 mm dia Cat No IBFLPC 200 3 Each
27 15.6 (f) 250 mm dia Cat No IBFLPC 250 3 Each
28 16 Supply & Fix Power Capacitor for Actuator suitable for 50/80/100/150 mm dia Motorized Butterfly Valve complete all as specified and directed. \nMake : UNIVERSAL SWITCHGEAR CO., KDAS "Kamal Drives & Automation Services" or equivalent, as approved by GE 5 Each
29 17 Supply & Fix Resistor for Actuator suitable for 50/80/100/150 mm dia motorized Butterfly Valve complete all as specified and directed. \nMake : UNIVERSAL SWITCHGEAR CO, KDAS "Kamal Drives & Automation Services" or equivalent as approved by GE. 5 Each
30 18 Supply & Fix Limit switch for Actuator suitable for 50/80/100/150 mm dia motorized Butterfly Valve complete all as specified and directed.\nMake : UNIVERSAL SWITCHGEAR CO, KDAS "Kamal Drives & Automation Services" or equivalent as approved by GE 10 Each
31 19 Supply & Fix SMPS input 230 V/AC, Output 24V DC complete all as specified and directed. \nMake : NHP/ TELEMEHANIQUE or equivalent as approved by GE 1 Each
32 20 Supply & Fix Ultrasonic Level Sensor range 0-8 M Make: Banner (Make : BANNER or equivalent as approved by GE, CAT No QT50ULB) 1 Each
33 21 Supply & Fix GPRS Modem complete all as specified and required at site as approved by GE. 1 Each
34 22 Supply & Fix 9DB Antenna GPRS Modem complete all as specified and directed as approved by GE. 2 Each
35 23 Supply only UPS Battary for 24V 36 Amp complete all as specified and directed. (Make : EXIDE, AMCO, Standard or eqivalent as approved by GE) 1 Each
36 24 Supply & Fix Selector switch 2/3 pole suitable for auto/manual main power supply complete all as specified and directed. (Make : ESBEE/TEKNIC/TELE MEACHNIQUE or equivalent as approved by GE, Cat No : XB5AD33N) 1 Each
37 25 Supply & Fix 2KVA inverter with sealed acid maintenance free battries for powering the panel upto the period 01 hour. (Make : NUMERIC/APC/TATA/LUMINIUS) 3 Each
38 26 Supply & Fix MCB 3P 6A complete all as specified and directed (Cat No : A9N3P06B). 2 Each
39 27 Supply & Fix coil for solenoid valve 10mm dia 230 Volt AC brass or stainless steel body with suitable pressure of coil power 6 Watt (Cat No 2151VIAPC). 3 Each
40 28 Ditto as per item No 27 above but for 25 mm dia (Cat No : 9210B61). 3 Each
41 29 Supply & Fix motorized ball valve 25 mm complete all as specified and directed. (Make : UNIVERSAL SWITCHGEAR or equivalent as approved by GE, CAT No : V-25/MBV16/220AC) 3 Each
42 30 Important Notes :-\n(i) Minimum wages as per Minimum Wages Act 1948 shall be paid to the tradesmen by the contractor. Proper wages paid record shall be maintained and submitted to Engineer-in-charge. Contractor shall supply log book, attendance register, payment register and operator shall be responsible to maintain the log book daily and submit to department duly completed along with attendance register and payment record register at the end of every month. All provisions as laid down in Contract Labour Act 1970 such as payment of minimum fair wages, working conditions, etc shall be complied by the contractor.\n(ii) The contractor shall quote the rates for deputing man power and reliever arrangement as per labour commissioners rule requirement of labours as given in BoQ.\n(iii) The staff employed by the contractor shall be responsible for carrying out cleaning of all equipments, plants and machineries in a presentable condition for inspection at all time. If required, the contractor will employ more manpower to carry out the duties assigned above and no extra payment will be made on this account. Rates quoted by him will be deemed to be included, complete all as directed and specified by Engr-in-Charge.\n(iv) The contractor shall carry out routine check and maintain check sheet daily/ weekly/ monthly all as per manufacturers instructions/SOP and upkeep the installation, rectify normal troubleshootings and will submitt daily updated log sheet at the end of every month in the AGE E/M office.\n(v) Verification of antecedents of Contractors representatives/ trained personnel/labour deployed at site in connection with execution of work under the contract, as per security requirement of User Unit/installation shall be the responsibility of the contractor and all expenses in connection with verification of antecedents by Police Authority/security Agency shall be borne by the contractor.\n(vi) Qualification :- The team comprising 01 Nos of technician in one shift for 08 hours including sundays and holidays total 03 Nos of technicians shall be engaged per day for the duty at the substation. The technician employed should posses ITI in electrician trade with minimum 03 years of experience in the same. \n(vii) Staff engaged for maintenance/operation of the installation will not leave the installation under any circumstances.\n(viii) Contractor will provide all kinds of stationary as required for the work as directed by the Engr-in-Charge during currency of the work.\n(ix) All tradesmen will be in uniform (grey colour formal trousers with full sleeved light blue colour shirt) with name plate/badge as approved by GE, cost of these is deemed to be included in the unit rate quoted by the contractor. \n(x) All tradesmen shall be individually life insured under group insurance scheme or any other scheme for minimum of Rs.1.00 Lakh. Insurance certifcate in this regard shall be submitted to Enginer-in-charge before commencement of work.\n(xi) If the quoted amount is less that the estimated cost of the work i.e, as per NIT amount then the lowest bidder will have to deposit FDR/BGB in favour of Accepting Officer within 07 day of opening of Financial Bid for the difference in estimated cost i.e, NIT amount and quoted amount. In case the said FDR/BGB is not submitted wihtin the stipulated period as mentioned above, the contractor shall be banned for 06 months and his bid will be rejected. FDR/BGB shall be released only after satisfactory completion of work.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail