}

Dry Dock Repair And Maintenance Of Fast Attack Craft ( Fac ) Gaurav, Dry dockrepair work of the vessel to be carried ou-Gujarat

Border Security Force-BSF has published Dry Dock Repair And Maintenance Of Fast Attack Craft ( Fac ) Gaurav. Submission Date for this Tender is 30-01-2021. Vessel docking service Tenders in Dry dockrepair work of the vessel to be carried ou Gujarat. Bidders can get complete Tender details and download the document.




Tender Notice

26458987
Dry Dock Repair And Maintenance Of Fast Attack Craft ( Fac ) Gaurav
Open Tender
Indian
Gujarat
Dry dockrepair work of the vessel to be carried ou
30-01-2021

Tender Details

Dry Dock Repair And Maintenance Of Fast Attack Craft ( Fac ) Gaurav

Key Value

Document Fees
Refer document
EMD
INR 400000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: < DRY DOCK REPAIR AND MAINTENANCE OF FAC GAURAV
Sl. No. Item Description Item Code / Make Quantity Units
1 1 DECK SIDE/HULL SIDE :-\n02 Nos Zinc anodes near buckets are required to replace with new one.\n Item1 1 Job
2 2 Bow Thruster system required to repair and made functional.\nA Parts to be replaced with new parts \nBearings seals, gaskets of bow thruster be replaced 02 Nos Item2 1 Job
3 3 Winding motor insulation - 02 Nos Item3 1 Job
4 4 Zinc anode and bow thruster impeller to be replaced 02 Nos Item4 1 Job
5 5 Remote joystick to be made operational and calibrated for input / output signals. 01 Set Item5 1 Job
6 6 B Service to be carried out on the parts \ncomplete body servicing be carried out by removing sea growth Item6 1 Job
7 7 Bow landing door, door spindle required servicing. All hinges and doors rubber packing required replacing. Quick release system to be made functional.\nA Parts to be replaced with new parts \nHinges, bushes and doors rubber packing required to be replaced 02 Set Item7 1 Job
8 8 B Service to be carried out on the parts \nQuick release system to be made functional 01 No Item8 1 Job
9 9 Bow landing door, co- door spindle required servicing and repairing 01 No Item9 1 Job
10 10 Under water Hull Maintenance, surface cleaning FRP work required.\nA Service to be carried out on the parts \nSurface cleaning is required to be carried out for entire hull 01 No \n Item10 1 Job
11 11 Under water hull requires complete FRP repairing and lamination. 01 No Item11 1 Job
12 12 AFT deck guard railing wire required to replace (Approx. 15 feet).\nThe locking system of the guard wires, also to be repaired. \nA Parts to be replaced with new parts \nAFT deck guard railing wire required to be replaced 15 feet (Approx.) Item12 1 Job
13 13 B Service to be carried out on the parts \nThe locking system of the guard wires, also to be repaired. 06 Nos Item13 1 Job
14 14 In side passenger cabin and pilothouse side wall required lamination and FRP work.\n Item14 1 Job
15 15 Anchoring system required to repair. \nA Service to be carried out on the parts \nAnchor system required to be servicing and to be functional 01 No Item15 1 Job
16 16 Chain and motor be serviced and defective parts be replaced. Item16 1 Job
17 17 Defective 04 Nos cleats required to be repaired wherever required. Item17 1 Job
18 18 Complete 40 Mtr all round side fenders to be replaced Item18 1 Job
19 19 Under water proper pigment coating work required along with cleaning\nA Service to be carried out on the parts \nUnder water cleaning and removing marine growth and surface fining 01 No Item19 1 Job
20 20 Under water proper pigment coating work required 01 No Item20 1 Job
21 21 Trim tab system (02 Nos motor operational on each side) required to be made functional and calibrated with wheelhouse control panel.\nA Service to be carried out on the parts \nTrim tab system required to be made operational (Motor operated trim tab system on each side) and calibration is required to be carried out. 02 No Item21 1 Job
22 22 FRP body repair work required at the lower portion of bullet proof cabin- all around Item22 1 Job
23 23 FWD & AFT main door stopper system, locking system, door line level, door rubber packing required replacing.\nA Parts to be replaced with new parts \nDoor lever, door rubber, door locks and packing required replacing- 02 SET \n\n Item23 1 Job
24 24 B Service to be carried out on the parts \nFWD & AFT main door stopper system and locking system required to be repaired 02 Set \n Item24 1 Job
25 25 06 Nos hatches defective rubber packing to be replaced and modification in hatches locking portion to be inter-rotated, for making the hatches water tight.\nA Parts to be replaced with new parts \n Hatches defective rubber packing to be replaced 06 Nos \n Item25 1 Job
26 26 B Service to be carried out on the parts \n Hatches locking portion to be inter-rotated to be made, for making the hatches water tight. 01 No \n Item26 1 Job
27 27 Pilot cabin, passenger cabin seat chair or hand rest support plywood which is defective, required replace.\nA Parts to be replaced with new parts \ni Defective Pilot cabin, passenger cabin seat chair or hand rest support plywood to be replaced 16 Nos \n Item27 1 Job
28 28 B Service to be carried out on the parts \ni Pilot cabin, passenger cabin seat chair or hand rest support are required to be repaired 16 Nos \n Item28 1 Job
29 29 All side window glasses curtain required.\nA Parts to be replaced with new parts \ni All side window glasses curtain required new fitting 10 Nos \n Item29 1 Job
30 30 Curtain holder required to be installed 10 Nos Item30 1 Job
31 31 Pilot cabin plastic Almirah lock system to be repaired. Item31 1 Job
32 32 Pump/motor fitted with all sink/basin required to repair.\nA Parts to be replaced with new parts \n Defective pump / motor spares to be replaced 01 Set \n Item32 1 Job
33 33 B Service to be carried out on the parts \ni Pump/motor & grinder fitted at sink/basin required to repair. 01 Set \n Item33 1 Job
34 34 Both side wiper Assy required checking and defective items to be replaced including blades.\nA Parts to be replaced with new parts \n Wiper Motor, blade and holder to be replaced 02 Nos \n Item34 1 Job
35 35 B Service to be carried out on the parts \n Wiper Motor required to be repaired 02 Nos \n Item35 1 Job
36 36 ENGINE SIDE \nMain Engine make MAN 800 BHP PORT/STBD side found completed Run-Hrs 2914 Hrs respectively. Both the main engine required servicing as per Run-Hrs covered. Other maintenance of Main engine and its system to be carried out. Defective sensors replacement. Defective silencer pipes / muffler’s replace / re-insulation if any is required \nInjector calibration & fuel pump pressure checking is required.\nEngine Srl No. 41039548143955 (Port)\nEngine Srl No. 41039548063955 (Stbd)\nA Parts to be replaced with new parts\n Fuel filters, fuel pre-filter and lub oil filters of both engine replaced 02 Nos\n \n Item36 1 Job
37 37 Engine oil both engine be replaced -02 Nos Item37 1 Job
38 38 Air cleaner element - 02 Nos Item38 1 Job
39 39 Replace all hoses for coolant and sea water- 02 set Item39 1 Job
40 40 Replace both valve covers on expansion tank Item40 1 Job
41 41 Defective electrical wiring with harness & meters and sensors be replaced -02 set Item41 1 Job
42 42 Main engine door rubber beat to be replaced- 02 set Item42 1 Job
43 43 Oil separator repair/seal kit be replaced - 02 Nos Item43 1 Job
44 44 Water pump repair kit - 02 set Item44 1 Job
45 45 Coolant be replaced - 02 set Item45 1 Job
46 46 V belts be replaced - 02 set Item46 1 Job
47 47 B Service to be carried out on the parts (Service of the parts to be carried out by manufacturers authorized /reputed service center/ yard)\ni. Fuel Pump ( Servicing & calibration and adjustment as per specified fuel pressure for marine engine regulation ) 02 Nos \n Item47 1 Job
48 48 Injector (Calibration and pressure testing) - 12 Nos Item48 1 Job
49 49 Alternator service to be carried out and carbon brush, brush holders end cap, bearings to be replaced - 02 Nos Item49 1 Job
50 50 Starter Motor serving to be carried out and armature, field coil carbon brush, bush holder, bearings, solenoid switch be replaced - 02 Nos Item50 1 Job
51 51 Intercooler servicing and defective parts to be replaced - 02 Nos Item51 1 Job
52 52 Clean charge air cooler tube cluster and perform pressure test - 02 Nos Item52 1 Job
53 53 Engine alarms checking and functional - 02 Nos Item53 1 Job
54 54 Engine operation instruments servicing and be functional - 02 Nos Item54 1 Job
55 55 Resilient mounts of engine and gearbox checking and replace if any- 02 Nos Item55 1 Job
56 56 Alignment of shaft be carried out - 02Nos Item56 1 Job
57 57 Defective silencer pipes/ flange / muffler’s replace/re-insulation is required - 02 set Item57 1 Job
58 58 Exhaust manifold & inlet manifold decarbonisation - 02 set Item58 1 Job
59 59 Chemical cleaning of heat exchanger oil cooler etc.\nA Parts to be replaced with new parts \n Tube Bundle 02 Nos \n Item59 1 Job
60 60 Seal - 04 Nos Item60 1 Job
61 61 Heat exchanger seal kit - 02 set Item61 1 Job
62 62 Heat exchanger cooling water lines hose pipes - 02set Item62 1 Job
63 63 B Service to be carried out on the parts \nChemical cleaning of heat exchanger & oil cooler be carried out - 02 Nos \n Item63 1 Job
64 64 Defective Turbocharger to be replaced.\nA Parts to be replaced with new parts \n Defective turbo charger to be replaced 02 Nos \n Item64 1 Job
65 65 B Service to be carried out on the parts \n Turbo charger be removed and new fitted and adjusted 02 Nos \n Item65 1 Job
66 66 In seawater cooling line, valve and hosepipe of both main engine required checking and servicing, if found any defect need replacement. \nA Parts to be replaced with new parts \niSea water cooling valve of both main engine required to be replaced 04 Nos \n Item66 1 Job
67 67 Sea water hose pipe of both main engine require to be replaced 02 Set Item67 1 Job
68 68 B Service to be carried out on the parts \n Sea Water cooling line required to be serving and cleaning 02 Nos \n Item68 1 Job
69 69 All retaining/non-retaining/delivery valves required servicing/repairing and if required replacing. Overboard discharge valve, sea suction valve to be overhauled and pressure tested \nA Parts to be replaced with new parts \niFlanges, wheels, gasket and nut and bolts of retaining valve, non-retaining valve/ discharge valve be replaced 01 Set \n Item69 1 Job
70 70 B Service to be carried out on the parts \nAll retaining valve, non-retaining valve/ delivery valve required to repair. Defective valves be replaced 01 Set \n Item70 1 Job
71 71 Overboard discharge valve, sea suction valve to be overhauled and pressure tested 01 Set Item71 1 Job
72 72 All bilge pumps and related pipelines in bilge suction need to be checked and serviced. Bilge pump control panel (Auto/Manual switch) at wheelhouse need to be serviced. Replacing of all sensors are required to make auto functional system.\nA Parts to be replaced with new parts \n Bilge suction pump required to be replaced with auto functional system 01 Set \n Item72 1 Job
73 73 Defective pipes, flanges, gaskets, seals and nut and bolts are replaced- 01 set Item73 1 Job
74 74 Defective sensor be replaced auto functional system - 01 set Item74 1 Job
75 75 Service to be carried out on the parts \nBilge pump control panel both auto and manual switch be refitted and serviced. 01 Set \n Item75 1 Job
76 76 Bilge pipeline need to be cleaned and serviced- 01 set Item76 1 Job
77 77 Both side main engine water pump servicing by replacing the repair kit.\nA Parts to be replaced with new parts \nWater pump impeller, bushing, shaft, bearing, gasket be replaced 02 Nos \n Item77 1 Job
78 78 B Service to be carried out on the parts \nBoth side water pumps are required to be serviced and refitted with alignment 02 Nos \n Item78 1 Job
79 79 Both side drive shaft bearing required servicing and if required to be replaced.\nA Parts to be replaced with new parts \nDrive shaft bearings, seals and gasket to be replaced 02 Nos Item79 1 Job
80 80 B Service to be carried out on the parts \n Drive shaft required to be serviced and alignment to be made 02 Nos \n Item80 1 Job
81 81 All fire alarm and horn system to be checked and be made operational.\nA Parts to be replaced with new parts \nWiring, switches, cables and sensors of fire alarm and horn system be replaced 01 Set \n Item81 1 Job
82 82 B Service to be carried out on the parts \ni Fire alarm and horn system required to be repaired and to be operational and 01 Set \n Item82 1 Job
83 83 All batteries required to be checked and to be replaced if required.\nA Parts to be replaced with new parts \nAll batteries, high tension cable, terminal to be replaced 07 Nos \n Item83 1 Job
84 84 B Service to be carried out on the parts \n Batteries installed with proper terminals and insulation 07 Nos \n Item84 1 Job
85 85 All hydraulic/lubricating hose pipe line required servicing and if defective to be replaced\nA Parts to be replaced with new parts \nHigh pressure hydraulic/ lubricating pipes be replaced 02 Set \n Item85 1 Job
86 86 B Service to be carried out on the parts \nHigh pressure hydraulic/ lubricating pipes refitted with proper clamping systems 02 Set\n Item86 1 Job
87 87 Engine room blowers required to repair/servicing.\nA Parts to be replaced with new parts \nBearing, gasket, bushes and seals and nut and bolts be replaced 01 Set \n Item87 1 Job
88 88 B Service to be carried out on the parts \nEngine room blower required to be servicing and defective parts be replaced 02 Nos \n Item88 1 Job
89 89 STEERING SYSTEM :- \nSteering and HDM system/oil seals to be checked and if required to be repaired & serviced.\nA Parts to be replaced with new parts \nOil seal, o ring, hydraulic oil be replaced 01 Set\n Item89 1 Job
90 90 Interconnection hose pipe be replaced 01 Set Item90 1 Job
91 91 Steering electrical line to be replaced 01 Set Item91 1 Job
92 92 Insulation hose of electrical lines be replaced 01 SET Item92 1 Job
93 93 All cables to be replaced 01 Set Item93 1 Job
94 94 b. Service to be carried out on the parts \nSteering and HDM system required to be serviced 01 SET Item94 1 Job
95 95 Potential meter to be calibrated -01 No Item95 1 Job
96 96 GEAR BOX MODEL NO. ZF- 360\nGear box 02 Nos accessories need servicing and defective spares/seals to be replaced.\nA Parts to be replaced with new parts \n shaft seal to be changed 02 Set\n Item96 1 Job
97 97 Recommended Gear oil as per OEM to be replaced -02 set Item97 1 Job
98 98 Gear oil filter be replaced - 02 set Item98 1 Job
99 99 B Service to be carried out on the parts \nSolenoid valve checked and defective be serviced 04 Nos \n Item99 1 Job
100 100 Gear oil cooler chemical cleaning 02 Set Item100 1 Job
101 101 PROPULSION UNIT \nMarine Jet Propulsion System (MJP) needs servicing and defective spare parts like seal/bushes to be changed. Buckets and hub housing gap to be checked for maintaining necessary gaps. The impeller clearance to be checked and servicing.\n A Parts to be replaced with new parts \nShaft Seals, bushes of propulsion unit be replaced 02 Set \n Item101 1 Job
102 102 All oil seals, water seals to be changed in MJP system - 02 set Item102 1 Job
103 103 All filters required to change in MJP system - 02 set Item103 1 Job
104 104 Graphite seal need replacement Item104 1 Job
105 105 B Service to be carried out on the parts \nMJP system required checking and defective items to be replaced. 02 Set \n Item105 1 Job
106 106 Hydraulic oil tank cleaning to be carried out- 02 set Item106 1 Job
107 107 Hydraulic pump to be serviced - 02 set Item107 1 Job
108 108 Both side hydraulic of MJP system required dismantling, cleaning and lubricating & and defective parts to be replaced - 02 set Item108 1 Job
109 109 Both sides shafting propulsion (jet system) gauging (Pressure / temperature) required to be checked and servicing. \nA Service to be carried out on the parts \nBoth sides shafting propulsion (jet system) gauging required be checking and calibrating and replacing if required. 02 Set \n Item109 1 Job
110 110 Shaft bearing to be inspected replace if found necessary 02 Set Item110 1 Job
111 111 All clearances to be checked and corrected as per OEM 02 Set Item111 1 Job
112 112 DG SET\n6.1/8 KVA indigenous service facilitated marine DG Set in the existing place replacement complete new installation including cooling system in place of existing place. \nA Parts to be replaced with new parts \n6.1/8 KVA indigenous service facilitated marine DG Set complete replment 01 No \n Item112 1 Job
113 113 B Service to be carried out on the parts \nD G set be installed and all harness connection for system and checking for proper working and adjusting including cooling system 01 No.\n Item113 1 Job
114 114 SPECIAL EQUIPMENT :-\nRadar system to be repaired. \nA Service to be carried out on the parts \nRadar system to be repaired. 01 No \n Item114 1 Job
115 115 Antenna, rotor unit need Servicing by authorised workshops and adjustment and defective parts be replaced. 01 No Item115 1 Job
116 116 GPS system required checking/servicing and calibrated Item116 1 Job
117 117 In Multifunction display system, latest & updated version map-chart to be uploaded Item117 1 Job
118 118 All navigation light, deck light and police light to be made functional.\nA Parts to be replaced with new parts \n Defective bulbs, switches wiring be replaced 01 Set\n Item118 1 Job
119 119 B Service to be carried out on the parts \n All navigation light, deck light and police light to be made functional 01 Set \n Item119 1 Job
120 120 Display unit of engine to be made functional.\nA Parts to be replaced with new parts \nDefective unit harness be replaced 01 No \n Item120 1 Job
121 121 B Service to be carried out on the parts \nDisplay unit of engine required to be serviced and to be made functional. Defective parts be replaced 01 No \n Item121 1 Job
122 122 Echo sounder system required to be repaired.\nA Service to be carried out on the parts \nEcho Sounder found defective, wrong display and required to be repaired and calibrated for exact reading by authorized engineers 01 No\n Item122 1 Job
123 123 Remote operating weapon (ROW) system joystick is in operational and same needs to be repaired and system made operational. Item123 1 Job
124 124 Search light required repair.\nA Parts to be replaced with new parts \nDefective bulbs/ wiring be replaced 01 Set\n Item124 1 Job
125 125 B Service to be carried out on the parts \n Search light required to be repaired 01 No\n Item125 1 Job
126 126 Flood light required replace (LED)\nA Parts to be replaced with new parts \n Flood light required replace (LED) 02 Nos\n Item126 1 Job
127 127 B Service to be carried out on the parts \n Flood light fitting and adjusting for rotary, movement. 02 Nos\n Item127 1 Job
128 128 Anemometer required replace.\nA Parts to be replaced with new parts \nAnemometer required replace 0 01 No \n Item128 1 Job
129 129 B Service to be carried out on the parts \n Anemometer fitting and adjusting 01 No \n Item129 1 Job
130 130 LIFE SAVING EQUIPMENT :-\nLife raft to be service and refilled.\nA Parts to be replaced with new parts \n Life jacket be replaced 16 Nos \n Item130 1 Job
131 131 B Service to be carried out on the parts \nLife raft to be serviced and refilled 02 Nos \n Item131 1 Job
132 132 All distress signals of the vessel should be serviced/ replaced.\nA Parts to be replaced with new parts \n Defective distress signals of the vessel be replaced 01 Set\n Item132 1 Job
133 133 B Service to be carried out on the parts \nAll distress signals of the vessel should be serviced 01 Set \n Item133 1 Job
134 134 FIRE FIGHTING EQUIPMENT :-\n10 Nos fire extinguisher required to be replaced. Item134 1 Job
135 135 All smoke detector and fire detector system required replacing.\nA Parts to be replaced with new parts \nSmoke detector to be replaced 04 Nos \n Item135 1 Job
136 136 Fire detector system required replacing Item136 1 Job
137 137 TANKs :- \nBlack water tank (Sewage tank) should be cleaned properly.\n Item137 1 Job
138 138 Toilet system required servicing \nA Service to be carried out on the parts \nToilet System be cleaning and serving and defective pipes, flanges, coupling, gasket be replaced 01 No \n Item138 1 Job
139 139 Both fuel tank, fuel line cleaning and delivery valve to be checked for any leakage and to be replaced if defective.\nA Parts to be replaced with new parts \nGasket, sealing be replaced and defective Valves, flanges and pipes be replaced 02 Set\n Item139 1 Job
140 140 B Service to be carried out on the parts \nFuel tank and fuel line be cleaning and leakage proof. Defective parts be replaced 02 Set \n Item140 1 Job
141 141 By modification a provision should be kept for cleaning the fuel tank.\nA Service to be carried out on the parts \nCleaning option be provide for cleaning of fuel tanks 02 Nos \n Item141 1 Job
142 142 Modification for Manual measurement of fuel tank level to be provide 01 No Item142 1 Job
143 143 AC & VENTILATION :-\nMachinery room blower required checking and repairing. Toilet and cabin blower may be repaired.\nA Parts to be replaced with new parts \n Bearing, brushes , seals and gasket be replaced 01 Set \n Item143 1 Job
144 144 B Service to be carried out on the parts \n Machinery room blower required checking and repairing 01 Set \n Item144 1 Job
145 145 Toilet and cabin blower may be repaired. 01 Set Item145 1 Job
146 146 Both AC plant required complete repairing.\nA Parts to be replaced with new parts \nRefilling of Refrigerant Gas 01 Set \n Item146 1 Job
147 147 Defective valves, copper pipe, filters to be replaced-01 SET Item147 1 Job
148 148 B Service to be carried out on the parts \n Servicing of AC and make operational 01 Set \n Item148 1 Job
149 149 Leakage test be conducted and wiring be proper insulation - 01 SET Item149 1 Job
150 150 MISCELLANEOUS :-\nSeating chairs required repairing.\n02 Nos Bunk fans to be installed newly at the pilot cabin\n04 Nos Wall fans also to be installed at passenger cabin\nA Parts to be replaced with new parts \nNew bunk fans be installed at pilot cabins 02 Nos \n Item150 1 Job
151 151 New wall fans be installed at passenger cabins 04 Nos Item151 1 Job
152 152 B Service to be carried out on the parts \n Seating chairs at passengers cabin and pilot cabins be repaired 18 Nos \n Item152 1 Job
153 153 01 Set Sea chest Non returning valves required replacement. Item153 1 Job
154 154 SS plates at bow to be replaced \nA Parts to be replaced with new parts \n S S plates fitted at bow be replaced 01 Set \n Item154 1 Job
155 155 B Service to be carried out on the parts \n Repair of replacement of SS plate carried out and fining 01 Set \n Item155 1 Job
156 156 Bushes of landing door to be replaced \nA Parts to be replaced with new parts \nLanding door bushes be replaced 01 No \n Item156 1 Job
157 157 B Service to be carried out on the parts \nLanding door serviced and adjusted 01 No \n Item157 1 Job
158 158 Both fuel gauges required replacing.\nVisual fuel pipe system may be installed outside the tank to check the fuel level. \nFuel tank and line required cleaning.\nA Parts to be replaced with new parts \ni Fuel gauges required to be replaced 02 Nos \n Item158 1 Job
159 159 B Service to be carried out on the parts \nFuel pipe line installed outside the tank checked. Defective pipes, seals and gasket be replaced. 02 Nos \n Item159 1 Job
160 160 Fuel tank and pipe line be clean and checked leakage free. Defective accessories be replaced 02 Nos Item160 1 Job
161 161 All plumbing line of galley sink & toilet to be cleaned & made operational. Discharge motors to be serviced\nA Service to be carried out on the parts \n Plumbing line of galley and toilet be cleaned and serviced. Defective pipes, flanges, elbow, taps hoses and clamps be replaced 01 Set \n Item161 1 Job
162 162 Discharge motor be serviced and made operational. Defective parts be replaced 01 Set Item162 1 Job
163 163 Electrical Side :-\nInsulation resistance (Megger test) and original OEM recommended preventive maintenance to be carried out and the following electrical items should be made operational/functional :-\ni) All electrical machineries.\nii) Main switch board, LED light pilot cabin and passenger cabin required checking.\niii) Power and lighting circuit\niv) All electrical panel board required checking and be in functional condition.\nv) Cabin and toilet exhaust fan required checking.\nA Parts to be replaced with new parts \ni Defective Wiring, switches, buttons, panel board covers be replaced 01 Set\n Item163 1 Job
164 164 B Service to be carried out on the parts \nInsulation resistance be megger test and original as per OEM recommended for vessel 01 Set\n Item164 1 Job
165 165 All electrical machineries be checked and service and defective parts be replaced and should be operational - 01 SET Item165 1 Job
166 166 Electrical power wiring and lighting circuit be checked and replace damaged wiring, switches, boards, and other accessories- 01 SET Item166 1 Job
167 167 Main Switch board and all electrical panel board be checked the and servicing. Defective wiring, buttons, covers screws be replaced - 01 SET Item167 1 Job
168 168 Cabin and exhaust fans be checked and serving and made operational. Defective parts be replaced - 01 SET Item168 1 Job
169 169 All electrical connections including wiring, board, buttons, screw, bolts etc be insulated as per marine norms -01 SET Item169 1 Job
170 170 PAINTING \nAll above water painting as per vessel requirement \nA Service to be carried out on the parts \nAbove water level complete cleaning surface fining and lamination wherever required and fining and panting as per vessel requirement 01 No \n\n Item170 1 Job
171 171 All vessel outer body required painting\nA Service to be carried out on the parts \n Vessel outer body cleaning and complete paining in disruptive pattern as per original painting scheme 01 No \n Item171 1 Job
172 172 Under water hull painting with anti-fouling paints and primer \nA Service to be carried out on the parts \nUnder water hull surface cleaning and painting.\nPen guard HB primer (Epoxy primer) 01 Coat-100 Micron (DFT)\nSafeguard universal ES grey tie coat 01 Coat-100 Micron (DFT)\nSea Quantum pro-u light red- 01 coat-150 micron (DFT)\n(Silyl Acrylate Anti-fouling self-polishing paint)\nSea quantum pro-u-dark red -01 coat-150 micron (DFT)\n(Silyl acrylate anti-fouling self-polishing paint)\nMetal oxide paint & primer to jet units 01 No \n Item172 1 Job
173 173 MJP jet system/bucket & nozzle to be spray painted.\nA Service to be carried out on the parts \nBucket system completely surface cleaning, remove marine growth and spray painting 02 Nos \n Item173 1 Job
174 174 Propulsion nozzle cleaning and surface finishing checking and spray painting 02 Nos Item174 1 Job
175 175 DOCKING AND PILOTING CHARGES :-\nInspection charges including IRS fees\n Item175 1 Job
176 176 Cost of Docking to carry out under water repair & painting etc & un-Docking. The dry dock repair work will be carried out by the firm at Lakkinala by making cradles and using heavy crane to lift/place the FAC on cradle Item176 1 Job
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail