}

Repair And Maintenance Of Gyser , Solar Water Heater And Allied Works Under Ge Gurdaspur ., Garrison Engineer, Gurdaspur (Tibri)-Punjab

Military Engineer Services-MES has published Repair And Maintenance Of Gyser , Solar Water Heater And Allied Works Under Ge Gurdaspur .. Submission Date for this Tender is 09-11-2020. Solar Heater Tenders in Garrison Engineer, Gurdaspur (Tibri) Punjab. Bidders can get complete Tender details and download the document.




Tender Notice

25767846
Repair And Maintenance Of Gyser , Solar Water Heater And Allied Works Under Ge Gurdaspur .
Open Tender
Indian
Punjab
Garrison Engineer, Gurdaspur (Tibri)
09-11-2020

Tender Details

Repair And Maintenance Of Gyser , Solar Water Heater And Allied Works Under Ge Gurdaspur .

Key Value

Document Fees
INR 500 /-
EMD
INR 40000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work : Repair and maint of geyser, solar water heater and allied works under GE Gurdaspur.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 BOQ
2 2 Material and labour for maintenance of storage type electric water heater geyser of capacity 25 litre comprising of the following activities:- (a) Inspection, taking down, opening, dismantling , descaling, brushing and cleaning of storage tank and examining ofwater tightness of storage tank after cleaning and descaling.\n(b) Check and connect earth continuity of electric items\n(c) Checking and adjustment of pressure release valves\n(d) Cleaning and maintainance and refix thermostat and ensure its functioning\n(e) Checking of dead weight, cleaning / seal and ensuring vent hole is fuctioning propely\n(f) Visual examination of fusibie plug (g) Testing of geyser after repair\n 600 Each Job
3 3 All as item No 2 here in before abovebut for 50 litre capacity 30 Each Job
4 4 Taking down carefully existing unservicable heating element of any type from geyser and supply and fixing new heating element 1.5KW Capacity including necessary element connection as required at site and testing complete all as specified and directed (Note:-petty item such as nut ,bolt, clamps etc are deemed to be included in unit rate) 750 Each
5 5 Taking down carefully existing unserviceable thermostat and supply and fixing new thermostate ISI marked for geyser any capacity with necessary connection and heatimg complete all as specified and directed 450 Each
6 6 Taking down carefully existing unserviceable indicator lamp and supply and fixing new indicator lamp to geyser of any size, square, round complete all as specified and directed 175 Each
7 7 Supply and fixing in replacement of inner shell of suitable size made of stainless steel sheet of 22 SWG ISI Marked for g’eyserof any type/Make and 25 litres capacity complete with all suitable accessories such as thermal insulation etc complete all as specified and directed as per sample. \n 45 Each
8 8 Supply and fixing in replacement of inner shell of suitable size made of stainless steel sheet of 22 SWG ISI Marked for geyser of any type/Make and 50 litres capacity complete with all suitable accessories such as thermal insulation etc complete all as specified and directed. \n 5 Each
9 9 Supply and fixing in replacement of outer cover and supply and fix new out cover of geyser capacity 25/35 ltr complete all as specified and directed by Engr-in-Chage 35 Each
10 10 Supply and fixing in replacement of outer cover and supply and fix new out cover of geyser capacity 50 ltr complete all as specified and directed by Engr-in-Chage 5 Each
11 11 Supply and fixing in replacement water heater storage type single phase of capacity 25 ltrs with steel tank ,heating element 1.5 KW ,thermostat with complete assembly all as specified and ditected by Engineer in charge Make /Havells/Recold /usha 20 Each
12 12 Supply and fixing in replacement of glass wool for geyser 50 ltr capacity complete all as specified and directed by Engr-in charge. 5 Each job
13 13 Supply and fixing in replacement of glass wool for geyser 25ltr capacity complete all as specified and directed by Engr-in charge. 70 Each
14 14 Taking down existing unserviceable inner base assembly supply and fix new inner base assembly complete with inlet ,outlet, thermostat pipes with drain plug and screw including clamps for holding the elements, nuts, bolt etc, ISI, Marked for geyser of any type/Make and 25 litres capacity complete all as specified and directed 65 Each
15 15 Taking down existing unserviceable inner base assembly supply and fix new inner base assembly complete with inlet, outlet, thermostat pipes with drain plug and screw including clamps tor holding the elements, nuts, bolt etc, ISI, Marked for geyser of any type/Make and 50 litres capacity complete all as specified and directed 5 Each
16 16 Taking down existing unserviceable copper flexible cable 3 core supply and fix new cable PVC insulated 3 core,copper conductor 2.5 sqmm all as specified and directed . Make: Plaze/polycab/Havells 200 RM
17 17 Taking down existing unserviceable bottom cover plate (two halves) and fix with new bottom cover plate with matching colour of geysers of any type/Make and capacity complete all as speclfisd and directed.\n 30 Set of two
18 18 Taking down existing unserviceable Non return valve and supply and fixing in poisition with new non return valve iSi marked made of cast copper alloy screwed both ends internally suitable for iron pipe of size 15mm complete all as specified and directed 120 Each
19 19 Taking down existing unserviceable safety pressure valve and supply and fixing new safety pressure valve with vent to geyser as per latest ISI specification complete all as specified and directed. 150 Each
20 20 Supply and fixing in replacement for PVC connection (Hot) of size 15 mm x 60 mm long superior quality for geyser complete with brass adopter for geyser for any capacity Make Prayag or equivlant make available in market. 300 Each
21 21 Supply and fixing in replacement of neoprene seal (bottom ring)for 25/35/50 ltr capacity geyser of superior quality complete all as specified and directed 50 Each
22 22 M&L for painting the outer surface of geysers of 25 itrs as per original shade with two coats of synthetic enamel paint over one coat of primer by spray gun after scrapping the existing paint, denting, filling depression with putty etc and refixing the geyser in position including water/electric connection and testing, complete all as specified and directed. 150 Each
23 23 All as per srl item No 22 here-in-before but for 50 Itr capacity 5 Each Job
24 24 M&L for brazing / welding of inner copper tank at leaking spots up to five leakage of geyser of capacity 25/35/50 ltrs of any type and make of tank after checking up worn out nuts bolts and washers complete all as specified and directed by Engineer - in - charge. 50 Each Job
25 25 Supply and fixing in replacment gun metal angle valve of size 15 mm dia ISI marked complete all as specified and directed. Make 120 Each
26 26 Supply and fixing in replacement of sheet metal enclosure (industrial type DB) complete including single pole and neutral with 2 pin and earth plug and socket complete with one MCB SP C Curve type of capacity 20 Amp 10 KA complete all as specified and directed.\nMake: Haveiis/ standante/HW/ Indo Asian.\n 40 Each
27 27 Material and labour for grouting of nuts & bolts for fixing of 50/25 Itrs capacity geyser including cement work and colour matching on existing wall complete all as specified and directed. 130 Each Job
28 28 Supply and fixing in replacement Bib tap cast copper alloy with crutch or butterfly handle screwed for GI pipe 15 mm dia chromium plated compl;ete all as specified and directed by Engineer-in-Charge. 50 Each
29 29 Sub main concealed wiring with 2 single core 2.5 Sqmm PVC insulated FR cable with stranded copper conductor drawn in to PVC conduit with and including independent PVC insulated 2.5 Sqmm stranded copper earth wire FR from main DB to sub main DB complete all as specified (conduit and conduit accessories shall be included and cost of earth wire is included in sub main wiring). Make - L&T/Havells/Finolex 200 RM
30 30 S & F in repair of plug top 3 pin 5 Amp 240 volt all as specified and directed Make: Anchor /Havells/Bajaj 20 Each
31 31 S & F in repair of plug top 3 pin 15 Amp 240 volt all as specified and directed Make: Anchor /Havells/Bajaj 120 Each
32 32 Disconnacting electrical connection of solar heating device carefully dismantling solar panel with water tube (copper assembly/ETC tube) rubber gaskiet; nut bolt; biding aluminum channel and glass carefully and servicing/cleanning with acid & water circulation and wire brush and breazing of cooper tube if any. After servicing reassemble the same and testing. Make : Inter Solar, Sintex, sun magic are equivalent make in market. 45 Each Job
33 33 Supply and fixing in replacement of gas kit set for ETC tube All as specified and directed by Engineer-in- Charge 5 Each set
34 34 Supply and fixing in replacement of ETC tank nipple gas ket All as specified and directed by Engineer-in- Charge 5 Each
35 35 Supply and fixing in replacement of ETC silicone gas ket .All as specified and directed by Engineer-in- Charge 5 Each
36 36 Supply and fixing in replacement of ETC tube holder without cups . All as specified and directed by Engineer-in- Charge 5 Each
37 37 Supply and fixing in replacement of aluminium foil roll / self adhesive. All as specified and directed by Engineer-in- Charge 10 Each Roll
38 38 Supply and fixing in replacement of sintex tank 1000 ltr complete all as specified and directed. Make : Inter Solar, Sintex, equivalent make in market 6 Each
39 39 Supply and fixing in replacement of sintex tank 500 ltr complete all as specified and directed. Make : Inter Solar, Sintex, sun magic are equivalent make in market 5 Each
40 40 Supply and fixing in replacement of aluminium foil for collector All as specified and directed by Engineer-in- Charge 5 Each
41 41 Supply and fixing in replacement of rubber gromet (for collector). Make : Inter Solar, Sintex, sun magic are equivalent make in market 3 Each
42 42 supply and fixing in replacement of MS dead flange. All as specified and directed by Engineer-in- Charge 4 Each
43 43 Supply and fixing in replacement of gasket/sleevs for collector. All as specified and directed by Engineer-in- Charge 10 Each
44 44 M&L descaling chemical. All as specified and directed by Engineer-in- Charge 50 Ltr
45 45 Supply and fixing in replacement of brass flang. All as specified and directed by Engineer-in- Charge 6 Each
46 46 Supply and fixing in replacement of rubber gas ket (blind). All as specified and directed by Engineer-in- Charge. 25 Each
47 47 Supply and fixing in replacement of Toughened/ tempered glass 4 mm thickness transmissivity mor than 85 %.as per existing size (125/100 Ltrs cap)All as specified and directed by Engineer-in- Charge 15 Each
48 48 Supply and fixing in replacement Temperature gauge complete all as specified and directed. 5 Each
49 49 Supply and fixing in replacement of solar collector with water tube125/100 ltr capacity (copper assembly complate) After reassemble the same and testing. All as specified and directed by Engineer-in- Charge 14 Each
50 50 Supply and fixing in replacement of heating element for water heating system 3 KW with rubber gas ket for suitable Size. All as specified and directed by Engineer-in- Charge 50 Each
51 51 Supply and fixing in replacement of thermostate suitable for solar water heater of any capacity all as specified and directed by Engineer-in- Charge 25 Each
52 52 Supply and fixing in replacement of sacrificial anode complete all as specified and directed by Engineer-in- Charge 5 Each
53 53 M&L inreplacement of copper tube in pieces for solar collecter of any size installed at site by manufacture design including brazing of copper tubes all as specfied and directed. 70 RM
54 54 Supply and fixing in replacement poly Nitrite insulation sleves 16 MM thikness for 20 MM dia pipe All as specified and directed by Engineer-in- Charge 75 RM
55 55 Suply and fixing in replacement gate valve gun metal with iron wheel head, screwed both ends for iron pipe and fixed size 25 mm dia All as specified and directed by Engineer-in- Charge 12 Each
56 56 Suply and fixing in replacement gate valve gun metal with iron wheel head, screwed both ends for iron pipe and fixed size 20 mm dia All as specified and directed by Engineer-in- Charge 10 Each
57 57 Dismantling complete solar water heater of capacity 300 ltrs including all accessories such as hot water stainless steel tank 300 ltrs,aluminium channel,solar collectoe plate ,GI tubing and GI channel etc complete all as specified and directed 2 Each
58 58 Supply and fixing solar water heater storage stainless steel tank of capacity 300 ltrs including all accessories and connection all as specified and directed 2 Each
59 59 Taking up or down steel water tubing of size 15/20mm bore from trenches or walls etc. complete all as directed. 200 RM
60 60 Supply & Laying Galvanized steel water tubing, medium grade, of 15 mm bore, screwed and socketed joints with and including all required fittings and fixed complete to wall and ceiling or laid in floor old and new location, etc complete all as directed. (Make :Jindal/surya parkash/unique 100 RM
61 61 All as per Sl item no 57 but Pipe of size 20mm bore 100 RM
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail