Labour Charges For Construction Of 50 Bedded Women Hospital In Pt . Ddu Pandeypur Varanasi, PANDEYPUR, VARANASI-Uttar Pradesh

Uttar Pradesh Rajkiya Nirman Nigam Limited has published Labour Charges For Construction Of 50 Bedded Women Hospital In Pt . Ddu Pandeypur Varanasi. Submission Date for this Tender is 28-10-2020. Labour Work Tenders in PANDEYPUR, VARANASI Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

25789755
Labour Charges For Construction Of 50 Bedded Women Hospital In Pt . Ddu Pandeypur Varanasi
Open Tender
Indian
Uttar Pradesh
PANDEYPUR, VARANASI
28-10-2020

Tender Details

Labour Charges For Construction Of 50 Bedded Women Hospital In Pt . Ddu Pandeypur Varanasi

Key Value

Document Fees
INR 590 /-
EMD
INR 42531.0 /-
Tender Value
INR 8.50 Lakhs /-

BOQ Items

Name of Work: Labour Charges for Construction of 50 Bedded Women Hospital in campus of Pt. DDU Pandeypur,Varanasi.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Labour charges BI01010001010000000000000515BI0100001112
2 1.01 L/C for Earth work in excavation ordinary soil in trenches for foundation including lift upto 1.5 mts and lead upto 50 mts and including dressing of sides and ramming of bottoms and disposal of surplus excavated earth as per direction of E/I BI01010001010000000000000515BI0100001113 200 Cum
3 1.02 L/C for general earth work in cutting or filling for site develpoment work in 20 cm layers including ramming and dressing the surface as per direction of E/I BI01010001010000000000000515BI0100001114 100 Cum
4 1.03 L/C for filling in trenches and in floors in layers not exceeding 20 cm. in depth including watering ramming and dressing of the surface for local sand . BI01010001010000000000000515BI0100001115 300 Cum
5 1.04 L/C for levelling and dressing ncluding earth work upto 15 cm depth as per direction of E/I BI01010001010000000000000515BI0100001116 1500 Sqm
6 1.05 L/C for Jungle clearance including derooting as per PWD detail specifications and direction of E/I. BI01010001010000000000000515BI0100001117 1500 Sqm
7 1.06 L/C for laying cement concrete 1:4:8 as specified mix in foundation or in under floors including compaction as per direction of E/I BI01010001010000000000000515BI0100001118 150 Cum
8 1.07 L/C for RCC work for load bearing structure in ground floor BI01010001010000000000000515BI0100001119 200 Cum
9 1.08 Hire charge of mixer with hopper for mis=xing of cement concrete including operator running and maintenance of mixer machine but excluding cost of fuel BI01010001010000000000000515BI0100001120 200 Cum
10 1.09 Labour charges of brick work in foundation and plinth with cement mortar of specified mix excluding cost of T & P and curing as per direction of E/I . BI01010001010000000000000515BI0100001121 100 Cum
11 1.1 L/C for brick work in specified mix in step over the ramp for staircase including cutting of brick etc. as required as per direction of E/I. upto 1.5 mtr width staircase BI01010001010000000000000515BI0100001122 30 Each
12 1.11 do but upto 1.5 to 2 mtr width staircase BI01010001010000000000000515BI0100001123 20 Each
13 1.12 L/C for cement plaster in single coat on wall in specified mix including wetting the surface and racking the joints as per direction of E/I excluding cost of curing and T&P upto 12 mm thick BI01010001010000000000000515BI0100001124 300 Sqm
14 1.13 Do but 12 mm to 20 mm thick BI01010001010000000000000515BI0100001125 500 Sqm
15 1.14 L/C for 25 mm thick 1:2:4 plain cement concrete floor laid in panels including fixing of glass strip and finishing with 3 mm thick floating cost of neat cement and marble dust as per direction of E/I BI01010001010000000000000515BI0100001126 80 Sqm
16 1.15 Shifting of material by Head load upto 50 mt only. NOTE-Shifting of material per 50 mt. beyond initial 50 mt. lead = 50% Extra (A) General material BI01010001010000000000000515BI0100001128 300 Cum
17 1.16 Shifting of material by Head load upto 50 mt only (B) Bricks BI01010001010000000000000515BI0100001129 10000 Per Nos
18 1.17 Shifting of material by Head load upto 50 mt only (C) Cement BI01010001010000000000000515BI0100001130 100 Per Bag
19 1.18 RCC malwa with JCB dumper BI01010001010000000000000515BI0100001131 100 Cum
20 1.19 L/C for layout of building upto 500 sqm area BI01010001010000000000000515BI0100001136 450 Sqm
21 1.2 L/C for making level pillars 45cm ht upto 70 cm heights BI01010001010000000000000515BI0100001137 30 Each
22 1.21 L/C for dismantling of brick work in cement mortar /lime mortar including stacking of dismantled material as per required plce upto 60 mt distance as per direction of E/I BI01010001010000000000000515BI0100001138 400 Cum
23 1.22 L/C for demolishing /shifting of mechanical instrument for old SPT BI01010001010000000000000515BI0100001139 1 Per job
24 1.23 L/C for Curing of RCC .Brick work ,plaster and other as per UPPWD norms as per justification of work done according to the direction of E/I per job per month BI01010001010000000000000515BI0100001178 4 Month
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail