}

Manning And Operation Through Outsourcing Of Sewage Treatment Plant Installations , Water Supply Installations At Pump House No 09 , 13 Under Ge Satwari, GE SATWARI-Jammu And Kashmir

Military Engineer Services-MES has published Manning And Operation Through Outsourcing Of Sewage Treatment Plant Installations , Water Supply Installations At Pump House No 09 , 13 Under Ge Satwari. Submission Date for this Tender is 17-11-2020. Sewage Treatment Plant Tenders in GE SATWARI Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

25845141
Manning And Operation Through Outsourcing Of Sewage Treatment Plant Installations , Water Supply Installations At Pump House No 09 , 13 Under Ge Satwari
Open Tender
Indian
Jammu And Kashmir
GE SATWARI
17-11-2020

Tender Details

Manning And Operation Through Outsourcing Of Sewage Treatment Plant Installations , Water Supply Installations At Pump House No 09 , 13 Under Ge Satwari

Key Value

Document Fees
INR 500 /-
EMD
INR 82000.0 /-
Tender Value
Refer document

BOQ Items

NAME OF WORK: MANNING AND OPERATION THROUGH OUTSOURCING OF SEWAGE TREATMENT PLANT INSTALLATIONS, WATER SUPPLY INSTALLATIONS AT PUMP HOUSE NO 09,13 UNDER GE SATWARI
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Maintenance & Operation of complete sewage treatment plant cap -1.00 MLD installation at MAP-I ( Peeru Vihar) for 16 hrs( 0600 hrs to 1400 Hrs & 1400 hrs to 2200 Hrs) in two shifts per day (Each shift of 08 hours) one Skilled FGM per shift contineous all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift and at the time of change of shift). The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimum 2 years experience or having 7 years experience in related field in operation STP Plant.The detail of the equipment installed to be operated by operators in two shifts are as under :- (i) Sewage type Submersible Pump set of cap 10 HP. - 03 No (ii) Heavy Duty Air Blower with 20 HP motor. - 02 No (iii) DG Set 40 KVA - 01 No (iv) Chlorination mixing chamber - 01 No
2 2 Rates required to be quoted by the bidders in absolute figures for execution of work as described in serial No 1.00 here-in-before for the following components:
3 3 Min Wages of trademan as per prevailing Notification by the Govt of India prevailing as on bid submission end date for industrial worker employed in construction or maintenance in building operations including laying down underground cabling work,electric lines,water supply lines and sewage pipe lines. 670 Per man Shift of 8 hrs
4 4 Employees provident Fund as per prevailing Notification by the Govt of India. 670 Per man Shift of 8 hrs
5 5 Employees State Insurance contribution as per prevailing Notification by the Govt of India. (ESI only be accepted) 670 Per man Shift of 8 hrs
6 6 Contribution of bonus as as per prevailing Notification by the Govt of India. 670 Per man Shift of 8 hrs
7 7 Good and Service Tax (GST) as per prevailing Notification by the Govt of India. 670 Per man Shift of 8 hrs
8 8 Labour welfare cess as per prevailing Notification by the Govt of India. 670 Per man Shift of 8 hrs
9 9 Over head & Profit of the contractor 670 Per man Shift of 8 hrs
10 10 Maintenance & Operation of complete sewage treatment plant cap - 1.25 MLD installation near BSO yard ( GE Satwari) for 16 hrs( 0600 hrs to 1400 Hrs & 1400 hrs to 2200 Hrs) in two shifts per day (Each shift of 08 hours) one Skilled FGM per shift contineous all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift and at the time of change of shift). The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimum 2 years experience or having 7 years experience in related field in operation STP Plant the detail of the equipment installed to be operated by operators in two shifts are as under :-. (i) Sewage type Submersible Pump set of cap 12.5 HP. - 03 No (ii) Heavy Duty Air Blower with 20 HP motor. - 02 No (iii) Chlorination mixing chamber - 01 No
11 11 Rates required to be quoted by the bidders in absolute figures for execution of work as described in serial No 10.00 here-in-before for the following components:
12 12 Min Wages of trademan as per prevailing Notification by the Govt of India prevailing as on bid submission end date for industrial worker employed in construction or maintenance in building operations including laying down underground cabling work,electric lines,water supply lines and sewage pipe lines. 670 Per man Shift of 8 hrs
13 13 Employees provident Fund as per prevailing Notification by the Govt of India. 670 Per man Shift of 8 hrs
14 14 Employees State Insurance contribution as per prevailing Notification by the Govt of India. (ESI only be accepted) 670 Per man Shift of 8 hrs
15 15 Contribution of bonus as as per prevailing Notification by the Govt of India. 670 Per man Shift of 8 hrs
16 16 Good and Service Tax (GST) as per prevailing Notification by the Govt of India. 670 Per man Shift of 8 hrs
17 17 Labour welfare cess as per prevailing Notification by the Govt of India. 670 Per man Shift of 8 hrs
18 18 Over head & Profit of the contractor 670 Per man Shift of 8 hrs
19 19 Maintenance & Operation of complete sewage treatment plant cap - 0.425 MLD installation at Raipur Satwari for 16 hrs( 0600 hrs to 1400 Hrs & 1400 hrs to 2200 Hrs) in two shifts per day (Each shift of 08 hours) one Skilled FGM per shift contineous all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift and at the time of change of shift). The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimum 2 years experience or having 7 years experience in related field in operation STP Plant the detail of the equipment installed as under to be operated by operators in two shifts.are as under :- (i) Sewage type Submersible Pump set of cap 30 HP. - 02 No (ii) Sewage type Submersible Pump set of cap 7.5 HP. - 02 No (iii) Centrifugal non-clog pumping set cap 25 HP - 01 No (iv) Heavy Duty Air Blower cap 10 HP - 02 No (v) DG Set 62.5 KVA - 01 No (vi) Chlorination mixing chamber - 01 No
20 20 Rates required to be quoted by the bidders in absolute figures for execution of work as described in serial No 19.00 here-in-before for the following components:
21 21 Min Wages of trademan as per prevailing Notification by the Govt of India prevailing as on bid submission end date for industrial worker employed in construction or maintenance in building operations including laying down underground cabling work,electric lines,water supply lines and sewage pipe lines. 670 Per man Shift of 8 hrs
22 22 Employees provident Fund as per prevailing Notification by the Govt of India. 670 Per man Shift of 8 hrs
23 23 Employees State Insurance contribution as per prevailing Notification by the Govt of India. (ESI only be accepted) 670 Per man Shift of 8 hrs
24 24 Contribution of bonus as as per prevailing Notification by the Govt of India. 670 Per man Shift of 8 hrs
25 25 Good and Service Tax (GST) as per prevailing Notification by the Govt of India. 670 Per man Shift of 8 hrs
26 26 Labour welfare cess as per prevailing Notification by the Govt of India. 670 Per man Shift of 8 hrs
27 27 Over head & Profit of the contractor 670 Per man Shift of 8 hrs
28 28 Maintenance & Operation of complete sewage buster pump at satwari offrs Qtr set -1 ,buster pump at satwari offrs Qtr set -2 ,buster pump at Balicharana post of Cap 12.5 HP in each installation at Satwari for 08 hrs( 0900 hrs to 1700 Hrs Hrs) in Gen shifts per day one Skilled FGM per shift all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimum2 years experience or having 7 years experience in related field in operation sewage buster pump the detail of the equipment installed to be operated by operators in Gen shifts.are as under :- (i) Non-clog sewage buster pumping set cap 12.5 HP - 01 No (ii) Non-clog sewage buster pumping set cap 12.5 HP - 01 No (iii) Non-clog sewage buster pumping set cap 12.5 HP - 01 No
29 29 Rates required to be quoted by the bidders in absolute figures for execution of work as described in serial No 28.00 here-in-before for the following components:
30 30 Min Wages of trademan as per prevailing Notification by the Govt of India prevailing as on bid submission end date for industrial worker employed in construction or maintenance in building operations including laying down underground cabling work,electric lines,water supply lines and sewage pipe lines. 335 Per man Shift of 8 hrs
31 31 Employees provident Fund as per prevailing Notification by the Govt of India. 335 Per man Shift of 8 hrs
32 32 Employees State Insurance contribution as per prevailing Notification by the Govt of India. (ESI only be accepted) 335 Per man Shift of 8 hrs
33 33 Contribution of bonus as as per prevailing Notification by the Govt of India. 335 Per man Shift of 8 hrs
34 34 Good and Service Tax (GST) as per prevailing Notification by the Govt of India. 335 Per man Shift of 8 hrs
35 35 Labour welfare cess as per prevailing Notification by the Govt of India. 335 Per man Shift of 8 hrs
36 36 Over head & Profit of the contractor 335 Per man Shift of 8 hrs
37 37 Maintenance & Operation of complete sewage buster pump at Army School set -1 ,buster pump at Army School set -2 ,buster pump at 5 Gaurd of Cap 12.5 HP in each installation at Rai pur Satwari for 08 hrs( 0900 hrs to 1700 Hrs Hrs) in Gen shifts per day one Skilled FGM per shift all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimum 2 years experience or having 7 years experience in related field in operation sewage buster pump the detail of the equipment installed to be operated by operators in Gen shifts.are as under :- (i) Non-clog sewage buster pumping set cap 12.5 HP - 01 No (ii) Non-clog sewage buster pumping set cap 12.5 HP - 01 No (iii) Non-clog sewage buster pumping set cap 12.5 HP - 01 No
38 38 Rates required to be quoted by the bidders in absolute figures for execution of work as described in serial No 37.00 here-in-before for the following components:
39 39 Min Wages of trademan as per prevailing Notification by the Govt of India prevailing as on bid submission end date for industrial worker employed in construction or maintenance in building operations including laying down underground cabling work,electric lines,water supply lines and sewage pipe lines. 335 Per man Shift of 8 hrs
40 40 Employees provident Fund as per prevailing Notification by the Govt of India. 335 Per man Shift of 8 hrs
41 41 Employees State Insurance contribution as per prevailing Notification by the Govt of India. (ESI only be accepted) 335 Per man Shift of 8 hrs
42 42 Contribution of bonus as as per prevailing Notification by the Govt of India. 335 Per man Shift of 8 hrs
43 43 Good and Service Tax (GST) as per prevailing Notification by the Govt of India. 335 Per man Shift of 8 hrs
44 44 Labour welfare cess as per prevailing Notification by the Govt of India. 335 Per man Shift of 8 hrs
45 45 Over head & Profit of the contractor 335 Per man Shift of 8 hrs
46 46 Outsourcing of services for water supply installations at pump house No-13 (Peeru Vihar )round the clock in three shifts per day ( 0600 hrs to 1400 Hrs & 1400 hrs to 2200 Hrs, 2200 Hrs to 0600 Hrs) in three shifts per day (Each shift of 08 hours) one Skilled FGM per shift contineous all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift and at the time of change of shift). The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimum 2 years experience or having 7 years experience in related field in operation water supply installations .The detail of the equipment installed to be operated by operators in three shifts are as under :- (i) Submersible Pump Set of Cap 30 HP-01 No. (ii) Chlorination plant -01 No
47 47 Rates required to be quoted by the bidders in absolute figures for execution of work as described in serial No 46.00 here-in-before for the following components:
48 48 Min Wages of trademan as per prevailing Notification by the Govt of India prevailing as on bid submission end date for industrial worker employed in construction or maintenance in building operations including laying down underground cabling work,electric lines,water supply lines and sewage pipe lines. 335 Per man Shift of 8 hrs
49 49 Employees provident Fund as per prevailing Notification by the Govt of India. 335 Per man Shift of 8 hrs
50 50 Employees State Insurance contribution as per prevailing Notification by the Govt of India. (ESI only be accepted) 335 Per man Shift of 8 hrs
51 51 Contribution of bonus as as per prevailing Notification by the Govt of India. 335 Per man Shift of 8 hrs
52 52 Good and Service Tax (GST) as per prevailing Notification by the Govt of India. 335 Per man Shift of 8 hrs
53 53 Labour welfare cess as per prevailing Notification by the Govt of India. 335 Per man Shift of 8 hrs
54 54 Over head & Profit of the contractor 335 Per man Shift of 8 hrs
55 55 Outsourcing of services for water supply installations at pump house No-17 (Map Qtr) round the clock in three shifts per day ( 0600 hrs to 1400 Hrs & 1400 hrs to 2200 Hrs, 2200 Hrs to 0600 Hrs) in three shifts per day (Each shift of 08 hours) one Skilled FGM per shift contineous all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift and at the time of change of shift). The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimum 2 years experience or having 7 years experience in related field in operation water supply installations .The detail of the equipment installed to be operated by operators in three shifts are as under :- \n(i) Submersible Pump Set of Cap 30 HP-01 No. (ii) Chlorination plant -01 No (iii) DG Set of Cap 30 KVA-01 No
56 56 Rates required to be quoted by the bidders in absolute figures for execution of work as described in serial No 55.00 here-in-before for the following components:
57 57 Min Wages of trademan as per prevailing Notification by the Govt of India prevailing as on bid submission end date for industrial worker employed in construction or maintenance in building operations including laying down underground cabling work,electric lines,water supply lines and sewage pipe lines. 335 Per man Shift of 8 hrs
58 58 Employees provident Fund as per prevailing Notification by the Govt of India. 335 Per man Shift of 8 hrs
59 59 Employees State Insurance contribution as per prevailing Notification by the Govt of India. (ESI only be accepted) 335 Per man Shift of 8 hrs
60 60 Contribution of bonus as as per prevailing Notification by the Govt of India. 335 Per man Shift of 8 hrs
61 61 Good and Service Tax (GST) as per prevailing Notification by the Govt of India. 335 Per man Shift of 8 hrs
62 62 Labour welfare cess as per prevailing Notification by the Govt of India. 335 Per man Shift of 8 hrs
63 63 Over head & Profit of the contractor 335 Per man Shift of 8 hrs
64 64 Note.for Srl No 1 to 63 :- (I) FGM deployed by the contractor will also be capable to carry out minor repairs of pumping sets/sluice valves , be responsible to entire operation of valves and adjustment of valve ,Control panel,starter ensure proper functioning of Pumping set, sluice valve etc.( safety precaution of the employee will be the responsibility of the contractor) (ii) Safety precautions to be followed while handling the chlorinarion plant Dozing 0.5 PPM to 2 PPM as per requirement of site condition contractor shall maintain the daily log sheet of chlorine consumption as per given format by Engr-in-Charge\n(iii)24 Hrs will be considered is one day, FGM shall attend the telephone (telephone will be provided by the contractor ) while on duty and will attend the complaint and keep the record of complaints\n(iv) The contractor is responsible for safe custody of plant\n(v) The cost of maintenance of documents installation charts and daily records i.e log sheet as clarified under relevant particular specifications shall deemed to be included in the rates quoted for the above item (vi) in case of operator found absent from duty due to any reason a penal recovery of double the rate quoted by the contractor per shift per person shall be made from contractor dues. Decision of accepting officer in this regard shall be final and binding.\n(x) Contractor shall provide all safety precautions /tools as per IE rules and dress to the operators and maint of attendance register /loogsheet .
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail