Jammu And Kashmir Small Scale Industries Development Corporation Limited has published Design , Construction , Installation , Testing And Commissioning Of 500 Kld Common Effluent Treatment Plant Along With 5 Year Operation And Maintenance At Iid Center Udhampur Site Ii , District Udhampur Jammu And Kashmir. Submission Date for this Tender is 17-11-2020. Effluent Treatment Plant Tenders in Udhampur Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Name of Work: Design,construction,installation testing and comissioning of 500 KLD CETP plant along with 5 years operation & maintenance at IID Center Udhampur(Site II) ,district Udhampur,Jammu & Kashmir | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | EFFLUENT TREATMENT PLANT 500 KLD | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | All ETP system completes in all respect and including all Civil & construction works. | |||
3 | 1.02 | Design, supplying, installing, testing & commissioning of EFFLUENT Treatment Plant | |||
4 | 1.03 | Nature of Waste - Industrial Effluent | |||
5 | 1.04 | Daily average flow - 500 cum/day | |||
6 | 1.05 | Effluent treatment plant shall include the following items: | |||
7 | 1.06 | Bar Screen Chamber | |||
8 | 1.07 | Oil & Grease chamber | |||
9 | 1.08 | Effluent equalization tank | |||
10 | 1.09 | Flocculation Tank | |||
11 | 1.1 | Primary settling tank | |||
12 | 1.11 | FAB Tanks | |||
13 | 1.12 | Tube Settler | |||
14 | 1.13 | Clear water Tank | |||
15 | 1.14 | Sludge Holding Tank | |||
16 | 1.15 | Filtration through DMF & ACF | |||
17 | 1.16 | Air Blowers, Pumps & equipment | |||
18 | 1.17 | Piping, valves etc | |||
19 | 1.18 | Electrical Panel & Cabling | |||
20 | 1.19 | Sludge Dryer /Centrifuge | |||
21 | 1.2 | Instrumentation like Metering devices, Sensors etc | |||
22 | 1.21 | Mixed oxidant generation system for disinfection. | |||
23 | 2 | Supply, installation, testing & commissioning of 1 Nos. Stainless Steel mechanical Bar Screen havin size 6 mm opening with suitable lifting arrangement. | 1 | Set | |
24 | 2.01 | Make-Shyasheelrit Engineering/Micro water/I2m corporation/Aerochem Enviro/Jash/Treveni | |||
25 | 3 | Supply, installation, testing & commissioning of level indicators and controllers for automatic operation of the complete system with high/low level alarm complete with auxillary NO/NC contacts. (Required in equalization tank, chlorine contact tank, sludge holding tank).Make-Pune techtrol/Minilec | 5 | Set | |
26 | 4 | Supply, installation, testing & commissioning of non clogging type centrifugal type pumps capable of solids handling upto 15 mm having CI casing & CI impeller complete with mechanical seal & all accessories, motor of required capacity. Delivery header with isolation valve, Pumps shall have following duty. | |||
27 | 4.01 | Equalization Transfer Pumps | |||
28 | 4.02 | ONE set - (1 Working + 1 Standby) | |||
29 | 4.03 | Flow rate (each) = 25.0 m3/hr | |||
30 | 4.04 | Head = 10.00 Mtr | |||
31 | 4.05 | Motor HP = As per manufacturer recommendation | |||
32 | 4.06 | Make-Kirloskar/CRI/KSB/Willo | 1 | Set | |
33 | 5 | Supply, installation, testing & commissioning of non clogging type Sludge transfer pumps CI material complete with mechanical seal & all accessories, motor of required capacity.Suction header with Isolation Butterly valves, Delivery header with isolation Butterly valve,NRV's. Pumps shall have following duty. | |||
34 | 5.01 | Sludge Transfer pumps | |||
35 | 5.02 | ONE set - (1 Working + 1 Standby) | |||
36 | 5.03 | Flow Rate (each) = 15.0 m3 / hr | |||
37 | 5.04 | Head = 10 - 12 Mtr | |||
38 | 5.05 | Motor HP = As per manufacturer recommendation | |||
39 | 5.06 | Make-Kirloskar/CRI/KSB/Willo | 2 | Set | |
40 | 6 | AIR DIFFUSION SYSTEM | |||
41 | 6.01 | Air diffusion system shall include the following: | |||
42 | 6.02 | Capable of delivering 500.0 cum/hr of free air at 0.5 kg/cm2 driven through “V” belt or directly coupled through flexible coupling to a TEFCmotor of suitable HP Suitable for 415 ± 10% volts, 3 phase, 50 cycles A/C supply. | |||
43 | 6.03 | Twin type rotary air blowers. | |||
44 | 6.04 | ONE sets - ( 1 Working + 1 Standby) | |||
45 | 6.05 | Mke:- Everest/Airvac/IR/Akash/Beta | 1 | Set | |
46 | 7 | Air piping shall comprise of pipes droppers / laterals with MS C Class (epoxy coated) Header complete with all fitting such as tees, crosses, plugs, sockets, Elbows, reducer,supporters & clamps, Puddle flange etc cutting chases and making good. | 1 | Lot | |
47 | 8 | Non-clog type air dispersion system in the form of Air grid , Bottom faced holes at designed angles for FAB reactors / retreviable type diffusers & Top face for Equilisation Tank,Flocculation chamber,Sludge Holdng Tank, | 1 | Lot | |
48 | 9 | Providing and fixing all interconnecting piping with all required isolation control valves for making the system complete functional as per site. | |||
49 | 9.01 | All piping submerged in EFFLUENT waste / pumping EFFLUENT waste shall be 10 -kg/cm2 HDPE or schedule 80 CPVC pipes. | 1 | Lot | |
50 | 9.02 | Supply, installation, testing and commissioning of MBBR media to be installed in FAB Tank along with suitable sludge removal arrangement either by pumps or air lifting pumps. Make:-MM aqua/cooldeck/Micro water/Shyasheelrit engineering | 1 | Lot | |
51 | 9.03 | Supply, installation, testing and commissioning of suitable PVC tube deck settling media to be installed in Primary &SecondaryTube Setller tank alongwith suitable sludge removal arrangement either by pumps or air lifting pumps. Make:-MM aqua/cooldeck/Micro water/Shyasheelrit engineering | 1 | Lot | |
52 | 10 | Dosing Systems | |||
53 | 10.01 | Providing and fixing wall mounted Oxylite (Mixed Oxidant) Generation System, based on ECA Technology, producing non toxic mixed Oxidant Solution of 30LPH@ 500 ppm of Oxidant Concentration . The solution should be at a pH -7 (Neutral ) suitable for 24x7 operations .The system should have a single cell & wall mounted , supplied complete with appropriate dosing pumps , valves, piping, fittings, chemical dosing tank etc. Make:- Shyasheelrit Engineering/Progressive Engineering/I2m corporation/Aerochem enviro | 1 | Set | |
54 | 10.02 | Supply, installation, testing & commissioning of Polyelectrolyte dosing system comprising of 100 ltrs HDPE tank with 0- 6 lph electronic metering type pump in flocculation chamber Make-Edose/Asia LMI | 2 | Set | |
55 | 10.03 | Supply, installation, testing & commissioning of Alum dosing system comprising of 100 ltrs HDPE tank with 0-6 lph electronic metering type pump in flocculation chamber Make-Edose/Asia Lmi | 2 | Set | |
56 | 10.04 | Supply, installation, testing & commissioning of Lime dosing system comprising of 200 ltrs HDPE tank with 0-6 lph electronic metering type pump in flocculation chamber.. Make-Edose/Asia Lmi | 2 | Set | |
57 | 11 | Supply, installation, testing & commissioning factory assembled and tested vertical pumpset with CI body and CI impeller, shaft of Stainless Steel,CI suction and discharge and C.I. Base & head, mechanical seal, connected to a TEFC induction motor suitable for 400/440 volts, 3 phase 50 cycles A.C. supply with,isolation valve, non return valve of required sizes at discharge and suction of each pump, vibration eliminating pads as required, M.S channel fabricated common base plate bolted to cement concrete foundations complete. | |||
58 | 11.01 | Filter feed pumps: | |||
59 | 11.02 | Capacity : 25.0 Cum/hr. | |||
60 | 11.03 | Head : 30 Mtr | |||
61 | 11.04 | ONE set – ( 1 W + 1 S) | |||
62 | 11.05 | Motor HP = As per manufacturer recommendation | |||
63 | 11.06 | Make-Kirloskar/CRI/KSB/Willo | 1 | Set | |
64 | 11.07 | Treated Water Transfer pumps. | |||
65 | 11.08 | Capacity : 25.0 m3/hr | |||
66 | 11.09 | Head: 30 mtrs. | |||
67 | 11.1 | ONE set - ( 1 Working + 1 Standby) | |||
68 | 11.11 | Motor HP = As per manufacturer recommendation | |||
69 | 11.12 | Make-Kirloskar/CRI/KSB/Willo | 1 | Set | |
70 | 12 | Supply, installation, testing and commissioning of MSEP vessel filter with frontal piping and associated valves and accessories. Filter shall be suitable for minimum working pressure of 3.5 kg / cm2 and shall include media, standard fittings like pressure gauges, sampling cock, rinse drain, vacuum breaker etc | |||
71 | 12.01 | Multigrade filter | |||
72 | 12.02 | Flow rate : 25.0 Cum/hr | |||
73 | 12.03 | Make:-Shyasheelrit engineering //Micro water/Ion exchange/Thermax | 1 | Set | |
74 | 12.04 | Activated Carbon Filter- Iodine value Graded Activated Carbon. | |||
75 | 12.05 | Flow Rate : 25.0 Cum/hr | |||
76 | 12.06 | Make:-Shyasheelrit engineering //Micro water/Ion exchange/Thermax | 1 | Set | |
77 | 13 | Supply, installation, testing and commissioning Hydroulic sludge handling system capable for 500 KLD ETP, including filter press of Suitable Capacity with CI frame, PP plates complete with filter cloth complete with Filter press feed pump (Screw Type-1W+ 1 S) – with interconnecting piping .Make-I2m corporation/Shyasheelrit engineering /Micro water/Aerochem enviro | 1 | Set | |
78 | 14 | Supply , Installation, Testing & Commissioning of Following metering devices:- | |||
79 | 14.01 | Outlet Treated water effluent Electromagnetic Flow meter cum Totaliser including all piping, isolation valves,cabling etc.Make:-Aster/Kranti | 1 | Set | |
80 | 14.02 | Online pH meter at ETP outlet.Make:-Aster/Kranti | 1 | Set | |
81 | 14.03 | Panel mounted Energy meter | 1 | Set | |
82 | 15 | Supply ,installation testing and commissioning of online monitoring system for controlling the out flow and inflow water quality.Make:- Logic ladder / Xylem / Hack | 1 | Set | |
83 | 16 | ELECTRICAL INSTALLATION FOR 500 KLD CETP | |||
84 | 16.01 | Design, fabrication, assembling, wiring, supply, installation, testing and commissioning of motor control centre fabricated out of 14 gauge CRCA sheet steel. Cable gland plates shall be provided on top as well as at the bottom of the panels. Panels shall be treated with all anticorrosive process before painting as per specifications with 2 coats of red oxide primer and final approved shade of powder coated paint. 2 Nos. earthing terminals shall be provided for 3 phase, 4 wire, 50 Hz supply system. Lifting hooks shall also be provided in case of large panels. Approval shall be taken for each panel before fabrication. Quoted rates shall be inclusive of cables (in accordance to specification) with earthing from panel to each motor / equipment.Make:-Micro water/Shyasheel rit engineering/Vidhyut/Advance/Aldec | 1 | Set | |
85 | 17 | CIVIL UNITS FOR 500 KLD ETP | |||
86 | 17.01 | Screen Chamber (RCC 2 cum) | 2 | Nos | |
87 | 17.02 | Oil & Grease Trap (RCC 2 cum) | 1 | Nos | |
88 | 17.03 | Equalization Tank (RCC 170 cum) | 1 | Nos | |
89 | 17.04 | Coagulation & Flocculation Tank (MSFRP 15 cum) | 2 | Nos | |
90 | 17.05 | Primary settling Tank (MSFRP 50 cum) | 1 | Nos | |
91 | 17.06 | FAB Tank (MSFRP 65 cum) | 2 | Nos | |
92 | 17.07 | Secondary settling tank (MSFRP 60 cum) | 1 | Nos | |
93 | 17.08 | Clear water tank (MSFRP 30 cum) | 1 | Nos | |
94 | 17.09 | Treated water tank (RCC 170 cum) | 1 | Nos | |
95 | 17.1 | Sludge Holding Tank (MSFRP 55 cum) | 1 | Nos | |
96 | 17.11 | Other foundation (RCC) | 1 | Job | |
97 | 17.12 | Lab Room with Lab Instrument | 1 | Job | |
98 | 18 | Operation & Maintenance of plant for 5 Years with all consumables and wear & tears | |||
99 | 18.01 | Ist year Maintenance | 1 | Job | |
100 | 18.02 | 2nd yesr Maintenance | 1 | Job | |
101 | 18.03 | 3rd yesr Maintenance | 1 | Job | |
102 | 18.04 | 4th yesr Maintenance | 1 | Job | |
103 | 18.05 | 5th Year mintenance | 1 | Job | |
104 | Total in Figures |