Rashtriya Chemicals And Fertilizers Limited-RCF has published Miscellaneous Jobs On Various Earth Moving Equipment In Auto Workshop At Rcf , Trombay Unit .. Submission Date for this Tender is 19-01-2021. Earth Moving Machinery Tenders in MES DEPT ROOM NO 25 ADMIN Maharashtra. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 16-Jan-2021 | Due date of submission of offer extended | Date | 19-01-2021 |
Name of Work : Miscellaneous jobs on various Earth Moving Equipment in Auto Workshop at RCF, Trombay Unit | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | 1-Hydraulic / Air jacks removal / fitting jobs for Dozers / Pay Loaders / Cranes. | 30 | Nos | |
2 | 2 | 2-High pressure jet cleaning of Dozers / Pay Loaders / Cranes. | 400 | Nos | |
3 | 3 | 3-Dozer / Pay Loader / Crane | |||
4 | 4 | 3-a) Overhauling of Transmission assembly | 8 | Nos | |
5 | 5 | 3-b) Replacement of FIP, | 8 | Nos | |
6 | 6 | 3-c) Overhauling of engine CYL. head , | 8 | Nos | |
7 | 7 | 3-d) Overhauling of Idler of Dozer | 8 | Nos | |
8 | 8 | 3-e) Jobs related to Engine cooling / steering system: Radiator flushing by water, replacement of strainer / filter of steering system. Replacement of hoses. | 200 | Nos | |
9 | 9 | 3-f) Replacement of strainer / filter of steering system. Replacement of hoses. | 50 | Nos | |
10 | 10 | 3-g) Overhauling of guide / Track roller of Dozer , | 50 | Nos | |
11 | 11 | 3-h) Replacement of Universal joint of Dozer | 8 | Nos | |
12 | 12 | 3-i) Replacement of Lube oil / Fuel / Air cleaner / Transmission filters | 150 | Nos | |
13 | 13 | 3-j) Replacement of batteries / starter | 150 | Nos | |
14 | 14 | 3-k) Replacement of hydraulic pumps | 8 | Nos | |
15 | 15 | 3-l) Replacement of pins for steering jack / lifting jack / tilting jack for Pay Loader | 16 | Nos | |
16 | 16 | 4-Crane 30T TIL / 80T TIL / 12T ACE | |||
17 | 17 | 4-a) Replacement of wire rope / pulleys | 18 | Nos | |
18 | 18 | 4-b) Replacement of hydraulic hoses | 280 | Nos | |
19 | 19 | 4-c) Replacement of hook blocks of Crane | 48 | Nos | |
20 | 20 | 4-d) Fitting / removal of Fly gib on 80T TIL Crane. | 12 | Nos | |
21 | 21 | 5-Loco’s ( WDS 6-1 / 6-2 / 4B ) | |||
22 | 22 | 5-a) Replacement of Expressor valves ( One set=6 valves) | 4 | Set | |
23 | 23 | 5-b) Radiator / oil cooler replacement | 6 | Nos | |
24 | 24 | 5-c) Air / oil bath filters cleaning / repl. | 12 | Nos | |
25 | 25 | 5-d) Expressor coupling check-up / bush repl. | 4 | Nos | |
26 | 26 | 5-e) Replacement of eddy current clutch / Gear box | 2 | Nos | |
27 | 27 | 5-f) Replacement of Lube oil / Pneumatic hoses | 12 | Nos | |
28 | 28 | 5-g) Replacement of brake valves | 6 | Nos | |
29 | 29 | 6- a) Supply of helper for 8 Hrs. shift | 150 | Shifts | |
30 | 30 | 6- b) Supply of helper beyond 8 Hrs. per hr OT rate | 220 | Hrs |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail