Provision Of Ground Based Solar Power Generation 01 Mw Capacity At Mathura, MATHURA-Uttar Pradesh

Military Engineer Services-MES has published Provision Of Ground Based Solar Power Generation 01 Mw Capacity At Mathura. Submission Date for this Tender is 06-03-2021. Solar Generators Tenders in MATHURA Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

25781781
Corrigendum : Provision Of Ground Based Solar Power Generation 01 Mw Capacity At Mathura
Open Tender
Indian
Uttar Pradesh
MATHURA
06-03-2021

Tender Details

Provision Of Ground Based Solar Power Generation 01 Mw Capacity At Mathura

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 12-Nov-2020 Corrigendum No.01 Date 02-12-2020
2 26-Nov-2020 Corrigendum No. 02 Date 16-12-2020
3 09-Dec-2020 Corrigendum No. 03 Date 28-12-2020
4 22-Dec-2020 Corrigendum No. 04 Date 11-01-2021
5 05-Jan-2021 Corrigendum No. 05 Date 20-01-2021
6 14-Jan-2021 Corrigendum No. 06 Date 27-01-2021
7 22-Jan-2021 Corrigendum No. 07 Date 04-02-2021
8 29-Jan-2021 Corrigendum No. 8 Date 13-02-2021
9 04-Feb-2021 Corrigendum No. 09 Technical Bid 13-02-2021
10 05-Feb-2021 Corrigendum No. 10 Date 22-02-2021
11 09-Feb-2021 Corrigendum No. 11 BOQ 22-02-2021
12 11-Feb-2021 Corrigendum No. 13 Date 27-02-2021
13 17-Feb-2021 Corrigendum No. 14 BOQ 27-02-2021
14 19-Feb-2021 Corrigendum No 15 Financial Bid 27-02-2021
15 23-Feb-2021 Corrigendum No.16 Financial Bid 27-02-2021
16 27-Feb-2021 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 06-03-2021

Key Value

Document Fees
INR 3000 /-
EMD
INR 675000.0 /-
Tender Value
INR 7 Crore /-

BOQ Items

Name of Work: PROVISION OF GROUND BASED SOLAR POWER GENERATION 01 MW CAPACITY AT MATHURA
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Lump sum price worked out by the Contractor for "Building works” as listed in Schedule ‘A’ Part I **Above / Below the lump sum price inserted by the MES in Schedule ‘A’ Part-I\n 1 Each
2 2 Lump sum price worked out by contractor for "Internal water supply" as listed in Schedule `A' Part-II Above/below the lump sum price inserted by the MES in Schedule `A' Part-II 1 Each
3 3 Lump sum price worked out by contractor for "Internal Electrification" as listed in Schedule `A' Part-III*Above/below the lump sum price inserted by the MES in Schedule `A' Part-III 1 Each
4 4 Lump sum price worked out by contractor for "Road Path and Culverts" as listed in Schedule `A' Part-IV*Above/below the lump sum price inserted by the MES in Schedule `A' Part-IV 1 Each
5 5 Lump sum price worked out by contractor for " Security Fencing, Compound Wall and Gate " as listed in Schedule `A' Part-V Above/below the lump sum price inserted by the MES in Schedule `A' Part-V 1 Each
6 6 Lump sum price worked out by contractor for "Area Drainage" as listed in Schedule `A' Part-VI Above/below the lump sum price inserted by the MES in Schedule `A' Part-VI 1 Each
7 7 Lump sum price worked out by contractor for "Sewage Disposal" as listed in Schedule `A' Part-VII*Above/below the lump sum price inserted by the MES in Schedule `A' Part-VII 1 Each
8 8 Lump sum price worked out by contractor for "External water supply" as listed in Schedule `A' Part-VIII Above/below the lump sum price inserted by the MES in Schedule `A' Part-VIII 1 Each
9 9 Lump sum price worked out by contractor for "External Electrification" as listed in Schedule `A' Part-IX Above/below the lump sum price inserted by the MES in Schedule `A' Part-IX 1 Each
10 10 Lump sum price worked out by contractor for "EARTH WORK" as listed in Schedule `A' Part-X Above/below the lump sum price inserted by the MES in Schedule `A' Part-X 1 Each
11 11 Lump sum price worked out by the Contractor for Schedule `A' Part-XI (rate against Srl No.12.00 to 38.12 shall be quoted by the Contractor)
12 12 Internal Water Supply\nS&F Wall mixture CP hot and cold 15mm bore with long bend pipe for connection to overhead shower , bright finish with three joints screwed the ends for iron pipe and plugging complete all as specified and directed. ( Cat Part No: DLX -517B Make Jaquar and euivalent Make specified in Appendix 'B'. 1 Each
13 13 Internal Electrification\nSupply and fix 20 W surface/wall mounted LED batten having high efficiency long life LED chips with luminous efficacy of > 100 lumen/W, independent isolated SMPS based constant current electronic LED driver with THD < 20%, surge voltage protection and other safety tests as per IS: 15885 (Part-2/Sec-13): 2012, polycarbonate diffuser, housed in powder coated white extruded aluminium channel housing and white coloured ABS end caps having input voltage 220- 240 V, input frequency 50- 60 Hz, PF > 0.95, including electrical connection with 3 core flexible Cu conductor cable of appropriate size from ceiling rose to the fixture complete all as specified and directed. 18 Each
14 14 Supply and fix 45W Security light having high efficiency long life LED module with SMD LED package mounted on MCPCB with high LED efficacy of = 100 lumen/W, integral SMPS based constant current electronic LED driver with THD < 20%, surge voltage protection and other safety tests as per IS: 15885 (Part-2/Sec-13): 2012, IP 66 protection, high effiency polycarbonate cover with integrated lens housed in pressure die-cast aluminium alloy heat sink for effective thermal management, sturdiness, excellent corrosion resistance, separate optical and control gear compartment & top opening for easy maintenance, suitable for side entry, pole mounting with bracket arm OD 35 mm to 42 mm including necessary electrical connection to the fixture with 3 core flexible Cu conductor cable of appropriate size and 1.5 m long bracket, having 40 mm diameter light grade GI pipe, including GI clamps, nuts, bolts & washers with two coats of synthetic enemal paint over a coat of red oxide primer complete all as specified and directed. [Make: BAJAJ 169799 BRTFG 45W LED I or equivalent model of makes as specified in Appendix 'B'. 4 Each\n
15 15 Supply and Fix BEE five star rated energy efficient high-speed ceiling fan having 1200 mm blade sweep, air-flow not less than 210 CMM, operating voltage 220-240 V and frequency 50 Hz, including a downroad of suitable size and electrical connection with 3 core flexible Cu conductor cable of appropriate size from ceiling rose to the fan complete all as specified and directed. 4 Each
16 16 Supply and fix Energy efficient metalic exhaust fan having blade sweep 300 mm, air delivery not less than 900 CMH, operating voltage 220-240 V and frequency 50 Hz, including electrical connection with 3 core flexible Cu conductor cable of appropriate size from ceiling rose to the fresh-air fan complete all as specified and directed. 6 Each\n
17 17 MCB for AC applications upto 63 A, having breaking capacity Icn = 10 kA, conforming to IS/IEC 60898-1, sliding bottom clamp, colour coded on/off indication on dolly, biconnect IP 20 protected lower terminals and sliding shutters as under all complete as specified and directed.
18 17.01 MCB SP 6-32 A, B- curve \n 7 Each
19 17.02 MCB SPN 16 A, C- curve 1 Each
20 18 Road, Path and Culvert\nM&L for preparation of new surfaces providing and making lines, dashes , arrows, letters etc on road with hot applied thermoplastic road marking paint min 2.50 mm thick complete in all respects such as furnishing all labour, material, tool, equipment incl all incidental cost necessary to carryout the work at site conforming to technical specification clause No.803 of MORTH specifications 4th Revision of 2001/Latest edition complete all as specified and directed. 70 Sqm
21 19 Sewage Disposal\nM&L for providing Ready Made Hume pipe Septic tank designed to carry sewage and sludge water Vent shaft, connection etc. complete for 10 users complete all as specified and directed. 1 Each
22 20 External Water Supply\nSupply and fixing self priming 1 HP Monoblock Pump Set for cleaning of Solar Panels having Single Phase 240V ,1500 RPM,delivery size 25mm and head upto 40mtr, complete with installation at site and connecting & testing all as specified 2 Each
23 21 M&L for valve chamber of size 600mm x 600mm x 600mm (internal dimentions) built in PCC 1:3:6 type C1 solid block masonary in CM 1:4 including base concrete PCC 1:4:8 mix, type D2 100mm thick, plastering with CM 1:4, 15mm thick internally and externally including provision of 3.15mm thick MS sheet cover fixed with 50x50x6mm angle iron embeded in PCC 1:2:4 mix, type B1 coping 100mm thick including painting to steel and iron work with two coats of synthetic enamel paint over a coat of red oxide primer and necessary earth work and excavation in any type of soil complete with locking arrangement lifting handles all complete as specified and directed. 3 Each\nJob
24 22 Supply,install,testing and commissioning of CPRI approved factory made LT Outdoor Type Panel box ,floor mounted 4 wire, 3 phase 200amp and made out of powder coated CRCA sheet 3.15mm thick outer sheet and 2.00mm thick inner sheet double door , front openable door with locking arrangement , dust,vermin and water proof duly mounted on 40x40x4mm thick angle iron stand 04 legs 750mm long each 450 mm grouted in PCC 1:2:4 type B-1 and 300mm above ground and including necessary incoming and out going cable connection with proper size aluminium lugs, nut bolts, glands etc and including comprising of the following :-\n (i) MCB 20 Amp, SPN 10KA rating -01 No (incommer) \n (ii) MCB 10 Amp, SP 10KA rating -02 No (Outgoing) \n (iii) DOL Pump Starter Single Phase for 1 HP Motor - 02 Nos\n(iv) Digital universal meter with LED display for 3-ph Amp, Volt, Frequency and\n P.F Cl 0.5 Make- L&T (Cat Part No WL411021OOOO)\n(v)CT coil of ratio 100/5-01 Set. Make: AE\n(vi) Aluminium strip bus bars for 3 Phase system\n(vii) LED type AC 220V Phase Indicators RYB, \n(viii) Internal wiring of panel board with copper cable single core of sutable size \n\nNote:- Panel shall be mounted on PCC platform as per manufacturer instructions and unit rate quoted shall be deemed to be included for this provision.\n 1 Each\nJob
25 23 External Electrification\nSupply laying & testing UG cable XLPE insulated screened PVC bedded galvanised steel strip armoured elect power cable heavy duty with stranded compect circuler aluminium conductor 33000 volts (E) grade earthed system of cross section area 95 Sqmm x 3 core complete with confirming to IS 7098 (Part-II) 2011 with updated amendments incl laid in trenches / duct / fixing on walls /poles or passing through pipe including connecting with installations / equipments / GOD and testing complete all as specified and directed.\n(Note : Cable Joint kit shall be measured and paid separately under respective item) 2000 RM
26 24 M&L for Cable route indicator showing " MES HT 33 KV UG Cable" and route of cable with arrow made of CI in suitable eliptical shape and fixed on angle iron 40x40x6mm, 800mm long painted in Brown Colour with two coats of synthetic enamel paint cover a coat of red oxide primer duly embedded in PCC block 0.40x0.40x0.40 mtr in ground and 0.15mtr above ground level complete all as directed and specified. 40 Each
27 25 M&L for Cable route indicator showing " MES LT UG Cable" and route of cable with arrow made of CI in suitable eliptical/round shape and fixed on angle iron 40x40x6mm, 800mm long painted in Blue Colour with two coats of synthetic enamel paint cover a coat of red oxide primer duly embedded in PCC block (0.40x0.40x0.40)mtr including in ground and 0.15mtr above ground level complete all as directed and specified. 10 Each
28 26 Supply & fixing cable jointing kit 33 KV (earthed)grade cable for outdoor end termination cold shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor HT cable of size 95 Sqmm complete all as specified and directed. \n\n 14 Each
29 27 Supply & fixing cable jointing kit 33 KV (earthed)grade cable for Indoor end termination cold shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor HT cable of size 95 Sqmm complete all as specified and directed. \n 2 Each
30 28 S & F Gang operated Air Break Switch outdoor type 33 KV, 200 Amp capacity triple pole mechanically operated suitable for operation from ground level and for Horizontal / vertical mounting complete with HT insulators 9 Nos with earth switch., channel, knife blades, GI pipe medium grade not below 25 mm dia for operating mechanism worked from ground level , locking arrangement with handle all as specified and directed. \n 2 Each\nSet
31 29 Supply and install of 70W LED street light fitting with lens & driver, powder coated pressure die cast aluminium, top opening and maintainable with heat resistance toughened glass, built-in Short-Circuit Protection, Overload Protection and Surge Protection, IP-66 proction with luminaire efficiecy of greater than 80Lumen/Watt, Colour rendering (CRI) of = 70 and co- related colour temperature (CCT) of 5700K (±500K) . The luminaire should have 5 KV surg protection, PF = 0.9 and total harmonic distortion of THD = 10%, voltage range of 140-280V should be provided. Over voltage proction should be there after 300 V +/- 10%, The driver used must be a constant current driver with efficiency of = 85%. The manufactures logo must be embossed into the housing of the luminaire. Manufactures to provide LM80 report from source manufacturer and should have adequate testing facilities approved by ministry of science or any other Govt of India lab to provide LM79 report, including all connections complete all as specified. Make of fitting : C&S (as per Cat Part No : INDUS-T/70W/LS LTESST70WLED/LS ) or equivalent make as specified in Appendix 'B) (meeting all the above specification). 16 Each
32 30 M&L for Thermoplastic polycarbonate street light junction box of size 250x200x105mm inside for loop-in-loop out connections with provision of 4 way connector or Aluminium busbar for 3 Phase with Neutral connection of 4 core cable (In-Out)and single pole MCB 2.5 Amps with hinged door and locking provision fixed on GI poles with suitable clamps, nuts and bolts including incoming / outgoing cable connection complete all as directed by Engineer-in-Charge. Make : Sintex or equivalent 16 Each
33 31 M&L for street light bracket made out of 40mm dia light grade GI pipe of 1.5m length bent to required shape suitable for fixing street light fitting on Steel tubular pole including two Nos clamps made out 40mm X 6mm flat with suitable nuts and bolts including two coats of aluminium paint over a coating of red oxide primer complete all as directed.\n 16 Each
34 32 Supply & fixing pin type porcelain vitreous insulator with 33KV grade including galvanised mild steel spindle, one nut and two washers complete all as specified and directed. 12 Each
35 33 Supply,install,testing and commissioning of CPRI approved factory made LT Outdoor Type Panel box ,floor mounted 4 wire, 3 phase 200amp and made out of powder coated CRCA sheet 3.15mm thick outer sheet and 2.00mm thick inner sheet double door , front openamle door with locking arrangement , dust,vermin and water proof duly mounted on 40x40x4mm thick angle iron stand 04 legs 750mm long each 450 mm grouted in PCC 1:2:4 type B-1 and 300mm above ground and including necessary incoming and out going cable connection with proper size aluminium lugs, nut bolts, glands washers, insulators. sleevs and provision of extra holes in bus bar etc and including comprising of the following :-\n (i) MCB 16 Amp, 4 Pole 10KA rating -01 No (incommer) Make: Havells\n (ii) MCB 10 Amp, SPN 10KA rating -03 No (Outgoing) Make: /Havells\n (iii) 4 pole,4 Nos Automatic Power Contactors with coil & Manual Override with nominal current rating 16Amp, Make: L&T\n (iv) Digital timer switch, Astro 110-240V AC 1-Phase - make Havells Cat Part No DHTJW01016 or equivalent in Legrad / L&T\n (v) Toggle switch 2-way for Auto / manual arrangement for by - pass\n(vi) Digital universal meter with LED display for 3-ph Amp, Volt, Frequency and P.F Cl 0.5 Make- L&T (Cat Part No WL411021OOOO)\n(vii)CT coil of ratio 100/5-01 Set. Make: AE\n(viii) Aluminium strip bus bars for 3 Phase system\n(ix) LED type AC 220V Phase Indicators RYB, Make : Havells - 01 Set\n(x) Internal wiring of panel board with copper cable single core of sutable size \n\nNote:- Panel shall be mounted on PCC platform as per manufacturer instructions and unit rate quoted shall be deemed to be included for this provision. 1 Each\nJob
36 34 Supply,installation , commissioning and testing of HT 33KV 3-phase totally enclosed metal clad SF6 switch gear suitable for Indoor Kiosks installation having rupturing capacity upto 250MVA, overload and earth fault protection, ammeter,voltmeter (Metering System & Protection relay shall be suitable for SCADA operatable System) and of rating 400 Amp complete including comprising following accessories / fitments all as specified all as per standard norms :- Make : ABB / Schneider / SIEMENS / LARSEN & TOUBRO (L&T)\n(a) Parameters of circuit breaker :- \n(i) Rated voltage (nominal/max) : 33KV / 36 KV\n(ii) Type/service : SF-6 switch gear / Indoor\n(iii) Frequency : 50 Hz\n(iv) No of phases : 3\n(v ) System neutral : Effectively earthed\n(vi) Impulse withstand : 75 KV p\n(vii) Rated continuous current : 400Amp\n(viii)1 Minute power frequency withstand voltage : 35KV r.m.s.\n(ix) Short time current for 3 secs : 26.3 KA to 31.5 KA\n(x) Operating duty : 0 – 3 secs – Co – 3 min – Co\n(xi) Operating mechanism : Motor operated spring charged closing mechanism.\n(b) Protection system \n(i) Triple pole IDMT over load /earth fault relay with instant elements (2 O/C + 1 E/ F) on all three phases . \n(ii) Master trip relay protection.\n (c) Metering system ;- \n (i) Ammeter and voltmeter with selector switches, frequency meter indicating lamp for 'ON' and 'OFF' flushed in front of panel (on incoming side)\n(ii) Ammeter and voltmeter with selector switches indication lamp for 'ON' and 'OFF' flushed in front of panels on outgoing side\n 1 Each\nJob
37 34.01 (d) Provn for manual charging of the operating system of 'ON' and 'OFF' \n(e) Provn of motor operated spring stored energy trip and closing coil system \n(f) Auxiliary switches as suitable for system at (d) and (e) above \n(g) Set of CTs in resin cast wound double core for system voltage, 33 KV with double ratio suitable to above system / capacity CTs - 03 Nos\n(h) Set of PT's resin cast, 3 phase, 33 KV.\n(j) Necessary HT & LT fuses for metering and protection \n(k) Power and control wiring with copper cables \n(l) Any other accessries, control which are required as per standard norms and engineering practice, IE rules to ensure system safe for operation and maintenance. \n(m) Supply and install auxillary power supply for operation of relays, meters complete all as per standard norms.\nNote :- 1. The panel shall be SCADA Compatible system. \n2. Unit rate quoted shall be deemed to be included included the cost of danger notice board, 33KV grade 25 cm CRCA ISI Marked, 33 KV grade, operating and maintenence manual, spares list, periodical mainenance chart / manual, lay out of panel / wiring shall be included in the rate quoted. \n\n
38 35 Boring of holes under road, Pavement, Hard standing by trenchless technology using ultra sounding technique and necessary machinel for crossing of cable through use of GI Pipe of length and horizontal depth not exceeding 6 mtr and n. exc. 200mm dia and getting out excavated surplus soil to a distance not exceeding 50 mtr and depositing where directed at a level not exceeding 1.5m compllete all as specified and directed.\nNote : GI Pipe measured and paid separately under relevent items. 12 Each Job
39 36 Note :- Scope of this item extends . from Serial No 36.00, 36.01 to 36.14 here in after\n01 MWp SPV GENERATION PLANT\nDesign,Supply, installation, testing & commissioning of ground based Solar Power Generating system without battery of capacity 01 MWp AC output peak, Grid tied with Solar Photo voltaic modules with minimum 315 Wp rating polly crystalline Silicon PV Modules including designing, supply & fabricating of civil foundation work and array mounting structure, DC / AC disconnector switch / MCCB, SPD, fuses, array junction box including string combiner box (SCB) with IP 65 & above protection. Solar plant shall also include DC distribution board, AC distribution board, DC and AC cables, safety and protection arrangements, grid connectivity and metering facility complete in all respects as applicable as per existing policy of UPPCL and including DC cable connection with string as well as for invertor input connection with DC isolator, string monitoring unit to communicate with SCADA system required as per manufacturer recommendation including PVC insulated single core unsheathed multi stranded DC cable copper conductor wire 1100 volt grade of size not less than 6 Sqmm connecting from Array Junction box / panel to SCB and Invertor complete including temperature and pressure sensor device with communication device to comminicate with SCADA for energy calculations complete including comprising items / Components from (A) to (M) all as directed below:-\n Note : 1. Design shall be done from MNRE approved channel partners of rating as specified in NIT and according to latest IS / IEC code and MNRE latest guidelines and specifications tentatively as shown in Drgs. Final design & Drgs. of subject work to be vetted by any one of the followings approved agencies :- \n 1 EACH \nJOB
40 36.01 (a) National Institute of Solar Energy\n(b) Solar Energy Corporation of India\n(c) Sardar Swarn singh National Institute of Renewal Energy\n(d) The Indian Renewable Energy Development agency\n2. Permission from DISCOM (DVVNL) for grid connectivity (33KV) and metering facility has already been received as required and the unit rate quoted will include the cost of necessary infrastructure complete including metering facility for import and export consumption as applicable as per existing policy of UPPCL and its connected items , components, CT & PT/,Cables , Meter Box ,check meter etc.\n\n(A) SOLAR PHOTO VOLTAIC MODULES\nSupply, fixing, testing, connecting, charging and commissioning of Solar Photo Voltaic Modules of minimum rating 315 Wp with positive tolerance, with minimum 1100mm cable length with module efficiency greater than 15.8%, fill factor greater than 0.7, module free from PID, Module connector suitable fo MC4 bizlink and junction box with minimum IP 67 rating,wit minimum 72 cells, poly crystalline Silicon PV Modules should be indigenously made, latest technical specification and MNRE approved and should comply the following IEC specifications: IEC 61215 Edition -II, IEC 61646 and IEC 61730- I & II.ISO 9001:2008 Quality management system, ISO 14001:2004: Environmental management system or equivalent. PV Modules shall be tentatively 3750 Nos for 1 MW AC output. \n
41 36.02 NOTES :- 1. Solar Module should have high conversional efficiency of minimum 15.8% each module and two 4 Sqmm UV resistant cable approx 1.2m length and terminated with connectors MC4 compatible connectors. Glass with anti reflective coating, excellent performance in low light, torsion and corrision resistant with anodized aluminium frame. \n2. Solar PV Modules shall have Warranty for a minimumn period of 10 years against all material/manufacturing defects and workmanship. PV Modules shall be warranted for their output Peak Watt capacity which should not be less than 90% at the end of 10 years and 80% at the end of 25 years from the date of successful completion of trial run is the scope of the bidder. \n3. Each PV module must use a RF identification tag (RFID), which must contain following information:- \n(i) Name of the manufacturer of PV module & Solar cells. (indigenously made) \n(ii) Month and year of the manufacture (Seperately for solar cell and module). \n(iII) Country of origin (seprately for solar cell and module).(Made in INDIA only) \n(Iv) I-V curve for the module. \n(v) Peak Wattage, Im, Vm and FF for the module, also Unique serial no and Model No of the module. \n(vi) Date and year of obtaining IEC PV module qualification certificate. \n(vii) Name of the test lab issuing IEC certificate. \n(Viii) Other revelant information on traceability of solar cells and modules as per ISO 9000 series. \n\n
42 36.03 (B). MODULE MOUNTING STRUCTURE FOR SOLAR PANEL & CONNECTED WORK :\nSupply, design and fabricate module mounting / fixed type structure ( for SPV Plant of combined capacity 1 MWp, AC output) hot dipped galvanised mild steel with coating not less than 85 microns and suitable to withstand wind speed upto 170km /hour and electrolytically compatible channels, bracing purlins of any size, electromagnetic washers, nuts, bolts including cutting, drilling etc alongwith concrete grouting for required rigid support as required at site as per OEM/MNRE Norms recommendations. The design should be as per IS 2061 & galvensing as per IS 4759 code and suitable for the wind speed, sun light and climatic condition of the plant loaction i.e. mathura. The design life should be more than 25 years and minimum yeild strength of steel should be 340 MPa. The structure should be 500mm +100mm above ground level suitable for easy removing and refixing/replacing of PV modules of the Solar Plant. The properties of RHS will confirm to IS 4923 : 1997 HDG fastners of 4.6 grade and 8.8 grade for structure module mounting structure should be of manual seasonal tilt of 0 degree to 45 degree to provide maximum generation\n(C). ARRAY JUNCTION BOX , STRING COMBINER BOX (SCB / SCU) :\nSupply, installing, testing & comissioning of Array Junction Box and six channels string combing box not less than 24 in 1 out, with 15 Amp fuse on positive side, 315 Amp DC disconnector switch (06 Nos) and six channels string combing box not less than 12 in 1 out, with 15 Amp fuse on positive side, 150 Amp DC disconnector switch (02 Nos).Weather proof, outdoor installation, shaded, UV resistant, glass fibre reinforced plastic, self extinguishing, halogen free, IP-65 (IEC 60529), Voltage grade 1100V with earthing stud with self locking door handle, for mounting on rail or cage clamp type suitable for conductor sizes upto 185 mm² with no. of cable inlet and outlet as per requirement. 1000V DC, with surge Protection device (SPD), over voltage proction & earthing as per relevent standerd. Facility for manually operated switch. \n\n
43 36.04 Note:- Current-198 A and voltage 760 V each SCB, complete with all control cable connecting & all as specified and as directed.\nThe Junction boxes shall have suitable arrangement of followings: \n(i) Strings are required to be connected to the busbar through individual fuses. Provide arrangement for disconnection for each of the groups. \n(ii) Provide a test point for each subgroup for quick fault location & to provide group array isolation. \n(iii) Each array junction box will have suitable by pass & reverse blocking diodes for maximum DC blocking voltage of 1000V with suitable arrangement for its connection. Reverse blocking & by-pass diodes shall work for temperature extreames & shall have efficiency of 99.98% conformed by appropriate IEC standard.\n(D).CENTRAL INVERTER (POWER CONDITIONING UNIT) DC TO AC :\nSupplying, installing, testing and commissioning of Central Inverter / PCU, DC to AC (indoor Type) of capacity 2 X 500KW AC or next higher side capacity suitable for 1 MW AC inputs with 4 (+/-) load each with SCADA capabilities as specified house in OEM provided complete.\nNote(A): 1. Central inverter Unit / PCU should be associated control and protection devices integrated (grid tied) to convert DC power into 3 phase AC voltage, alongwith grid synchronizing facility, made up of 2.00 mm CRCA sheet, cubical floor mounted with double hinged doors with locking arrangment, bus bars with bus bar chambers, cable chambers, provisions for cable entry and exit, prefoundation etc including PCC work complete all as specified and as directed.\n\n\n
44 36.05 2. Central inverter Unit / PCU should be comprising of following :-\n(a) All the equipment and accessories installed in panel should be in seprate compartments.\n(b)Maximum input voltage 1000 V DC.\n(c) Humidity 15% to 95%, non-condensing.\n(d) Enclosure (type) IP 22 ( Indoor rated)/ IP 42 (Outdoor rated).\n(e) Maximum noise level 60 dB DC injection less than .5% of nominal load current 60 db.\n(f) The combined KVA rating of all the PCUs shall not be less than 750 kVA.\n(g) The inverter supplied shall have minimum of 10% additional DC input capacity.\n(h) Incomer : \nThe inverter inputs suitable as per site requirement shall be provided with PV rated DC fuses suitable for DC voltage upto 1000 Volt and integrated DC isolator 1200 Amp for easy operation including necessary protection as recommended by manufacturer.\n(j) Outgoing:\n(i) MPPT Central inverter not less than 500 kW ( capacity of inverter) with associated control and protection devices integrated to convert DC Power into 3 Phase AC voltage, along with grid synchronizing facility - voltages 300 Volt AC(+15% to -10%) 3 Phase 50 Hz, Peak Effficiency > 98%, THD < 3% , Temp range -10°C to +55°C power factor Control range > 0.95 lead or lag including all measuring meters complete - 01 Set \n
45 36.06 (ii) ACB 1250 Amps capacity, 3 pole, 50 KA, 440 Volt 50 HZ draw out type breaking capacity 50 KA MICROPROCESSOR protection based with overlead, short circuit, earth fault and instantaneous over current.\n(k) Protection unit complete with digital meters all as per specified and directed - 01 No.\n(l) Complete wiring of the panel carried out with appropriate size of copper conductor PVC insulated multistranded cable and all the connection between Inverter and MCCB will be done with suitable size of single core PVC insulated with multi stranded copper cable.\n(m) Air cooling system complete with blower motor etc of suitable Nos & capacity as per manufacturer designs.\nNote(B)- 1. PCU/inverter front panel shall be provided with display (LCD or equivalent) to monitor but not limited to the following:\n*DC power input, *DC input voltage, *DC current, *AC power output, *AC voltage (all the 3 phases and line), *AC current (all the 3 phases and line), *Power factor.\n2. PCU shall conform to the following standards and appropriately certified by the labs:\n*Efficiency measurement :IEC 61683\n*Environmental testing: IEC 60068-2 or IEC 62093\n*EMC, Harmonics, etc.: IEC 60068-2 or IEC 62093\n*Electrical safety:IEC 61000 series- relevant parts\n\n
46 36.07 Note- All the Equipment and accossories installed in panel should be in seprate compartments. Anti-islanding (Protection against islanding of grid). The PCU shall have anti islanding protection. (IEEE 1547/UL 1741/ equivalent BIS standard)\nIEC 62116 Nominal Output frequency 50/60 Hz. (Inverter to follow grid frequency upto +/- 3% of the nominal output frequency during normal operation).\nNOTE (C) : The Inverter (PCU) shall be warranted for minimum 5 years against all material / manufacturing defects and workmanship after date of completion of Phase - I work.\n(E) STEP UP TRANSFORMER UNIT (300 V - 415 V /33 KV)\nSupplying, installation, testing and commissioning outdoor type step up power transformer (Inverter duty for solar application) with copper winding having continuous rating of 1250 KVA, 0.30 KV/33KV 3-Phase (or nearest size on higher side), 50Hz, vector group YND-11 having ONAN Off-load T/C, Z=5%,Tap changer arrangement on HV side complete with protection accessories as latest IE & IS rule. The tapping to be provided for variation of HV voltage from +5% to -5% in seven steps of 2.5% each. oil immersed & filled up to desired level ,naturally cooled with externally cooling tubes core type delta connected on HV side and star connected on LV side in a accordance with vector symbol YND-11 with neutral brought on secondary LV side.The transformer shall be complete with standard fittings all as specified and confirming to IS:335 of 1983 for oil and IS: 1180:2014 for transformer on suitable size of PCC platform and including comprising of following:-\n
47 36.08 (a) One cable box on LV side (secondary side) consisting of 04 nos of porcelain bushing with bushing rods complete with nut,washers,cable gland etc.\n(b) Oil conservator tank with filter type drain valve and oil level guage & bucholz eclay.\n(c) Dehydration breather assy with first fill of dehydrating agent .\n(d) Explosion vent.\n(e) Thermometer pocket on tank cover.\n(f) Dial type thermometer vapour pressure having range 0-120 degree C with max reading pointer max temp indicator and resetting device.\n(g) Rating plate with terminal marking.\n(h) 02 earthing terminal on tank and cover for fixing earth strip of size 32x6mm.\n(i) Oil level gauge and oil drain filter valve.\n(j) Lifting hook.\n(k) Oil filler hole with cap /plug with connection complete.\n(l) Air relief valve plug.\n(m) Detachable rollers -04 Nos\n(n) Extra bushing for Neutral out side the cable box for independent earthing for neutral earth.\n(o) First fill of fresh transformer oil confirming to relevant IS and tested up to 40 KV die electric strength.\nNote: (a) Transformer shall be complete with SCADA system.\n (b) The erection of transformer shall be done under the supervision of manufacture auth rep and certificate in this regard shall be submitted by contractor duly signed by rep of manufacturer.\n(c) Plinth for Transformer including 40mm to 100mm graded stone metal aggregate 1.5 Mtr wide and upto 3 Mtr deep around Transformer plinth with and including slant slot for accommodating 100mm dia pipe on both LT & HT side with clamping arrangement of size and specification as per manufacturers instructions shown on drawings and as directed by Engineer-in - Charge complete shall be deemed to be included in the unit rate quoted by contractor.\n
48 36.09 (F) LIGHTENING PROTECTION SYSTEM FOR SOLAR PLANT AREA INCL COPPER EARTHING :-\nSupplying, designing, testing and commissioning of lightning protection system covering the entire Solar Power Plant area by using ESE (Early Streamer Emission) lightening arrestor of stainless steel rod / mast, air terminal protector of 4 m height with maximum coverage area of minimum 80m radius, suitable for wind load level-3 with aluminium down conductor of 32mm x 3mm, test point and copper earthing as under:- \nEarthing with copper earth plate 600mm x 600mm x 3.15mm thick, burried directly in ground (earth pit not less than 2.25 metre deep below normal ground level) with top edge of the plate not less than 1.5 metre below normal ground level connected to copper earth strip 20x3mm by means of bolts, nuts check nuts and washers of galvanized iron or steel with protection pipe of GI, light grade 40mm bore, watering pipe 20mm bore of GI medium grade, earth plate surrounded by alternate layer of coal dust and common salt 15 cm thick each layer all as per electrical plate No 3 of SSR Part-I and connected to earthing test point all as specified or indicated and testing on completion including funnel with wire mesh, earthing chamber with PCC (1:2:4) type B-1 using 20mm graded stone aggregate, 80 mm thick precast RCC 1:1.5:3 type A-1 cover duly reinforced with XPM (weight not less than 3 kg/sqm) and frame including all excavation and earth work etc. complete all as specified and as directed.\nNote : 1. Earth chamber shall be constructed at least 1.50 metre away from the top of earth electrode, the earth pit and pipe for watering shall be provided in slanting manner.\n2. Cost of required length of copper strip & GI protection pipe upto the test point and further connected to Eqpt etc. is included in the unit rate quoted for this item .\n3. Qty of Earthing Solar lightning shall be provided as per latest IS / IEC rule .\n\n
49 36.1 (G) ON GRID DATA ACQUISTION MONITORING SYSTEM (SCADA) :-\nSupplying, installation, testing and commissioning of ON Grid Data Acquistition / Plant monitoring system (SCADA SYSTEM) suitable for solar power plant 3P 50Hz, AC power string inverter with all protection & controlling as per specifications complete with all electronic and electrical parts and all necessary software and hardware etc to make fully functional connected to monitor with complete plant parameters as required and operate the system from remote and other accessories and the system will be controlled from the main control room where all the data from different parts of the plant will be received, analyzed and action taken either manually or on auto as per the system design.\nThe SCADA System should include the following technical details and parts :\n(a) SCADA System overall efficiency should not be less than 98% (with inbuilt or external data logging device & on line portal log-in ID & password) & one PC HP Make with intel i5 processor, 2TB HDD, 4GB RAM, DVD Driver with Writer, 21'' LED monitor,mouse, key board, CPU, key pad , preloaded with Window10 & MS Office, one all-in-one Laser Printer suitable for A-4 & Legal size papers (black and white). \n(b) Main SCADA control wall mounting panel complete with fixing arragement like nut bolt, washers of suitable size.\n(c) Single phase UPS 5 KVA with 12 Volt battery, 100 Ah and required battery backup should not be less than 4 Hrs, complete with all accessories.\n(d) 4 Nos of Analog Inputs ( Voltage: 0 to 10V DC & Current: 0 to 20mA DC).\n(e) 4 Nos of Digital Inputs.\n(f) Output communication shall be either through RS485 or 10 /100 MB Ethernet at Modbus protocol.\n(g) Data Storage facility\n(h) Data transfer facility to FTP Server via FTP Push Function.\n(j) Easily operated using a web interface\n(k) It should have necessary indication Lights, SD Card Slot, Modem connection, USB connection, Network Connection, E-mail alert feature, data recording in .csv & .xml format every minute.\n(l) Mounting plates/angle, connectors with Washers, nuts-bolts, screws and screw anchors shall be provided along with the sensor.\n(m) All instantaneours data shall be shown on the computer screen. Software shall be provided for USB download and analysis of DC and AC parametric data for individual plant.\n
50 36.11 (H) METERING SYSTEM:-\nSupply, installing, connecting, testing and commissioning of HT 33KV bidirectional meter for metering system with suitable rating set of CT & PT (33KV), complete all as specified and as directed.\nNote : 1. The unit rate quoted includes necessary CT & PT, Cable, Meter Box with metering system as applicable as per existing policy of UPPCL complete including connection to make meter facility in functional condition after necessary laison with DVVNL Mathura.\n2. All types testing, protection parameters as recommeded by UPPCL / DVVNL will be complied with for the solar plant after physical completion of work and rates thereof are deemed to be included in quoted rates.\n(J) EARTHING FOR SOLAR PLANT SYSTEM :-\nMaterial and labour for installation of Earthing for String monitoring / Combiner box, Inverter, Solar PV Module, Array Structure, Panels complete entire system complete with suitable size of copper cable / strip /G I strip as per following details and as required at site & connecting to latest IS / IEC all as specified and directed\n(K) GI EARTHING FOR ARRAY STRUCTURE, SCB :-\nEarthing with galvanized steel earth plate electrode 600mm x 600mm x 6mm thick, burried directly in ground (earth pit not less than 2.25 metre deep below normal ground level) with top edge of the plate not less than 1.5 metre below normal ground level connected to galvanized 32x6mm GI earth strip by means of bolts, nuts check nuts and washers of galvanized iron or steel with protection pipe of GI, medium grade 15mm bore, watering pipe 20mm bore of GI medium grade, earth plate surrounded by alternate layer of coal dust and common salt 15 cm thick each layer all as per electrical plate No 3 of SSR Part-I and connected to earthing test point all as specified or indicated and testing on completion including funnel with wire mesh, earthing chamber with PCC (1:2:4) type B-1 using 20mm graded stone aggregate, 80 mm thick precast RCC 1:2:4 type B-1 cover duly reinforced with XPM (weight not less than 3 kg/sqm) and frame including all excavation and earth work etc. all as specified.\n
51 36.12 Note : 1. Earth chamber shall be constructed at least 1.50 metre away from the top of earth electrode, the earth pit and pipe for watering shall be provided in slanting manner.\n2. Cost of required length of GI strip & GI protection pipe upto the test point and further connected with Eqpt is deemded to be included in the unit rate quoted of this item. \n 3. The double earthing of Array structure, SCB and as site requirment will be provided through a bus arrangement from their respective earth pits. [30 No. earth pits for structure, STB, Modules Panels, ] \n(L) COPPER EARTHING FOR TRANSFORMER , INVERTER, LT/ HT PANELS :-\nEarthing with copper earth plate 600mm x 600mm x 3.15mm thick, burried directly in ground (earth pit not less than 2.25 metre deep below normal ground level) with top edge of the plate not less than 1.5 metre below normal ground level connected to copper earth strip 20x3mm by means of bolts, nuts check nuts and washers of galvanized iron or steel with protection pipe of GI, medium grade 15mm bore, watering pipe 20mm bore of GI medium grade, earth plate surrounded by alternate layer of coal dust and common salt 15 cm thick each layer all as per electrical plate No 3 of SSR Part-I and connected to earthing test point all as specified or indicated and testing on completion including funnel with wire mesh, earthing chamber with PCC (1:2:4) type B-1 using 20mm graded stone aggregate, 80 mm thick precast RCC 1:2:4 type B-1 cover duly reinforced with XPM (weight not less than 3 kg/sqm) and frame including all excavation and earth work etc. all as specified. \nNote : 1. Earth chamber shall be constructed at least 1.50 metre away from the top of earth electrode, the earth pit and pipe for watering shall be provided in slanting manner.\n2. Cost of required length of copper strip & GI protection pipe upto the test point and further connected to Eqpt is deemed to be included in the unit rate quoted of this item\n3. (Transformer Earth -04 Nos , Inverter - 02 Nos, LT and HT Panel in bus form - 02+ 02 = 04 ).\n
52 36.13 (M) Supply, installation, testing and commissioning of AC distribution board fabricated out of 16 gauge CRCA sheet, duly painted with seven tank process, comprising of suitable capacity aluminium bus bar, DNS support, suitable wiring, multi function meter, indicator lights, complete as required of following capacities.\n4x100A, 4P, 35kA MCCB(incoming) and 1x400A, 4P, 35kA MCCB (outgoing) for array No. 1,2,3,4----Qty 4 No\n5x100A, 4P, 35kA MCCB (incoming) and 1x500A, 4P, 35kA MCCB (outgoing) ---Qty 1 No\n4x400A, 35kA, 4P, MCCB (3 incomer and 1spare) and 1x500A 35kA, 4P, MCCB (incomer) and 1x2500A, 50 kA ACB (outgoing) with builtin Overload, earthfault, short circuit protection set ccomplete as required--- Qty 1 No\nNote :- Qty and Rating & type of MCCB /ACB shall be change as per connection and site requirement and unit rate quoted is deemed to be included for the same.\nNOTES:-\n1. All foundation & fixing arrangement shall be in according to drawing and as designed by structural Engineer duly vetted from IIT / NIT/Govt Engg College duly approved by Accepting Officer before execution of wrok. \n 2. All cables and wires shall be fixed with PVC bus bar trunk and bigger size cable shall be under ground as directed by GE. \n 3. Schematic diagram shall be approved by GE before commencement of work. \n 4. Bus bars shall be extended and jointed with bus bars in existing HT Panel at MRS in suitable shape. Bus bars shall be properly encapsulated. \n 5. Earthings & connected Earthing Strip & protection Pipe as per specified in schedule for whole Solar Plant System ( Arrays , SCB, Inverte ,Transformer , Panels, Solar lightening protection system etc ) shall be deemed to be included in the unit rate quoted of this item.\n \n.\n
53 36.14 6. Testing & commissioning will be done under supervision of channel partner and all the necessary engineering requirement shall be fullfilled by contractor at site. \n7. Any minor repair of Civil work during installation of SF6 Breaker / panels shall be carried out by contractor. GE's decision in this regard is final. \n 8. Before quoting the rate cotractor should visit the site for any clarification. \n9. Contractor shall provide schematic diagram & operating procedure & shock treatment chart on laminated sheet & framed in respective Sub Stations \n10. Relay testing & reports should also be carried out by contractor through Channel Partner. \n11. Necessary control cable from various items/ equipments of Solar Plant to SCADA is included in the unit rate quoted. \n12. All sizes not less than 6 Sqmm to 185 sqmm (single core) and type of DC LT cables required in this work for under Solar Plant ( Modular / Array Junction box to STB and STB to Inverter DC Side) shall be copper cables and shall be deemed included in the unit rate quoted.\n13. All necessary LT cables of various sizes (185 Sqmm to 630 Sqmm Single Core) from invertors to sub panels, sub panels to main panels of each area, main panel to transformer all as shown on manfactured drawings and as required shall be deemed included in the unit rate quoted.. \n
54 37 PHASE II ( 60 MONTHS OF COMPREHENSIVE MAINTENANACE, MANNING AND OPERATION)
55 37.01 Manning,Operation and comprehensive maintenance works for Five (05 ) years (after date of completion of phase-I works). Works for two shifts as specified for all days including Sundays/ Holidays complete for 01 MWp Solar Energy Plant installation , SCADA system including cleaning of solar PV modules, ensuring the serviceability and functionality of PV modules, LT/ HT lines, Panels, transformer, GODs, insulators, string inverters etc, securing all equipments/ materials against damage, serviceability of SCADA system, taking printout of all the data from SCADA once daily installed under Phase I complete all as specified with following manpower : \n (a) One No. Engineer ( Minimum Diploma Holder) and One No. trained Electrician(Min ITI) and 02 Nos. Helpers in first shift (0600 hrs to 1400). \nattending / monitoring the breakdown and preventive maintenance \n(b) One No. Engineer ( Minimum Diploma Holder) and Two Nos. Helpers for second shift (1400 hrs to 2200 hrs)\n\n\n
56 37.02 Notes: (A)\n1. The Engineer must have Diploma certificate in Electricals and Electronics, the electrician having experience in operation & maintenance of solar power plant, familiar with SCADA operating system, weathering monitoring system , HT/ LT Installation and secuirty and safety complete.\n2. The unit rate quoted includes repair and maintenance of Solar Plant along with spare parts as required. The techcinan and the helper shall carry out the below described preventive maintenance and maintain proper log sheets of the works carried out.\n3. Servicing of all Solar equipments, HT & LT control system, Transformers ,weather monotoring equipments , SCADA system etc all as per OEM recomendation.\n4. Everay day cleaning of Solar PV modules by washing plants, sprays, brushes, tools and plants, any washing solutions as per OEM reccomendations complete.\n5. Checking ABT meter reading and recording in log book as per instruction given by Engr-in-Charge.\n6. The Engineer/ Electrician shall submit reports in soft / hard copy format as required by the Engineer in Charge.\n7. Safe, security of all E&M equipments, solar panels,T&P, Sub Stn complete.\n8. Area cleaning removing of grasses, bushes etc as per the instruction of Engineer-in-Charge.\nNote (B): All stationery, T&P , minor items required to maintain the installations in a presentable manner and always keep in 100 % functionable condition and operating and maintenence manual, spares list, periodical mainenance chart / manual, lay out diagram of solar Plant and connected Eqpt display board and Shock treatment chart with drawing duly framed shall be provided by the contractor \nNote(C) : The unit rate quoted for following items 37.00 to 43.12 shall be deemed to be included for all the provisions mentioned in paras and notes here-in-before and as specifed in particular specification.
57 38 PHASE II(A) ( 11 MONTHS OF COMPREHENSIVE MAINTENANACE , MAANING AND OPERATION ON COMPLETION OF PHASE I) Unit Rate required to be quoted for executing the work as described in Srl No 37 ,37.01 & 37.02 here-in-before.
58 38.01 For Shift - 0600AM to 1400 hours\nOne No. Engineer ( Minimum Diploma holder) and One No. trained electrician and 02 Nos helper wages (for Shift - hours) as per existing rules\n 330 Per Shift
59 38.02 Employees Provident Fund for one no. Engineer and One No. trained electrician and two Nos helper as mentioned in the tender documents 330 Per Shift
60 38.03 Employees State Insurance Contribution for one no. Engineer and One No. trained electrician and Two Nos. Helper as mentioned in the tender documents\n 330 Per Shift
61 38.04 Contribution of Bonus for one no. Engineer and One No. trained electrician and two Nos helpers as mentioned in the tender documents, if applicable.\n 330 Per Shift
62 38.05 Over head & Profit on srl No 38.01 to 38.04 here-in-before. 330 Per Shift
63 38.06 GST over serial No. 38.05 mentioned in the tender documents as per existng rules. 330 Per Shift
64 38.07 For Shift - 1400 hrs to 2200 hours\nOne No. Engineer ( Minimum Diploma holder) and two Nos Helpers wage as per existing rules \n\n 330 Per Shift
65 38.08 Employees Provident Fund for one No. Engineer and two Nos Helpers as mentioned in the tender documents 330 Per Shift
66 38.09 Employees State Insurance Contribution for one No. Engineer and two Nos Helpers as mentioned in the tender documents\n 330 Per Shift
67 38.1 Contribution of Bonus for one No. Engineer and two Nos Helpers as mentioned in the tender documents, if applicable.\n 330 Per Shift
68 38.11 Over head & Profit on srl No 38.07 to 38.10 here-in-before. 330 Per Shift
69 38.12 GST over serial No. 38.11 mentioned in the tender documents as per existng rules. 330 Per Shift
70 39 PHASE II(B) ( 11 MONTHS OF COMPREHENSIVE MAINTENANACE, MANNING AND OPERATION ON COMPLETION OF PHASE II(A))Unit Rate required to be quoted for executing the work as described in Srl No 37 ,37.01 & 37.02 here-in-before.
71 39.01 For Shift -0600 Hrs to 1400 hours\nOne No. Engineer ( Minimum Diploma holder) and One No. trained electrician and 02 Nos helper wages (for Shift - hours) as per existing rules\n 330 Per Shift
72 39.02 Employees Provident Fund for one no. Engineer and One No. trained electrician and two Nos helper as mentioned in the tender documents 330 Per Shift
73 39.03 Employees State Insurance Contribution for one no. Engineer and One No. trained electrician and Two Nos. Helper as mentioned in the tender documents\n 330 Per Shift
74 39.04 Contribution of Bonus for one no. Engineer and One No. trained electrician and two Nos helpers as mentioned in the tender documents, if applicable.\n 330 Per Shift
75 39.05 Over head & Profit on srl No 39.01 to 39.04 here-in-before. 330 Per Shift
76 39.06 GST over serial No. 39.05 mentioned in the tender documents as per existng rules. 330 Per Shift
77 39.07 For Shift - 1400 hrs to 2200 hours\nOne No. Engineer ( Minimum Diploma holder) and two Nos Helpers wage as per existing rules \n\n 330 Per Shift
78 39.08 Employees Provident Fund for one No. Engineer and two Nos Helpers as mentioned in the tender documents 330 Per Shift
79 39.09 Employees State Insurance Contribution for one No. Engineer and two Nos Helpers as mentioned in the tender documents\n 330 Per Shift
80 39.1 Contribution of Bonus for one No. Engineer and two Nos Helpers as mentioned in the tender documents, if applicable.\n 330 Per Shift
81 39.11 Over head & Profit on srl No 39.07 to 39.10 here-in-before. 330 Per Shift
82 39.12 GST over serial No. 39.11 mentioned in the tender documents as per existng rules. 330 Per Shift
83 40 PHASE II(C) ( 11 MONTHS OF COMPREHENSIVE MAINTENANACE, MANNING AND OPERATION ON COMPLETION OF PHASE II(B)) Unit Rate required to be quoted for executing the work as described in Srl No 37 ,37.01 & 37.02 here-in-before.
84 40.01 For Shift - 0600 Hrs to 1400 hours\nOne No. Engineer ( Minimum Diploma holder) and One No. trained electrician and 02 Nos helper wages (for Shift - hours) as per existing rules\n 330 Per Shift
85 40.02 Employees Provident Fund for one no. Engineer and One No. trained electrician and two Nos helper as mentioned in the tender documents 330 Per Shift
86 40.03 Employees State Insurance Contribution for one no. Engineer and One No. trained electrician and Two Nos. Helper as mentioned in the tender documents\n 330 Per Shift
87 40.04 Contribution of Bonus for one no. Engineer and One No. trained electrician and two Nos helpers as mentioned in the tender documents, if applicable.\n 330 Per Shift
88 40.05 Over head & Profit on srl No 40.01 to 40.04 here-in-before. 330 Per Shift
89 40.06 GST over serial No. 40.05 mentioned in the tender documents as per existng rules. 330 Per Shift
90 40.07 For Shift - 1400 hrs to 2200 hours\nOne No. Engineer ( Minimum Diploma holder) and two Nos Helpers wage as per existing rules \n\n 330 Per Shift
91 40.08 Employees Provident Fund for one No. Engineer and two Nos Helpers as mentioned in the tender documents 330 Per Shift
92 40.09 Employees State Insurance Contribution for one No. Engineer and two Nos Helpers as mentioned in the tender documents\n 330 Per Shift
93 40.1 Contribution of Bonus for one No. Engineer and two Nos Helpers as mentioned in the tender documents, if applicable.\n 330 Per Shift
94 40.11 Over head & Profit on srl No 40.07 to 40.10 here-in-before. 330 Per Shift
95 40.12 GST over serial No. 40.11 mentioned in the tender documents as per existng rules. 330 Per Shift
96 41 PHASE II(D) ( 11 MONTHS OF COMPREHENSIVE MAINTENANACE, MANNING AND OPERATION ON COMPLETION OF PHASE II(C)) Unit Rate required to be quoted for executing the work as described in Srl No 37 ,37.01 & 37.02 here-in-before.
97 41.01 For Shift - 0600 Hrs to 1400 hours\nOne No. Engineer ( Minimum Diploma holder) and One No. trained electrician and 02 Nos helper wages (for Shift - hours) as per existing rules\n 330 Per Shift
98 41.02 Employees Provident Fund for one no. Engineer and One No. trained electrician and two Nos helper as mentioned in the tender documents 330 Per Shift
99 41.03 Employees State Insurance Contribution for one no. Engineer and One No. trained electrician and Two Nos. Helper as mentioned in the tender documents\n 330 Per Shift
100 41.04 Contribution of Bonus for one no. Engineer and One No. trained electrician and two Nos helpers as mentioned in the tender documents, if applicable.\n 330 Per Shift
101 41.05 Over head & Profit on srl No 41.01 to 41.04 here-in-before. 330 Per Shift
102 41.06 GST over serial No. 41.05 mentioned in the tender documents as per existng rules. 330 Per Shift
103 41.07 For Shift - 1400 hrs to 2200 hours\nOne No. Engineer ( Minimum Diploma holder) and two Nos Helpers wage as per existing rules \n\n 330 Per Shift
104 41.08 Employees Provident Fund for one No. Engineer and two Nos Helpers as mentioned in the tender documents 330 Per Shift
105 41.09 Employees State Insurance Contribution for one No. Engineer and two Nos Helpers as mentioned in the tender documents\n 330 Per Shift
106 41.1 Contribution of Bonus for one No. Engineer and two Nos Helpers as mentioned in the tender documents, if applicable.\n 330 Per Shift
107 41.11 Over head & Profit on srl No 41.07 to 41.10 here-in-before. 330 Per Shift
108 41.12 GST over serial No. 41.11 mentioned in the tender documents as per existng rules. 330 Per Shift
109 42 PHASE II(E) ( 11 MONTHS OF COMPREHENSIVE MAINTENANACE, MANNING AND OPERATION ON COMPLETION OF PHASE II(D))Unit Rate required to be quoted for executing the work as described in Srl No 37 ,37.01 & 37.02 here-in-before.
110 42.01 For Shift - 0600 Hrs to 1400 hours\nOne No. Engineer ( Minimum Diploma holder) and One No. trained electrician and 02 Nos helper wages (for Shift - hours) as per existing rules\n 330 Per Shift
111 42.02 Employees Provident Fund for one no. Engineer and One No. trained electrician and two Nos helper as mentioned in the tender documents 330 Per Shift
112 42.03 Employees State Insurance Contribution for one no. Engineer and One No. trained electrician and Two Nos. Helper as mentioned in the tender documents\n 330 Per Shift
113 42.04 Contribution of Bonus for one no. Engineer and One No. trained electrician and two Nos helpers as mentioned in the tender documents, if applicable.\n 330 Per Shift
114 42.05 Over head & Profit on srl No 42.01 to 42.04 here-in-before. 330 Per Shift
115 42.06 GST over serial No. 42.05 mentioned in the tender documents as per existng rules. 330 Per Shift
116 42.07 For Shift - 1400 hrs to 2200 hours\nOne No. Engineer ( Minimum Diploma holder) and two Nos Helpers wage as per existing rules \n\n 330 Per Shift
117 42.08 Employees Provident Fund for one No. Engineer and two Nos Helpers as mentioned in the tender documents 330 Per Shift
118 42.09 Employees State Insurance Contribution for one No. Engineer and two Nos Helpers as mentioned in the tender documents\n 330 Per Shift
119 42.1 Contribution of Bonus for one No. Engineer and two Nos Helpers as mentioned in the tender documents, if applicable.\n 330 Per Shift
120 42.11 Over head & Profit on srl No 42.07 to 42.10 here-in-before. 330 Per Shift
121 42.12 GST over serial No. 42.11 mentioned in the tender documents as per existng rules. 330 Per Shift
122 43 PHASE II(F) ( 05 MONTHS OF COMPREHENSIVE MAINTENANACE, MANNING AND OPERATION ON COMPLETION OF PHASE II(E))Unit Rate required to be quoted for executing the work as described in Srl No 37 ,37.01 & 37.02 here-in-before.
123 43.01 For Shift - 0600 Hrs to 1400 hours\nOne No. Engineer ( Minimum Diploma holder) and One No. trained electrician and 02 Nos helper wages (for Shift - hours) as per existing rules\n 150 Per Shift
124 43.02 Employees Provident Fund for one no. Engineer and One No. trained electrician and two Nos helper as mentioned in the tender documents 150 Per Shift
125 43.03 Employees State Insurance Contribution for one no. Engineer and One No. trained electrician and Two Nos. Helper as mentioned in the tender documents\n 150 Per Shift
126 43.04 Contribution of Bonus for one no. Engineer and One No. trained electrician and two Nos helpers as mentioned in the tender documents, if applicable.\n 150 Per Shift
127 43.05 Over head & Profit on srl No 43.01 to 43.04 here-in-before. 150 Per Shift
128 43.06 GST over serial No. 43.05 mentioned in the tender documents as per existng rules. 150 Per Shift
129 43.07 For Shift - 1400 hrs to 2200 hours\nOne No. Engineer ( Minimum Diploma holder) and two Nos Helpers wage as per existing rules \n\n 150 Per Shift
130 43.08 Employees Provident Fund for one No. Engineer and two Nos Helpers as mentioned in the tender documents 150 Per Shift
131 43.09 Employees State Insurance Contribution for one No. Engineer and two Nos Helpers as mentioned in the tender documents\n 150 Per Shift
132 43.1 Contribution of Bonus for one No. Engineer and two Nos Helpers as mentioned in the tender documents, if applicable.\n 150 Per Shift
133 43.11 Over head & Profit on srl No 43.07 to 43.10 here-in-before. 150 Per Shift
134 43.12 GST over serial No. 43.11 mentioned in the tender documents as per existng rules. 150 Per Shift
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail