Kerala State Electricity Board-KSEB has published Ht Line And Transformer New Daivapura To Malamari Standardisation Work. Submission Date for this Tender is 09-11-2020. Transformer Supply Tenders in Peringammala Kerala. Bidders can get complete Tender details and download the document.
Name of Work: HT line and transformer New Deivapura- Malamari Standarisation work. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). | 1 | 49 | No |
2 | 2 | Loading HT 'A' type pole from the stacking place and unloading the same at work site (transport by vehicle). | 2 | 5 | No |
3 | 3 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. | 3 | 14 | Trip |
4 | 4 | Drilling hole of various sizes on existing Channel/Cross Arm. | 4 | 75 | No |
5 | 5 | Drilling oval shaped hole of various sizes on existing Channel/Cross Arm/GI/MS cleat etc. | 5 | 15 | No |
6 | 6 | Cutting Channel/Cross Arm/Angle Iron into two pieces. | 6 | 2 | No |
7 | 7 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. | 7 | 41 | No |
8 | 8 | Fitting and erecting one HT 'A' type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. | 8 | 3 | No |
9 | 9 | Additional rate for providing one disc set on any type of HT pole for making cut point. | 9 | 42 | No |
10 | 10 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. | 10 | 2 | No |
11 | 11 | Fitting and erecting one HT DP using 'A' type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. | 11 | 1 | No |
12 | 12 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. | 12 | 55 | No |
13 | 13 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. | 13 | 2 | No |
14 | 14 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits. | 14 | 2 | No |
15 | 15 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. | 15 | 85 | No |
16 | 16 | Additional rate for excavation of Pit for 'A' type pole in Laterite. | 16 | 5 | No |
17 | 17 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary. | 17 | 1.5 | km |
18 | 18 | Erecting one 100kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation. | 18 | 1 | No |
19 | 19 | Fitting one additional Fuse unit and giving connection from Transformer to fuse and DB to LT OH line. | 19 | 6 | No |
20 | 20 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. | 20 | 11 | No |
21 | 21 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. | 21 | 13 | No |
22 | 22 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. | 22 | 50 | No |
23 | 23 | Fitting one set (3No.) 11kV LA and giving connections excluding earthing. | 23 | 1 | No |
24 | 24 | Fitting one set (3No.) 11kV DO Fuse and giving connection. | 24 | 1 | No |
25 | 25 | Fitting one set AB switch and giving connection | 25 | 3 | No |
26 | 26 | Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles). | 26 | 6 | km/ km |
27 | 27 | Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. | 27 | 2 | No |
28 | 28 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. | 28 | 18 | No |
29 | 29 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. | 29 | 12 | No |
30 | 30 | Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing 11kV DP incl. conveyance of materials. | 30 | 1 | No |
31 | 31 | Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. | 31 | 25 | No |
32 | 32 | Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. | 32 | 21 | No |
33 | 33 | Fitting one Additional 2.4m Channel cross arm in existing single pole incl. conveyance of materials. | 33 | 6 | No |
34 | 34 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. | 34 | 3 | No |
35 | 35 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. | 35 | 33 | No |
36 | 36 | Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking. | 36 | 2 | No |
37 | 37 | Dismantling one section fuse | 37 | 6 | No |
38 | 38 | Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole. | 38 | 28 | No |
39 | 39 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. | 39 | 47 | No |
40 | 40 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. | 40 | 46 | No |
41 | 41 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. | 41 | 3 | No |
42 | 42 | Erecting one LT PSC Pole in position incl. digging & back filling pit. | 42 | 2 | No |
43 | 43 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. | 43 | 2 | No |
44 | 44 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc. | 44 | 6 | No |
45 | 45 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. | 45 | 20 | No |
46 | 46 | Dismantling one 2x40W fluorescent tube fitting from the existing pole and refitting the same on newly erected pole and reconnecting. | 46 | 1 | No |
47 | 47 | Cutting trees beyond 30cm but upto and incl. 60cm girth, cutting of trunks/branches, removing the root completely and stacking. | 47 | 5 | No |
48 | 48 | Pole numbering using printed Aluminium sheets / Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl. cost of paint. | 48 | 56 | No |
49 | 49 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). | 49 | 12 | No |
50 | 50 | Providing Transformer fencing , using 50x50x6mm Angle iron, 40 x 6 mm MS flat and 8 mm MS rod as specified, incl cost of transportation & foundation | 50 | 22 | m2 |
51 | 51 | Providing yard metallings with 6mm & 40mm thick blue metal as specified after constructing a curb wall. | 51 | 12 | m2 |
52 | 52 | Providing one Earth using earth pipe incl. digging & backfilling pit and supply of charcoal, salt, sand etc. | 52 | 2 | No |
53 | 53 | Brick work in cement mortar for superstructure as per the direction of departmental staff. | 53 | 1.2 | m3 |