Delhi Development Authority-DDA has published Maintenance Of Completed Scheme Under Na-Ii/Nz Providing Anti Pollution Measures By Sprinkling Water And Repairing Pot Holes On 60M And 40M R/W Peripheral Roads , Providing Brick Masonary Barricading Walls , Cleaning , Sweeping Of Peripheral Roads An. Submission Date for this Tender is 28-10-2020. Agricultural Watering Equipment Tenders in Pitampura Delhi. Bidders can get complete Tender details and download the document.
Name of Work: M/o completed scheme under NA-II/NZ Sub-Head:- Providing anti pollution measures by sprinkling water and repairing pot holes on 60m & 40m R/W peripheral roads , providing brick masonary barricading walls, cleaning, sweeping of peripheral roads and disposal of malba from roads and vacant land in IFC Narela | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Cleaning & sweeping of roads, paths and road berms, central verge and open area etc. and collection of malba, garbage, sludge, building rubbish refuse of all types including dead animals and birds etc at site and disposal of the same to the nearest dustbin / dumping ground / collection point , with all T & P required complete as per direction of Engineer-in-charge. | BI01010001010000000000000515BI0100001113 | 1.84464e+06 | 1000 Sqm |
2 | 2 | Sprinling of water on roads / berms on daily basis with water tanker of capacity 5 K.L with sprinkller attachment wherever required as per direction of Engineer-in-charge. | BI01010001010000000000000515BI0100001114 | 420 | Eah |
3 | 3 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | BI01010001010000000000000515BI0100001115 | 420 | Cum |
4 | 4 | Engaging /hiring JCB(Hydraulic excavator 3D) with fuel and operating staff for collection of malba, industrial waste, garbage lying on vacant plots, road berms, central verge and other locations and dumping the same in nearby low lying area including levelling and dressing of the area , complete. as per direction of Engineer-in-charge. | BI01010001010000000000000515BI0100001116 | 30 | Per Day |
5 | 5 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | BI01010001010000000000000515BI0100001117 | 14700 | Sqm |
6 | 6 | Providing and layingcoping 50mm thick with cement concrete 1:2:4(1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) including the cost of centring and shuttering. | BI01010001010000000000000515BI0100001118 | 69 | Sqm |
7 | 7 | Cutting road and taking out soling, and metallting excluding screening and sorting (a) Bituminous portion. | BI01010001010000000000000515BI0100001119 | 13 | Cum |
8 | 8 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | BI01010001010000000000000515BI0100001120 | 43 | Cum |
9 | 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) | BI01010001010000000000000515BI0100001121 | 12 | Cum |
10 | 10 | Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler,cleaning and preparing the existing road surface as per specifications :\n(a) On bituminous surface @ 0.50 Kg/Sqm | BI01010001010000000000000515BI0100001122 | 70 | Sqm |
11 | 11 | Repair to pot holes in road surface with bituminous macadam using crushed stone agregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface to required grade, level and alignment and rolling with smooth wheeled roller as per specification to achieve the desired compaction and density, complete as per directions of Engineer-in-charge (a) In layers of 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.50 % (Percentage by weight of total mix) prepared in drum type Hot Mix Plant of 60-90 TPH capacity | BI01010001010000000000000515BI0100001123 | 8 | Cum |
12 | 12 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) | BI01010001010000000000000515BI0100001124 | 131 | Cum |
13 | 13 | 12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) | BI01010001010000000000000515BI0100001125 | 309 | Sqm |
14 | 14 | 15 mm cement plaster on rough side of single or half brick wall of mix: 1:6 (1 cement: 6 fine sand) | BI01010001010000000000000515BI0100001126 | 240 | Sqm |
15 | 15 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work | BI01010001010000000000000515BI0100001127 | 240 | Sqm |
16 | 16 | Filling available excavated earth in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | BI01010001010000000000000515BI0100001128 | 24 | Cum |
17 | 17 | Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm) | BI01010001010000000000000515BI0100001129 | 309 | Sqm |
18 | 18 | Condition:-\n1. The contractor shall engage 6 nos (Six) Safai Karamcharis every 7th Days for item No.1 for cleaning and sweeping the entire area. It the work is found to be unsatisfactory or not done on any day, a penalty of Rs. 9400.00 per day shall be imposed on the contractor and no payment shall be made for that day\n2. The contractor shall supply 07 (Seven) nos of water tankers for sprinkling water on roads & berms per ay against item No.2. If any water tanker is found less a penalty of Rs. 2400.00 per tanker shall be imposed on the contractor.\n3. The contractor shall provide Hydraulic Excavator (JCB) every 6th day or as required by the Engineer -in-charge against item NO.4. If the Hydraulic Excavator (JCB) is not provided when required a penalty of Rs. 18750.00 per day shall be imposed on the contractor andno payment shall be made for that day | BI01010001010000000000000515BI0100001130 |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy