Recall Design , Construction , Erection , Testing And Commissioning Of Automatic And Plc Controlled With Scada 1 . 5 Mld Stp , 1 . 5 Mld Main Pumping Station , Construction Of Automatic And Plc Controlled With Scada 1 . 5 Mld Capacity Sewage Treat, Karnal-Haryana

Public Health Engineering Department-PHED has published Recall Design , Construction , Erection , Testing And Commissioning Of Automatic And Plc Controlled With Scada 1 . 5 Mld Stp , 1 . 5 Mld Main Pumping Station , Construction Of Automatic And Plc Controlled With Scada 1 . 5 Mld Capacity Sewage Treat. Submission Date for this Tender is 12-11-2020. Reactor Tenders in Karnal Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

25799980
Recall Design , Construction , Erection , Testing And Commissioning Of Automatic And Plc Controlled With Scada 1 . 5 Mld Stp , 1 . 5 Mld Main Pumping Station , Construction Of Automatic And Plc Controlled With Scada 1 . 5 Mld Capacity Sewage Treat
Open Tender
Indian
Haryana
Karnal
12-11-2020

Tender Details

Recall Design , Construction , Erection , Testing And Commissioning Of Automatic And Plc Controlled With Scada 1 . 5 Mld Stp , 1 . 5 Mld Main Pumping Station , Construction Of Automatic And Plc Controlled With Scada 1 . 5 Mld Capacity Sewage Treatment Plant Based On Sequential Batch Reactor Technology Complete In All Respect Including Disposal Of Treated Effluent Through Rcc Pipes Np-3 By Gravity , Storm Water/Sewerage System In Plant Campus , Staff Quarters , Approach Roads , Boundary Wall , Land Scaping , M

Key Value

Document Fees
INR 15000 /-
EMD
INR 557300.0 /-
Tender Value
INR 2.78 Crore /-

BOQ Items

Name of Work: Recall:- Design, construction , Erection , testing and commissioning of automatic and PLC controlled with SCADA 1.5 MLD STP, 1.5 MLD Main Pumping Station, construction of automatic and PLC controlled with SCADA 1.5 MLD capacity sewage treatment plant based on Sequential Batch Reactor technology complete in all respect including disposal of treated effluent through RCC pipes NP-3 by gravity, storm water/sewerage system inplant campus, Staff quarters, approach roads, boundary wall, land scaping, MCC panel Room, Laboratory, CCTV cameras, Transformer, DG set, HT/ LT panel room, meter room, Security room, Boundary wall, providing and installation of high mast lights and street lights, internal lighting, other contingent, Electrical, Mechanical, Piping & instrumentation work and all other works contingent thereto including Operation & Maintenance for 12months during defect liability period after trial run of 3months and 5years thereafter at Village NIGDHU, Distt. Karnal (HARYANA). Rs. 278.65 lacs
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Design, construction, erection, testing and Commissioning of MPS of 1.5MLD and following Components including operation & Maintenance of 5 years after 1 Year defect liability period & 3months of trial run.\n (i) Providing, laying jointing RCC NP-3 pipe sewer of size 500mm from terminal manhole to inlet chamber of MPS with R.C.C. Man holes and SFRC covers EHD-35 (as per layout and drawings attached) complete in all respect.\n (ii) RCC inlet chamber, screen chamber, collecting tank/Wetwell suitable for 1.5 MLD average flow with peak factor of 3.0, pipe gallery, flow measurement devices landscaping of the campus, providing and installing 3No. Non- clog sewage pumps i.e.\n1. 1No. – 63 m3/hr @ 15m head \n2. 1No. – 126 m3/hr @ 15m head \n3. 1No. – 189 m3/hr @ 15m head \nwith suitable LT Panel equipped with all safety devices, automatic capacitor bank, PLC, SCADA and submersible cable from LT Panel to pump sets complete in all respects with panel room (35m2) including toilet block with RCC framed structure complete as per DNIT.\n(iii) K-9 D.I. Pipe of suitable dia at MPS including welding and screwing of Flanges. ISI Marked D.I. fittings, Sluice Valves, Non-return valves as per requirement even for by pass arrangement and connection of STP units complete in all respects as per DNIT. \n(iv) 3 Nos. CI Gear Operated Sluice Gate with\nSS spindle (SS 410) and seats (SS 304) (2 Nos\nfor Screens and 1 no. for partition of collecting\ntank) as per design.\n(v) Supply and installation of 2 Nos. mechanical coarse screens of minimum length 7meters for 1.5 MLD average flow with peak factor of 3.0 complete in all respects as per DNIT.\n(vi) Development of lawns/Plantation etc. at MPS and its up keeping /maintenance as per DNIT.\nNote:\n1. The connecting sewer of same diameter and material of construction, laid at adequate depth between existing sewers/terminal manhole to newly constructed structures is included in scope of work.\n2. All the Infrastructure except construction of staff quarters, Platform (50Sqm) for Transformer /DG Set, Boundary wall (520m), path ways/ roads 400sqm (as per detail attached) required to be executed at site to make the MPS functional is included in the scope of work of lump sum job.\n3. All the Pumping Machinery, Panel Board, Level Sensor etc. shall be controlled by PLC & SCADA and shall be synchronized with the PLC panels at MPS & STP site through broadband internet facility.\n4. The size and quantities of all the above components will be as per approved Structural/ Hydraulic/ Mechanical/ Electrical Design to be approved by Department before actual execution of work.\n\n\n\n\n\n5. All DI pipes, specials and accessories etc. required within the campus of MPS will be provided by the contractor/agency.\n6. For installation/fixing of machinery it will be responsibility of contractor/agency to divert the flow of existing sewer which may include plugging of sewer and pumping if any.\n BI01010001010000000000000515BI0100001113 1 Complete Job
2 2 “Design, construction, erection, testing & commissioning of 1.5 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including disposal of treated effluent through NP-3 pipe of adequate size (vibrated cast with HDPE lining) by gravity in nearby Pundri Drain, Landscaping, MCC Panel Room & all other contingent Electrical, Mechanical, Piping & Instrumentation works. With PLC & SCADA Arrangement for STP & MPS along with Synchronizing it with each other including furniture & laboratory equipments as per detail given in the bid document and including following components including Operation & Maintenance during 1year of defect liability period after 3months of satisfactory trial run and 5 years thereafter.\n (i) 1No. Supply, Erection, installation & commissioning of 12.5 mtr. high Mast GI Octagonal pole with Energy efficient LED lights (8Nos. x 180 watt) in each High Mast lights with suitable size of wires, cables MCCB, Pedestal, pipe Digital time switch (Programming of ON-OFF timing) as per satisfaction of Engineer-In-Charge and as per specification laid in the DNIT including Operation & Maintenance during 1year of defect liability period after 3 months of satisfactory trial run and 5 years thereafter.\nii)10Nos. Supply & Erection of Solar Powered (on Grid) street lights with Hot Dip G.I. octagonal pole 10Mtr. Height of 4mm thickness with LED based street light 120W with pressure die cast aluminum housing with IP66 protection, underground cable in the trench, metal clad switches, MCCB, Earthing and suitable size of wire & cables, Digital time switch (Programming of ON-OFF timing) as per specification laid in the DNIT including Operation & Maintenance during 1year of defect liability period after 3 months of satisfactory trial run and 5 years thereafter.\n(iii) Supply and installation of 1 No. SS Main Gate of SS-304 Grade 4m wide and 1 No. SS wicket gate of SS-304 Grade 1.25m wide (total weight not less than 500kg) at STP site.\n(iv) Providing and installing 2 No. centrifuges (1Working + 1 Stand bye) including centrifuge feed pump, all fittings, instrumentations, electric panel board, dry sludge platforms etc. as per design complete in all respect including packing dry sludge in 20 Kg. bag and supplying the same to market Kisan Sewa Kendra or as directed by Engineer-in-charge within the lead as pointed at clause 4.4.5 of the DNIT, including Operation & Maintenance during 1year of defect liability period after 3 months of satisfactory trial run and 5 years thereafter.\n\n(v) “Supply, installation, testing, commissioning operation and comprehensive annual maintenance of effluent quality monitoring system at 1.5 MLD capacity Sewage Treatment Plant based on SBR Technology for online (continuous) measurement of pH, TSS, BOD, COD, by single analyzer with various sensors (spectral measurement in the in the UV-VIS range 200-720mm) performing reagent and chemical free analysis with automatic cleaning of sensors, power cables and signal cable, local data acquisition and display of data on continuous basis for up linking the data to CPCB, HSPCB AND PHED, TUV approved complete in all respect as per CPCB guidelines for online continuous monitoring system for effluents and as contained in scope of work in the DNIT:\na) Multi-parameter measuring converter, for connecting upto 18 intelligent sensors, scope including 8 analog inputs/outputs (4 input & 4 outputs) (0/4-\n\n20ma), wide-range power supply , optical COD/BOD AND TSS probe with special spectral processing of the UV-VIS range, for measurement in the outlet/effluent of STP \nb) Robust digital ph/ORP sensor for ph/ORP electrodes, with built in per–amplifier & temperature compensation (ATC) cable length 100m minimum\nc) Sensor adopter cable for all intelligent sensor with IP68 water proof connection to the intelligent sensor net system cable length 100m minimum.\nd) Data transfer to CPCB, HSPCB & PHED Servers during Operation & Maintenance for 1year of defect liability period after 3 months of satisfactory trial run and 5 years thereafter.\ne) Providing GSM 3G, 4G Modem with mobile network connectivity including network charges for 1year of defect liability period after 3 months of satisfactory trial run and 5 years thereafter.\n\n(vi) Development of lawns/Plantation at STP etc. and it’s up keeping /maintenance as per DNIT.\n BI01010001010000000000000515BI0100001114 1 Completer job
3 3 Providing and Installing 6NO. CCTV Cameras (4NO. Cameras for STP and 2NO. Cameras for MPS) complete as per satisfaction of the Engineer– in- Charge, within 96 hours of signing the Agreement along with 90 days recording (NVR), 32 inches LED Screen, 16 Channel NVR with 2TB Hard disc at STP Site and 8 Channel NVR with 1TB HD at MPS Site with connectors, cables, poles and power supply with online real-time output facility. The cameras at both the sites i.e. MPS and STP shall be synchronized at STP site complete as per DNIT.\n\n\nCameras:\ni) At STP & MPS Site- 2 No. PTZ speed dome 360 degree 50X zoom camera, 4 No. 12mm lens size, 2 No. 3.6mm lens size.\nMake: - Sony/ Canon/Panasonic/ Samsung. CCTV Cameras should be installed and commissioned before starting execution of work \nincluding Operation & Maintenance during 1year of defect liability period after 3 months of satisfactory trial run and 5 years thereafter.\n BI01010001010000000000000515BI0100001118 6 Completer job
4 4 Design, Supply & Erection of 1 NO. copper wound ester oil filled Transformer of 200KVA on load tap changer or suitable capacity on higher side (at STP), with servo stabilizer of standard make outdoor type, VCB Panel, G.O. Switch, H.T. Metering Panels, APFC Panels along with for each Transformer, 11KV Substation, entire cable network from G.O. Switch to H.T. Metering equipment and from H.T. Metering to Transformer Main to L.T. Panel, Earthing, safety equipment and any other contingent thereto complete in all respect as per DNIT and getting it passed from Chief Electrical Officer including Operation & Maintenance during 1year of defect liability period after 3 months of satisfactory trial run and 5 years thereafter. BI01010001010000000000000515BI0100001119 1 Completer job
5 5 Design, Supply & Erection of 1 Nos. DG Set of 125 KVA or suitable capacity on higher side (at STP) capacity each with Acoustic Canopy, AMF Panel and Copper Earthing of suitable rate with change over switch & synchronizing panel complete (CPCB norms compliance) as per DNIT including Operation & Maintenance during 1year of defect liability period after 3 months of satisfactory trial run and 5 years thereafter. BI01010001010000000000000515BI0100001120 1 Complete job
6 6 Construction of HT / LT Panel room, PLC room, Centrifuge house, Laboratory, office, MCC, Pantry, Porch, Chlorination Building, security room, centrifuge building, sludge pump room, toner room, Meter room, blower room including doors, windows & fittings with toilet blocks(1Ladies+1Gents=2nos), pantry including all Sanitary fittings etc. as per drawings attached in DNIT at MPS & STP site covered area with RCC framed structure of brick work vitrified glazed tiles flooring, anodized/powder coated aluminium frame of size 101.60mm x 50.80mm x 4.78mm for chowkhat, 99.00mm x 52.00mm x 3.00mm for door frame, 76.20mm x 44.46mm x 3.20mm for window frame with 5mm thick toughened glass AIS/Saint Gobain/ Modi Float Covered Area (470 sqm) (As per enclosed plan and DNIT) including Operation & Maintenance during 1year of defect liability period after 3 months of satisfactory trial run and 5 years thereafter. BI01010001010000000000000515BI0100001121 470 Sqm
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail