Public Works Department-PWD has published Repair Of Damaged Pullia In Km 2 On Baizanthpur Deshai Dumri Marg. Submission Date for this Tender is 31-10-2020. Culvert Tenders in Deoria Uttar Pradesh. Bidders can get complete Tender details and download the document.
Name of Work: Repair of Damaged pullia in KM 2 on Baizanthpur Deshai Dumri Marg | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Excavation in foundation in ordinary soil (Loam clay or sand) including lift upto 1.5 mtr and lead upto 30 meter and including filling watering and ramming of exvataed earth into the space between the building and the sides of foundations tenches or in to | 26 | Cum | |
2 | 2 | Brick masonry work in 1:3 in super-structure complete excluding pointing and plastering, as per drawing and Technical Specifications. | 17.53 | Cum | |
3 | 3 | Providing and laying wire mesh Murga Jali 1/2x24 gauge complete in all respect | 50.05 | Sqm | |
4 | 4 | M20 grade of C.C. bed blocks, deck slabs, approach slabs in proportation of 1:1.5:3 (1 part of cement 1.5 part of approved coarse sand and 3 part of 20mm nominal size stone grites) As per analysis of rate as per MORD specification no 1500, 1600, 1700 and Sl No. 14.10 as per A/R | 0.06 | Cum | |
5 | 5 | Struck pointing with cement mortar consisting of one part of cement and two parts of fine sand of 1.25 finencess modulous on brick work including raking the joints washing and cleaing and supply of all matreials labour and tools and plants required for the proper completion of the work.as per S.I. No. 574 | 14.06 | Sqm | |
6 | 6 | Supply of empty plastic cement bag filling by carted earth & its sewing plastic string properly & its stacking in collapsed site etc. complete for proper complition of work as per direction of E/I. | 6965 | Cum | |
7 | 7 | Construction of embankment with approved material obtained from borrow pits with all lifts and lead upto 1 km transporting to site, spreading ,grading to required slope and compacting to meet requirement of 95% proctor density excluding royalty of earth as per MORTH specification 3.18 as direction of E/I | 288 | Cum |