Overhauling Of Boiler Pressure Parts , High Pressure Valves , Burners , Wind Box And Providing Cuplock Scaffolding Inside The Furnace Installed In Unit-Ii , Rgtpp During Forthcoming Overhauling Of 600 Mw Unit-Ii , Rgtpp , Hpgcl , Khedar , Hisar, RGTPP, HISAR-Haryana

Haryana Power Generation Corporation Limited-HPGCL has published Overhauling Of Boiler Pressure Parts , High Pressure Valves , Burners , Wind Box And Providing Cuplock Scaffolding Inside The Furnace Installed In Unit-Ii , Rgtpp During Forthcoming Overhauling Of 600 Mw Unit-Ii , Rgtpp , Hpgcl , Khedar , Hisar. Submission Date for this Tender is 01-12-2020. Boiler Supply Tenders in RGTPP, HISAR Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

25833007
Corrigendum : Overhauling Of Boiler Pressure Parts , High Pressure Valves , Burners , Wind Box And Providing Cuplock Scaffolding Inside The Furnace Installed In Unit-Ii , Rgtpp During Forthcoming Overhauling Of 600 Mw Unit-Ii , Rgtpp , Hpgcl , Khedar , Hisar
Open Tender
Indian
Haryana
RGTPP, HISAR
01-12-2020

Tender Details

Overhauling Of Boiler Pressure Parts , High Pressure Valves , Burners , Wind Box And Providing Cuplock Scaffolding Inside The Furnace Installed In Unit-Ii , Rgtpp During Forthcoming Overhauling Of 600 Mw Unit-Ii , Rgtpp , Hpgcl , Khedar , Hisar

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 19-Nov-2020 Corrigendum-II Date Extension Date 01-12-2020

Key Value

Document Fees
INR 1180 /-
EMD
INR 191835.0 /-
Tender Value
INR 95.91 Lakhs /-

BOQ Items

Name of Work : Overhauling of boiler pressure parts, high pressure valves, burners, wind box and providing cuplock scaffolding inside the furnace installed in Unit-II, RGTPP during forthcoming overhauling of 600 MW Unit-II, RGTPP, HPGCL, Khedar, Hisar.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Part-A (as per main scope of work) : BI01010001010000000000000515BI0100001112
2 1.01 Lumsum Rate for Overhauling of boiler pressure parts, high pressure valves, burners, wind box and providing cuplock scaffolding inside the furnace installed in Unit-II, RGTPP during forthcoming overhauling of 600 MW Unit-II, RGTPP, HPGCL, Khedar, Hisar. BI01010001010000000000000515BI0100001113 1 Job
3 2 Part-B (variable Scope of work) : (Unit rate wise items) : BI01010001010000000000000515BI0100001124
4 2.01 HP joint including cutting, edge preparation etc. upto 80 mm 350 Nos.
5 2.02 Lowering of any eco coil (upper & lower) repositioning after carrying out work/replacement wherever required. HP joints excluded. 4 Nos.
6 2.03 Lifting of any LTSH coil (upper & lower) repositioning after carrying out work/ replacement wherever required. HP joints excluded 3 Nos.
7 2.04 Replacement of damaged skin casing /welding 15 per sq. metre
8 2.05 FIN welding 50 per metre
9 2.06 Repair/replacement of high pressure piping hangers.(MS, HRH & CRH) 20 each
10 2.07 Repair/replacement of auxiliaries piping hangers. 20 each
11 2.08 Fabrication of high pressure bends with dia up to 70 mm & thickness up to 5 mm 20 each
12 2.09 Making space in 01 no. LTSH coils in order to facilitate/To Carry out in build-ups/joints in these coils by pulling the adjacent LTSH coils with pulling & lifting machine after cutting the hanger tubes if required 15 each.
13 2.1 Servicing of wall soot blower including lance replacement if required. 1 each
14 2.11 Servicing of long retractable soot blower 1 each
15 2.12 Complete servicing & commissioning of long retractable soot blower which includes replacement of burnt out lance ; other spares and its alignment. 1 each
16 2.13 Casting of refractory 5 per MT
17 2.14 Providing shields on tubes 50 Nos.
18 2.15 Providing of cassettes baffles for Economizer. 10 each
19 2.16 Providing of cassettes baffles for LTSH. 10 each
20 2.17 Cutting of hand hole plate & its re-welding 2 No.
21 2.18 repair of header by weld overlay/metal build up 2 sqr. metre
22 2.19 Replacement of skin casing 5 sqr. Metre
23 2.2 Replacement of complete loop of divisional SH panels as per scope mentioned in main scope of work 2 No.
24 2.21 Replacement of complete loop of platen SH panels as per scope mentioned in main scope of work 1 No.
25 2.22 Restoration of sagged tubes in radian roof 10 No.
26 2.23 Servicing of Drum Safety valves 1 No.
27 2.24 Servicing of Super Heater Safety valve 1 No.
28 2.25 Servicing of H.R.H. Safety valve 1 No.
29 2.26 Servicing of C.R.H. Safety valve 1 No.
30 2.27 Servicing of ERV Safety valve 1 No.
31 2.28 Servicing of Pneumatic Control Valve 1 No.
32 2.29 Servicing of LP Valves, Size upto 15 mm. 20 No.
33 2.3 Servicing of LP Valves, Size : 25 mm to 40 mm 15 No.
34 2.31 Servicing of LP Valves, Size : 50 mm to 100 mm 5 No.
35 2.32 Servicing of LP Valves, Size : 150 mm to 200 mm 5 No.
36 2.33 Servicing of High Pressure valves, Size upto 25 mm 2 No.
37 2.34 Servicing of High Pressure valves, size : 25 mm to 50 mm 2 No.
38 2.35 Servicing of High Pressure valves, size : 50 mm to 100 mm. 2 No.
39 2.36 Servicing of High Pressure valves, size : 100 mm to 150 mm 1 No.
40 2.37 Servicing of High Pressure valves, size : 150 mm to 350 mm 1 No.
41 2.38 Servicing of 600 NB motor operated 1 No. main feed line valve & its actuator 1 No.
42 2.39 Servicing of peep holes/manholes 10 No.
43 2.4 Replacement of valves/bends/ 1mtr. Length pipeline by cutting, welding, grinding and fit-up work for each job (for valves & bends)/per mtrs. (for pipeline) by certified IBR welder upto 25 mm 5 Each job per mtr.
44 2.41 Replacement of valves/bends/1mtr. Length pipeline by cutting, welding, grinding and fit-up work for each job (for valves & bends)/per mtrs. (for pipeline) by certified IBR welder, 25 mm to 80 mm 5 Each job per mtr.
45 2.42 Replacement of valves/bends/1mtr. Length pipeline by cutting, welding, grinding and fit-up work for each job (for valves & bends)/per mtrs. (for pipeline) by certified IBR welder, 80 mm to 200 mm 5 Each job per mtr.
46 2.43 Repair/servicing of oil Burner valve and replacement if required. 1 No.
47 2.44 Removal of oil tip & its refitting including alignment. 1 No.
48 2.45 Removal of air tip & its refitting including alignment. 1 No.
49 2.46 Replacement of wind box expansion joints 1 No.
50 2.47 Retention /early removal of cup lock Scaffolding (kindly refer Note 5 of point No. 7 in main scope of work) 10 days
51 2.48 Man hour rates (including T&P, gas, consumables) Skilled labour/welder 75 Hrs.
52 2.49 Man hour rates (including T&P, gas, consumables) semi-skilled 75 Hrs.
53 2.5 Man hour rates (including T&P, gas, consumables) Un skilled 100 Hrs.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail