Provision Of Services For Operation Of Em Installation Sewage Plants , Swimming Pool , Hot Water Plants , Incinerator , Dg Sets And Repair Maintenance Of Water Treatment Plant And Supply Of Chemicals For Water Treatment Including Connected Items For N

Tender Notice

25825610
Provision Of Services For Operation Of Em Installation Sewage Plants , Swimming Pool , Hot Water Plants , Incinerator , Dg Sets And Repair Maintenance Of Water Treatment Plant And Supply Of Chemicals For Water Treatment Including Connected Items For N
Indian
Maharashtra
24-10-2020
07-11-2020
09-11-2020

Tender Details

Provision Of Services For Operation Of Em Installation Sewage Plants , Swimming Pool , Hot Water Plants , Incinerator , Dg Sets And Repair Maintenance Of Water Treatment Plant And Supply Of Chemicals For Water Treatment Including Connected Items For Nsb

Key Value

Document Fees
INR 500 /-
EMD
INR 97000.00 /-
Tender Value
Refer document

BOQ Items

Name of Work: PROVISION OF SERVICES FOR OPERATION OF E/M INSTALLATION (SEWAGE PLANTS, SWIMMING POOL, HOT WATER PLANTS, INCINERATOR, DG SETS AND REPAIR/MAINTENANCE OF WATER TREATMENT PLANT AND SUPPLY OF CHEMICALS FOR WATER TREATMENT INCLUDING CONNECTED ITEMS FOR NSB) AT INS SHIVAJI LONAVLA (8951/E8)
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Providing services for operation of electric driven sewage pump set and periodical maintenance with one operator FMG (Skilled) in one shift of 08 hrs (from 0500 hrs to 1300 hrs) (including Sunday's & Holiday's) complete all as specified and as directed for the following type/capacities of pump and location :- \n(a) New Sewage Pump at Pratap Nagar. \n(i) Non clog centrifugal type set 15 HP capacity. Make - Kirloskar. No of pumps - 01 No. (ii) Non clog centrifugal type set 7.5 HP capacity. Make - Kirloskar. No of pumps - 01 No. (b) Pratap Nagar Old Sewage Pump House. (i) Non clog submersible sewage pump set 20 HP. Make - Kishore. No of pump sets - 2 No's. (ii) Non clog submersible sewage pump set 25 HP. Make - Kirloskar. No of pump set - 01 No
2 2 Basic Rate for (01) operator FMG skilled in one shift per day 11 Month
3 3 Employer's contribution towards EPF as per existing rules. 11 Month
4 4 ESIC as per existing rules. 11 Month
5 5 Contribution of bonus 11 Month
6 6 Over head charges and profit 11 Month
7 7 LWC as per existing rules. 11 Month
8 8 Providing services for operation of electric driven sewage pump sets and periodical maintenance in two shift with one operator FMG (Skilled) each shift of 08 hrs (from 0500 to 1300 hrs and 1300 to 2100 hrs) (including Sunday's & Holiday's) complete all as specified and as directed for the following type / capacity of pump sets. (a) Simulator Complex (CAC) & New Sewage Pump House near Clear Water Pump House. (i) Non clog submersible sewage pump set 25 HP. Make : Kishore. No of pump set - 01 No. (ii) Non clog vertical sewage type pump set 20 HP capacity. Make : Kirloskar. No of pump set - 01 No
9 9 Basic Rate for (01) operator (FMG, Skilled) in two shift per day. 11 Month
10 10 Employer's contribution towards EPF as per existing rules. 11 Month
11 11 ESIC as per existing rules. 11 Month
12 12 Contribution of bonus 11 Month
13 13 Over head charges and profit 11 Month
14 14 LWC as per existing rules. 11 Month
15 15 Providing services for operation of electric driven sewage pump set and periodical maintenance in one shift with one operator (FMG, Skilled), each shift of 08 hour from 0500 hrs to 1300 hrs (including Sunday's & Holiday's) complete all as specified and as directed for the following type/capacity of pump sets :- (a) 'K' Block and Rajendra nagar Sewage pump. \n(i) Non clog centrifugal type pump set 3 HP. Make - Kishore. No of pump set - 1 No. (ii) Non clog centrifugal type pump set 5 HP capacity. Make - Kirloskar. No of pump set - 01 No. (iii) Submersible sewage pump set 12 HP. Make - Kishore. No of pump set - 01 No
16 16 Basic Rate for (01) operator (FMG Skilled) in one shift per day. 11 Month
17 17 Employer's contribution towards EPF as per existing rules. 11 Month
18 18 ESIC as per existing rules. 11 Month
19 19 Contribution of bonus 11 Month
20 20 Over head charges and profit 11 Month
21 21 LWC as per existing rules. 11 Month
22 22 Providing services for operation of electric driven sewage plant and its periodical maintenance with one operator(FMG Skilled) per shift of 08 hrs (for two shifts) from 0500 hrs to 1300 hrs and from 1300 hrs to 2100 hrs (including Sunday's & Holiday's) complete all as specified and as directed for the following type/ capacities of sewage plant with stand by generater :- Kali mata & P-46 Sewage pump.\n(i) Non clog centrifugal type pump set 3 HP. Make - Kishore. No of pump set - 1 No\n(ii) Non clog centrifugal type pump set 5 HP capacity. Make - Kirloskar. No of pump set - 01 No.\n(iii) Submersible sewage pump set 30 HP. Make - Kirloskar. No of pump set - 01 No\n(iv) Submersible sewage pump set 10 HP. Make - Kirloskar. No of pump set - 01 No
23 23 Basic Rate for (01) operator(FMG, Skilled) in one shift per day. 11 Month
24 24 Employer's contribution towards EPF as per existing rules. 11 Month
25 25 ESIC as per existing rules. 11 Month
26 26 Contribution of bonus 11 Month
27 27 Over head charges and profit 11 Month
28 28 LWC as per existing rules. 11 Month
29 29 Providing services for operation of electric driven sewage plant and its periodical maintenance with one operator (FMG, Skilled) per shift of 08 hrs (for General shift) from 0900 hrs to 1700 hrs (including Sunday's & Holiday's) complete all as specified and as directed for the following type/ capacities of sewage plant with stand by generater :-\nCentral Sewage Plant (behind market area). \n(i) Surface areator NGEF coupled with 15 HP induction motor - 02 No's. \n(ii) Clarifier unit coupled with 01 HP induction motor - 01 No's . \n(iii) Sludge pump vertical coupled with 05 HP induction motor - 02 No's. Make NGEF . \n(iv) Gen set diesel engine driven of capacity 62.5 KVA capacity - 01 No. Make : Kirloskar / Cummins. Note - No extra payment for operating DG set in case of power failure will be made and diesel for running the DG set will be issued under Sch 'B' as "Free for filling".
30 30 Basic Rate for (01) operator(FMG, Skilled) in one shift per day. 11 Month
31 31 Employer's contribution towards EPF as per existing rules. 11 Month
32 32 ESIC as per existing rules. 11 Month
33 33 Contribution of bonus 11 Month
34 34 Over head charges and profit 11 Month
35 35 LWC as per existing rules. 11 Month
36 36 Providing services for operation and maint old swimming pool and pump sets along with electrical panel board (starters) and chlorination plant including their periodical maintenance, repairs, adding chemicals and suction sweeping of swimming pools by employing One operator (FMG, Skilled) in one shift of 8 hours from 0900 hrs to 1700 hrs General shift (excluding major assembly/ item / jobs) (including Sunday's & Holiday's) and one operator of 08 hours from 2200 hrs to 0600 hrs Night shift (including Sunday's & Holiday's) complete all as specified and as directed consisting of the following:- pressure filter, NRVs, sluice valves etc and pump set centrifugal with 10 HP, 3 phase, electric motor complete 02 No's. \n(a) Suction sweeper trolley mounted complete with pumping set monoblock with 2 HP, 3 phase, electric motor complete - 01 No's\n(b) Chlorination plant, cylinder mounted type, Vaccum operated complete with injection assembly, booster monoblock pump set including mixing chamber control valves, 3 No's & 1 No chlorine gas cylinder 100 Kg capacity complete.\n(c) Air compressor, LT panel board suitable for 3 phase, 415 volt supply, wall mounted with 200 Amps MCCB incoming and MCBS in outgoingor 97.5 CFM pressure 0.35 Kg per cum driven by 5 HP induction electric motor, 3 phase, 415 Volts, 50 Hz including DOL starter 1 No Rotary type Make - Candy.. \n(d) Electrical control panel board with starter, switches, MCB. \n(e) Alum dosing tank of FRP material, 8 gallons capacity with manual mixing arrangement inlet & outlet connection 1 No including servicing complete for proper functioning complete all as specified and as directed.
37 37 Basic Rate for (01) operator (FMG, Skilled) in two shift per day. 1 Each
38 38 Employer's contribution towards EPF as per existing rules. 1 Each
39 39 ESIC as per existing rules. 1 Each
40 40 Contribution of bonus 1 Each
41 41 Over head charges and profit 1 Each
42 42 LWC as per existing rules. 1 Each
43 43 Providing services for operation of diesel engine generating set, 40 KVA capacity at Buriya simulator site for 8 hrs starting from 0900 hrs to 1700 hrs (excluding Sundays and Holidays) for one shift by employing one FGM operator including cleaining of the eqpt, checking of starting battery for proper charge, checking of electrical panel for proper functioning opening the diesel tank for filling in diesel, collection of diesel as and when reqd from MT Section of AGE E/M yard, transporting to site, operate the DG set as reqd by user when main supply fails, switch off DG supply after main supply resumes, properly lock and unlock plant run safely complete as directed and maintaining log sheet as per standard practice complete all as specified and as directed. Note:- DHPP shall be issued under Sch 'B' free of cost.
44 44 Basic Rate for (01) operator (FMG, Skilled) in one shift per day. 11 Month
45 45 Employer's contribution towards EPF as per existing rules. 11 Month
46 46 ESIC as per existing rules. 11 Month
47 47 Contribution of bonus 11 Month
48 48 Over head charges and profit 11 Month
49 49 LWC as per existing rules. 11 Month
50 50 Providing services for operation of diesel engine generating set, 160 KVA capacity at CAC site for 8 hrs starting from 0900 hrs to 1700 hrs for one shift by employing one operator skilled FGM also operation and maintenance of AC plant of capacity 2 x 13 TR including cleaining of the eqpt, checking of starting battery for proper charge, checking of electrical panel for proper functioning opening the diesel tank for filling in diesel, collection of diesel as and when reqd from MT Section of AGE E/M yard, transporting to site, operate the DG set as reqd by user when main supply fails, switch off DG supply after main supply resumes, properly lock and unlock plant run safely complete as directed and maintaining log sheet as per standard practice complete all as specified and as directed.
51 51 Basic Rate for (01) opeator (Skilled, FMG) in one shift per day.. 11 Month
52 52 Employer's contribution towards EPF as per existing rules. 11 Month
53 53 ESIC as per existing rules. 11 Month
54 54 Contribution of bonus 11 Month
55 55 Over head charges and profit 11 Month
56 56 LWC as per existing rules. 11 Month
57 57 Providing services for operation of electrically operated lift having capacaity of 1360 Kg / 20 passenger with three shift per day with one lift attendent each shift of 08 hrs for three shifts (from 0600 to 1400 hrs, 1400 to 2200 hrs and 2200 to 0600 hrs) (including Sunday's & Holiday's) . Location - Kasturi Hospital.\n(a) The lift operator shall adhere to the following points while carrying out his duties :-\n(i) Keep the lift car neat & clean.\n(ii) Check stoppage of lift at all the floors.\n(iii) Ensure functioning of emergency alarm system\n(iv) Guarding/security of lift & its allied items.\n(v) Lookafter & care all items of the lift.\n(vi) Keep a complaint register which shall be made available for endorsement of complaint if any by users\n(vii) Report to the Engr-in-Charge of any abnormality in working of lift.
58 58 Basic Rate for (01) lift operator (un-skilled) in one shift per day 11 Month
59 59 Employer's contribution towards EPF as per existing rules. 11 Month
60 60 ESIC as per existing rules. 11 Month
61 61 Contribution of bonus 11 Month
62 62 Over head charges and profit 11 Month
63 63 LWC as per existing rules. 11 Month
64 64 Providing services for operation including periodical maintenance of central hot water plant in single sailors living accomodation at location Ganga by appointing one Boiler operator cum technician for operating the plant four hours in the morning (04 AM to 08 AM) and four hours in the evening (04 PM to 08 PM) (including Sunday's & Holiday's) by first opening the incoming water, then firing the boiler, with the help of pump, pumping the hot water received in the calerifiero to each bath room :-\nNote :- Diesel shall be issued under Sch 'B' free for use as and when required.
65 65 Basic Rate for (01) Boiler operator cum technician (skilled) for opeating plant Four hours in morning (04 AM to 08 AM) and (four) hours in the evening (04 PM to 08 PM) per day. 11 Month
66 66 Employer's contribution towards EPF as per existing rules. 11 Month
67 67 ESIC as per existing rules. 11 Month
68 68 Contribution of bonus 11 Month
69 69 Over head charges and profit 11 Month
70 70 LWC as per existing rules. 11 Month
71 71 All as per item No 64 above but at Location - Betwa Hot Water Plant
72 72 Basic Rate for (01) Boiler operator cum technician (Skilled) for opeating plant Four hours in morning (04 AM to 08 AM) and (four) hours in the evening (04 PM to 08 PM) per day. 11 Month
73 73 Employer's contribution towards EPF as per existing rules. 11 Month
74 74 ESIC as per existing rules. 11 Month
75 75 Contribution of bonus 11 Month
76 76 Over head charges and profit 11 Month
77 77 LWC as per existing rules. 11 Month
78 78 All as per item No 64 above but at Location - Bhramputra Hot Water Plant/Incinerator
79 79 Basic Rate for (01) Boiler operator cum technician (Skilled) for opeating plant Four hours in morning (04 AM to 08 AM) and (four) hours in the evening (04 PM to 08 PM) per day. 11 Month
80 80 Employer's contribution towards EPF as per existing rules. 11 Month
81 81 ESIC as per existing rules. 11 Month
82 82 Contribution of bonus 11 Month
83 83 Over head charges and profit 11 Month
84 84 LWC as per existing rules. 11 Month
85 85 All as per item No 64 above but at Location - Godavari/Indrayani Hot Water Plant
86 86 Basic Rate for (01) Boiler operator cum technician (Skilled) for opeating plant Four hours in morning (04 AM to 08 AM) and (four) hours in the evening (04 PM to 08 PM) per day. 11 Month
87 87 Employer's contribution towards EPF as per existing rules. 11 Month
88 88 ESIC as per existing rules. 11 Month
89 89 Contribution of bonus 11 Month
90 90 Over head charges and profit 11 Month
91 91 LWC as per existing rules. 11 Month
92 92 Supply of liquid chlorine in empty cylinder of capacity 100 Kg each.\nNote:- Empty cylinders will be provided by department for filling. 3200 Kg
93 93 Supply of liquid Sodium HypoCholorite solution in Drum of Capacity 40 to 50 Kg Each 19500 Kg
94 94 Supply of alum, crystal type, suitable for portable water (1st quality). 10500 Kg
95 95 Supply of ammonia in 450 ml in bottles. 1 Bottle
96 96 Supply only chlorine testing kit complete with capacity upto 3 PPM. 1 Each
97 97 Supply only orthotoulidine solution in bottles of 450 ml for chlorine testing 1 Bottle
98 98 Supply only chemical canister gas mask having 2 sets of canisters gas masks (Chlorine/ Hypochlorite gas)\n 1 Each
99 99 Supply only empty 100 kgs capacity chlorine cylinder fitted with valves and valve guard complete all as specified and as directed 1 Each
100 100 M & L for complete removal of existing treatment on steel surfaces of 100 Kg chlorine gas cylinder and applying two coats of yellow synthetic enamel paint over one coat of red oxide primer complete all as specified and as directed. 2 Each
101 101 S&F in replacement unserviceable plug with new dead end plug of mild steel suitable for 100 Kg chlorine gas cylinder complete all as specified and as directed. 1 Each
102 102 S&F in replacement unserviceable cylinder cap with new cylinder cap of mild steel suitable for 100 Kg chlorine gas cylinder complete all as specified and as directed. 1 Each
103 103 S&F in replacement unserviceable chlorine filter with new chlorine filter suitable for chlorine plant of capacity 200 to 400 gm/hr complete all as specified and as directed. 1 Each
104 104 S&F in replacement unserviceable pressure reducing valve of brass with new pressure reducing valve suitable for chlorine plant of capacity 200 to 400 gm/hr complete all as specified and as directed. 1 Each
105 105 S&F in replacement unserviceable copper pipe with new copper pipe of 10 mm dia with coupling at both ends of length 1.5 mtr complete all as specified and as directed. 1 Each
106 106 S&F in replacement Mono meter with new Mono meter suitable for chlorine plant of capacity 200 to 400 gm/hr complete all as specified and as directed. 1 Each
107 107 S&F in replacement unserviceable valve seat of mild steel suitable for chlorine plant of cap 200 to 400 gm/hr complete all as specified and as directed. 1 Each
108 108 S&F in replacement unserviceable valve spring of mild steel suitable for chlorine plant of cap 200 to 400 gm/hr complete all as specified and as directed. 1 Each
109 109 S&F in replacement unserviceable valve cover of brass suitable for chlorine plant of cap 200 to 400 gm/hr complete all as specified and as directed. 1 Each
110 110 S&F in replacement unserviceable chlorine gas cylinder spindle of mild steel suitable for chlorine plant of cap 200 to 400 gm/hr complete all as specified and as directed.\nNote for BOQ Item No's 11 to 20 :-\nThe spares/ items are required for the chlorine plant manufactured by M/s Candy filters or existing filter available at site. 1 Each
111 111 Checking, servicing and repairing of Three No's chloronome plants at Dam Pump House, Swimming Pool & AF Stn and Two Sodium Hypochlorite plant at Dam Pump House and NSB weekly once for satisfactory functioning of all plants including replacement of minor unserviceable parts i.e. nut bolts, washers, teflon tape and cleaning of filter assembly complete all as specified and as directed. 22 Per Visit
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2020 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail