}

Dismantling Of One No Old Defective Damaged Tower And Erection Of New Ht Grade Gi Tower Including Restoration Of Power On Ers During Time Of Replacement Of Tower And Other Allied Jobs As Per Detailed Scope Of Work In Sbd, Shirpora Pattan-Jammu And Kashmir

Jammu And Kashmir Power Development Department-PDDJK has published Dismantling Of One No Old Defective Damaged Tower And Erection Of New Ht Grade Gi Tower Including Restoration Of Power On Ers During Time Of Replacement Of Tower And Other Allied Jobs As Per Detailed Scope Of Work In Sbd. Submission Date for this Tender is 05-11-2020. Transmission Tower Tenders in Shirpora Pattan Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

25766791
Corrigendum : Dismantling Of One No Old Defective Damaged Tower And Erection Of New Ht Grade Gi Tower Including Restoration Of Power On Ers During Time Of Replacement Of Tower And Other Allied Jobs As Per Detailed Scope Of Work In Sbd
Open Tender
Indian
Jammu And Kashmir
Shirpora Pattan
05-11-2020

Tender Details

Dismantling Of One No Old Defective Damaged Tower And Erection Of New Ht Grade Gi Tower Including Restoration Of Power On Ers During Time Of Replacement Of Tower And Other Allied Jobs As Per Detailed Scope Of Work In Sbd

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 29-Oct-2020 EXTENSION I Date 05-11-2020

Key Value

Document Fees
INR 500 /-
EMD
INR 8500.0 /-
Tender Value
INR 4.25 Lakhs /-

BOQ Items

Name of Work: Dismantling of 1 no old defective/damaged tower and erection of new HT grade GI tower including restoration of power on ERS during time of replacement of tower and other allied jobs as per detailed scope of work in SBD.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Erection of ERS ( Emergency Restoration of System) between Tower Location no 13 and 15 of 132 KV D/C Pattan-Magam Transmission Line including laying & stringing of 0.1 Conductor between tower location no 13 (C+6) and 15(C+0) via ERS and Dismantling of same after necessary workdone. BI01010001010000000000000515BI0100001115
2 2 Loading of ERS and other allied material from Divisional Stores of TLMD-IV Pampore & its Unloading at nearby roadsite of Shirpora wudri, Mechanical or manual carriage of ERS from roadsite upto worksite and its proper stacking/stocking etc ( Complete Job) BI01010001010000000000000515BI0100001116 1 JOB
3 3 Excavation of pits for fixing of anchoring/stack plates and also removal of same after necessary workdone rods for 1 no pit=1 mtr x 1.5 x 2.5 =3.75 Cum for such 10 no pits = 3.75 x 10=37.50 Cum .The work is to carried out as per the directions of the Engineer-incharge. BI01010001010000000000000515BI0100001117 57.5 CUM
4 4 Fixing of anchoring/stack plates with stack rods and back filling same i.e, of item no. 3 BI01010001010000000000000515BI0100001119 55 CUM
5 5 Erection of ERS including fixing of guy wires to these anchoring rods etc (Complete Job) OR The work is to be carried out as per the directions of the Engineer-incharge. The erection of ERS is to be carried out as per the current erection standards in vogue. BI01010001010000000000000515BI0100001120 1 JOB
6 6 Laying of 0.1 Dog Conductor to String 0.650 Kms + 10% extra for uneven terrain ( i.e of S/C from Tower No.13 to Tower No.15 via ERS BI01010001010000000000000515BI0100001124
7 7 (A) First phase string BI01010001010000000000000515BI0100001125 0.715 KM
8 8 (B) For subsequent 2 strings BI01010001010000000000000515BI0100001126 1.43 KM
9 9 Stringing of 0.1 Dog Conductor for 0.65Kms + 1.5 % for sag for 3 phase strings including erection of insulator strings/fittings. ( 0.66 x 3 = 1.98) BI01010001010000000000000515BI0100001128 1.98 KM
10 10 Erection of jumpers. BI01010001010000000000000515BI0100001129 6 NO
11 11 Dismantling/Lowering of conductor and laying it to ground and rolling of condutor for its safe stocking. BI01010001010000000000000515BI0100001131 1.98 KM
12 12 Dismantling of ERS including removing of all sorts of anchoring (Complete Job) The work is to carried out as per the directions of the Engineer-incharge BI01010001010000000000000515BI0100001132 1 JOB
13 13 Manual or mechanical carriage including loading of ERS and other allied material from worksite upto Divisional stores of TLMD-IV Pampore for handing over of ERS and other allied material including unloading of same at Pampore.(Complete Job) BI01010001010000000000000515BI0100001135 1 JOB
14 14 Dismantling and Re-Erection of Tower superstructure of Location no 14 (DD+3) of 132 KV D/C Pattan-Magam Transmission Line. BI01010001010000000000000515BI0100001139
15 15 Loading/unloading and Mechanical carriage of DD+3 Tower Material, Nuts and Bolts and other allied material from Divisional Stores TLMD-III Amargarh upto nearest roadsite and from nearest roadsite upto worksite via manual or mechanical means whatever is feasible or as per the directions of engineer incharge. BI01010001010000000000000515BI0100001140 0.6 MT
16 16 Anchoring of towers at Tower Loc.No-13 and 15 with 2 No. of guys at each Tower Loc or as per the directions of the Engineer-incharge. BI01010001010000000000000515BI0100001144 2 Tower
17 17 Unmounting/Dismantling of earth wire between T-Loc no 13 to 15 via Tower location no 14 between a nallah (0.65Km + 1.5% for Sag) or as per the directions of the Engineer-incharge BI01010001010000000000000515BI0100001146 0.66 KM
18 18 Unmounting/ Dismantling of panther condcutor 0.65Km + 1.5% for\nsag for 6 phases (0.66 x 6 = 3.96Kms) including removal of insulator strings/fittings for all six phases between tower location no 13 to 14 and 14 to 15 of PMTL tarsnmsiion line or as per the directions of the Engineer-incharge BI01010001010000000000000515BI0100001147 3.96 KM
19 19 Dismantling of Tower Superstructure(DD Type) from Peak upto & Including Bottom Cross-Arm with complete expertise and keeping all the standards of erection and dismantling of towers intact or as per the directions of engineer incarge. BI01010001010000000000000515BI0100001149 3 MT
20 20 Erection of Tower Superstructure (DD type) from & Including Bottom Cross-Arm upto Peak with complete expertise and keeping all the standards of erection and dismantling of towers intact or as per the directions of the Engineer-incharge BI01010001010000000000000515BI0100001150 3 MT
21 21 Re-Stringing of earthwire between T-Loc no 13 to 15 (0.65 Km + 1.5% for Sag) including erection of fittings. or The work is to be carried out as per the directions of the Engineer-incharge BI01010001010000000000000515BI0100001152 0.66 KM
22 22 Re-Stringing of panther conductor 0.65Km +1.5% for sag for 6 phase strings (0.66 x 6 = 3.96Kms) including erection of insulator strings/fittings.The work is to carried out as per the directions of the Engineer-incharge BI01010001010000000000000515BI0100001153 3.96 KM
23 23 Erection of jumpers at tension towers. BI01010001010000000000000515BI0100001155 18 NO
24 24 Loading/unloading & Back-Carriage of stringing equipments and other allied material etc from site of work to Divisional Stores TLMD-III Amargarh. BI01010001010000000000000515BI0100001156 1 JOB
25 25 Watch and ward of material at site during erection & Stringing works. BI01010001010000000000000515BI0100001158 1 JOB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail