Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Supply Of Smc Dt Metering Box As Per Tender Specification. Submission Date for this Tender is 10-12-2020. Bolts Tenders in CSO CS Thanjavur Tamil Nadu. Bidders can get complete Tender details and download the document.
Name of Work: Supply of SMC DT Metering Box | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Supply of SMC DT Metering Box | |||
2 | 1.01 | 0.6KVA UPS | |||
3 | 1.02 | SMC DT Metering Boxes with all accessories for 50 - 100 A Meters | Item 1 | 190 | Nos |
4 | 2 | Pole pit for 9.0M and 9.14 M PSC/RCC / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr | |||
5 | 2.01 | Ordinary soil | Item 3 | 1 | Pit |
6 | 2.02 | Semi rocky soil | Item 4 | 1 | Pit |
7 | 2.03 | Heavy rocky soil where blasting/ cheseling required [specific approval should be obtained from concerned EE] | Item 5 | 1 | Pit |
8 | 3 | Stay pit | |||
9 | 3.01 | in ordinary soil [0.95 x 0.6 x 1.2m] | Item 6 | 1 | Pit |
10 | 3.02 | semi rocky soil | Item 7 | 1 | Pit |
11 | 3.03 | Stay pit in heavy rocky soil where blasting/ cheseling reqiured [specific approval should be obtained from concerned EE] | Item 8 | 1 | Pit |
12 | 4 | Erection of poles & stays (Including refilling of excavated earth) | |||
13 | 4.01 | Erection of 7.5m / 8.0m poles [RCC / PSC] | Item 9 | 1 | Pit |
14 | 4.02 | Erection of 9.00m / 9.14m RCC / PSC/Rail pole, Tubular pole and all Metal Poles | Item 10 | 1 | E |
15 | 5 | Stay set | |||
16 | 5.01 | Erection stay set complete | Item 11 | 1 | Pit |
17 | 5.02 | Stay erection without rod and pit | Item 12 | 1 | Set |
18 | 5.03 | Replacement of stay rod only. (Including stay pit excavation & refilling & erection) | Item 13 | 1 | Pit |
19 | 5.04 | Replacement of guy shackle only in existing stay | Item 14 | 1 | E |
20 | 6 | Erection of LINE MATERIALS | |||
21 | 6.01 | Fixing of LT 1 ph "X" Arm | Item 15 | 1 | Pit |
22 | 6.02 | Fixing of LT/HT TI Fitting | Item 16 | 1 | Pit |
23 | 6.03 | Fixing of LT 3 ph "X" Arm | Item 17 | 1 | E |
24 | 6.04 | Fixing of 3[1/2]' ' V ` X ' arm | Item 18 | 1 | E |
25 | 6.05 | Fixing of 4[1/2]' V ` X ' arm | Item 19 | 1 | E |
26 | 6.06 | Fixing of 5' V X arm | Item 20 | 1 | E |
27 | 6.07 | Fixing of tapping channel / guarding "X" arm | Item 21 | 1 | E |
28 | 6.08 | Providing of line spacers in LT lines 1 phase | Item 22 | 1 | E |
29 | 6.09 | Providing of line spacers in LT lines 3 phase | Item 23 | 1 | E |
30 | 6.1 | Erection of AB Switch with PT insulator & Jumpering complete | Item 24 | 1 | Set |
31 | 6.11 | Erection of centre rotating Switch AB Switch complete | Item 25 | 1 | Set |
32 | 7 | FIXING OF HT PIN INSULATOR / STRAIN DISC | |||
33 | 7.01 | 11 KV Pin insulator with pin | Item 26 | 1 | Pit |
34 | 7.02 | 11 KV strain disc / polymer disc with hardware | Item 27 | 1 | Pit |
35 | 7.03 | 22 KV Pin insulator with pin | Item 28 | 1 | E |
36 | 7.04 | 22 KV Strain disc / polymer disc with hardware | Item 29 | 1 | E |
37 | 7.05 | 33 KV Pin insulator with pin | Item 30 | 1 | Pit |
38 | 7.06 | 33 KV Pin Strain disc/polymer disc with hardware | Item 31 | 1 | Pit |
39 | 7.07 | Fixing of LT Pin insulator with pin | Item 32 | 1 | E |
40 | 7.08 | LT Shakle with hardware | Item 33 | 1 | E |
41 | 7.09 | Fixing of Aluminium knob | Item 34 | 1 | E |
42 | 8 | Paving Stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from Road side to work spot] per run | |||
43 | 8.01 | Upto 7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm | Item 35 | 1 | Pit |
44 | 8.02 | ACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm | Item 36 | 1 | km |
45 | 8.03 | ACSR 7/4.09 mm | Item 37 | 1 | Pit |
46 | 8.04 | Above 7/4.09 mm ACSR & DOG conductor | Item 38 | 1 | km |
47 | 9 | Earthing wiring and connection including transporting of earth pipe and excavation of pit] | |||
48 | 9.01 | Transformer structure earthing 10ft depth - 3 nos of pipe through Tubes | Item 39 | 1 | Pit |
49 | 9.02 | DP earthing including all works [double side earthing] | Item 40 | 1 | E |
50 | 9.03 | Erection of 4th Earth pipe including earthing | Item 41 | 1 | E |
51 | 9.04 | Earthing of poles | Item 42 | 1 | E |
52 | 9.05 | Earth pit masonary work 3 nos earth pits or using 3 nos concrete tub. | Item 43 | 1 | Set |
53 | 9.06 | Replacement of detoriated earth pipe per location | Item 44 | 1 | E |
54 | 10 | Concreting with Mixture 1:3:6 [including All materials]. | |||
55 | 10.01 | Mass Concreting for centre support for 2 feet including all materials | Item 45 | 1 | Pit |
56 | 10.02 | Mass concreting for pole0.6x0.6x1.25M.with coping | Item 46 | 1 | Loc |
57 | 10.03 | Sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping | Item 47 | 1 | Loc |
58 | 10.04 | Sleeve concreting for stay set 0.3 m & 0.75 long | Item 48 | 1 | Loc |
59 | 11 | Erection of Distribution Transformer Structure Complete | |||
60 | 11.01 | Excavation of structure pole Pits 0.9 X 0.9 X 1.83 Mtr | Item 49 | 1 | Pit |
61 | 11.02 | Transporting of pole to pit location 2 Nos. | Item 50 | 1 | 2Nos |
62 | 11.03 | Erection of poles 2 Nos | Item 51 | 1 | 2Nos |
63 | 11.04 | Excavation of stay pit 4 Nos | Item 52 | 1 | 4Nos |
64 | 11.05 | Erection of stay set (4 sets) | Item 53 | 1 | 4Nos |
65 | 11.06 | Mass concreting (Cement:Sand:Jelly supplied by the contractor) 2 Nos. | Item 54 | 1 | 2Nos |
66 | 11.07 | Erection of 22 KV AB Switch | Item 55 | 1 | E |
67 | 11.08 | Ttransformer structure earthing 10ft depth - 3 nos of pipe through Earth Tubes | Item 56 | 1 | Pit |
68 | 11.09 | Erection of Top Channel | Item 57 | 1 | E |
69 | 11.1 | Bed Channel [2 nos channel] Erection | Item 58 | 1 | Set |
70 | 11.11 | Cross with stud for bed channel Erection | Item 59 | 1 | Pit |
71 | 11.12 | Erection of belting angle / HG fuse angle | Item 60 | 1 | Set |
72 | 11.13 | Erection of HG fuse Set | Item 61 | 1 | Pit |
73 | 11.14 | Erection of HT LAS with jumpering and earthing | Item 62 | 1 | Set |
74 | 11.15 | Erection of LT LAS with jumbering and earthing | Item 63 | 1 | Set |
75 | 11.16 | Erection of Jumpering [HT Side] | Item 64 | 1 | Set |
76 | 11.17 | Transformer wiring in LT side including Jumpering Bus bar etc. | Item 65 | 1 | Set |
77 | 11.18 | Erection LT open type fuse unit arrangement single | Item 66 | 1 | Set |
78 | 11.19 | Erection LT open type fuse unit arrangement Double | Item 67 | 1 | Pit |
79 | 11.2 | Painting of stru. Complete excluding DT [two coat of red oxide] all metal parts(excluding cost of paint). | Item 68 | 1 | E |
80 | 11.21 | Painting of stru. Complete excluding DT [one coat Alu paint, excluding cost of paint) | Item 69 | 1 | E |
81 | 11.22 | Colour washing of 2 numbers structure pole [excluding cost of distember / snowsem] | Item 70 | 1 | E |
82 | 11.23 | Painting name of SS at seating channel including paint. | Item 71 | 1 | E |
83 | 11.24 | Painting of DT alone [excluding painting] with red oxide and double coating of aluminium paint. | Item 72 | 1 | E |
84 | 11.25 | DT metering arrangement (without materials) | Item 73 | 1 | E |
85 | 12 | Erection of distribution Transformer /dismantling of DT | |||
86 | 12.01 | Upto 100 KVA | Item 74 | 1 | Pit |
87 | 12.02 | above 100 KVA and Upto 250 KVA | Item 75 | 1 | E |
88 | 12.03 | 500 KVA | Item 76 | 1 | E |
89 | 12.04 | Colour washing of RCC / PSC poles | Item 77 | 1 | E |
90 | 12.05 | Numbering of poles including cost of paint / loc [black background and yellow letters] | Item 78 | 1 | E |
91 | 12.06 | Painting of SC details in the meter board / Agl boxes / Hut SCs including paint. | Item 79 | 1 | Pit |
92 | 13 | SERVICE CONNECTION | |||
93 | 13.01 | Transporting of required materials from road side to work spot and erection of street light fixture including wiring Clamping of pipe aerial board assembling | Item 80 | 1 | Pit |
94 | 13.02 | Transporting of required materials from road side to work spot and erection of 250 W S.V. lamp / Mercury lamp/LED Yard Light Fitting including wiring, clamping of pipe, serial board assembling etc. | Item 81 | 1 | Pit |
95 | 13.03 | Fixing of street light fitting with 2 CFL/ 4 CFL | Item 82 | 1 | Pit |
96 | 13.04 | Provision of St. Lt. switching arrangements including fixing meters, wiring, service board etc. | Item 83 | 1 | Pit |
97 | 13.05 | Erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot | Item 84 | 1 | Pit |
98 | 13.06 | Erection/dismantling of metering set 11 KV / 22 KV/33 KV | Item 85 | 1 | Pit |
99 | 14 | Fabrication Works. | |||
100 | 14.01 | Labour charges for alteration of back clamp / stay clamp to suitable for works. | Item 86 | 1 | Pit |
101 | 15 | Providing of Holes. | |||
102 | 15.01 | All size angles / channel upto 5/8" | Item 87 | 1 | Pit |
103 | 15.02 | All size angles / channel above 5/8" | Item 88 | 1 | Pit |
104 | 15.03 | Slot holes in flat / angles / channel upto 3/4" | Item 89 | 1 | Pit |
105 | 15.04 | Slot holes in flat / angles / channel above 3/4" | Item 90 | 1 | Pit |
106 | 15.05 | Fabrication of centre support only for DT structure | Item 91 | 1 | Pit |
107 | 15.06 | Cutting of RS Joist / Angles / MS Channels | Item 92 | 1 | Pit |
108 | 15.07 | Welding of RS Joist / Angles / MS Channels | Item 93 | 1 | Pit |
109 | 16 | GENERAL | |||
110 | 16.01 | Set right the leaning pole in both HT & LT [ pin point ] location | Item 94 | 1 | Pit |
111 | 16.02 | Set right the leaning pole in both HT & LT [ cut point ] location | Item 95 | 1 | Pit |
112 | 16.03 | Resagging of lines for all sizes cut point location | Item 96 | 1 | km |
113 | 16.04 | Converting pin point into cut point HT lines | Item 97 | 1 | Loc |
114 | 16.05 | Converting pin point into cut point LT lines | Item 98 | 1 | Loc |
115 | 16.06 | Clearing tree branches of coconut tree | Item 99 | 1 | Per tree |
116 | 16.07 | Clearing tree branches of Neem, tamarind, country tree etc., | Item 100 | 1 | per tree |
117 | 16.08 | Releasing and erection 1 ph SC wire [during conductor or support change] | Item 101 | 1 | E |
118 | 16.09 | Releasing and erection 3 ph SC wire [during conductor or support change] | Item 102 | 1 | E |
119 | 16.1 | Destruction of pole concerting at site. | Item 103 | 1 | Loc |
120 | 16.11 | Retrieving grill from detoriated pole [grill separate from damaged pole] | Item 104 | 1 | E |
121 | 16.12 | Re earthing of structure completely including earthpipe changing if any 3nos earth pipe | Item 105 | 1 | E |
122 | 16.13 | Re examination of DT earthing ( Digging , inspection and making connection in between extg. 3nos Earth pipe ) | Item 106 | 1 | E |
123 | 17 | Guarding Arrangement :- | |||
124 | 17.01 | Cradle guarding including earthing and earth pit excavation [railway & P&T crossing ] | Item 107 | 1 | Pit |
125 | 17.02 | Flat guarding with 4 wire | Item 108 | 1 | Span |
126 | 17.03 | Split Netural Guarding | Item 109 | 1 | Span |
127 | 18 | LOADING AND UNLOADING : | |||
128 | 18.01 | Loading of 7.5 Mtr / 8.0 Mtr RCC / PSC/ Metal Pole [per pole ] | Item 110 | 1 | Pit |
129 | 18.02 | Loading of [ 9.14 mtr ] 9.0 mtr poles RCC /PSC Pole / Metal Pole [ per pole ] | Item 111 | 1 | Pit |
130 | 18.03 | Unloading of PSC / RCC / Metal Poles | Item 112 | 1 | Pit |
131 | 19 | TRANSPORTING FROM ROAD SIDE TO WORKSPOT | |||
132 | 19.01 | Transport 7.5 mtrs / 8.00 mtrs of poles including R.S.Joist and Rail Poles Upto 1.0 Km | Item 113 | 1 | km |
133 | 19.02 | Transport 7.5 mtrs / 8.00 mtrs of poles including R.S.Joist and Rail Poles above additional 1.0 Km or part thereof [ certified by AEE ] | ltem114 | 1 | km |
134 | 19.03 | Transport of 9.0 mtr and above poles including R.S. Joist and Rail poles upto 1.0 Km | ltem115 | 1 | km |
135 | 19.04 | Transport of 9.0 mtr and above poles including R.S. Joist and Rail poles upto above additional 1.0 Km or part thereof | ltem116 | 1 | km |
136 | 20 | TRANSPORT OF LINE MATERIALS | |||
137 | 20.01 | Transport of line Materials [ minimum 1 MT ] from sub stores to section pocket store or near to work spot at road side by using private vehicle or vice versa excluding loading and unloading Upto 8 kms | Item 117 | 1 | MT |
138 | 20.02 | Transport of line Materials [ minimum 1 MT ] from sub stores to section pocket store or near to work spot at road side by using private vehicle or vice versa excluding loading and unloading above 8 Kms and for every addl. 1 KM | ltem118 | 1 | MT |
139 | 21 | TRANSPORT OF EQUIPEMENTS | |||
140 | 21.01 | Transporting of Distribution Transformer/Metering set by using private vehicle load of one No.Minimum Up to 30 Km | ltem218 | 1 | Trip |
141 | 21.02 | .Transporting of Distribution Transformer/Metering set by using private vehicle load of one No.Minimum above 30 Km for every addl .1 KM | ltem120 | 1 | Trip |
142 | 22 | DISMANTLING WORKS | |||
143 | 22.01 | Dismantling of 7.5m / 8.0m poles [RCC / PSC] | ltem121 | 1 | Pit |
144 | 22.02 | Dismantling of 9.00m / 9.14m RCC / PSC/Rail pole, Tubular pole and all metal poles | ltem122 | 1 | E |
145 | 22.03 | Dismantling stay set complete | ltem123 | 1 | Set |
146 | 22.04 | Dismantling of LT 1 ph "X" Arm / LT/HT TI Fitting | ltem124 | 1 | E |
147 | 22.05 | Dismantling of LT/HT TI Fitting | ltem125 | 1 | E |
148 | 22.06 | Dismantling of LT 3 ph "X" Arm | ltem126 | 1 | E |
149 | 22.07 | Dismantling of 3[1/2]' V ` X ' arm | ltem127 | 1 | E |
150 | 22.08 | Dismantling of Tapping channel and Guarding X Arm | ltem128 | 1 | E |
151 | 22.09 | Dismantling of 11 KV strain disc/polymer disc with hardware | ltem129 | 1 | E |
152 | 22.1 | Dismantling of 22 KV Pin insulator with pin | ltem130 | 1 | E |
153 | 22.11 | Dismantling of 22 KV Strain disc with hardware | ltem131 | 1 | E |
154 | 22.12 | Dismantling of 33 KV Pin insulator with pin | ltem132 | 1 | E |
155 | 22.13 | Dismantling of 33 KV Strain disc with hardware | ltem133 | 1 | E |
156 | 22.14 | Dismantling of LT Pin insulator with pin | ltem134 | 1 | E |
157 | 22.15 | Dismantling of LT Shackle with hardware | ltem135 | 1 | E |
158 | 22.16 | Dismantling of Aluminium knob | ltem136 | 1 | E |
159 | 22.17 | Dismantling of Conductor 7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm | ltem137 | 1 | Km |
160 | 22.18 | Dismantling of Conductor ACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm | ltem138 | 1 | Km |
161 | 22.19 | Dismantling of Conductor ACSR 7/4.09 mm | ltem139 | 1 | Km |
162 | 23 | SINGLE PHASE METER &3 PHASE METER | |||
163 | 23.01 | Fixing of single phase meter | ltem140 | 1 | E |
164 | 23.02 | Fixing of 3 phase meter | ltem141 | 1 | E |
165 | 23.03 | Dismantling of single phase meter | ltem142 | 1 | E |
166 | 23.04 | Dismantling of 3 phase meter | ltem143 | 1 | E |