}

Outsourcing For Manning And Operation Of Ac Plant , Dg Sets And Fire Fighting System At Alh Hanger , Annexie And Akash At Af Station Tezpur, TEZPUR-Assam

Military Engineer Services-MES has published Outsourcing For Manning And Operation Of Ac Plant , Dg Sets And Fire Fighting System At Alh Hanger , Annexie And Akash At Af Station Tezpur. Submission Date for this Tender is 02-02-2021. Fire Fighting Consumable Tenders in TEZPUR Assam. Bidders can get complete Tender details and download the document.




Tender Notice

26504719
Corrigendum : Outsourcing For Manning And Operation Of Ac Plant , Dg Sets And Fire Fighting System At Alh Hanger , Annexie And Akash At Af Station Tezpur
Open Tender
Indian
Assam
TEZPUR
02-02-2021

Tender Details

Outsourcing For Manning And Operation Of Ac Plant , Dg Sets And Fire Fighting System At Alh Hanger , Annexie And Akash At Af Station Tezpur

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 26-Jan-2021 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 02-02-2021

Key Value

Document Fees
INR 500 /-
EMD
INR 54000.0 /-
Tender Value
INR 27 Lakhs /-

BOQ Items

Name of Work: Outsourcing for manning and operation of AC plant, DG sets and fire fighting system at ALH Hanger, Annexie and Akash at AF Station Tezpur under GE AF Tezpur
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Outsourcing for operation of Air Conditioning Installation fully computerized system at 115HU ( ALH ) for Annexie I & II, with min one operator per shift (semi skilled), in three shifts per day for 8 hours each shift for seven days in a week comprising of the following Plants / Machineries / Equipments at AF Stn Tezpur all as directed:-\n(i) Chiller unit complete with compressor 66 TR. Make-Kirloskar - 04 Nos\n(ii) Primary chiller water pump 600LPM /hr. Make - Kirloskar - 04 Nos\n(iii) Secondary chiller water pump 600 LPM. Make - Kirloskar - 04 Nos\n(iv) Condensor Pump -04 Nos \n(v) AHU floor mounted type of capacities -08 Nos( Annexie I& II )\n(vi) -do- but SCU ( suspended ceiling unit -03 No( Annexie I )\n(vii) Control panel for complete AC plant -01 No\n(viii) Air compressor unit /Air dryer - 02 Nos ( Pneumatic air system) \n(ix) Borewell with 5HP submirsible pump set, MAKE -Kirloskar-02 Nos \n(x)Water treatment plant with with Iron removal filter , chlorine dozing pump.\n(xi) Treatment water pump motor 5HP-06 Nos\n(xii)Electrical driven pump 2580 LPM-01 No\n(xiii)Diesel engine driven pump 2850LPM-01 No\n(xiv)Jockey pump cap(Electrical driven) 180LPM-01 No\n(xv)DG Set 380KVA capacity with AMF panel make-Kirloskar-03 Nos\n(xvi) Synchronicing control panel-01 No\nNote:- The operator should ensure proper/regular operation of all type of valves in the system and do back wash of IRP as required and as directed. 11 Month
2 2 Outsourcing for operation of Air Conditioning Installation fully computerized system at 115HU ( ALH) for Annexie III, with min one operator per shift (semi skilled), in three shifts per day for 8 hours each shift for seven days in a week comprising of the following Plants / Machineries / Equipments at AF Stn Tezpur all as directed:-\n(i) Chiller unit complete with compressor 75 TR. Make- Kirloskar - 02 Nos\n(ii) Primary chiller water pump 680LPM /hr. Make - Kirloskar - 02 Nos\n(iii) Secondary chiller water pump 680 LPM. Make - Kirloskar - 02 Nos\n(iv) Condensor Pump -15 KW -02 Nos\n(v) AHU floor mounted type of capacities -09 Nos( Annexie III )\n(vi) -do- but SCU ( suspended ceiling unit -02 No( Annexie III )\n(vii) Control panel for complete AC plant -01 No\n(viii) DG Set 320 KVA -02 Nos 11 Month
3 3 Outsourcing for operation of centeral Air Condition plant water cololed of capacity 80TRX3 Nos (including 01 No stand by along with DG sets) installed at Akash Missile complex, with min two operator per shift (semi skilled), in three shifts per day for 8 hours each shift for seven days in a week to operate the following plants and machinaries complete all as directed:-\n(i) DG set of capacity 750KVA,415 Volts,50 Hz AC-01 No\n(ii) AHU of capacity 160Tr centrral AC plant - 02 Nos\n(iii)Chiler water pump of capacity 7.5HP-02 Nos\n(iv) Hot water pump of capacity 7.5HP-02Nos\n(v) Herater of capacity 175KW-01No\n(vi) Chiller compressor -03Nos\n(vii)LT control panel board-02 Nos\n(viii)Ducts\n(ix) Operation of security lights switches as per time table\nNotes applicable for item Nos. 1 to 3 \n(i)The operator should record temperature, humidity for AC plant & daily DI details for DG set in the register as provided by contractor\n(ii) The AC plant operator must be qualified for operating the entire plant system \n(iii) Rate quoted rate is inclusive of all taxes, cess, levies as applicable and GST\n(iv) The quoted rate is inclusive of employee contribution of EPF and ESI as per EPF act 1952 and ESI act 1948, as ammended from time to time\n\n(v) Quoted rate shall not be less than the min wage (higher of min wage published by center / state as on the last date of bid submission end date) 11 Month
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail