Military Engineer Services-MES has published Manning And Operation Through Outsourcing Of Sewage Treatment Plant Installations , Water Supply Installations At Pump House No 09 , 13 Under Ge Satwari. Submission Date for this Tender is 17-11-2020. Sewage Treatment Plant Tenders in GE SATWARI Jammu And Kashmir. Bidders can get complete Tender details and download the document.
NAME OF WORK: MANNING AND OPERATION THROUGH OUTSOURCING OF SEWAGE TREATMENT PLANT INSTALLATIONS, WATER SUPPLY INSTALLATIONS AT PUMP HOUSE NO 09,13 UNDER GE SATWARI | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Maintenance & Operation of complete sewage treatment plant cap -1.00 MLD installation at MAP-I ( Peeru Vihar) for 16 hrs( 0600 hrs to 1400 Hrs & 1400 hrs to 2200 Hrs) in two shifts per day (Each shift of 08 hours) one Skilled FGM per shift contineous all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift and at the time of change of shift). The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimum 2 years experience or having 7 years experience in related field in operation STP Plant.The detail of the equipment installed to be operated by operators in two shifts are as under :- (i) Sewage type Submersible Pump set of cap 10 HP. - 03 No (ii) Heavy Duty Air Blower with 20 HP motor. - 02 No (iii) DG Set 40 KVA - 01 No (iv) Chlorination mixing chamber - 01 No | |||
2 | 2 | Rates required to be quoted by the bidders in absolute figures for execution of work as described in serial No 1.00 here-in-before for the following components: | |||
3 | 3 | Min Wages of trademan as per prevailing Notification by the Govt of India prevailing as on bid submission end date for industrial worker employed in construction or maintenance in building operations including laying down underground cabling work,electric lines,water supply lines and sewage pipe lines. | 670 | Per man Shift of 8 hrs | |
4 | 4 | Employees provident Fund as per prevailing Notification by the Govt of India. | 670 | Per man Shift of 8 hrs | |
5 | 5 | Employees State Insurance contribution as per prevailing Notification by the Govt of India. (ESI only be accepted) | 670 | Per man Shift of 8 hrs | |
6 | 6 | Contribution of bonus as as per prevailing Notification by the Govt of India. | 670 | Per man Shift of 8 hrs | |
7 | 7 | Good and Service Tax (GST) as per prevailing Notification by the Govt of India. | 670 | Per man Shift of 8 hrs | |
8 | 8 | Labour welfare cess as per prevailing Notification by the Govt of India. | 670 | Per man Shift of 8 hrs | |
9 | 9 | Over head & Profit of the contractor | 670 | Per man Shift of 8 hrs | |
10 | 10 | Maintenance & Operation of complete sewage treatment plant cap - 1.25 MLD installation near BSO yard ( GE Satwari) for 16 hrs( 0600 hrs to 1400 Hrs & 1400 hrs to 2200 Hrs) in two shifts per day (Each shift of 08 hours) one Skilled FGM per shift contineous all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift and at the time of change of shift). The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimum 2 years experience or having 7 years experience in related field in operation STP Plant the detail of the equipment installed to be operated by operators in two shifts are as under :-. (i) Sewage type Submersible Pump set of cap 12.5 HP. - 03 No (ii) Heavy Duty Air Blower with 20 HP motor. - 02 No (iii) Chlorination mixing chamber - 01 No | |||
11 | 11 | Rates required to be quoted by the bidders in absolute figures for execution of work as described in serial No 10.00 here-in-before for the following components: | |||
12 | 12 | Min Wages of trademan as per prevailing Notification by the Govt of India prevailing as on bid submission end date for industrial worker employed in construction or maintenance in building operations including laying down underground cabling work,electric lines,water supply lines and sewage pipe lines. | 670 | Per man Shift of 8 hrs | |
13 | 13 | Employees provident Fund as per prevailing Notification by the Govt of India. | 670 | Per man Shift of 8 hrs | |
14 | 14 | Employees State Insurance contribution as per prevailing Notification by the Govt of India. (ESI only be accepted) | 670 | Per man Shift of 8 hrs | |
15 | 15 | Contribution of bonus as as per prevailing Notification by the Govt of India. | 670 | Per man Shift of 8 hrs | |
16 | 16 | Good and Service Tax (GST) as per prevailing Notification by the Govt of India. | 670 | Per man Shift of 8 hrs | |
17 | 17 | Labour welfare cess as per prevailing Notification by the Govt of India. | 670 | Per man Shift of 8 hrs | |
18 | 18 | Over head & Profit of the contractor | 670 | Per man Shift of 8 hrs | |
19 | 19 | Maintenance & Operation of complete sewage treatment plant cap - 0.425 MLD installation at Raipur Satwari for 16 hrs( 0600 hrs to 1400 Hrs & 1400 hrs to 2200 Hrs) in two shifts per day (Each shift of 08 hours) one Skilled FGM per shift contineous all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift and at the time of change of shift). The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimum 2 years experience or having 7 years experience in related field in operation STP Plant the detail of the equipment installed as under to be operated by operators in two shifts.are as under :- (i) Sewage type Submersible Pump set of cap 30 HP. - 02 No (ii) Sewage type Submersible Pump set of cap 7.5 HP. - 02 No (iii) Centrifugal non-clog pumping set cap 25 HP - 01 No (iv) Heavy Duty Air Blower cap 10 HP - 02 No (v) DG Set 62.5 KVA - 01 No (vi) Chlorination mixing chamber - 01 No | |||
20 | 20 | Rates required to be quoted by the bidders in absolute figures for execution of work as described in serial No 19.00 here-in-before for the following components: | |||
21 | 21 | Min Wages of trademan as per prevailing Notification by the Govt of India prevailing as on bid submission end date for industrial worker employed in construction or maintenance in building operations including laying down underground cabling work,electric lines,water supply lines and sewage pipe lines. | 670 | Per man Shift of 8 hrs | |
22 | 22 | Employees provident Fund as per prevailing Notification by the Govt of India. | 670 | Per man Shift of 8 hrs | |
23 | 23 | Employees State Insurance contribution as per prevailing Notification by the Govt of India. (ESI only be accepted) | 670 | Per man Shift of 8 hrs | |
24 | 24 | Contribution of bonus as as per prevailing Notification by the Govt of India. | 670 | Per man Shift of 8 hrs | |
25 | 25 | Good and Service Tax (GST) as per prevailing Notification by the Govt of India. | 670 | Per man Shift of 8 hrs | |
26 | 26 | Labour welfare cess as per prevailing Notification by the Govt of India. | 670 | Per man Shift of 8 hrs | |
27 | 27 | Over head & Profit of the contractor | 670 | Per man Shift of 8 hrs | |
28 | 28 | Maintenance & Operation of complete sewage buster pump at satwari offrs Qtr set -1 ,buster pump at satwari offrs Qtr set -2 ,buster pump at Balicharana post of Cap 12.5 HP in each installation at Satwari for 08 hrs( 0900 hrs to 1700 Hrs Hrs) in Gen shifts per day one Skilled FGM per shift all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimum2 years experience or having 7 years experience in related field in operation sewage buster pump the detail of the equipment installed to be operated by operators in Gen shifts.are as under :- (i) Non-clog sewage buster pumping set cap 12.5 HP - 01 No (ii) Non-clog sewage buster pumping set cap 12.5 HP - 01 No (iii) Non-clog sewage buster pumping set cap 12.5 HP - 01 No | |||
29 | 29 | Rates required to be quoted by the bidders in absolute figures for execution of work as described in serial No 28.00 here-in-before for the following components: | |||
30 | 30 | Min Wages of trademan as per prevailing Notification by the Govt of India prevailing as on bid submission end date for industrial worker employed in construction or maintenance in building operations including laying down underground cabling work,electric lines,water supply lines and sewage pipe lines. | 335 | Per man Shift of 8 hrs | |
31 | 31 | Employees provident Fund as per prevailing Notification by the Govt of India. | 335 | Per man Shift of 8 hrs | |
32 | 32 | Employees State Insurance contribution as per prevailing Notification by the Govt of India. (ESI only be accepted) | 335 | Per man Shift of 8 hrs | |
33 | 33 | Contribution of bonus as as per prevailing Notification by the Govt of India. | 335 | Per man Shift of 8 hrs | |
34 | 34 | Good and Service Tax (GST) as per prevailing Notification by the Govt of India. | 335 | Per man Shift of 8 hrs | |
35 | 35 | Labour welfare cess as per prevailing Notification by the Govt of India. | 335 | Per man Shift of 8 hrs | |
36 | 36 | Over head & Profit of the contractor | 335 | Per man Shift of 8 hrs | |
37 | 37 | Maintenance & Operation of complete sewage buster pump at Army School set -1 ,buster pump at Army School set -2 ,buster pump at 5 Gaurd of Cap 12.5 HP in each installation at Rai pur Satwari for 08 hrs( 0900 hrs to 1700 Hrs Hrs) in Gen shifts per day one Skilled FGM per shift all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimum 2 years experience or having 7 years experience in related field in operation sewage buster pump the detail of the equipment installed to be operated by operators in Gen shifts.are as under :- (i) Non-clog sewage buster pumping set cap 12.5 HP - 01 No (ii) Non-clog sewage buster pumping set cap 12.5 HP - 01 No (iii) Non-clog sewage buster pumping set cap 12.5 HP - 01 No | |||
38 | 38 | Rates required to be quoted by the bidders in absolute figures for execution of work as described in serial No 37.00 here-in-before for the following components: | |||
39 | 39 | Min Wages of trademan as per prevailing Notification by the Govt of India prevailing as on bid submission end date for industrial worker employed in construction or maintenance in building operations including laying down underground cabling work,electric lines,water supply lines and sewage pipe lines. | 335 | Per man Shift of 8 hrs | |
40 | 40 | Employees provident Fund as per prevailing Notification by the Govt of India. | 335 | Per man Shift of 8 hrs | |
41 | 41 | Employees State Insurance contribution as per prevailing Notification by the Govt of India. (ESI only be accepted) | 335 | Per man Shift of 8 hrs | |
42 | 42 | Contribution of bonus as as per prevailing Notification by the Govt of India. | 335 | Per man Shift of 8 hrs | |
43 | 43 | Good and Service Tax (GST) as per prevailing Notification by the Govt of India. | 335 | Per man Shift of 8 hrs | |
44 | 44 | Labour welfare cess as per prevailing Notification by the Govt of India. | 335 | Per man Shift of 8 hrs | |
45 | 45 | Over head & Profit of the contractor | 335 | Per man Shift of 8 hrs | |
46 | 46 | Outsourcing of services for water supply installations at pump house No-13 (Peeru Vihar )round the clock in three shifts per day ( 0600 hrs to 1400 Hrs & 1400 hrs to 2200 Hrs, 2200 Hrs to 0600 Hrs) in three shifts per day (Each shift of 08 hours) one Skilled FGM per shift contineous all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift and at the time of change of shift). The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimum 2 years experience or having 7 years experience in related field in operation water supply installations .The detail of the equipment installed to be operated by operators in three shifts are as under :- (i) Submersible Pump Set of Cap 30 HP-01 No. (ii) Chlorination plant -01 No | |||
47 | 47 | Rates required to be quoted by the bidders in absolute figures for execution of work as described in serial No 46.00 here-in-before for the following components: | |||
48 | 48 | Min Wages of trademan as per prevailing Notification by the Govt of India prevailing as on bid submission end date for industrial worker employed in construction or maintenance in building operations including laying down underground cabling work,electric lines,water supply lines and sewage pipe lines. | 335 | Per man Shift of 8 hrs | |
49 | 49 | Employees provident Fund as per prevailing Notification by the Govt of India. | 335 | Per man Shift of 8 hrs | |
50 | 50 | Employees State Insurance contribution as per prevailing Notification by the Govt of India. (ESI only be accepted) | 335 | Per man Shift of 8 hrs | |
51 | 51 | Contribution of bonus as as per prevailing Notification by the Govt of India. | 335 | Per man Shift of 8 hrs | |
52 | 52 | Good and Service Tax (GST) as per prevailing Notification by the Govt of India. | 335 | Per man Shift of 8 hrs | |
53 | 53 | Labour welfare cess as per prevailing Notification by the Govt of India. | 335 | Per man Shift of 8 hrs | |
54 | 54 | Over head & Profit of the contractor | 335 | Per man Shift of 8 hrs | |
55 | 55 | Outsourcing of services for water supply installations at pump house No-17 (Map Qtr) round the clock in three shifts per day ( 0600 hrs to 1400 Hrs & 1400 hrs to 2200 Hrs, 2200 Hrs to 0600 Hrs) in three shifts per day (Each shift of 08 hours) one Skilled FGM per shift contineous all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift and at the time of change of shift). The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimum 2 years experience or having 7 years experience in related field in operation water supply installations .The detail of the equipment installed to be operated by operators in three shifts are as under :- \n(i) Submersible Pump Set of Cap 30 HP-01 No. (ii) Chlorination plant -01 No (iii) DG Set of Cap 30 KVA-01 No | |||
56 | 56 | Rates required to be quoted by the bidders in absolute figures for execution of work as described in serial No 55.00 here-in-before for the following components: | |||
57 | 57 | Min Wages of trademan as per prevailing Notification by the Govt of India prevailing as on bid submission end date for industrial worker employed in construction or maintenance in building operations including laying down underground cabling work,electric lines,water supply lines and sewage pipe lines. | 335 | Per man Shift of 8 hrs | |
58 | 58 | Employees provident Fund as per prevailing Notification by the Govt of India. | 335 | Per man Shift of 8 hrs | |
59 | 59 | Employees State Insurance contribution as per prevailing Notification by the Govt of India. (ESI only be accepted) | 335 | Per man Shift of 8 hrs | |
60 | 60 | Contribution of bonus as as per prevailing Notification by the Govt of India. | 335 | Per man Shift of 8 hrs | |
61 | 61 | Good and Service Tax (GST) as per prevailing Notification by the Govt of India. | 335 | Per man Shift of 8 hrs | |
62 | 62 | Labour welfare cess as per prevailing Notification by the Govt of India. | 335 | Per man Shift of 8 hrs | |
63 | 63 | Over head & Profit of the contractor | 335 | Per man Shift of 8 hrs | |
64 | 64 | Note.for Srl No 1 to 63 :- (I) FGM deployed by the contractor will also be capable to carry out minor repairs of pumping sets/sluice valves , be responsible to entire operation of valves and adjustment of valve ,Control panel,starter ensure proper functioning of Pumping set, sluice valve etc.( safety precaution of the employee will be the responsibility of the contractor) (ii) Safety precautions to be followed while handling the chlorinarion plant Dozing 0.5 PPM to 2 PPM as per requirement of site condition contractor shall maintain the daily log sheet of chlorine consumption as per given format by Engr-in-Charge\n(iii)24 Hrs will be considered is one day, FGM shall attend the telephone (telephone will be provided by the contractor ) while on duty and will attend the complaint and keep the record of complaints\n(iv) The contractor is responsible for safe custody of plant\n(v) The cost of maintenance of documents installation charts and daily records i.e log sheet as clarified under relevant particular specifications shall deemed to be included in the rates quoted for the above item (vi) in case of operator found absent from duty due to any reason a penal recovery of double the rate quoted by the contractor per shift per person shall be made from contractor dues. Decision of accepting officer in this regard shall be final and binding.\n(x) Contractor shall provide all safety precautions /tools as per IE rules and dress to the operators and maint of attendance register /loogsheet . |