Providing Stub Setting Concreting Earthing And Erection Of Various Types Of Towers For Making Lilo Of The Existing Madhampatty Devarayapuram 110 Kv Feeder At The Proposed Karunyanagar 110/22 Kv Substation At Mathuvarayapuram Loc 8 And 9, Coimbatore-Tamil Nadu

Tamil Nadu Transmission Corporation Limited-TANTRANSCO has published Providing Stub Setting Concreting Earthing And Erection Of Various Types Of Towers For Making Lilo Of The Existing Madhampatty Devarayapuram 110 Kv Feeder At The Proposed Karunyanagar 110/22 Kv Substation At Mathuvarayapuram Loc 8 And 9. Submission Date for this Tender is 08-12-2020. Electrification Work Tenders in Coimbatore Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

26105304
Corrigendum : Providing Stub Setting Concreting Earthing And Erection Of Various Types Of Towers For Making Lilo Of The Existing Madhampatty Devarayapuram 110 Kv Feeder At The Proposed Karunyanagar 110/22 Kv Substation At Mathuvarayapuram Loc 8 And 9
Open Tender
Indian
Tamil Nadu
Coimbatore
08-12-2020

Tender Details

Providing Stub Setting Concreting Earthing And Erection Of Various Types Of Towers For Making Lilo Of The Existing Madhampatty Devarayapuram 110 Kv Feeder At The Proposed Karunyanagar 110/22 Kv Substation At Mathuvarayapuram Loc 8 And 9

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 28-Nov-2020 Tender specification corrigendum - Eligibility criteria Technical Bid 08-12-2020

Key Value

Document Fees
Refer document
EMD
INR 32800.0 /-
Tender Value
Refer document

BOQ Items

Name of the work : Providing stub setting, concreting, earthing and erection of various types of towers for making LILO of the existing Madhampatty – Devarayapuram 110 KV feeder at the proposed Karunyanagar 110/22 KV Sub-Station at Mathuvarayapuram. (Loc 8 and 9).
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Clearing Light jungle and disposing off to a place away from the site as directed by the Engineer in charge including all Labour charges,T&Ps etc., complete. Item Code / 1 2000 m2
2 2 Surveying and pitmarking of various tower location inlcuding hire charges for theodolite instrument, cost of all materials labour, lead, lift, etc., complete. Item Code / 2 2 Loc
3 3 Earth work excavation for foundation in hard gavelly soil, stiff black cotton soil, murram, gravel, stoney,earth and earth mixed with small size boulders with hard gravelly soil including initial lead of 10 m and lift of 2 m etc., complete. Item Code / 3 330 m3
4 4 Earth work excavation and deposting on bank with initial lead of 10 metre and initial lift of 2 metre in medium rock and dense medium rock not requiring blasting including all leads, lifts etc., as per standard specification complete.for foundation Item Code / 4 248 m3
5 5 Earth work excavation and deposting on bank with initial lead of 10 metre and initial lift of 2 metre in medium rock and dense medium rock requiring blasting including all leads, lifts etc., as per standard specification complete.for foundation Item Code / 5 207 m3
6 6 Earth work excavation for foundation in hard rock by wedging, chisseling and trimming to proper shape where blasting is prohibited including all leads, lifts, etc., complete. Item Code / 6 42 m3
7 7 PCC 1 : 3 : 6 using 20mm metal for foundation without form work including cost of all materials, lead, lift, curing, etc., complete. Item Code / 7 23 m3
8 8 Transporting of template and stubs, cleat For KCR tower and assembling at site and shifting the template from loc to loc including cost of all materials, labour for fabrication, galvanising etc., lead, lift, etc., complete. (Stub and cleat will be supplied by TANTRANSCO at departmental stores) Item Code / 8 2 Loc
9 9 RCC 1:1.5:3 using 20mm metal (machine crushed) with form work for base pier footing concrete including cost of all materials, shuttering, lead, lift, curing, etc., complete. But excluding cost of steel reinforcement. Item Code / 9 116 m3
10 10 RCC 1:1.5:3 using 20mm metal (machine crushed) with form work for base pier circular column concrete including cost of all materials, shuttering, lead, lift, curing, etc., complete. But excluding cost of steel reinforcement. Item Code / 10 40 m3
11 11 Providing platform for setting of stub and cleat, assembling of template concrete placing and arrangements for department inspection of all works above ground level including cost of all materials, labour charges, all leads, lifts, cost of strutting and shuttering as per standard specification complete. Item Code / 11 300 m2
12 12 Providing steel reinforcement MS/RTS rods for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, labour charges for cutting, straightening bending as per type design drawing, placing aligning and tying properly with all leads and lift, etc., complete, as per standard specification. Item Code / 12 13900 Kg
13 13 Providing pipe type earthing including necessary excavation for fixing 3m long 40mm dia GI "B" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of all materials, lead, lift, etc., complete. Item Code / 13 2 Loc
14 14 Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. Item Code / 14 645 m3
15 15 Transporting of excess earth excavated and disposing them with a lead of 5 KM including all lead, lift, labour chrges, etc., complete. Item Code / 15 180 m3
16 16 Plastering the concrete surface upto Ground level in CM 1:3, 12mm thick including cost of all materils, lead, lift, curing, labour charges, etc., complete. Item Code / 16 8 m2
17 17 Transporting & Erection of Tower Parts including Sorting out of Tower Parts at stores and at Site, tightening, Punching of Bolt and nuts including transporting charges, and rectification of defects in tower parts if any found at the time of erection, Cost of T&P'S, all materials, labour, lead, lift, etc., complete. (Including Bolt & Nuts ) Item Code / 17 15 MT
18 18 Tack welding ( Three Tacks )of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials hire charges for diesel generator and welding transformer all labour, transport charges, etc., complete. Item Code / 18 1960 No
19 19 Dewatering charges including rent of Pump rent of Generator, labour lead lift etc complete as per Standard Specification. Item Code / 19 50 Hr
20 20 Painting with anticorrosive black paint, two coats on the tower legs upto 1 mtr height from chimney coping including cost of all materials, lead, lift, etc., complete. Item Code / 20 2 Loc
21 21 SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only Item Code / 21 1 Percentage
22 22 CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only Item Code / 22 1 Percentage
23 23 Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only Item Code / 23 1 Percentage
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail