Military Engineer Services-MES has published Grass Cutting Around Operational Area And Allied Works To Runway Taxi Track And Dispersal Etc At Ins Hansa Under Age Br I Of Ge Nw Vasco 8326/E8. Submission Date for this Tender is 25-01-2021. Runway Tenders in VASCO Goa. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 11-Jan-2021 | Revised Tender Pages Corrigendum | Other | 25-01-2021 |
NAME OF WORK : GRASS CUTTING AROUND OPERATIONAL AREA AND ALLIED WORKS TO RUNWAY, TAXI TRACK AND DISPERSAL ETC AT INS HANSA UNDER AGE B/R – I OF GE (NW) VASCO. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | M&L cutting of vegetation / grass shrubs using grass cutting machine including cutting of small trees etc by manually on runway, taxi track, dispersal and W/T pad sides upto GL & cutting of bushes including grubbing up small trees and removing the waste to a distance exc 5 km outside the periphery of the airfield area complete all as directed. | 1.945e+06 | Sqm | |
2 | 2 | All as per item No 1.00 above for the same location after a minimum gap of one month or more than one month after first cutting all as directed. | 2.43125e+06 | Sqm | |
3 | 3 | Removing leaves, grass, bushes, soil, plastic bags or any other waste material / debris from drains of depth not exceeding 1 mtr and removing the debris to a distance not exceeding 5 Km outside the periphery of the airfield area including removing and refixing of cover slabs all as directed. | 1000 | Sqm | |
4 | 4 | M&L for dry sand filling over SGA including spreading, leveling and ploughed to form furrows at an angle of 30 degrees proportionally to the existing ground. (Sand shall be coarse sand as approved of size 1.16 to 2.34 micron all as specified and as directed). \nNote : (i) Mode of measurement shall be truck measurement / trucks body (internal consolidated) measurements. | 50 | Cum | |
5 | 5 | Ploughing and furrowing SGA point by mannually all as directed (Furrows should be to form of 30 deegree angle). | 1225 | Sqm | |
6 | 6 | All as per item No. 5.00 above on the same area after three months of first time or as and when required. | 1225 | Sqm | |
7 | 7 | All as per item No. 5.00 above on the same area after three months of second time or as and when required. | 1225 | Sqm | |
8 | 8 | All as per item No. 5.00 above on the same area after three months of third time or as and when required. | 1225 | Sqm | |
9 | 9 | All as per item No. 5.00 above on the same area after three months of fourth time or as and when required. | 1225 | Sqm |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail