Bridge Work Construction Of Bridge At Km 1 . 2 Of Puthulupatti-Thiyagarajapuram Road, Virudhunagar-Tamil Nadu

Highways Department-HD has published Bridge Work Construction Of Bridge At Km 1 . 2 Of Puthulupatti-Thiyagarajapuram Road. Submission Date for this Tender is 14-12-2020. Bridge Work Tenders in Virudhunagar Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

26129927
Bridge Work Construction Of Bridge At Km 1 . 2 Of Puthulupatti-Thiyagarajapuram Road
Open Tender
Indian
Tamil Nadu
Virudhunagar
14-12-2020

Tender Details

Bridge Work Construction Of Bridge At Km 1 . 2 Of Puthulupatti-Thiyagarajapuram Road

Key Value

Document Fees
Refer document
EMD
INR 80000.0 /-
Tender Value
Refer document

BOQ Items

Name of work: Construction of Bridge at km 2/2 of Pethulupatti-Thiyagarajapuram road
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Bridge Work
2 2 Earthwork excavation in all classes of soil and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UPTO SILL LEVEL 156.82 Cubic Metre
3 3 Earthwork excavation in all classes of soil depositing on bank with all leads and lifts as per SS20B and all over incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions,trimming bottom of excavation, backfilling and clearing the site and disposal of all surplus materials etc. complete as per relevant standards specification for FOUNDATION OF ABUTMENTS, WINGS AND PIERS 627.31 Cubic Metre
4 4 Vibrated Cement Concrete of M10 (Nominal Mix) using 40 mm ISS size HBG graded Metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, working at depths, hire charge for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for LEVELLING COURSE UNDER FOOTINGS 25.1 Cubic Metre
5 5 Vibrated Cement Concrete of grade M20 (Nominal Mix) using 40 mm ISS size HBG graded Metal including cost and conveyance of all materials to site and including cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, working on height, hire charge for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for FOOTING OF ABUTMENTS and WINGS BELOW SILL LEVEL 331.37 Cubic Metre
6 6 Vibrated Cement Concrete of grade M20 (Nominal Mix) using 40 mm ISS size HBG graded Metal including cost and conveyance of all materials to site and including cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, working on height, hire charge for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for SUBSTRUCTURE OF ABUTMENTS and WINGS ABOVE SILL LEVEL 81.55 Cubic Metre
7 7 Vibrated Reinforced Cement Concrete of M30 (Design Mix) using 20mm HBG graded Metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrications of steel at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, working on heights, hire charges for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for BED BLOCK CUM DIRT WALL OVER ABUTMENTS. 9.84 Cubic Metre
8 8 Providing and Fixing 110mm dia Class I PVC Seepage Pipes of required length for abutment and wings, including cost and conveyance of all materials to work site, cost and labour for 900mm dia semi-spherical backfill arrangements with 110mm size broken granite chips at the periphery and labour charges for fixing etc., to drain of the backfill IN THE ABUTMENTS AND WINGS 30 Nos
9 9 Providing and Fixing KRAFT PAPER in full width of seating of Deck Slab and including cost and conveyance to work site, labour charges for fixing the same in the correct position and all other incidental charges etc. complete 26.17 Square Metre
10 10 Vibrated Reinforced Cement Concrete of M30 (Design Mix) using 20mm HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrications of steel at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, working on heights,hire charges for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for DECK SLAB. 200.68 Cubic Metre
11 11 Providing FILTER MEDIA behind the Abutments and Wings with clean graded III material to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc. for filter media as per MORTH Revision vth Cl.309-3-2-2 and 305-4-4 etc., complete.· 39.17 Cubic Metre
12 12 Filling behind Abutment and Returns as per Appendix 6 of IRC: 78-2014 with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under OMC to get the maximum density, including watering with all leads and lifts for water and all other incidental charges etc., complete. 83.7 Cubic Metre
13 13 Providing and Fixing PVC Expansion Joint in between Deck Slabs over Abutment and Pier as shown in the drawing including cost and conveyance of expanions joints, including shalimar pad and joint sealent etc. complete. 39.8 Running Metre
14 14 Supply and Fabrication of steel at site Grade Fe-500 at site required for all RCC items of works involved in the schedule including cost of steel at site, cost of fabrication, labour charges for cleaning the bars, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of space bars, cover blocks and all other incidental charges etc., complete, 19.2 Metric Tonne
15 15 Vibrated Cement Concrete of M15 (Nominal Mix ) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charges for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for Base course below approach slab 13 Cubic Metre
16 16 Vibrated Reinforced Cement Concrete of M30 (Design Mix ) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charges for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for Approach slab 18.27 Cubic Metre
17 17 Vibrated Reinforced Cement Concrete of M30 (Design Mix ) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charges for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for Wearing coat over deck slab and Approach slab 264 Square Metre
18 18 Vibrated Reinforced Cement Concrete of M40 (Design Mix ) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charges for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for outer crash barrier 16.02 Cubic Metre
19 19 Vibrated Cement Concrete of M20 (Nominal Mix ) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charges for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for PARAPET OVER RETURNS 6.07 Cubic Metre
20 20 Providing and Fixing of G.I. Drainage Spouts of 100mm dia as per GOI drawing No. SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spouts projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing including cost and conveyance of GI pipe and flats and fixing them in position etc. complete as per standard specification. 6 Each
21 21 Supply and Fixing of High Quality PVC pipes of 150mm dia of required length including cost and conveyance of pipes to site and fixing in position to proper gradient and level including all labour charges for fixing and including all other incidental charges etc. complete for providing utilities service in Safety kerb 141.12 Running Metre
22 22 Sub Estimates
23 23 Approach Road
24 24 Earthwork for subgrade, shoulders and back fills in accordance with the specifications, lines, grades and cross sections as shown in the drawings or as indicated by the Engineer as per SS20B for 97% Compaction for making up Diversion road using Carted Earth with an average lead of 5Km MORTH Rev. V 612.8 Cubic Metre
25 25 Granular Sub-base with Graded Material (Table:-400-1)-Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401)-for Grading V Material (Specification Number as per MORTH Rev.V 111,112,401,900). 168.78 Cubic Metre
26 26 Wet Mix Macadam (Table400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406) (Specification Number as per MORTH Rev.V 111,112,406,900). 234.41 Cubic Metre
27 27 Prime coat (Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502) - over WMM/ WBM.(Specification Number as per MORTH Rev.V 111,112,502,900). 937.65 Square Metre
28 28 Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over granular surfaces treated with primer.(Specification Number as per MORTH Rev.V 111,112,503,900). 937.65 Square Metre
29 29 Bituminous Macadam - Providing and laying bituminous macadam 50mm compacted thick with Central Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 of MORTH Specification - Grading II 46.88 Cubic Metre
30 30 Bituminous Concrete 30mm thick (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading,premixed with bituminous binder (Viscosity Grade - 30) at percentage specified by JMF of mix and filer, transporting the hot mix to work site, laying wih a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No.507 complete in all respects) - Grading II.(Specification Number as per MORTH Rev.V 111,112,507,900). 28.12 Cubic Metre
31 31 Diversion Road
32 32 Earthwork for subgrade, shoulders and back fills in accordance with the specifications, lines, grades and cross sections as shown in the drawings or as indicated by the Engineer as per SS20B for 95% Compaction for making up Approach road using Carted Earth with an average lead of 5Km MORTH Rev. V 1398.6 Cubic Metre
33 33 Earthwork for subgrade, shoulders and back fills in accordance with the specifications, lines, grades and cross sections as shown in the drawings or as indicated by the Engineer as per SS20B for 97% Compaction for making up Approach road using Carted Earth with an average lead of 5Km MORTH Rev. V 667.57 Cubic Metre
34 34 Granular Sub-base with Graded Material (Table:-400-1)-Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401)-for Grading V Material (Specification Number as per MORTH Rev.V 111,112,401,900). 84.38 Cubic Metre
35 35 Wet Mix Macadam (Table400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406) (Specification Number as per MORTH Rev.V 111,112,406,900). 112.5 Cubic Metre
36 36 Prime coat (Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502) - over WMM/ WBM.(Specification Number as per MORTH Rev.V 111,112,502,900). 562.5 Square Metre
37 37 Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over granular surfaces treated with primer.(Specification Number as per MORTH Rev.V 111,112,503,900). 562.5 Square Metre
38 38 Providing and Laying compacting open graded Premix Carpet 20mm thick with a liquid seal coat which shall consist of open graded carpet of 20mm thickness in a single course composed of suitable small sized aggregates premixed with bituminous binder (VG 30) with application of liquid seal coat for sealing the voids in a bituminous surface conforming to the specification including cost of material, labour charges, rental for machinery, fuel and all other incidental charges etc., complete as per clause 510 of MORTH specification Rev. V 562.5 Square Metre
39 39 Supply of RCC NP3 class pipes of 1000mm dia standard length supplied by the Contractor at his own cost specified below confirming to IS 458 / 2003 cost of pipe as a finished work including all other incidental charges, testing charges, including loading and unloading, transport and delivery in good condition at work site as directed by the departmental officers etc., complete as per MORTH specication Rev. V for forming for Diversion Road 30 Running Metre
40 40 Retaining Wall
41 41 Earthwork excavation in all classes of soils depositing on bank, with all leads and lifts as per SS 20B, including cost of all labour, equipments and all other incidental charges such as shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifation for Foundation for Retaining Wall 244.8 Cubic Metre
42 42 Vibrated Cement concrete M 20(Nominal Mix) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site, including cost of cement at site and including soft water, labour charges for mixing, transporting, laying, curing and compacting concrete, hire charges for tools and plants and all other incidental charges etc., complete as per standard specification for FOUNDATION for Retaining Wall 51 Cubic Metre
43 43 Vibrated Cement Concrete of M 20 (Nominal Mix) using 40 mm ISS size HBG graded Metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charge for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for Retaining Wall (below sill) 134.52 Cubic Metre
44 44 Vibrated Cement Concrete of M 20 (Nominal Mix) using 40 mm ISS size HBG graded Metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charge for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for Retaining Wall (above sill) 162.52 Cubic Metre
45 45 Providing and fixing SEEPAGE PIPES of 110mm dia PVC pipes of required length for Retaining Wall including cost and conveyance of all materials to worksite, cost and labour for 900mm dia. Semi-spherical back fill arrangements with 110mm size broken granite chips at the periphery and labour charges for fixing etc., to drain of the Backfill in the Retaining Wall 144 Nos
46 124 Calculation of SubTotal, GST and Total carried out by system automatically
47 125 Sub Total Amount for above all items (excluding GST) 1 subtotal
48 126 GST 12% for above SubTotal Amount 1 gst
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail