Travancore Cochin Chemicals Limited has published Repairs To Epoxy Lined Floor Surface And Vinyl Flooring At Sodium Chlorate Plant. Submission Date for this Tender is 01-02-2021. PVC Flooring Tenders in THE TRAVANCORE COCHIN CHEMICALS UDYOGAMANDAL Kerala. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 20-Jan-2021 | Repairs to epoxy lined floor surface and vinyl flooring at sodium chlorate plant | Date | 01-02-2021 |
Name of Work: Repairs to epoxy lined floor surface and vinyl flooring at sodium chlorate plant. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within the factory as pointed out by engineer in-charge. | BI01010001010000000000000515BI0100001113 | 280 | Sq.m |
2 | 2 | Application of coaltar epoxy screeding, based on ciba solventless or equivalent, Araldite GY-250, Hardner HY-830/850, coaltar quartz system over primer coat of ciba solventless (or equivalent), Araldite GY-257 and Hardner HY-840 coaltar system and final finish seal coat of ciba solventless (or equivalent), Araldite GY-255 and Hardner 45 to a thickness of 3mm (all inclusive), cleaning the existing floor surface thoroughly, removing the coating, acid washing etc., removing wastes to east yard, including all labour charges, hire for tools, all safety precautions to workers, materials, equipments, pipe lines etc.,including cost of Materials complete. | BI01010001010000000000000515BI0100001114 | 280 | Sq.m |
3 | 3 | Supplying and fixing vinyl flooring sheets using approved colour vinyl sheets 2mm thickness, including cost of sheets, wastages, cost of synthetic adhesives like Fevicol SR etc., cutting to sizes and fixing to position, joint sealing or finishing (width of sheet to be selected maximum available), all labour charges for fixing, all safety precautions and all other incidentals etc., including cost of materials. | BI01010001010000000000000515BI0100001115 | 50 | Sq.m |
4 | 4 | Plastering with cement mortar 1:4, 12mm thick at all elevations and locations, including racking and hacking the surface for proper grip, plastering and keeping the plastering without flooding with water continuously for 48 hours, including all labour charges, scaffolding charges, cost of all consumables, curing charges, all safety precautions etc., complete. (Required cement will be issued free of cost by TCC) | BI01010001010000000000000515BI0100001116 | 280 | Sq.m |
5 | 5 | Engaging labourers for removing the existing flooring mat, carefully without damaging the platform, transporting and dumping sheets to places pointed out, all wages, contributions, all safety precautions etc., complete.\nSkilled Worker | 3 | Each | |
6 | 6 | Male Coolies | 3 | Each |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail