Name of Work: Errection, Maintenance & Distmentalling of Pontoon Bridge at Laktaha Ghat. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Earth work in cutting or in embankment for cambering of approach link Road including filling pits and Kagar Cutting due to errosion of Ganga river in proper longitudinal and side grade and slope as per level given at site including cost of labour T & P complete work as per direction of E/I | 900 | cum | |
2 | 2 | Earth work in cutting or in embankment for cambering of approach link Road including filling pits and in proper longitudinal and side grade and slope as per level given at site including cost of labour T & P complete work as per direction of E/I | 1900 | cum | |
3 | 3 | Levelling and dressing of road surface including cutting / filling including labour T& P complete work as per direction of E/I | 2000 | Sqm | |
4 | 4 | Cartage & laying of following materials from side store to bridge site including loading unloading labour T&P etc placing as per direction of E/I (i) RS joist(5.2M) | 435 | No. | |
5 | 5 | (II) Same as Item No. 4 but RS joist (10 M) | 10 | No. | |
6 | 6 | (III) Same as Item No. 4 but Railing Post | 730 | No. | |
7 | 7 | (IV) Same as Item No. 4 but Sal Sleeper | 2100 | No. | |
8 | 8 | (V) Same as Item No. 4 but Sal Edging | 260 | No. | |
9 | 9 | (VI) Same as Item No. 4 but Ballies khunta (Cartage only) | 50 | No. | |
10 | 10 | (vii) Same as Item No. 4 but Chequered Plate | 1254 | No. | |
11 | 11 | (Viii) Same as Item No. 4 but material sisal rope, coir rope, washer U clamp, wire rope nut bolts | 23 | Qtl | |
12 | 12 | S/o wooden anchor of size 2.4x 1.8x 3.1 with 10 & 15 cm balli including cost of ballies, nails all labours & T&P etc complete work as per direction of E/I | 120 | No. | |
13 | 13 | S/o Mallahi nails of approved quality 15-30 cm long including its cost cartage loading, unloading and stacking at site etc complete work as per direction of E/I | 3 | Qtl | |
14 | 14 | S/o of bagai bandh of good quality and good condition including cost of material taxes Cartage etc for proper completion work as per direction of E/I | 2 | Qtl | |
15 | 15 | S/o of sand filled cement bags of good quality & good condition duly filled with local sand and properly stitching with calcutta sutali for filling in anchor, bandling etc work including cost of all materials, labour cartage T & P etc and placing complete work as per direction of E/I | 10000 | No. | |
16 | 16 | Carriage of pontoons pairs from the place of anchoring down stream side of the bridge to the bridge aglinment in water and fixing the same with other pontoons pair of bridge including labour T&P etc complete as per direction of E/I | 42 | Pair | |
17 | 17 | Laying of wooden anchor in the river on the U/s & D/s of pantoon bridge including their weaving by bagai badh and packing with sand filled bags (average 90 bags) before laying and fixing to pontoons with rope as directed by E/I including all labour, material etc complete. | 120 | No. | |
18 | 18 | Fixing of railing post in position with nut & bolts in bridge including making holes & all labour T&P as required as per direction of E/I | 730 | No. | |
19 | 19 | Fixing of 10 mm railing wire in three row through hole of railing post and titentening with the help of railing wire clamp as per direction of E/I | 2800 | Rm | |
20 | 20 | Making stay on both side of pontoon bridge with help of 20 mm wire rope ( labour only) | 4 | No. | |
21 | 21 | Clamping of Chequered plate | 1254 | Pair | |
22 | 22 | Making barrier on both side of bridge head as per direction of E/I | 2 | No. | |
23 | 23 | Bandling with the help of 10 cm horizontal ballies & 15 cm vertical ballies @ 50 cm c/c ballies and fixing below 1.00 to 3.00 m of water level and placing sand filled bags up to 30 cm above water level for completion of work as per direction of E/I | 150 | Rm | |
24 | 24 | Maintenance of pontoons bridge i/c piles on either side from errection to dismantalling of pantoon bridge day and night including titentening of nuts bolts of pontoons & railing posts, maintenance of chequered plates, supervision of nuts & bolts of pontoons and fixing of nuts bolts removing damaged nut bolts, tightening of ropes and watch and ward of piles bridge and pontoons bridge and other works as per direction of E/I ( from errction of pontoons bridge to till dismentalling of pontoons) | 415 | Rm | |
25 | 25 | Same as above item 24 but for approach link road as per direction of E/I ( Two Row) | 0.75 | Km | |
26 | 26 | Same as above item 24 but for approach link road as per direction of E/I (Three Row) | 1.25 | Km | |
27 | 27 | Dismantalling of pontoons in pairs & proper anchoring at right side (Tela Side) including all labour T&P etc required for proper completion of work as per direction of E/I | 42 | Pair | |
28 | 28 | Dismantalling of following materials of pantoon bridge pile and approach link road including cartage of these material from site of work to site store of bridge and also including loading, unloading stacking Properly and also including all taxes and labour T&P etc required for proper completion of work as per direction of E/I (i) RS joist(5.2M) | 435 | No. | |
29 | 29 | (II) Same as above Item No. 28 but RS joist (10 M) | 10 | No. | |
30 | 30 | (III) Same as above Item No. 28 but Railing Post | 730 | No. | |
31 | 31 | (IV) Same as above Item No. 28 but Sal Sleeper | 2100 | No. | |
32 | 32 | (V) Same as above Item No. 28 but Sal Edging | 260 | No. | |
33 | 33 | (VI) Same as above Item No. 28 but Ballies khunta (Cartage only) | 50 | No. | |
34 | 34 | (vii) Same as above Item No. 28 but Chequered Plate | 1254 | No. | |
35 | 35 | (Viii) Same as above Item No. 28 but material sisal rope, coir rope, washer u clamp, wire rope nut bolts | 20 | Qtl | |
36 | 36 | Opening out U clamp from Chequered plate | 1254 | Pair | |
37 | 37 | Extraction of 10 mm wire rope from railing post as per direction of E/I | 2800 | Rm | |
38 | 38 | Errection of pile approaches including carriage of decking & ballies including piling as per direction of E/I labour only | 100 | Sqm | |
39 | 39 | Maintenance and watch & ward of anchor pantoon in pair from the period of dismentalling to till the errction of pantoon bridge and keeping the pantoon in pairs in safe position during the floods and receding floods | 42 | Pair | |
40 | 40 | Additional haulage in river (per Km) as per direction of E/I | 5 | Pair | |
41 | 41 | Relying of chequered plate to proper alignment and levelling dressing including shifting upto 30 m including all cost of labour T&P complete work as per direction of E/I | 310 | No. | |
42 | 42 | S/o PP rope including all labour material T&P complete work as per direction of E/I | 18 | Qtl | |
43 | 43 | S/o Eucliptus ballis including all labour material T&P etc complter work as per direction of E/I. 150 mm dia | 140 | Rm | |
44 | 44 | S/o Eucliptus ballis including all labour material T&P etc complter work as per direction of E/I. 100 mm dia | 100 | Rm | |
45 | 45 | S/o Nariyal Rope including all labour material T&P etc complter work as per direction of E/I. | 18 | Qtl | |
46 | 46 | Digging & cartage of local sand (within 2 Km) cartage including loading/unloading all labour material T&P etc complter work as per direction of E/I. | 470 | cum | |
47 | 47 | Spreading of local sand below chequered plate on approach road including all labour material T&P etc complete work as per direction of E/I. | 470 | cum | |
48 | 48 | S/o Nut bolts including all labour material T&P etc comple work as per direction of E/I (i) 30x300 | 1 | Qtl | |
49 | 49 | Same as above Item No 48 but 30x150 | 0.5 | Qtl | |
50 | 50 | Same as above Item No 48 but 16x 300 | 0.5 | Qtl | |
51 | 51 | Supply and fixing washer including all labour material T&P etc complete work as per direction of E/I | 0.5 | Qtl | |
52 | 52 | Carrying and spreading of Kasa Poola 5 cm thick over bridge road way before filling of 7.5 cm thick kapsa soil including cartage of Kapsa soil from a distance of 1.00 Km On either side of bridge & spreading ramming and dressing the surface as per direction of E/I | 1950 | Sqm | |
53 | 53 | Sinking of Pantoon to obtain the proper gradient as laid in dry bed by digging earth including all labour, T&P etc required for the proper completion of work as direction of E/I | 5 | No. | |
54 | 54 | Dragging the pantoon from dry on the river bank to river water pulling and rolling them in the water to bring in the proper position and making pairs of two pontoons with girder and achoring them in D/S of pontoons bridge including all labour, T&P etc reuired for the proper completion of work as direction of E/I | 4 | Pair |