Border Security Force-BSF has published Dry Dock Repair And Maintenance Of Fast Attack Craft ( Fac ) Gaurav. Submission Date for this Tender is 30-01-2021. Vessel docking service Tenders in Dry dockrepair work of the vessel to be carried ou Gujarat. Bidders can get complete Tender details and download the document.
Name of Work: < DRY DOCK REPAIR AND MAINTENANCE OF FAC GAURAV | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | DECK SIDE/HULL SIDE :-\n02 Nos Zinc anodes near buckets are required to replace with new one.\n | Item1 | 1 | Job |
2 | 2 | Bow Thruster system required to repair and made functional.\nA Parts to be replaced with new parts \nBearings seals, gaskets of bow thruster be replaced 02 Nos | Item2 | 1 | Job |
3 | 3 | Winding motor insulation - 02 Nos | Item3 | 1 | Job |
4 | 4 | Zinc anode and bow thruster impeller to be replaced 02 Nos | Item4 | 1 | Job |
5 | 5 | Remote joystick to be made operational and calibrated for input / output signals. 01 Set | Item5 | 1 | Job |
6 | 6 | B Service to be carried out on the parts \ncomplete body servicing be carried out by removing sea growth | Item6 | 1 | Job |
7 | 7 | Bow landing door, door spindle required servicing. All hinges and doors rubber packing required replacing. Quick release system to be made functional.\nA Parts to be replaced with new parts \nHinges, bushes and doors rubber packing required to be replaced 02 Set | Item7 | 1 | Job |
8 | 8 | B Service to be carried out on the parts \nQuick release system to be made functional 01 No | Item8 | 1 | Job |
9 | 9 | Bow landing door, co- door spindle required servicing and repairing 01 No | Item9 | 1 | Job |
10 | 10 | Under water Hull Maintenance, surface cleaning FRP work required.\nA Service to be carried out on the parts \nSurface cleaning is required to be carried out for entire hull 01 No \n | Item10 | 1 | Job |
11 | 11 | Under water hull requires complete FRP repairing and lamination. 01 No | Item11 | 1 | Job |
12 | 12 | AFT deck guard railing wire required to replace (Approx. 15 feet).\nThe locking system of the guard wires, also to be repaired. \nA Parts to be replaced with new parts \nAFT deck guard railing wire required to be replaced 15 feet (Approx.) | Item12 | 1 | Job |
13 | 13 | B Service to be carried out on the parts \nThe locking system of the guard wires, also to be repaired. 06 Nos | Item13 | 1 | Job |
14 | 14 | In side passenger cabin and pilothouse side wall required lamination and FRP work.\n | Item14 | 1 | Job |
15 | 15 | Anchoring system required to repair. \nA Service to be carried out on the parts \nAnchor system required to be servicing and to be functional 01 No | Item15 | 1 | Job |
16 | 16 | Chain and motor be serviced and defective parts be replaced. | Item16 | 1 | Job |
17 | 17 | Defective 04 Nos cleats required to be repaired wherever required. | Item17 | 1 | Job |
18 | 18 | Complete 40 Mtr all round side fenders to be replaced | Item18 | 1 | Job |
19 | 19 | Under water proper pigment coating work required along with cleaning\nA Service to be carried out on the parts \nUnder water cleaning and removing marine growth and surface fining 01 No | Item19 | 1 | Job |
20 | 20 | Under water proper pigment coating work required 01 No | Item20 | 1 | Job |
21 | 21 | Trim tab system (02 Nos motor operational on each side) required to be made functional and calibrated with wheelhouse control panel.\nA Service to be carried out on the parts \nTrim tab system required to be made operational (Motor operated trim tab system on each side) and calibration is required to be carried out. 02 No | Item21 | 1 | Job |
22 | 22 | FRP body repair work required at the lower portion of bullet proof cabin- all around | Item22 | 1 | Job |
23 | 23 | FWD & AFT main door stopper system, locking system, door line level, door rubber packing required replacing.\nA Parts to be replaced with new parts \nDoor lever, door rubber, door locks and packing required replacing- 02 SET \n\n | Item23 | 1 | Job |
24 | 24 | B Service to be carried out on the parts \nFWD & AFT main door stopper system and locking system required to be repaired 02 Set \n | Item24 | 1 | Job |
25 | 25 | 06 Nos hatches defective rubber packing to be replaced and modification in hatches locking portion to be inter-rotated, for making the hatches water tight.\nA Parts to be replaced with new parts \n Hatches defective rubber packing to be replaced 06 Nos \n | Item25 | 1 | Job |
26 | 26 | B Service to be carried out on the parts \n Hatches locking portion to be inter-rotated to be made, for making the hatches water tight. 01 No \n | Item26 | 1 | Job |
27 | 27 | Pilot cabin, passenger cabin seat chair or hand rest support plywood which is defective, required replace.\nA Parts to be replaced with new parts \ni Defective Pilot cabin, passenger cabin seat chair or hand rest support plywood to be replaced 16 Nos \n | Item27 | 1 | Job |
28 | 28 | B Service to be carried out on the parts \ni Pilot cabin, passenger cabin seat chair or hand rest support are required to be repaired 16 Nos \n | Item28 | 1 | Job |
29 | 29 | All side window glasses curtain required.\nA Parts to be replaced with new parts \ni All side window glasses curtain required new fitting 10 Nos \n | Item29 | 1 | Job |
30 | 30 | Curtain holder required to be installed 10 Nos | Item30 | 1 | Job |
31 | 31 | Pilot cabin plastic Almirah lock system to be repaired. | Item31 | 1 | Job |
32 | 32 | Pump/motor fitted with all sink/basin required to repair.\nA Parts to be replaced with new parts \n Defective pump / motor spares to be replaced 01 Set \n | Item32 | 1 | Job |
33 | 33 | B Service to be carried out on the parts \ni Pump/motor & grinder fitted at sink/basin required to repair. 01 Set \n | Item33 | 1 | Job |
34 | 34 | Both side wiper Assy required checking and defective items to be replaced including blades.\nA Parts to be replaced with new parts \n Wiper Motor, blade and holder to be replaced 02 Nos \n | Item34 | 1 | Job |
35 | 35 | B Service to be carried out on the parts \n Wiper Motor required to be repaired 02 Nos \n | Item35 | 1 | Job |
36 | 36 | ENGINE SIDE \nMain Engine make MAN 800 BHP PORT/STBD side found completed Run-Hrs 2914 Hrs respectively. Both the main engine required servicing as per Run-Hrs covered. Other maintenance of Main engine and its system to be carried out. Defective sensors replacement. Defective silencer pipes / muffler’s replace / re-insulation if any is required \nInjector calibration & fuel pump pressure checking is required.\nEngine Srl No. 41039548143955 (Port)\nEngine Srl No. 41039548063955 (Stbd)\nA Parts to be replaced with new parts\n Fuel filters, fuel pre-filter and lub oil filters of both engine replaced 02 Nos\n \n | Item36 | 1 | Job |
37 | 37 | Engine oil both engine be replaced -02 Nos | Item37 | 1 | Job |
38 | 38 | Air cleaner element - 02 Nos | Item38 | 1 | Job |
39 | 39 | Replace all hoses for coolant and sea water- 02 set | Item39 | 1 | Job |
40 | 40 | Replace both valve covers on expansion tank | Item40 | 1 | Job |
41 | 41 | Defective electrical wiring with harness & meters and sensors be replaced -02 set | Item41 | 1 | Job |
42 | 42 | Main engine door rubber beat to be replaced- 02 set | Item42 | 1 | Job |
43 | 43 | Oil separator repair/seal kit be replaced - 02 Nos | Item43 | 1 | Job |
44 | 44 | Water pump repair kit - 02 set | Item44 | 1 | Job |
45 | 45 | Coolant be replaced - 02 set | Item45 | 1 | Job |
46 | 46 | V belts be replaced - 02 set | Item46 | 1 | Job |
47 | 47 | B Service to be carried out on the parts (Service of the parts to be carried out by manufacturers authorized /reputed service center/ yard)\ni. Fuel Pump ( Servicing & calibration and adjustment as per specified fuel pressure for marine engine regulation ) 02 Nos \n | Item47 | 1 | Job |
48 | 48 | Injector (Calibration and pressure testing) - 12 Nos | Item48 | 1 | Job |
49 | 49 | Alternator service to be carried out and carbon brush, brush holders end cap, bearings to be replaced - 02 Nos | Item49 | 1 | Job |
50 | 50 | Starter Motor serving to be carried out and armature, field coil carbon brush, bush holder, bearings, solenoid switch be replaced - 02 Nos | Item50 | 1 | Job |
51 | 51 | Intercooler servicing and defective parts to be replaced - 02 Nos | Item51 | 1 | Job |
52 | 52 | Clean charge air cooler tube cluster and perform pressure test - 02 Nos | Item52 | 1 | Job |
53 | 53 | Engine alarms checking and functional - 02 Nos | Item53 | 1 | Job |
54 | 54 | Engine operation instruments servicing and be functional - 02 Nos | Item54 | 1 | Job |
55 | 55 | Resilient mounts of engine and gearbox checking and replace if any- 02 Nos | Item55 | 1 | Job |
56 | 56 | Alignment of shaft be carried out - 02Nos | Item56 | 1 | Job |
57 | 57 | Defective silencer pipes/ flange / muffler’s replace/re-insulation is required - 02 set | Item57 | 1 | Job |
58 | 58 | Exhaust manifold & inlet manifold decarbonisation - 02 set | Item58 | 1 | Job |
59 | 59 | Chemical cleaning of heat exchanger oil cooler etc.\nA Parts to be replaced with new parts \n Tube Bundle 02 Nos \n | Item59 | 1 | Job |
60 | 60 | Seal - 04 Nos | Item60 | 1 | Job |
61 | 61 | Heat exchanger seal kit - 02 set | Item61 | 1 | Job |
62 | 62 | Heat exchanger cooling water lines hose pipes - 02set | Item62 | 1 | Job |
63 | 63 | B Service to be carried out on the parts \nChemical cleaning of heat exchanger & oil cooler be carried out - 02 Nos \n | Item63 | 1 | Job |
64 | 64 | Defective Turbocharger to be replaced.\nA Parts to be replaced with new parts \n Defective turbo charger to be replaced 02 Nos \n | Item64 | 1 | Job |
65 | 65 | B Service to be carried out on the parts \n Turbo charger be removed and new fitted and adjusted 02 Nos \n | Item65 | 1 | Job |
66 | 66 | In seawater cooling line, valve and hosepipe of both main engine required checking and servicing, if found any defect need replacement. \nA Parts to be replaced with new parts \niSea water cooling valve of both main engine required to be replaced 04 Nos \n | Item66 | 1 | Job |
67 | 67 | Sea water hose pipe of both main engine require to be replaced 02 Set | Item67 | 1 | Job |
68 | 68 | B Service to be carried out on the parts \n Sea Water cooling line required to be serving and cleaning 02 Nos \n | Item68 | 1 | Job |
69 | 69 | All retaining/non-retaining/delivery valves required servicing/repairing and if required replacing. Overboard discharge valve, sea suction valve to be overhauled and pressure tested \nA Parts to be replaced with new parts \niFlanges, wheels, gasket and nut and bolts of retaining valve, non-retaining valve/ discharge valve be replaced 01 Set \n | Item69 | 1 | Job |
70 | 70 | B Service to be carried out on the parts \nAll retaining valve, non-retaining valve/ delivery valve required to repair. Defective valves be replaced 01 Set \n | Item70 | 1 | Job |
71 | 71 | Overboard discharge valve, sea suction valve to be overhauled and pressure tested 01 Set | Item71 | 1 | Job |
72 | 72 | All bilge pumps and related pipelines in bilge suction need to be checked and serviced. Bilge pump control panel (Auto/Manual switch) at wheelhouse need to be serviced. Replacing of all sensors are required to make auto functional system.\nA Parts to be replaced with new parts \n Bilge suction pump required to be replaced with auto functional system 01 Set \n | Item72 | 1 | Job |
73 | 73 | Defective pipes, flanges, gaskets, seals and nut and bolts are replaced- 01 set | Item73 | 1 | Job |
74 | 74 | Defective sensor be replaced auto functional system - 01 set | Item74 | 1 | Job |
75 | 75 | Service to be carried out on the parts \nBilge pump control panel both auto and manual switch be refitted and serviced. 01 Set \n | Item75 | 1 | Job |
76 | 76 | Bilge pipeline need to be cleaned and serviced- 01 set | Item76 | 1 | Job |
77 | 77 | Both side main engine water pump servicing by replacing the repair kit.\nA Parts to be replaced with new parts \nWater pump impeller, bushing, shaft, bearing, gasket be replaced 02 Nos \n | Item77 | 1 | Job |
78 | 78 | B Service to be carried out on the parts \nBoth side water pumps are required to be serviced and refitted with alignment 02 Nos \n | Item78 | 1 | Job |
79 | 79 | Both side drive shaft bearing required servicing and if required to be replaced.\nA Parts to be replaced with new parts \nDrive shaft bearings, seals and gasket to be replaced 02 Nos | Item79 | 1 | Job |
80 | 80 | B Service to be carried out on the parts \n Drive shaft required to be serviced and alignment to be made 02 Nos \n | Item80 | 1 | Job |
81 | 81 | All fire alarm and horn system to be checked and be made operational.\nA Parts to be replaced with new parts \nWiring, switches, cables and sensors of fire alarm and horn system be replaced 01 Set \n | Item81 | 1 | Job |
82 | 82 | B Service to be carried out on the parts \ni Fire alarm and horn system required to be repaired and to be operational and 01 Set \n | Item82 | 1 | Job |
83 | 83 | All batteries required to be checked and to be replaced if required.\nA Parts to be replaced with new parts \nAll batteries, high tension cable, terminal to be replaced 07 Nos \n | Item83 | 1 | Job |
84 | 84 | B Service to be carried out on the parts \n Batteries installed with proper terminals and insulation 07 Nos \n | Item84 | 1 | Job |
85 | 85 | All hydraulic/lubricating hose pipe line required servicing and if defective to be replaced\nA Parts to be replaced with new parts \nHigh pressure hydraulic/ lubricating pipes be replaced 02 Set \n | Item85 | 1 | Job |
86 | 86 | B Service to be carried out on the parts \nHigh pressure hydraulic/ lubricating pipes refitted with proper clamping systems 02 Set\n | Item86 | 1 | Job |
87 | 87 | Engine room blowers required to repair/servicing.\nA Parts to be replaced with new parts \nBearing, gasket, bushes and seals and nut and bolts be replaced 01 Set \n | Item87 | 1 | Job |
88 | 88 | B Service to be carried out on the parts \nEngine room blower required to be servicing and defective parts be replaced 02 Nos \n | Item88 | 1 | Job |
89 | 89 | STEERING SYSTEM :- \nSteering and HDM system/oil seals to be checked and if required to be repaired & serviced.\nA Parts to be replaced with new parts \nOil seal, o ring, hydraulic oil be replaced 01 Set\n | Item89 | 1 | Job |
90 | 90 | Interconnection hose pipe be replaced 01 Set | Item90 | 1 | Job |
91 | 91 | Steering electrical line to be replaced 01 Set | Item91 | 1 | Job |
92 | 92 | Insulation hose of electrical lines be replaced 01 SET | Item92 | 1 | Job |
93 | 93 | All cables to be replaced 01 Set | Item93 | 1 | Job |
94 | 94 | b. Service to be carried out on the parts \nSteering and HDM system required to be serviced 01 SET | Item94 | 1 | Job |
95 | 95 | Potential meter to be calibrated -01 No | Item95 | 1 | Job |
96 | 96 | GEAR BOX MODEL NO. ZF- 360\nGear box 02 Nos accessories need servicing and defective spares/seals to be replaced.\nA Parts to be replaced with new parts \n shaft seal to be changed 02 Set\n | Item96 | 1 | Job |
97 | 97 | Recommended Gear oil as per OEM to be replaced -02 set | Item97 | 1 | Job |
98 | 98 | Gear oil filter be replaced - 02 set | Item98 | 1 | Job |
99 | 99 | B Service to be carried out on the parts \nSolenoid valve checked and defective be serviced 04 Nos \n | Item99 | 1 | Job |
100 | 100 | Gear oil cooler chemical cleaning 02 Set | Item100 | 1 | Job |
101 | 101 | PROPULSION UNIT \nMarine Jet Propulsion System (MJP) needs servicing and defective spare parts like seal/bushes to be changed. Buckets and hub housing gap to be checked for maintaining necessary gaps. The impeller clearance to be checked and servicing.\n A Parts to be replaced with new parts \nShaft Seals, bushes of propulsion unit be replaced 02 Set \n | Item101 | 1 | Job |
102 | 102 | All oil seals, water seals to be changed in MJP system - 02 set | Item102 | 1 | Job |
103 | 103 | All filters required to change in MJP system - 02 set | Item103 | 1 | Job |
104 | 104 | Graphite seal need replacement | Item104 | 1 | Job |
105 | 105 | B Service to be carried out on the parts \nMJP system required checking and defective items to be replaced. 02 Set \n | Item105 | 1 | Job |
106 | 106 | Hydraulic oil tank cleaning to be carried out- 02 set | Item106 | 1 | Job |
107 | 107 | Hydraulic pump to be serviced - 02 set | Item107 | 1 | Job |
108 | 108 | Both side hydraulic of MJP system required dismantling, cleaning and lubricating & and defective parts to be replaced - 02 set | Item108 | 1 | Job |
109 | 109 | Both sides shafting propulsion (jet system) gauging (Pressure / temperature) required to be checked and servicing. \nA Service to be carried out on the parts \nBoth sides shafting propulsion (jet system) gauging required be checking and calibrating and replacing if required. 02 Set \n | Item109 | 1 | Job |
110 | 110 | Shaft bearing to be inspected replace if found necessary 02 Set | Item110 | 1 | Job |
111 | 111 | All clearances to be checked and corrected as per OEM 02 Set | Item111 | 1 | Job |
112 | 112 | DG SET\n6.1/8 KVA indigenous service facilitated marine DG Set in the existing place replacement complete new installation including cooling system in place of existing place. \nA Parts to be replaced with new parts \n6.1/8 KVA indigenous service facilitated marine DG Set complete replment 01 No \n | Item112 | 1 | Job |
113 | 113 | B Service to be carried out on the parts \nD G set be installed and all harness connection for system and checking for proper working and adjusting including cooling system 01 No.\n | Item113 | 1 | Job |
114 | 114 | SPECIAL EQUIPMENT :-\nRadar system to be repaired. \nA Service to be carried out on the parts \nRadar system to be repaired. 01 No \n | Item114 | 1 | Job |
115 | 115 | Antenna, rotor unit need Servicing by authorised workshops and adjustment and defective parts be replaced. 01 No | Item115 | 1 | Job |
116 | 116 | GPS system required checking/servicing and calibrated | Item116 | 1 | Job |
117 | 117 | In Multifunction display system, latest & updated version map-chart to be uploaded | Item117 | 1 | Job |
118 | 118 | All navigation light, deck light and police light to be made functional.\nA Parts to be replaced with new parts \n Defective bulbs, switches wiring be replaced 01 Set\n | Item118 | 1 | Job |
119 | 119 | B Service to be carried out on the parts \n All navigation light, deck light and police light to be made functional 01 Set \n | Item119 | 1 | Job |
120 | 120 | Display unit of engine to be made functional.\nA Parts to be replaced with new parts \nDefective unit harness be replaced 01 No \n | Item120 | 1 | Job |
121 | 121 | B Service to be carried out on the parts \nDisplay unit of engine required to be serviced and to be made functional. Defective parts be replaced 01 No \n | Item121 | 1 | Job |
122 | 122 | Echo sounder system required to be repaired.\nA Service to be carried out on the parts \nEcho Sounder found defective, wrong display and required to be repaired and calibrated for exact reading by authorized engineers 01 No\n | Item122 | 1 | Job |
123 | 123 | Remote operating weapon (ROW) system joystick is in operational and same needs to be repaired and system made operational. | Item123 | 1 | Job |
124 | 124 | Search light required repair.\nA Parts to be replaced with new parts \nDefective bulbs/ wiring be replaced 01 Set\n | Item124 | 1 | Job |
125 | 125 | B Service to be carried out on the parts \n Search light required to be repaired 01 No\n | Item125 | 1 | Job |
126 | 126 | Flood light required replace (LED)\nA Parts to be replaced with new parts \n Flood light required replace (LED) 02 Nos\n | Item126 | 1 | Job |
127 | 127 | B Service to be carried out on the parts \n Flood light fitting and adjusting for rotary, movement. 02 Nos\n | Item127 | 1 | Job |
128 | 128 | Anemometer required replace.\nA Parts to be replaced with new parts \nAnemometer required replace 0 01 No \n | Item128 | 1 | Job |
129 | 129 | B Service to be carried out on the parts \n Anemometer fitting and adjusting 01 No \n | Item129 | 1 | Job |
130 | 130 | LIFE SAVING EQUIPMENT :-\nLife raft to be service and refilled.\nA Parts to be replaced with new parts \n Life jacket be replaced 16 Nos \n | Item130 | 1 | Job |
131 | 131 | B Service to be carried out on the parts \nLife raft to be serviced and refilled 02 Nos \n | Item131 | 1 | Job |
132 | 132 | All distress signals of the vessel should be serviced/ replaced.\nA Parts to be replaced with new parts \n Defective distress signals of the vessel be replaced 01 Set\n | Item132 | 1 | Job |
133 | 133 | B Service to be carried out on the parts \nAll distress signals of the vessel should be serviced 01 Set \n | Item133 | 1 | Job |
134 | 134 | FIRE FIGHTING EQUIPMENT :-\n10 Nos fire extinguisher required to be replaced. | Item134 | 1 | Job |
135 | 135 | All smoke detector and fire detector system required replacing.\nA Parts to be replaced with new parts \nSmoke detector to be replaced 04 Nos \n | Item135 | 1 | Job |
136 | 136 | Fire detector system required replacing | Item136 | 1 | Job |
137 | 137 | TANKs :- \nBlack water tank (Sewage tank) should be cleaned properly.\n | Item137 | 1 | Job |
138 | 138 | Toilet system required servicing \nA Service to be carried out on the parts \nToilet System be cleaning and serving and defective pipes, flanges, coupling, gasket be replaced 01 No \n | Item138 | 1 | Job |
139 | 139 | Both fuel tank, fuel line cleaning and delivery valve to be checked for any leakage and to be replaced if defective.\nA Parts to be replaced with new parts \nGasket, sealing be replaced and defective Valves, flanges and pipes be replaced 02 Set\n | Item139 | 1 | Job |
140 | 140 | B Service to be carried out on the parts \nFuel tank and fuel line be cleaning and leakage proof. Defective parts be replaced 02 Set \n | Item140 | 1 | Job |
141 | 141 | By modification a provision should be kept for cleaning the fuel tank.\nA Service to be carried out on the parts \nCleaning option be provide for cleaning of fuel tanks 02 Nos \n | Item141 | 1 | Job |
142 | 142 | Modification for Manual measurement of fuel tank level to be provide 01 No | Item142 | 1 | Job |
143 | 143 | AC & VENTILATION :-\nMachinery room blower required checking and repairing. Toilet and cabin blower may be repaired.\nA Parts to be replaced with new parts \n Bearing, brushes , seals and gasket be replaced 01 Set \n | Item143 | 1 | Job |
144 | 144 | B Service to be carried out on the parts \n Machinery room blower required checking and repairing 01 Set \n | Item144 | 1 | Job |
145 | 145 | Toilet and cabin blower may be repaired. 01 Set | Item145 | 1 | Job |
146 | 146 | Both AC plant required complete repairing.\nA Parts to be replaced with new parts \nRefilling of Refrigerant Gas 01 Set \n | Item146 | 1 | Job |
147 | 147 | Defective valves, copper pipe, filters to be replaced-01 SET | Item147 | 1 | Job |
148 | 148 | B Service to be carried out on the parts \n Servicing of AC and make operational 01 Set \n | Item148 | 1 | Job |
149 | 149 | Leakage test be conducted and wiring be proper insulation - 01 SET | Item149 | 1 | Job |
150 | 150 | MISCELLANEOUS :-\nSeating chairs required repairing.\n02 Nos Bunk fans to be installed newly at the pilot cabin\n04 Nos Wall fans also to be installed at passenger cabin\nA Parts to be replaced with new parts \nNew bunk fans be installed at pilot cabins 02 Nos \n | Item150 | 1 | Job |
151 | 151 | New wall fans be installed at passenger cabins 04 Nos | Item151 | 1 | Job |
152 | 152 | B Service to be carried out on the parts \n Seating chairs at passengers cabin and pilot cabins be repaired 18 Nos \n | Item152 | 1 | Job |
153 | 153 | 01 Set Sea chest Non returning valves required replacement. | Item153 | 1 | Job |
154 | 154 | SS plates at bow to be replaced \nA Parts to be replaced with new parts \n S S plates fitted at bow be replaced 01 Set \n | Item154 | 1 | Job |
155 | 155 | B Service to be carried out on the parts \n Repair of replacement of SS plate carried out and fining 01 Set \n | Item155 | 1 | Job |
156 | 156 | Bushes of landing door to be replaced \nA Parts to be replaced with new parts \nLanding door bushes be replaced 01 No \n | Item156 | 1 | Job |
157 | 157 | B Service to be carried out on the parts \nLanding door serviced and adjusted 01 No \n | Item157 | 1 | Job |
158 | 158 | Both fuel gauges required replacing.\nVisual fuel pipe system may be installed outside the tank to check the fuel level. \nFuel tank and line required cleaning.\nA Parts to be replaced with new parts \ni Fuel gauges required to be replaced 02 Nos \n | Item158 | 1 | Job |
159 | 159 | B Service to be carried out on the parts \nFuel pipe line installed outside the tank checked. Defective pipes, seals and gasket be replaced. 02 Nos \n | Item159 | 1 | Job |
160 | 160 | Fuel tank and pipe line be clean and checked leakage free. Defective accessories be replaced 02 Nos | Item160 | 1 | Job |
161 | 161 | All plumbing line of galley sink & toilet to be cleaned & made operational. Discharge motors to be serviced\nA Service to be carried out on the parts \n Plumbing line of galley and toilet be cleaned and serviced. Defective pipes, flanges, elbow, taps hoses and clamps be replaced 01 Set \n | Item161 | 1 | Job |
162 | 162 | Discharge motor be serviced and made operational. Defective parts be replaced 01 Set | Item162 | 1 | Job |
163 | 163 | Electrical Side :-\nInsulation resistance (Megger test) and original OEM recommended preventive maintenance to be carried out and the following electrical items should be made operational/functional :-\ni) All electrical machineries.\nii) Main switch board, LED light pilot cabin and passenger cabin required checking.\niii) Power and lighting circuit\niv) All electrical panel board required checking and be in functional condition.\nv) Cabin and toilet exhaust fan required checking.\nA Parts to be replaced with new parts \ni Defective Wiring, switches, buttons, panel board covers be replaced 01 Set\n | Item163 | 1 | Job |
164 | 164 | B Service to be carried out on the parts \nInsulation resistance be megger test and original as per OEM recommended for vessel 01 Set\n | Item164 | 1 | Job |
165 | 165 | All electrical machineries be checked and service and defective parts be replaced and should be operational - 01 SET | Item165 | 1 | Job |
166 | 166 | Electrical power wiring and lighting circuit be checked and replace damaged wiring, switches, boards, and other accessories- 01 SET | Item166 | 1 | Job |
167 | 167 | Main Switch board and all electrical panel board be checked the and servicing. Defective wiring, buttons, covers screws be replaced - 01 SET | Item167 | 1 | Job |
168 | 168 | Cabin and exhaust fans be checked and serving and made operational. Defective parts be replaced - 01 SET | Item168 | 1 | Job |
169 | 169 | All electrical connections including wiring, board, buttons, screw, bolts etc be insulated as per marine norms -01 SET | Item169 | 1 | Job |
170 | 170 | PAINTING \nAll above water painting as per vessel requirement \nA Service to be carried out on the parts \nAbove water level complete cleaning surface fining and lamination wherever required and fining and panting as per vessel requirement 01 No \n\n | Item170 | 1 | Job |
171 | 171 | All vessel outer body required painting\nA Service to be carried out on the parts \n Vessel outer body cleaning and complete paining in disruptive pattern as per original painting scheme 01 No \n | Item171 | 1 | Job |
172 | 172 | Under water hull painting with anti-fouling paints and primer \nA Service to be carried out on the parts \nUnder water hull surface cleaning and painting.\nPen guard HB primer (Epoxy primer) 01 Coat-100 Micron (DFT)\nSafeguard universal ES grey tie coat 01 Coat-100 Micron (DFT)\nSea Quantum pro-u light red- 01 coat-150 micron (DFT)\n(Silyl Acrylate Anti-fouling self-polishing paint)\nSea quantum pro-u-dark red -01 coat-150 micron (DFT)\n(Silyl acrylate anti-fouling self-polishing paint)\nMetal oxide paint & primer to jet units 01 No \n | Item172 | 1 | Job |
173 | 173 | MJP jet system/bucket & nozzle to be spray painted.\nA Service to be carried out on the parts \nBucket system completely surface cleaning, remove marine growth and spray painting 02 Nos \n | Item173 | 1 | Job |
174 | 174 | Propulsion nozzle cleaning and surface finishing checking and spray painting 02 Nos | Item174 | 1 | Job |
175 | 175 | DOCKING AND PILOTING CHARGES :-\nInspection charges including IRS fees\n | Item175 | 1 | Job |
176 | 176 | Cost of Docking to carry out under water repair & painting etc & un-Docking. The dry dock repair work will be carried out by the firm at Lakkinala by making cradles and using heavy crane to lift/place the FAC on cradle | Item176 | 1 | Job |