Rural Development Department has published A ) Construction Of Shouchalaya Unit For Z P School At Chikhalthan No 2 B ) Construction Of Shouchalaya Unit For Z P School At Chikhalthan No 1 A ) Construction Of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-Karmala Dist-Solapur B ) Constr. Submission Date for this Tender is 31-10-2020. Toilet Bathroom Tenders in Chikhalthan Maharashtra. Bidders can get complete Tender details and download the document.
Name of Work: A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary backfilling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 14.47 | Cum | |
2 | 2 | Excavation for foundation in hard murum including removing the excavated material up to a distance of 50 m. beyond the building area & stacking and spreading as directed dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete ( Lift Upto 1.5 m) By Mechanical Means A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 4.03 | Cum | |
3 | 3 | Providing and laying Cast in situ/ Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/ pumping, compacting, roughening them if special finish is tobe provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand/ Crushed sand VSI Grade finely washed etc) A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 2.6307 | cum | |
4 | 4 | Providing uncoursed rubble masonry of trap / granite / quartzite / gneiss stones in cement mortar 1:6 in foundation and plinth of inner walls / in plinth of external walls including bailing out water manually , striking joints on un exposed faces and watering etc.complete.A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 12.98 | Cum | |
5 | 5 | Providing and laying Cast in situ/ Ready Mix cement concrete in M-15 of trap/ granite/ quartzite/ gneiss metal for Bed Blocks,Foundation Blocks And Such other items including bailing out water,steel Centering Formwork,laying pumping , compacting, curing, finishing and roughening them if special finish is to be provided finfishing uneven and honeycombed surface and curing complete. The Cement mortor 1:3 plaster is considered for rendering uneven and honeycombed surface only newly laid concrette shall be covered by gunny bag plastic tarpaulin etc (wooden centering will not be allowed) with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand/ Crushed sand VSI Grade finely washed etc) A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 0.9 | cum | |
6 | 6 | Providing and laying Cast in situ/Ready Mix cement concrete M-20 of trap/ granite / quartzite/ gneiss metal for R.C.C. slabs and landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Typemixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed etc) A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 1.67 | cum | |
7 | 7 | Providing second class Burnt Brick masonry with conventional/ I.S.type bricks in cement mortar 1:6 in Foundations and plinth of inner walls/in plinth external walss including bailing out water superstructure including striking joints,on unexposed faces raking out joints,on exposed faces and watering and scaffolding etc. Complete A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 3.18 | Cum | |
8 | 8 | Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting,bending, hooking the bars, binding with wires or tack welding and supporting as required complete. A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 0.1 | mt | |
9 | 9 | Filling in plinth and floors with approved excavated material in 15cm. To 20cm. Layers including watering and compacting etc. complete. A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 4.03 | Cum | |
10 | 10 | Providing second class Burnt Brick masonry with conventional/ I.S.type bricks in cement mortar 1:6 in superstructure including striking joints, raking out joints, watering and scaffolding etc. Complete A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 6.01 | sqm | |
11 | 11 | Providing second class Burnt Brick masonry with conventional/ I.S.type bricks in cement mortar 1:4 in Half bricks thicks wall including mild steel longitudinal reinforcement of 2 bars of 6mm diameter/2 hoop iron strips 25mm x 1.6mm at every third cource properly bent and bonded at ends scaffoldingstriking joints, raking out joints, watering etc. Complete A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 3.96 | sqm | |
12 | 12 | Providing internal cement plaster 12mm thick in single coat in cement mortar 1:4 without neeru finish to concrete or brick surfaces, in all position including scaffolding and curing etc. complete. A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 23.09 | sqm | |
13 | 13 | Providing internal cement plaster 20mm thick in two coats in cement mortar 1:5 without neeru finish, to concrete, brick surface, in all positions including scaffolding and curing etc. complete A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 24.65 | sqm | |
14 | 14 | Providing neeru finish to plastered surfaces in all positions including scaffolding and curing complete A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 25.79 | sqm | |
15 | 15 | Providing flush grooved pointing with cement mortar 1:3 for stone masonry work including scaffolding and curing etc. complete. A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 7.16 | sqm | |
16 | 16 | Providing and applying washable oil-bound distemper of approved colour and shade to old and new surfaces in two coats including scaffolding, preparing the surfaces. (excluding the primer coat.) etc. complete.A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 20.03 | sqm | |
17 | 17 | Providing and applying two coats of water proof cement paint of approved manufacture and of approved colour to the plastered surfaces including scaffolding if necessary, cleaning and preparing the surface, watering for two days etc. complete. A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 31.805 | sqm | |
18 | 18 | Providing and laying Antiskid ceramic tiles of approved quality of company RAK/kajaria/Nitco/Asian or Equivalant Make having size 30 cm x 30 cm confirming to I.S.15622/2006 (group D II-A) and Required thick for flooring in required position laid on a bed of 1:4 cement mortar including cement float, filling joint with white/colour cement slurry cleaning curing etc. complete A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 4.86 | sqm | |
19 | 19 | Providing and laying ceramic tiles of of approved quality of company RAK/kajaria/Nitco/Asian or Equivalant Make having size 30 cm. x 30 cm. and confirming to corresponding I.S. for dado and skirting in required position with readymade adhesive mortar of approved quality on plaster of 1:2 cement mortar including joint filling with white/ colour cement slurry cleaning curing etc. complete. A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 11.61 | sqm | |
20 | 20 | Providing and fixing double leaf steel door without ventilator including shuttar of M.S.frame of angle 50x50x6 and shutter frame of M.S.angle of 30x30x6 mm and shutter sheet of 10 guage of approved quality with holdd fast necessary fixture and fastening with oil painting tree coats including primer coat complete as per deteiled drawings and as directed complete A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 6.48 | sqm | |
21 | 21 | Providing and fixing steel ventilator glazed partly fixed as per detailed drawing awithout hot dip zinc coating including fabricating glazing with plain/obscured glass panes 5mm thick and approved type and quality iron oxidised fixtures and fastening oil paint 2 coats etc complete A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 0.41 | sqm | |
22 | 22 | Providing sills of polished kadappa stone 25mm to 30mm thick on a bed of 1:4 cement mortar including cement float filling joints with slurry curring polishing and cleaning etc complete A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 2.7 | sqm | |
23 | 23 | Providing and fixing Orissa type white glazed earthenware 575mm water closet pan including S trap with earthenware foot rests, cast iron soil and vent pipe up to out side face of the wall 1:2:4 brick bat lime concrete bedding without flushing tank and its accessories etc. complete.A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 2 | nos | |
24 | 24 | Providing soak pit of size 120cm x 120cm x 120cm including excavating and filling with brick-bats. A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 2 | nos | |
25 | 25 | Providing and fixing 100 mm dia stabiliser pipe/PVC soil vent/waste pipe and with necessary fixtures and fitting such as bends tees single junctions slotted vent clamps etc complete A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 6 | Rmt | |
26 | 26 | Providing and laying rough shahabad stone flooring 25mm to 30mm thick and of required width in plain /diamond pattern on a bed of 1:6 CM including cement folat striking joints pointing in cement mortar 1:3 curing and cleaning etc complete A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 3.24 | sqm | |
27 | 27 | Providing and fixing Screw Down 15 mm dia. wheeled stop tap of brass including necessary socket union nut complete A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 2 | nos | |
28 | 28 | Providing and fixing on walls/ ceiling/ floor 15 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 6 | nos | |
29 | 29 | Providing and fixing H.D.P container Syntex or alike one piece moulded water tank made out of low density polythyler and built corrugation including of delivery up to destination hoisting and fixing of accessories such as inlet, outlet overflow of all tanks capacity above 200 to 1000 litres A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 500 | Ltr | |
30 | 30 | Providing and fixing on walls/ ceiling/ floor 20 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 8 | Rmt | |
31 | 31 | Painting letters upto 20 cm height complete brushes, coir brushers, dusting, cleaning, including cost of paint etc complete A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 30 | nos | |
32 | 32 | Quality Control Charges A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 1 | Test | |
33 | 33 | Add Royalty charges of sandA) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 10.73 | Cum | |
34 | 34 | Add Royalty charges of Hard Murum A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 0.39 | Cum | |
35 | 35 | Add 12% GST On Materials A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 1 | Job | |
36 | 36 | Add 1% Insurance charges A) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 2 Tal-karmala Dist-Solapur | 1 | Job | |
37 | 37 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary backfilling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 17.15 | Cum | |
38 | 38 | Excavation for foundation in hard murum including removing the excavated material up to a distance of 50 m. beyond the building area & stacking and spreading as directed dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete ( Lift Upto 1.5 m) By Mechanical Means B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 4.68 | Cum | |
39 | 39 | Providing and laying Cast in situ/ Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/ pumping, compacting, roughening them if special finish is tobe provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand/ Crushed sand VSI Grade finely washed etc) B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 3.3867 | cum | |
40 | 40 | Providing uncoursed rubble masonry of trap / granite / quartzite / gneiss stones in cement mortar 1:6 in foundation and plinth of inner walls / in plinth of external walls including bailing out water manually , striking joints on un exposed faces and watering etc.complete.B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 17.74 | Cum | |
41 | 41 | Providing and laying Cast in situ/ Ready Mix cement concrete in M-15 of trap/ granite/ quartzite/ gneiss metal for Bed Blocks,Foundation Blocks And Such other items including bailing out water,steel Centering Formwork,laying pumping , compacting, curing, finishing and roughening them if special finish is to be provided finfishing uneven and honeycombed surface and curing complete. The Cement mortor 1:3 plaster is considered for rendering uneven and honeycombed surface only newly laid concrette shall be covered by gunny bag plastic tarpaulin etc (wooden centering will not be allowed) with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand/ Crushed sand VSI Grade finely washed etc) B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 1.22 | cum | |
42 | 42 | Providing and laying Cast in situ/Ready Mix cement concrete M-20 of trap/ granite / quartzite/ gneiss metal for R.C.C. slabs and landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Typemixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed etc) B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 1.67 | cum | |
43 | 43 | Providing second class Burnt Brick masonry with conventional/ I.S.type bricks in cement mortar 1:6 in Foundations and plinth of inner walls/in plinth external walss including bailing out water superstructure including striking joints,on unexposed faces raking out joints,on exposed faces and watering and scaffolding etc. Complete B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 3.18 | Cum | |
44 | 44 | Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting,bending, hooking the bars, binding with wires or tack welding and supporting as required complete.B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 0.1 | mt | |
45 | 45 | Filling in plinth and floors with approved excavated material in 15cm. To 20cm. Layers including watering and compacting etc. complete. B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 4.68 | Cum | |
46 | 46 | Filling in plinth and floors with Contractors soil sand or murum in 15cm. To 20cm. Layers including watering and compacting etc. complete. B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 1.4 | Cum | |
47 | 47 | Providing second class Burnt Brick masonry with conventional/ I.S.type bricks in cement mortar 1:6 in superstructure including striking joints, raking out joints, watering and scaffolding etc. Complete B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 8.81 | sqm | |
48 | 48 | Providing second class Burnt Brick masonry with conventional/ I.S.type bricks in cement mortar 1:4 in Half bricks thicks wall including mild steel longitudinal reinforcement of 2 bars of 6mm diameter/2 hoop iron strips 25mm x 1.6mm at every third cource properly bent and bonded at ends scaffoldingstriking joints, raking out joints, watering etc. Complete B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 3.96 | sqm | |
49 | 49 | Providing internal cement plaster 12mm thick in single coat in cement mortar 1:4 without neeru finish to concrete or brick surfaces, in all position including scaffolding and curing etc. complete. B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 33.89 | sqm | |
50 | 50 | Providing internal cement plaster 20mm thick in two coats in cement mortar 1:4 without neeru finish, to concrete, brick surface, in all positions including scaffolding and curing etc. complete B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 35.45 | sqm | |
51 | 51 | Providing neeru finish to plastered surfaces in all positions including scaffolding and curing complete B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 36.59 | sqm | |
52 | 52 | Providing flush grooved pointing with cement mortar 1:3 for stone masonry work including scaffolding and curing etc. complete. B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 10.04 | sqm | |
53 | 53 | Providing and applying washable oil-bound distemper of approved colour and shade to old and new surfaces in two coats including scaffolding, preparing the surfaces. (excluding the primer coat.) etc. complete. B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 30.83 | sqm | |
54 | 54 | Providing and applying two coats of water proof cement paint of approved manufacture and of approved colour to the plastered surfaces including scaffolding if necessary, cleaning and preparing the surface, watering for two days etc. complete. B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 45.49 | sqm | |
55 | 55 | Providing and laying Antiskid ceramic tiles of approved quality of company RAK/kajaria/Nitco/Asian or Equivalant Make having size 30 cm x 30 cm confirming to I.S.15622/2006 (group D II-A) and Required thick for flooring in required position laid on a bed of 1:4 cement mortar including cement float, filling joint with white/colour cement slurry cleaning curing etc. completeB) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 7.02 | sqm | |
56 | 56 | Providing and laying ceramic tiles of of approved quality of company RAK/kajaria/Nitco/Asian or Equivalant Make having size 30 cm. x 30 cm. and confirming to corresponding I.S. for dado and skirting in required position with readymade adhesive mortar of approved quality on plaster of 1:2 cement mortar including joint filling with white/ colour cement slurry cleaning curing etc. complete. B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 11.61 | sqm | |
57 | 57 | Providing and fixing double leaf steel door without ventilator including shuttar of M.S.frame of angle 50x50x6 and shutter frame of M.S.angle of 30x30x6 mm and shutter sheet of 10 guage of approved quality with holdd fast necessary fixture and fastening with oil painting tree coats including primer coat complete as per deteiled drawings and as directed complete B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 6.48 | sqm | |
58 | 58 | Providing and fixing steel ventilator glazed partly fixed as per detailed drawing awithout hot dip zinc coating including fabricating glazing with plain/obscured glass panes 5mm thick and approved type and quality iron oxidised fixtures and fastening oil paint 2 coats etc complete B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 0.41 | sqm | |
59 | 59 | Providing sills of polished kadappa stone 25mm to 30mm thick on a bed of 1:4 cement mortar including cement float filling joints with slurry curring polishing and cleaning etc complete B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 4.5 | sqm | |
60 | 60 | Providing and fixing Orissa type white glazed earthenware 575mm water closet pan including S trap with earthenware foot rests, cast iron soil and vent pipe up to out side face of the wall 1:2:4 brick bat lime concrete bedding without flushing tank and its accessories etc. complete. B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 2 | nos | |
61 | 61 | Providing soak pit of size 120cm x 120cm x 120cm including excavating and filling with brick-bats. B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 2 | nos | |
62 | 62 | Providing and fixing 100 mm dia stabiliser pipe/PVC soil vent/waste pipe and with necessary fixtures and fitting such as bends tees single junctions slotted vent clamps etc complete B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 6 | Rmt | |
63 | 63 | Providing and laying rough shahabad stone flooring 25mm to 30mm thick and of required width in plain /diamond pattern on a bed of 1:6 CM including cement folat striking joints pointing in cement mortar 1:3 curing and cleaning etc complete B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 6.48 | sqm | |
64 | 64 | Providing and fixing Screw Down 15 mm dia. wheeled stop tap of brass including necessary socket union nut complete B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 2 | nos | |
65 | 65 | Providing and fixing on walls/ ceiling/ floor 15 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 6 | nos | |
66 | 66 | Providing and fixing H.D.P container Syntex or alike one piece moulded water tank made out of low density polythyler and built corrugation including of delivery up to destination hoisting and fixing of accessories such as inlet, outlet overflow of all tanks capacity above 200 to 1000 litres B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 500 | Ltr | |
67 | 67 | Providing and fixing on walls/ ceiling/ floor 20 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 8 | Rmt | |
68 | 68 | Painting letters upto 20 cm height complete brushes, coir brushers, dusting, cleaning, including cost of paint etc B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur complete | 30 | nos | |
69 | 69 | Quality Control Charges B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 1 | Test | |
70 | 70 | Add Royalty charges of sandB) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 7.93 | Cum | |
71 | 71 | Add Royalty charges of Hard Murum B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 1.4 | Cum | |
72 | 72 | Add 12% GST On Materials B) Construction of Shouchalaya Unit For Z P School At Chikhalthan No 1 Tal-karmala Dist-Solapur | 1 | Job |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy