Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published Reconstruction Of 11/Lt Kv Lines Fallen Due To Diffrent Reasons, Straightening Of Tilted Pole, Replacment Of Damaged X Arm, Pin Insulator, Disc Insulator, Clamp, Transformer Etc. & Re-Sagging Of Existing Loose Conductor, Tightening Of Stay N Fixing Of Ear. Submission Date for this Tender is 31-10-2020. Clamps Tenders in SE EDC Hathras Uttar Pradesh. Bidders can get complete Tender details and download the document.
Name of Work : The work of reconstruction of 11/LT KV lines fallen due to Diffrent reasons, Straightening of Tilted pole, Replacment of damaged X Arm, Pin Insulator, Disc Insulator, Clamp, Transformer etc. & Re-sagging of existing loose conductor, Tightening of Stay n Fixing of earthing road in M & R Scheem at 33/11 KV Substation's Under EUDD Hathras. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Carriage of following from 132 KV Hathras store center to 33/11 KV Substations through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.) | item1 | ||
2 | 1.01 | 8.5 Mtr. long PCC Poles. | item2 | 15 | No. |
3 | 1.02 | 9/11 Mtr. S.T. Poles | item3 | 35 | No. |
4 | 1.03 | 11 KV X-Arms, weasal conductor, G.I wire,Disc Insulators, Pin insulators, clamps and other required line material, if any. | item4 | 20 | Qtl. |
5 | 2 | Carriage of following from 132 KV Store center Hathras to 33/11 KV Substations through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.) | item5 | ||
6 | 2.01 | 16 KVA T/F | item6 | 2 | No. |
7 | 2.02 | 25 KVA T/F, 63 KVA T/F, 100 KVA T/F | item7 | 3 | No. |
8 | 3 | Replacement of damaged poles 8.5 Mtr. long PCC pole by digging of pits in kharanja/mettalic roadand dismantling of all 11KV/LT accessories from the existing / damaged pole and erection of single new pole including fitting all accessories. | item8 | 13 | Job |
9 | 4 | Replacement of damaged poles 9/11 Mtr. Long ST pole by digging of pits in kharanja/mettalic road and dismantling of all 11KV/33 KV accessories from the existing / damaged pole and erection of single new pole including fitting of all accessories. | item9 | 31 | Job |
10 | 5 | Replacement of damaged Double pole on 8.5 meter long PCC Pole (first opening of all accessories & then removing damaged poles), re-erecting D/P including fixing of Disc Insulators with fitting and other LT/11 KV accessories as per RESPO manual and as per direction of supervising engineer, The double pole shall be grouted in ratio 1:4:8 (Cement, sand and brick ballast/ stone ballast) including cost of cement, sand, brick ballast/ stone ballast, stone pad as per actual requirement at site | item10 | 1 | Job |
11 | 6 | Replacement of damaged Double pole on 9/11 meter long ST Pole (first opening of all accessories & then removing damaged poles), re-erecting D/P including fixing of Disc Insulators with fitting and other 11 KV/ 33KV accessories as per RESPO manual and as per direction of supervising engineer. The double pole shall be grouted in ratio 1:4:8 (Cement, sand and brick ballast/ stone ballast) including cost of cement, sand, brick ballast/ stone ballast, stone pad as per actual requirement at site | item11 | 2 | Job |
12 | 7 | Straightening of tilted single PCC Poles in the existing lines as per direction of supervising engineer. | item12 | 5 | No. |
13 | 8 | Straightening of tilted single ST Poles in the existing lines as per direction of supervising engineer. | item13 | 5 | No. |
14 | 9 | Straightening of tilted Double Poles in the existing lines as per direction of supervising engineer. | item14 | 1 | No. |
15 | 10 | Replacement of following damaged accessoriess in 11 KV /LT line - | item15 | ||
16 | 10.01 | 11 KV X-Arms, 11 KV Pin Insulators with Pin & Nut & Bolt , 'F' Clamp | item16 | 35 | Job |
17 | 10.02 | 11 KV Disc Insulator With Fiting | item17 | 35 | No. |
18 | 11 | Erection and grouting of stays as per RESPO manual and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. | item18 | 15 | No. |
19 | 12 | Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer. | item19 | 8 | No. |
20 | 13 | Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasal conductor / GI in 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer. | item20 | ||
21 | 13.01 | ACSR Weasal conductor | item21 | 1650 | Mtr. |
22 | 13.02 | ACSR Dog / Racoon Conductor | item22 | 825 | Mtr. |
23 | 13.03 | 50/95/120 sqmm. Areal Bunch Conductor | item23 | 495 | Mtr. |
24 | 14 | Removal of Damaged/Burned LT dustribution boxes & fixing of New at already/Newly errected pole for giving supply to consumer by connecting consumer cables by using appropriated alumunium lugs tape N & B provided by conractor as per requirement. | item24 | 8 | No. |
25 | 15 | Re- sagging and stringing of existing following conductor in HT /LT line as per direction of supervising engineer. | item25 | ||
26 | 15.01 | ACSR Weasal conductor | item26 | 1650 | Mtr. |
27 | 15.02 | 50/95/120 sqmm. Areal Bunch Conductor | item27 | 495 | Mtr. |
28 | 15.03 | ACSR Dog Conductor | item28 | 825 | Mtr. |
29 | 16 | Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer | item29 | 25 | No. |
30 | 17 | Installation of following T/F on newly constructed double pole in proper alignment direction & making HT/LT connection. | item30 | ||
31 | 17.01 | 16 KVA T/F | item31 | 2 | No. |
32 | 17.02 | 25 KVA T/F, 63 KVA T/F, 100 KVA T/F | item32 | 3 | No. |
33 | 18 | Re Guarding / Guarding of 11 KV line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. | item33 | 5 | Span |
34 | 19 | Digging of proper size of pit for following work of damaged steel support with the provision of temporary support :-\n Then reinforcement of steel support by welding of 04 Nos. 2 feet long M.S. angle iron of 50x50x6 mm. at equal distance around each pole & also welding of these angle iron with each other by providing M.S. flat of size 35x6 mm. in round. After this construction of round plinth of pole will be done with cement, sand and concrete in 1:3:6 ratio of size 450 mm. dia & 600 mm height (300 mm. under the ground + 300 mm. the ground). The plinth should be plastered with ½ inch thick cement and sand of ratio 1:4 & taper rounding the upper most part of the plinth.\n The rate will include all cost of material, labour and T&P etc. for completion of the above work which will be provided by the contractor at his own cost. | item34 | 15 | Nos |
35 | 20 | Construction of round plinth around the S.T. Poles / RS Joists / Rails will be done with cement, sand and concrete in 1:3:6 ratio of size 450 mm. dia & 600 mm height (300 mm. under the ground + 300 mm. the ground). The plinth should be plastered with ½ inch thick cement and sand of ratio 1:4 & taper rounding the upper most part of the plinth. The rate will include all cost of material, labour and T&P etc. for completion of the above work which will be provided by the contractor at his own cost. | item35 | 15 | Nos |
36 | 21 | Opening of service cable of consummers and re-fixing the same after re-saging of conductor. | item36 | 165 | No. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail