Development Of Water Harvesting Theme Park At Venkataraya Colony In Circle-21, Slpz, Ghmc (Item No.1), RANGAREDDY-Telangana

Greater Hyderabad Municipal Corporation-GHMC has published Development Of Water Harvesting Theme Park At Venkataraya Colony In Circle-21, Slpz, Ghmc (Item No.1). Submission Date for this Tender is 02-11-2020. Water Harvesting Tenders in RANGAREDDY Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

25798329
Development Of Water Harvesting Theme Park At Venkataraya Colony In Circle-21, Slpz, Ghmc (Item No.1)
Open Tender
Indian
Telangana
RANGAREDDY
02-11-2020

Tender Details

Development Of Water Harvesting Theme Park At Venkataraya Colony In Circle-21, Slpz, Ghmc ( Item No.1 )

Key Value

Document Fees
Refer document
EMD
INR 171287.0 /-
Tender Value
INR 1.71 Crore /-

BOQ Items

S.No Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)
1 Development of Water harvesting Theme Park - 24.00 No 900.00 21600.00
Supply and fixing of precast CC bollards of size of 1000mm tall 200mm diameter natural moulded with M20 grade of concrete for barrication including labour charges, cost and conveyance of all materials etc.
2 Development of Water harvesting Theme Park - 65.00 Each 20000.00 1300000.00
Supply and transportation of 210 W +/-10% . LED Street light Body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F > 0.90, System having efficacy >100 lumens/watt, with Ingress protection IP66, Potted driver, Driver surge protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>80, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 certificates. LUMINAIRE MAKE : PHILIPS / OSRAM / GE Venture / CROMPTON / BAJAJ / Wipro / Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA / SYSKA / Capart / Fortune Art / FIEM / Panasonic LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.ELEC-3.11.1
3 Development of Water harvesting Theme Park - 0 No 0 0
ELECTRICALS
4 Development of Water harvesting Theme Park - 200.00 Rmt 91.00 18200.00
Supply and Delivery of 40 mm 16 Kg/cm2 HDPE Pipe heavy duty pipe fixing with nipples bolts and nuts to above motor cost and conveyance of all material and labour charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers. ELEC-4.9.1-1032 a
5 Development of Water harvesting Theme Park - 6.00 Each 70.00 420.00
Supply and fixing of 31/4" C.I. Taps
6 Development of Water harvesting Theme Park - 5.00 Rmt 159.84 799.20
Lowering of 150mm dia SWG pipe as per IS 651 of 1992 carfully in to trenches and laying in readymade trenches true to alignment graqdiant jointing with cemenr mortar ( 1:1) prop: curing and testing of store ware pipes for sewer lines including cost and conveyance
7 Development of Water harvesting Theme Park - 5.00 Rmt 500.00 2500.00
Supply of SWG SP-1 pipe conforming to ISI 651 - 5" dia (152.4mm) including cost of materials etc., complete TBSP-A-I-01
8 Development of Water harvesting Theme Park - 27.00 Cum 33.64 908.28
Refilling the pipeline tenches with the excavated soils (other than sand) complying with the standard specifications including water & tamping etc., complete
9 Development of Water harvesting Theme Park - 6.00 Each 93.00 558.00
c) 32mm dia GI Union TBSP-G-II-4
10 Development of Water harvesting Theme Park - 6.00 Each 139.00 834.00
b) 2" dia GI Union TBSP-G-II-6
11 Development of Water harvesting Theme Park - 1.00 Each 693.00 693.00
a) TBSP-G-III-23
12 Development of Water harvesting Theme Park - 0 Each 0 0
Supply of 32 mm dia G.M. Balvalve as per IS-778 I-Class heavy duty 32mm NB Size. Ist quality including MCA and vat etc. comlplete .
13 Development of Water harvesting Theme Park - 1.00 Each 1100.00 1100.00
Supply, installation, testing and commissioning of 25mm dia Gate valve Makes : Zoloto / Leader / Honeywell ELEC-10.7.37
14 Development of Water harvesting Theme Park - 20.00 Each 70.00 1400.00
Supply and delivery of 50mm dia 12" long GI Nipple including cost and conveyanc of all materials labour charges etc., complete
15 Development of Water harvesting Theme Park - 50.00 Each 56.00 2800.00
Supply of 50 mm PVC Flexible Couplings. Make: Precision or its equivaletELEC-1.2.4-75e
16 Development of Water harvesting Theme Park - 6.00 Each 52.00 312.00
Supply delivery of 50mm dia bends with arm length of 20Cms etc., complete SSR 2020-21
17 Development of Water harvesting Theme Park - 10.00 Rmt 195.00 1950.00
S& F 20 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings &labour chargescomplete TBSP-G.I-02
18 Development of Water harvesting Theme Park - 25.00 Rmt 355.00 8875.00
S& F 32 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings &labour chargescomplete TBSP-G.I-04
19 Development of Water harvesting Theme Park - 1.00 Each 1720.00 1720.00
Supply, installation, testing and commissioning of gun metal valves of following sizes as required. Make: Newage / Winco / Padmini / Safex of 50 mm dia ELEC-10.7.22-1889 a
20 Development of Water harvesting Theme Park - 30.00 Rmt 436.00 13080.00
S& F 50 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe and its fittings and labour charges complete TBSP-G.I-06
21 Development of Water harvesting Theme Park - 27.00 Cum 269.23 7269.21
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308)
22 Development of Water harvesting Theme Park - 1.00 Each 2100.00 2100.00
Supply & Fixing of D.O.L Starter 250V, Single phase, 50Hz. With SS enclouser comprising of contactor with bi-metalic relay with necessary push buttons, etc., complete suitable upto 7.5 HP Makes: Siemens / Crompton / L&T / BCH. ELEC-5.4.1-1089.b
23 Development of Water harvesting Theme Park - 6.00 Each 139.00 834.00
Supply and delivery of 50mm dia 12" long GI Nipple including cost and conveyanc of all materials labour charges etc., complete
24 Development of Water harvesting Theme Park - 90.00 Rmt 14.00 1260.00
Supply of 6 Sqmm 7/18 WPSC (Weather Proof single Core) ISI Aluminium Wire of makes Finolex/Polycab/Gold Medal/Million/Payal/Power Flex.
25 Development of Water harvesting Theme Park - 1.00 Each 194.00 194.00
Supply, Transportation and fixing of 150mm dia galvanised bore cover with required nuts and bolts. ELEC-5.13.6-1231 .d
26 Development of Water harvesting Theme Park - 1.00 Each 2124.00 2124.00
Supplying & fixing Bronze Vertical Check (Non return) Valve as per IS-778 I-class heavy duty - 50 mm NB SizeTBSP-G.III-19
27 Development of Water harvesting Theme Park - 2.00 Each 1434.00 2868.00
S & F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type - 50 mm NB Size TBSP-G.III- 25
28 Development of Water harvesting Theme Park - 2.00 Each 363.00 726.00
Supply, Transportation and fixing of 50mm dia, 450mm length, 12mm thickness and 75mm wide MS Clamp set with required nuts and bolts. ELEC-5.13.6.1228 a
29 Development of Water harvesting Theme Park - 200.00 Rmt 136.00 27200.00
Supply of 3 Core Flat Copper cable of ISI for Submersible Motors. Makes : Finolex / RR Kabel / Havells / KEI / L&T ELEC-1.6.3-276 c
30 Development of Water harvesting Theme Park - 90.00 Rmt 436.00 39240.00
S& F 50 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings &labour chargescomplete TBSP-G.I-06
31 Development of Water harvesting Theme Park - 1.00 Each 37191.00 37191.00
.Supply and Transportation of star rated(7.50 HP 20-25 Stage) Three phase ISI submersible motor pumpset suitable for 6" Bore well. Makes: Texmo / CRI / KSB / Aryan Varsha / Lubi
32 Development of Water harvesting Theme Park - 15.00 Rmt 520.00 7800.00
Supply delivery and fixing of 180mm dia PVC casing pipe 6Kg/SqCm etc complete cost and convienece of all materials for finished item of work
33 Development of Water harvesting Theme Park - 30.00 Rmt 690.00 20700.00
g) Depth 240-270mts
34 Development of Water harvesting Theme Park - 30.00 Rmt 537.00 16110.00
f) Depth 210-240mts
35 Development of Water harvesting Theme Park - 30.00 Rmt 471.00 14130.00
e) Depth 180-210mts
36 Development of Water harvesting Theme Park - 30.00 Rmt 419.00 12570.00
d) Depth 150-180mts
37 Development of Water harvesting Theme Park - 30.00 Rmt 372.00 11160.00
c) Depth 120-150mts
38 Development of Water harvesting Theme Park - 30.00 Rmt 335.00 10050.00
b) Depth 90-120mts
39 Development of Water harvesting Theme Park - 90.00 Rmt 305.00 27450.00
a) Depth 0-90mts
40 Development of Water harvesting Theme Park - 0 Rmt 0 0
Drilling of tube wells by down the hole hammer drilling, for a finalised dix of 150mm of in all formations suitable for down the hole hammer drilling back or medium rack etc, and drilling in overburden to a dia not less than 180mm etc complete for finishe
41 Development of Water harvesting Theme Park - 1.00 Each 960.00 960.00
Geologist Charges etc., complete
42 Development of Water harvesting Theme Park - 0 Rmt 0 0
Drilling of borewell
43 Development of Water harvesting Theme Park - 1.00 Each 500000.00 500000.00
FRP WATER FALL 2
44 Development of Water harvesting Theme Park - 1.00 Each 350000.00 350000.00
FRP WATER FALL 1
45 Development of Water harvesting Theme Park - 1.00 Each 420000.00 420000.00
FRP STATUES
46 Development of Water harvesting Theme Park - 1.00 Each 150000.00 150000.00
FRP SEATING
47 Development of Water harvesting Theme Park - 1.00 Each 250000.00 250000.00
FRP ENTRENCE ARCH
48 Development of Water harvesting Theme Park - 0 Each 0 0
FRP ELEMENT
49 Development of Water harvesting Theme Park - 2.00 Each 37191.00 74382.00
.Supply and Transportation of star rated (7.50 HP 20-25 Stage)Three phase ISI submersible motor pumpset suitable for 6" Bore well. Makes: Texmo / CRI / KSB / Aryan Varsha / Lubi ELEC-5.6.1-1114f
50 Development of Water harvesting Theme Park - 62.10 Sqm 1847.11 114705.53
Flooring with granite stone tiles 8 mm thick (mirror polished of all shades) set over base coat of cement mortar (1:6), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials..
51 Development of Water harvesting Theme Park - 62.10 Sqm 535.53 33256.41
Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing.
52 Development of Water harvesting Theme Park - 8.51 Cum 9080.58 77275.74
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and encluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.
53 Development of Water harvesting Theme Park - 3.65 Cum 4939.53 18029.28
Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture. All work upto plinth level.
54 Development of Water harvesting Theme Park - 30.00 Cum 269.23 8076.90
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
55 Development of Water harvesting Theme Park - 0 Cum 0 0
WATER POND
56 Development of Water harvesting Theme Park - 1750.00 Cum 33.64 58870.00
Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
57 Development of Water harvesting Theme Park - 1750.00 Cum 384.61 673067.50
Ordinary rock (not requiring blasting)-Manual Means-Upto 3 m depth
58 Development of Water harvesting Theme Park - 0 Cum 0 0
CLEANING AND ARRANGING BOULDERS
59 Development of Water harvesting Theme Park - 1740.00 Sqm 138.62 241198.80
Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls
60 Development of Water harvesting Theme Park - 1740.00 Sqm 553.53 963142.20
Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing.
61 Development of Water harvesting Theme Park - 200.10 Cum 6815.52 1363785.55
Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site Cost of Seigniorage Charges on all Materials, all taxes including all labour charges like mixing Cement Mortor Scaffoding Charges lift charges , Curing charges Etc., Complete for finished item of work. (S.S. No. 504)
62 Development of Water harvesting Theme Park - 10.01 Cum 4939.53 49444.70
Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture. All work upto plinth level.
63 Development of Water harvesting Theme Park - 30.02 Cum 269.23 8082.18
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
64 Development of Water harvesting Theme Park - 66.70 Cum 3666.67 244566.89
Dry Stone Masonry for Retaining Walls
65 Development of Water harvesting Theme Park - 0 Cum 0 0
COMPOUND WALL
66 Development of Water harvesting Theme Park - 1.00 Each 1500000.00 1500000.00
FRP CENTRAL ELEMENT
67 Development of Water harvesting Theme Park - 155.00 Sqm 1363.42 211330.10
Flooring with polished marble slab ...... mm thick set over base coat of cement mortar (1:6) 20 mm thick (joints of stone must be flushed) over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.30 kgs per sqm. Jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like flooring slab, cement, sand, and water etc., complete, including seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials.
68 Development of Water harvesting Theme Park - 93.60 Sqm 535.53 50125.61
Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing.
69 Development of Water harvesting Theme Park - 93.60 Cum 10634.35 995375.16
RCC M- 20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering. (350 Kgs Cement).
70 Development of Water harvesting Theme Park - 11.70 Cum 4939.53 57792.50
Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture. All work upto plinth level.
71 Development of Water harvesting Theme Park - 11.70 Cum 269.23 3149.99
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
72 Development of Water harvesting Theme Park - 0 Cum 0 0
CENTRAL ELEMENT
73 Development of Water harvesting Theme Park - 10.50 Sqm 138.62 1455.51
Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls
74 Development of Water harvesting Theme Park - 10.50 Sqm 535.53 5623.06
Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing.
75 Development of Water harvesting Theme Park - 1.55 Cum 10634.35 16483.24
RCC M- 20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering. (350 Kgs Cement).
76 Development of Water harvesting Theme Park - 0.20 Cum 4939.53 987.91
Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture. All work upto plinth level.
77 Development of Water harvesting Theme Park - 0.41 Cum 269.23 110.38
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
78 Development of Water harvesting Theme Park - 0 Cum 0 0
STATUES
79 Development of Water harvesting Theme Park - 3.00 Each 750000.00 2250000.00
Supply and fixing of Gazebo including coast and conveyance of all materials
80 Development of Water harvesting Theme Park - 1.44 Cum 4939.53 7112.92
Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture. All work upto plinth level.
81 Development of Water harvesting Theme Park - 1.30 Cum 269.23 350.00
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
82 Development of Water harvesting Theme Park - 0 Cum 0 0
GAZEBO
83 Development of Water harvesting Theme Park - 70.00 Sqm 1067.00 74690.00
Supply and fixing of Plain Float Glass 12 mm thick including all labour charges
84 Development of Water harvesting Theme Park - 2000.00 Kgs 155.54 311080.00
Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, MS Frame for chainlink mesh works, Roof Trusses by using square / rectangular MS hollow section as per IS 4923 including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials including wastage to site with all taxes and duties etc complete for finished item of work
85 Development of Water harvesting Theme Park - 0.72 Cum 4939.53 3556.46
Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture. All work upto plinth level.
86 Development of Water harvesting Theme Park - 1.08 Cum 269.23 290.77
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
87 Development of Water harvesting Theme Park - 0 Cum 0 0
TRELLIS
88 Development of Water harvesting Theme Park - 96.12 Sqm 1077.01 103522.20
Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.
89 Development of Water harvesting Theme Park - 171.28 Sqm 888.24 152137.75
Flooring with 100mm thick Cement Concrete 1:6:10, using 40mm metal, 100mm thick and 20 mm Cement Concrete surface (Ellis Pattern, 1st Sort)
90 Development of Water harvesting Theme Park - 211.21 Sqm 535.53 113109.29
Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer-in-Charge etc., complete for External & Uneven Surfaces of Brick Wall for finished item of work.(SS 901,903 &904).
91 Development of Water harvesting Theme Park - 171.28 Cum 13079.00 2240171.12
RCC M- 20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering. (350 Kgs Cement)
92 Development of Water harvesting Theme Park - 52.21 Cum 4939.53 257892.86
Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture. All work upto plinth level.
93 Development of Water harvesting Theme Park - 156.63 Cum 269.23 42169.49
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
94 Development of Water harvesting Theme Park - 0 Cum 0 0
WALL
95 Development of Water harvesting Theme Park - 3.00 Each 2278.00 6834.00
Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 660 x 460 mm - Single C.P. Pillar cock
96 Development of Water harvesting Theme Park - 12.00 Each 252.00 3024.00
75 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm
97 Development of Water harvesting Theme Park - 8.00 Each 553.00 4424.00
S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight with quarter turn spindle with either internal or external threaded connection conforming to IS 893
98 Development of Water harvesting Theme Park - 4.00 Each 1649.00 6596.00
Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2-2004 of white glazed with \S\ trap
99 Development of Water harvesting Theme Park - 5.00 Rmt 500.00 2500.00
Supplying, laying, jointing and testing 101.6mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. Including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 1524 mm(5\0") depth and refilling with watering and tamping
100 Development of Water harvesting Theme Park - 500.00 Kgs 155.54 77770.00
Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, MS Frame for chainlink mesh works, Roof Trusses by using square / rectangular MS hollow section as per IS 4923 including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials including wastage to site with all taxes and duties etc complete for finished item of work
101 Development of Water harvesting Theme Park - 129.25 Sqm 138.62 17916.64
Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls
102 Development of Water harvesting Theme Park - 28.26 Sqm 930.39 26292.82
Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.
103 Development of Water harvesting Theme Park - 15.12 Sqm 1731.00 26172.72
Supply and fixing of Flush door shutters, solid bond wood block board type with teak ply on both faces.: 25 mm thick conforming to IS:2202 including cost and conveyance of all materials and labour charges etc., complete.
104 Development of Water harvesting Theme Park - 129.25 Sqm 535.53 69217.25
Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer-in-Charge etc., complete for External & Uneven Surfaces of Brick Wall for finished item of work.(SS 901,903 &904).
105 Development of Water harvesting Theme Park - 7.10 Sqm 596.00 4231.60
Supply and Fixing of Cement bonded particle board conforming to IS 14276- 16 mm thick
106 Development of Water harvesting Theme Park - 14.69 Cum 7505.24 110251.98
Brick Masonry in CM (1:6) with Modular Bricks 19 x 9 x 9 cms 2nd class including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work.
107 Development of Water harvesting Theme Park - 1679.47 Kgs 67.36 113129.10
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)
108 Development of Water harvesting Theme Park - 0.83 Cum 15424.40 12802.25
f) Lintels:
109 Development of Water harvesting Theme Park - 27.85 Sqm 1754.50 48862.83
e) Roof Slab up to 150 mm thick
110 Development of Water harvesting Theme Park - 2.91 Cum 10084.60 29346.19
d) Roof Beams
111 Development of Water harvesting Theme Park - 1.80 Cum 15388.90 27700.02
c) Columns:
112 Development of Water harvesting Theme Park - 2.91 Cum 14823.80 43137.26
b) Plinth Beams
113 Development of Water harvesting Theme Park - 1.99 Cum 12156.10 24190.64
a) Footings
114 Development of Water harvesting Theme Park - 0 Cum 0 0
Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20 mm size graded machin crushed hard granite metel (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc. to site and including Seigniorage charges, Sales and other taxes on all materials including all oprational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO.402) with minimum cement content as per IS code from standerd suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finish item of work. FOUNDATIONS, PLINTH BEAMS, PEDESTALS & STEPS.
115 Development of Water harvesting Theme Park - 5.82 Cum 709.26 4127.89
Filling with Crusher Stone dust finer than 3mm with not more than 10% passing 0.075 sieve, including supply and delivery of crusher stone dust finer than 3mm for filling, including cost of crusher stone dust, seinourage charges and conveyance to site, filling charges, watering, tamping and rammming and all labour charges and operational charges complete as directed by the Departmental officers.
116 Development of Water harvesting Theme Park - 1.44 Cum 4939.53 7112.92
Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture. All work upto plinth level.
117 Development of Water harvesting Theme Park - 29.95 Cum 269.23 8063.34
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
118 Development of Water harvesting Theme Park - 0 Cum 0 0
WASHROOM BLOCK
119 Development of Water harvesting Theme Park - 68.40 Cum 1188.40 81286.56
Supply and filling with sand complying with standard specifications including cost and conveyance of sand to site to work labour charges watering tamping, ramming etc
120 Development of Water harvesting Theme Park - 57.63 Sqm 535.53 30862.59
Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site cost of seigniorage charges on all materials , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (As per S.S. 904)
121 Development of Water harvesting Theme Park - 5.28 Cum 6815.52 35985.95
Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site Cost of Seigniorage Charges on all Materials, all taxes including all labour charges like mixing Cement Mortor Scaffoding Charges lift charges , Curing charges Etc., Complete for finished item of work. (S.S. No. 504)
122 Development of Water harvesting Theme Park - 1.53 Cum 4939.53 7557.48
Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture. All work upto plinth level.
123 Development of Water harvesting Theme Park - 68.40 Cum 269.23 18415.10
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
124 Development of Water harvesting Theme Park - 0 Cum 0 0
PLAY AREA ( SAND PIT )
125 Development of Water harvesting Theme Park - 160.00 Sqm 797.10 127536.48
Flooring with polished shabad stones ............ set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials.
126 Development of Water harvesting Theme Park - 160.00 Cum 1188.40 190144.00
Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
127 Development of Water harvesting Theme Park - 0 Cum 0 0
JOGGING TRACK
128 Development of Water harvesting Theme Park - 2.52 Sqm 2182.00 5498.64
Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out ofM.S. tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture.M.S. frame shall be covered with 5mm thick heat moulded PVC ?C? channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail & bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Panelling of 5mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the ?C? Channel using PVC solvent adhesive. Complete as per direction of Engineer-in-charge, manufacturer?s specification & drawing for finished item ofwork
129 Development of Water harvesting Theme Park - 19.73 Sqm 1077.01 21249.41
Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.
130 Development of Water harvesting Theme Park - 55.80 Sqm 138.62 7735.00
Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls
131 Development of Water harvesting Theme Park - 29.50 Sqm 231.22 6820.99
Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for internal walls
132 Development of Water harvesting Theme Park - 29.50 Sqm 535.53 15798.13
Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site cost of seigniorage charges on all materials , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (As per S.S. 904) ( FOR OUTSIDE )
133 Development of Water harvesting Theme Park - 55.80 Sqm 517.39 28870.36
Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:6), 8mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site cost of seigniorage charges on all materials , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (As per S.S. 904)
134 Development of Water harvesting Theme Park - 10.01 Cum 6815.52 68223.36
Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site Cost of Seigniorage Charges on all Materials, all taxes including all labour charges like mixing Cement Mortor Scaffoding Charges lift charges , Curing charges Etc., Complete for finished item of work. (S.S. No. 504)
135 Development of Water harvesting Theme Park - 3.00 Cum 9080.58 27241.74
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and encluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.
136 Development of Water harvesting Theme Park - 20.00 Sqm 581.00 11620.00
Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1 Kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work, as directed by the department.
137 Development of Water harvesting Theme Park - 1.96 Cum 4667.96 9149.20
Plain CC (1:5:10) prop (cement : fine aggregate: Coars aggregate) using 40m size hard granite m/c metal including cost and conveyance of all materials like cement, sand,coarse aggregate water etc., to site seigniorage charges on all materials. and labours charges, for mixing laying concrete ramming in 15 cm layers, finishing top surface to the required level curing etc., Complete for finished item of work as per (SS .402).
138 Development of Water harvesting Theme Park - 9.79 Cum 269.23 2635.76
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
139 Development of Water harvesting Theme Park - 0 Cum 0 0
TICKET COUNTER
140 Development of Water harvesting Theme Park - 600.00 Kgs 155.54 93324.00
Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, MS Frame for chainlink mesh works, Roof Trusses by using square / rectangular MS hollow section as per IS 4923 including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials including wastage to site with all taxes and duties etc complete for finished item of work
141 Development of Water harvesting Theme Park - 11.25 Sqm 138.62 1559.48
Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls
142 Development of Water harvesting Theme Park - 11.25 Sqm 535.53 6024.71
Plastering 20mm thick in two coats with base coat of 16mm thick in CM(1:6) and top of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer-in-Charge etc., complete for External & Uneven Surfaces of Brick Wall for finished item of work.(SS 901,903 &904).
143 Development of Water harvesting Theme Park - 84.00 Kgs 67.36 5658.24
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)
144 Development of Water harvesting Theme Park - 1.50 Cum 15525.90 23288.85
b) Columns:
145 Development of Water harvesting Theme Park - 0.70 Cum 12156.10 8509.27
a) Footings
146 Development of Water harvesting Theme Park - 0 Cum 0 0
Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20 mm size graded machin crushed hard granite metel (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc. to site and including Seigniorage charges, Sales and other taxes on all materials including all oprational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO.402) with minimum cement content as per IS code from standerd suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finish item of work. FOUNDATIONS, PLINTH BEAMS, PEDESTALS & STEPS.
147 Development of Water harvesting Theme Park - 0.43 Cum 4939.53 2124.00
Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture. All work upto plinth level.
148 Development of Water harvesting Theme Park - 6.75 Cum 269.23 1817.28
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308)
149 Development of Water harvesting Theme Park - 0 Cum 0 0
ENTRANCE ARCH
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail