Manning And Operation Of E/M Installations At Af Stn Mothala, Naliya-Gujarat

Military Engineer Services-MES has published Manning And Operation Of E/M Installations At Af Stn Mothala. Submission Date for this Tender is 01-02-2021. Electromechanical Work Tenders in Naliya Gujarat. Bidders can get complete Tender details and download the document.




Tender Notice

26525526
Corrigendum : Manning And Operation Of E/M Installations At Af Stn Mothala
Open Tender
Indian
Gujarat
Naliya
01-02-2021

Tender Details

Manning And Operation Of E / M Installations At Af Stn Mothala

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 25-Jan-2021 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 01-02-2021

Key Value

Document Fees
INR 500 /-
EMD
INR 78000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: MANNING AND OPERATION OF E/M INSTALLATIONS AT AF STN MOTHALA
Sl. No. Description of work Item Code / Make No. Or Qty Units
1 1 Manning and operation of site pump house at Mothala with 01 (One) Semi Skilled FGM in each shift of 8 hours on three shifts a day round the clock including Sundays and Holidays and to operate/ handle/ maintain the following equipments for its smooth operation complete all as specified and as directed:-\n(a) Submersible pump set 3 Phase, 415V, 50Hz, 25 HP - 02 Nos.\n(b) DG set 3 Phase, 415 V, 50Hz, 63kVA,1500 RPM Engine make Greaves Ltd, Alternator-Crompton - 01 No.\n(c) Stabilizer 60 kVA, 3 Phase, 50Hz, servo motor operated - 01 No.\n(d) Two pole structure with GOD, drop-out fuses, etc. - 01 No.\n(e) Transformer 11 kV/ 433V, 100 kVA capacity make Rajasthan - 01 No. 11 Month
2 2 Manning and operation of technical pump house at Mothala with 01 (One) Semi skilled FGM in each shift of 8 hours on two shifts a day including Sundays and Holidays (1st shift 06.00 Hrs. to 14.00 Hrs. and 2nd shift 14.00 Hrs. to 22.00 Hrs.) and to operate/ handle/ maintain the following equipments for its smooth operation complete all as specified and as directed:-\n(a) Kirloskar Centrifugal pump set DSM 65/ 32Amp - 02 Nos.\n(b) DG set 3 Phase, 4 wire, 40 kVA, make Kirloskar with control panel - 01 No.\n(c) LT panel board - 01 No.\n(d) Chlorination plant - 01 No.\n(e) Bleaching dozer - 01 No.\n(f) UG sump 1,00,000 gallons capacity - 01 No. 11 Month
3 3 Manning and operation of main receiving station (MRS) at Mothala with 01 (One) skilled Electrician in each shift of 8 hours on three shifts a day round the clock including Sundays and Holidays and to operate/ handle/ maintain the following equipments for its smooth operation complete all as specified and as directed:-\n(a) Two pole structure with metering/ CTS/ GOD/ Dropout fuses etc. at receiving point - 01 No.\n(b) Transformer 200 kVA, 3 Phase, 11kV/ 433V make Rajasthan - 01 No.\n(c) LT panel board - 01 No.\n(d) Main HT switch gear 11 kV, 3 phase panel with following:-\nIncoming:- VCB 11 kV, 400 Amps, 3 phase, horizontal draw out with motorised mechanism and relays (earth fault/ over load) and metering. Make Alsthom - 01 No.\nOutgoing:- VCB 11 kV, 400 Amps, 3 Phase, horizontal draw out with motorised mechanism and relay (earth fault/ overload) and metering. Make Alsthom - 03 Nos.\nStaff to be employed:- (i) Electricain - 01 No./ shift. 11 Month
4 4 Manning and operation of Sub Stn No. 2 at Mothala with 01 (One) Skilled Electrician in each shift of 8 hours on three shifts a day round the clock including Sundays and Holidays and to operate/ handle/ maintain the following equipments for its smooth operation complete all as specified and as directed:-\n(i) Transformer 200 kVA, 3 Phase, 11kV/ 415 Volt. Make Rajasthan - 01 No.\n(ii) LT panel board - 01 No.\n(iii) HT Ring main unit SF 6, 3 phase, 11 kV, 400 Amps, VCB - 01 No. Make - Crompton Greaves. \n(iv) DG set 3 Phase, 4 wire, 40 kVA, Make - Kirloskar with control panel - 01 No. Make:- Kirloskar.\nStaff to be employed:- (i) Electricain - 01 No./ shift. 11 Month
5 5 Manning and operation of Sub Stn No. 3 at Mothala with 01 (One) Skilled Electrician in each shift of 8 hours on two shifts a day including Sundays and Holidays (1st shift 06.00 Hrs. to 14.00 Hrs. and 2nd shift 14.00 Hrs. to 22.00 Hrs.) and to operate/ handle/ maintain the following equipments for its smooth operation complete all as specified and as directed:-\n(i) Transformer 500 kVA, 3 Phase, 11 kV/ 415 Volts - 01 No. Make - Rajasthan. \n(ii) LT panel board - 01 No.\n(iii) HT Ring main unit SF 6, 3 Phase, 11 kV, 400 Amps, VCB - 02 Nos. Make - Crompton Greaves. \n(iv) Servo Voltage Stabilizer 500 kVA 3 Phase, 415 Volts. \nStaff to be employed:- (i) Electricain - 01 No./ shift. 11 Month
6 6 Manning and operation of RO Plant with Semi skilled FGM in each shift of 8 hours on two shifts a day including Sundays and Holidays (1st shift 06.00 Hrs. to 14.00 Hrs. and 2nd Shift 14.00 Hrs. to 22.00 Hrs.) and to operate/ handle/ maintain the RO Plant and connected equipments for its smooth operation complete all as specified and as directed.\nStaff to be employed:- FGM - 01 No./ shift.\n 11 Month
7 6.01 Note for item Nos. 1 to 6\n(i) The installations will be handed over in operating state on the date of commencement of work.\n(ii) The operator shall ensure the serviceability by trial and alert for operation.\n(iii) The work will be continued without Holidays. The Contractor shall employ extra Tradesmen for relief on Holidays/ weekly Holidays. The rate quoted shall be deemed to be inclusive of this aspect.\n(iv) Required fuel to be collected from MES Store Yard.\n(v) All the sluice valves near OH-01, OH-02, Technical area to be operated regularly.\n(vi) Any spares like gland packing/ rubber packing, hose pipes, belts etc. required for smooth functioning of DG sets and pump sets shall be Contractor's supply in timely and of full responsibility of the Contractor.\n
8 6.02 (vii) Employ (Electrician/ FGM) in each shift (ITI Certificate holder from Government/ Government recognised Institute having minimum 04 years of working experience in the trade only) with all protective clothing's, maintenance tools, metering equipments, safety equipments for working at above installations. \n(viii) All operators shall be paid their salary/ wages through Bank Account only and the proof thereof shall be produced strictly by the contractor while claiming RAR/ Final Bill.\n(ix) If the quoted amount is less than the estimated cost of the work, then the lowest bidder will have to deposit FDR/ BGB in favour of Accepting Officer within 07 days of opening of Financial Bid for the difference in estimated cost & quoted amount. In case the said FDR/ BGB is not submitted within stipulated period as mentioned above, the contractor shall be banned for 06 months and his bid will be rejected. FDR/ BGB shall be released only after satisfactory completion of work including defect liability period of contract whenever applicable.\nX) The minimum wages legally effective to be the minimum wages notified in Gazette / Governed by any local regulations or by Central Government whichever is higher.\n
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail