}

Miscellaneous Civil Work At Plant ( 2020 ) , MALABAR CEMENTS LTD, WALAYAR-Kerala

Malabar Cements Limited has published Miscellaneous Civil Work At Plant ( 2020 ) . Submission Date for this Tender is 16-11-2020. Excavation Work Tenders in MALABAR CEMENTS LTD, WALAYAR Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

25837350
Miscellaneous Civil Work At Plant ( 2020 )
Open Tender
Indian
Kerala
MALABAR CEMENTS LTD, WALAYAR
16-11-2020

Tender Details

Miscellaneous Civil Work At Plant ( 2020 ) , Note - Cement & Steel Reinforcement Will Be Supplied Free Of Cost By Mcl , Clearing Grass & Bushes Including Removal Of Rubbish Up To A Distance Of 150 M Etc . Complete As Directed By The Engineer-In-Charge . , Earth Work Excavation In All Classes Of Soil Except Hard Rock , Requiring Blasting Including Back Filling Disposal Of Surplus Earth WithinA Lead Up To 50M Levelling Etc . Complete . , Disposal Of Excavated Materials By Mechanical TransportUp To A Distance Of 5 Km Including Loading , Unloading And LevelingAt Dump Yard Etc . Complete . , Random Rubble Masonry In Cm 1:6 ( 1 Cement , 6 Sand ) In Foundation And Basement Including Pointing The Exposed Surfaces Of The Masonry Simultaneously During Construction , Curing Etc . Complete With All Incidental Charges , Dry Rubble Masonry For Foundation Including Packing , Wedging Etc Complete And Filling The Gap With Good Quality River Sand Properly Consolidating With Water , With All Incidental Charges As Per Standard Specification , Brick Work In Cm 1:6 ( 1 Cement , 6 Sand ) With Good QualityTable Moulded Well Burnt Country Bricks In Basement And Super StructureAt All Heights Etc . Complete With All Incidental Charges , Half Brick Work In Cm 1:4 ( 1 Cement , 4 Sand ) With Good Quality Table Moulded Country Burnt Bricks In Superstructure At All Elevations Etc . Complete . , Rcc 1:2:4 ( 1 Cement , 2 Sand 4 Hard Granite Broken Stone 20 Mm And Down ) Including Rendering The Surface With Cm 1:3 ( 1 Cement , 3 Sand ) To Set Right Honey Combs Surface Unevenness , Making And Forming Pockets , Sleeves , Embedding Inserts , Bolts , Anchor Plates Etc . Excluding Shuttering And Reinforcement For Columns , Beams , Slabs Etc . In Foundation , Rcc 1:1 . 5:3 ( 1 Cement , 1 . 5 Sand 3 Hard Granite Broken Stone 20 Mm And Down ) Including Rendering The Surface With Cm 1:3 ( 1 Cement , 3 Sand ) To Set Right Honey Combs Surface Unevenness , Making And Forming Pockets , Sleeves , Embedding Inserts , Bolts , Anchor Plates Etc . Excluding Shuttering And Reinforcement For Columns , Beams , Slabs , Lintels , Sun Shades , Racks , Shelves Etc . At All Heights . , Providing Formwork Of Any Size And Shape For Cement Concrete Works Including Strutting , Propping , Bracing And Removal Of The Form After The Concrete Sets Properly Etc . Complete At All Elevations . , Providing Steel Reinforcement For Rcc Works Including Cutting , Bending , Cranking , Laying In Position And Binding With Gi Binding Wire In Lines And Levels Etc . Complete With AllIncidental Charges . , Plastering In C M 1:4: 15 Mm Thick , One Coat Floated HardAnd Trowelled Smooth At All Elevations . , Ceiling Plastering In Cm 1:3 , 6 Mm Thick Etc . At All Elevations Complete , Plastering In C M 1:4: 20 Mm Thick , One Coat Floated Hard And Trowelled Smooth , Including Flushing Coat Etc . Complete , Providing And Laying Pcc 1:4:8 ( 1 Cement , 4 Sand , 8 Granite Broken Stone , 40 Mm And Down ) Including Finishing , Consolidation , Curing Etc . Complete , Providing And Laying Pcc 1:3:6 ( 1 Cement , 3 Sand , 6 Hard Granite Broken Stone 20 Mm And Down ) Including Finishing , Consolidation Etc . Complete , White Washing 2 Coats At All ElevationsIncluding Preparation Of The Surface Etc . Complete . , Colour Washing 2 Coats At All Elevation Including Preparation Of The Surface Etc . Complete . , Painting Walls At All Elevations With Exterior Weather Coat Paint Of Approved Shade , Brand And Manufacturer . Provide Two Coats Of Paint To Give An Even Finish Including Preparing The Surface Etc . At All Heights Complete As Per Standard Specification . , Providing And Fixing Glass Panels ( 3 Mm Thick , Plain Glass ) With Glazing Clip , Special Metal Sash Putty Of Approved Make Or Metal Beading With Screw Including Cost And Conveyance Of All Materials Etc . Complete At All Elevations , Painting Walls , Ceilings Etc . At All ElevationsWith Oil-Bound Distemper ( Obd ) Of Approved Shade , Brand And Manufacturer . Provide Two Coats Of PaintTo Give An Even Finish Including Preparing The SurfaceEtc . At All Heights Complete As Per StandardSpecification . , Painting With Enamel Paint Of Approved Brand And Manufacture In All Shades To Give An Even Finish Etc . Complete As Per Directions At All Heights For Old Wood Work 2 Coats . , Painting With Enamel Paint Of Approved BrandAnd Manufacture In All Shades To Give An Even Finish Etc . Complete As Per Directions At All Heights For Steel Works2 Coats Over A Coat Of Approved Metal Primer . , Supply And Stacking Good Quality M- Sand As Per The Direction Of Engineer-In-Charge . , Supply And Stacking Good Quality Table Moulded CountryBurned Bricks Of Standard Size As Per The Direction Of Engineer-In-Charge . , Supply And Stacking 20 Mm Down Hard Granite Stone As Per The Direction Of Engineer-In-Charge . , Supply And Stacking 40 Mm Down Hard Granite Stone As Per The Direction Of Engineer-In-Charge . , Supply And Stacking 6 Mm Down Hard Granite Stone As Per The Direction Of Engineer-In-Charge . , Supply And Stacking 75 Mm Down Hard Granite Stone As Per The Direction Of Engineer-In-Charge . , Cleaning And Clearing The Deposits Of Clinker , Coal , Limestone Dusts From Top Of Roofs , Sunshades , Sides Of Plant Surfaces Etc . , At All Elevations Including Removing And Depositing Spoil At Places Pointed Out By The Engineer-In-Charge , Dismantling Of Rcc Including Removing And Stacking AvailableReinforcement Bars And Clearing Away The Debris Within A Distance Of150 M Etc . Complete . , Dismantling Walls Of Any Thickness With Bricks Or Rubble In Cm Including Stacking Of Materials Useful For Re-Use And Disposal Of Debris Within A Distance Of 150 M Etc . Complete , Cutting And Removing Set Clinker Including Chiseling Etc . And Disposal Of The Same Within Initial Lead And Lift Complete As Per Directions , Providing And Operating Tractor On Hire Basis Including All Consumables , Including Fuel Charges And Maintenance Cost And Incidental Charges Etc . Complete As Directed By Engineer-In-Charge ( Per Hour Basis ) , Sectioning 150 Mm Average Thickness And Forming The Surface As Per Directions Of The Engineer-In-Charg , Dry Rubble Packing In Roads , Floor To Lines And Levels As Directed By The Engineer-In-Charge With Hard Granite Rubble Of Required Size Including Wedging And Tightening Etc . Complete As Per Standard Specifications , Supply Of Skilled Mason[Man Days] To Assist The Department . , Supply Of Skilled Carpenter [Man Days]To Assist The Department . , Supply Of Skilled Painter To Assist The Department . , Supply Of Man Mazdoors To Assist The Department . , Supply Of Skilled Plumber To Assist The Department .

Key Value

Document Fees
INR 2950 /-
EMD
INR 44000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail