Command Area Development Authority-CADA has published Construction Of Pucca Water Course In Chak 38 Lnp. Submission Date for this Tender is 03-11-2020. Water Course Tenders in Chak 38 LNP Rajasthan. Bidders can get complete Tender details and download the document.
Name of Work: Construction of Pucca Water Course in Chak 38 LNP (LNP Disty) | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Earth work\n(a) Earth work for water courses in ordinary soil with all leads and lifts, dressed as per specification | BI01010001010000000000000515BI0100001112 | 6301.58 | Per 10 Cum. |
2 | 2 | (b) Ramming of Earth work in ordinary soils in layers by wooden or iron rammers as per specification | BI01010001010000000000000515BI0100001113 | 5733.83 | Per 10 Cum. |
3 | 3 | Lining\n(a) Watering, ramming & dressing of sub grade including removal of irregularities up to 15 cm depth | BI01010001010000000000000515BI0100001114 | 5108.24 | Per 10 Sqm. |
4 | 4 | (b) Brick masonry in cement mortar (1:5) including cost of all materials including mechanical mixing of mortar with all leads & lifts and stacking etc. complete in all respect | BI01010001010000000000000515BI0100001115 | 902.58 | Per Cum. |
5 | 5 | (c) 10 mm thick Cement plaster in cement mortar (1:4) as per design and specification including cost of all materials including mechanical mixing of mortar with all leads & lifts and stacking etc. with curing for specified period complete in all respect | BI01010001010000000000000515BI0100001116 | 9118.45 | Per 10 Sqm. |
6 | 6 | Pucca Structures\n(a) Earth work excavation in foundation trench in ordinary soil for structures and then refilling soil in 15 cm. layers with all with all leads and lifts | BI01010001010000000000000515BI0100001117 | 1250.27 | Per 10 Cum. |
7 | 7 | (b) Cement concrete (1:4:8) including cost of all materials including using mechanical mixer with aggregate size 40mm with all leads & lifts and stacking etc. complete in all respects | BI01010001010000000000000515BI0100001118 | 37.74 | Per Cum. |
8 | 8 | (c) Brick masonry in cement mortar (1:6) including cost of all materials including mechanical mixing of mortar with all leads & lifts and stacking etc. complete in all respect\n | BI01010001010000000000000515BI0100001119 | 82.36 | Per Cum. |
9 | 9 | (d) 8mm thick Cement plaster in cement mortar (1:6) as per design and specification including cost of all materials including mechanical mixing of mortar with all leads & lifts and stacking etc. complete in all respect | BI01010001010000000000000515BI0100001119 | 341.54 | Per 10 Sqm. |
10 | 10 | (e) Supply of R.C.C. Naka Panel | BI01010001010000000000000515BI0100001119 | 54 | Each |
11 | 11 | (f) Supply of R.C.C. Naka Lid | BI01010001010000000000000515BI0100001119 | 32 | Each |
12 | 12 | (g) Fixing of Naka Farmes (Steel/R.C.C) | BI01010001010000000000000515BI0100001119 | 54 | Each |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail