}

Upgradation Of Existing 4 . 5 Mld Stp Based On Mbbr Technology Followed By Tt And Chlorination Punhana Town Upgradation Of Sewage Treatment Plant ( Stp ) Of 4 . 5 Mld Capacity Based On Moving Bed Bio Reactor ( Mbbr ) Technology , Operation And Mainte, Punhana Town-Haryana

Public Health Engineering Department-PHED has published Upgradation Of Existing 4 . 5 Mld Stp Based On Mbbr Technology Followed By Tt And Chlorination Punhana Town Upgradation Of Sewage Treatment Plant ( Stp ) Of 4 . 5 Mld Capacity Based On Moving Bed Bio Reactor ( Mbbr ) Technology , Operation And Mainte. Submission Date for this Tender is 09-11-2020. Sewage Treatment Plant Tenders in Punhana Town Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

25775475
Upgradation Of Existing 4 . 5 Mld Stp Based On Mbbr Technology Followed By Tt And Chlorination Punhana Town Upgradation Of Sewage Treatment Plant ( Stp ) Of 4 . 5 Mld Capacity Based On Moving Bed Bio Reactor ( Mbbr ) Technology , Operation And Mainte
Open Tender
Indian
Haryana
Punhana Town
09-11-2020

Tender Details

Upgradation Of Existing 4 . 5 Mld Stp Based On Mbbr Technology Followed By Tt And Chlorination Punhana Town Upgradation Of Sewage Treatment Plant ( Stp ) Of 4 . 5 Mld Capacity Based On Moving Bed Bio Reactor ( Mbbr ) Technology , Operation And Maintenance For 5 Years Including 1 Year Defect Liability Period After 3 Months Trial Run Period And All Other Works Cont

Key Value

Document Fees
INR 20000 /-
EMD
INR 450000.0 /-
Tender Value
Refer document

BOQ Items

Name of work:- Upgradation of existing 4.5 MLD STP based on MBBR technology followed by TT and chlorination "Upgradation of Sewage Treatment Plant (STP) of 4.5 MLD capacity based on Moving Bed Bio Reactor (MBBR) Technology, Operation and Maintenance for 5 years including 1 year defect liability period after 3 months trial run period and all other works contingent thereto" located at Punhana town of 4.5 MLD capacity.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Lump Sum cost for construction, oreration and maintenance, trial run and other maintenance of STP & other inrastructure including maintenance of existing STP during construction. 1 Lump Sum
2 2 Guaranteed Power Consumption -Electric Power consumption per year for Ist Year ( Units to be entered) 1 Per Year KWH
3 3 Guaranteed Power Consumption -Electric Power consumption per year for 2nd Year ( Units to be entered) 1 Per Year KWH
4 4 Guaranteed Power Consumption -Electric Power consumption per year for 3rd Year ( Units to be entered) 1 Per Year KWH
5 5 Guaranteed Power Consumption -Electric Power consumption per year for 4thYear ( Units to be entered) 1 Per Year KWH
6 6 Guaranteed Power Consumption -Electric Power consumption per year for 5th Year ( Units to be entered) 1 Per Year KWH
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail