60/202021 Of Se Gcc Cbe Providing Stub Setting Concreting Earthing And Erection Of Various Types Of Towers For Making Lilo Of The Existing Madhampatty Devarayapuram 110 Kv Feeder At The Proposed Karunyanagar 110/22 Kv Ss At Mathuvarayapuramloc 17 To 19 , Coimbatore-Tamil Nadu

Tamil Nadu Transmission Corporation Limited-TANTRANSCO has published 60/202021 Of Se Gcc Cbe Providing Stub Setting Concreting Earthing And Erection Of Various Types Of Towers For Making Lilo Of The Existing Madhampatty Devarayapuram 110 Kv Feeder At The Proposed Karunyanagar 110/22 Kv Ss At Mathuvarayapuramloc 17 To 19 . Submission Date for this Tender is 01-12-2020. Electrification Work Tenders in Coimbatore Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

26068655
60/202021 Of Se Gcc Cbe Providing Stub Setting Concreting Earthing And Erection Of Various Types Of Towers For Making Lilo Of The Existing Madhampatty Devarayapuram 110 Kv Feeder At The Proposed Karunyanagar 110/22 Kv Ss At Mathuvarayapuramloc 17 To 19
Open Tender
Indian
Tamil Nadu
Coimbatore
01-12-2020

Tender Details

60/202021 Of Se Gcc Cbe Providing Stub Setting Concreting Earthing And Erection Of Various Types Of Towers For Making Lilo Of The Existing Madhampatty Devarayapuram 110 Kv Feeder At The Proposed Karunyanagar 110/22 Kv Ss At Mathuvarayapuramloc 17 To 19 21 To 25 27 29 30

Key Value

Document Fees
Refer document
EMD
INR 39900.0 /-
Tender Value
Refer document

BOQ Items

Name of the work : Providing stub setting, concreting, earthing and erection of various types of towers for making LILO of the existing Madhampatty – Devarayapuram 110 KV feeder at the proposed Karunyanagar 110/22 KV Sub-Station at Mathuvarayapuram. (Loc 17 to 19, 21 to 25, 27,29 and 30)
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Clearing Light jungle and disposing off to a place away from the site as directed by the Engineer in charge including all Labour charges,T&Ps etc., complete. Item Code / 1 11000 m2
2 2 Surveying and pitmarking of various tower location inlcuding hire charges for theodolite instrument, cost of all materials labour, lead, lift, etc., complete. Item Code / 2 11 Loc
3 3 Earth work excavation for foundation in hard gavelly soil, stiff black cotton soil, murram, gravel, stoney,earth and earth mixed with small size boulders with hard gravelly soil including initial lead of 10 m and lift of 2 m etc., complete. Item Code / 3 963 m3
4 4 Earth work excavation for foundation and deposting on bank with initial lead of 10 metre and initial lift of 2 metre in medium rock and dense medium rock not requiring blasting including all leads, lifts, etc., complete. Item Code / 4 276 m3
5 5 Earth work excavation for foundation in hard rock by wedging, chiseling and trimming to proper shape where blasting is prohibited including all leads, lifts, etc., complete. Item Code / 5 138 m3
6 6 PCC 1 : 3 : 6 using 20mm metal without form work including cost of all materials, lead, lift, curing, etc., complete. Item Code / 6 26 m3
7 7 Transporting of template and stubs, cleats for KCR tower and assembling at site and shifting the template from loc to loc including cost of all materials, labour for fabrication, galvanising etc., lead, lift, etc., complete. Item Code / 7 7 Loc
8 8 Transporting of template and stubs, cleat for HCR tower and assembling at site and shifting the template from loc to loc including cost of all materials, labour for fabrication, galvanising etc., lead, lift, etc., complete. Item Code / 8 4 Loc
9 9 PCC 1:2:4 using 20mm metal (machine crushed) with form work for Frustum concrete including cost of all materials, lead, lift, curing, etc., complete including cost of frustum box etc. (for Frustum) Item Code / 9 230 m3
10 10 PCC 1:2:4 using 20mm metal metal (machine crushed) with form work for tower chimney concrete including cost of all materials, lead, lift, curing, etc., complete including cost of chimney box etc. (For Chimney) Item Code/10 14 m3
11 11 Providing pipe type earthing including necessary excavation for fixing 3m long 40mm dia GI "B" class pipe and refilling with excavated earth mixed with salt charcoal and connect the earthstrip with the leg of the stub including all cost of all materials, lead, lift, etc., complete. Item Code/11 11 Loc
12 12 Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. Item Code/12 1496 m3
13 13 Transporting of excess excavated earth and disposing them with a lead of 5 KM including all lead, lift, labour chrges, etc., complete. Item Code/13 1032 m3
14 14 Plastering the coping portion in CM 1:3, 12mm thick including cost of all materils, lead, lift, curing, labour charges, etc., complete. Item Code/14 51 m2
15 15 Transporting & Erection of Tower Parts including Sorting out of Tower Parts at stores and at Site, tightening, Punching of Bolt and nuts including rectification of tower parts if any at the time of erection, transporting charges, Cost of T&P'S, all materials, labour, lead, lift, etc., complete. (Including Bolt & Nuts ) Item Code/15 67.5 MT
16 16 Tack welding ( Three Tacks )of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials hire charges for diesel generator and welding transformer all labour, transport charges, etc., complete. Item Code/16 9000 Nos
17 17 Dewatering charges including rent of Pump rent of Generator, labour lead lift etc complete as per Standard Specification. Item Code/17 110 Hrs
18 18 Painting with anti corrosive black paint, two coats on the tower legs upto 1 mtr height from chimney coping including cost of all materials, lead, lift, etc., complete. Item Code/18 11 Loc
19 19 SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only Item Code/19 1 Percentage
20 20 CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only Item Code/20 1 Percentage
21 21 Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only Item Code/21 1 Percentage
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail