Indira Gandhi Canal Project Rajasthan-IGCPR has published Construction Of Pucca Water Course In Chak 87 Gb-B ( Binjor Minor ) . Submission Date for this Tender is 28-10-2020. Water Course Tenders in CHAK 87 GB-B(BINJOR MINOR) Rajasthan. Bidders can get complete Tender details and download the document.
Name of Work: Construction of Pucca Water course in Chak 87 GB-B (Binzor Minor) | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Earth work\n(a) Earth work for water courses in ordinary soil with all leads and lifts, dressed as per specification. | BI01010001010000000000000515BI0100001113 | 11998.5 | Per 10 Cum. |
2 | 2 | (b) Ramming of Earth work in ordinary soils in layers by wooden or iron rammers as per specification. | BI01010001010000000000000515BI0100001114 | 11650.4 | Per 10 Cum. |
3 | 3 | Lining\n(a) Watering ramming & dressing of Sub grade including removal of irregularities up to 15 cm depth. | BI01010001010000000000000515BI0100001115 | 3166.35 | Per 10 Sqm. |
4 | 4 | (b) Brick Masonary in Cement mortar (1:5) including cost of all materials including mechanical mixing of mortar with all leads & lifts and stacking etc. complete in all respect. | BI01010001010000000000000515BI0100001116 | 507.39 | Per Cum. |
5 | 5 | (c) 10 mm thick cement plaster in cement mortar (1:4) as per design and specification including cost of all materials including mechanical mixing of mortar with all leads & lifts and stacking etc. with curing for specified period complete in all respect. | BI01010001010000000000000515BI0100001117 | 5178.62 | Per 10 Sqm. |
6 | 6 | Pucca Structures\n(a) Earth work excavation in foundation trench in ordinary soil for structures and then refilling soil in 15 cm. Layers with all leads and lifts. | BI01010001010000000000000515BI0100001118 | 477.15 | Per 10 Cum. |
7 | 7 | (b) Cement Concrete (1:4:8) including cost of all materials including using mechanical mixer with aggregate sixe 40 mm with all leads & lifts and stacking etc. complete in all respect. | BI01010001010000000000000515BI0100001119 | 40.24 | Per Cum. |
8 | 8 | (c) Brick Masonary in cement mortar (1:6) including cost of all materials including mechanical mixing of mortar with all leads & lift and stacking etc. Complete in all respect.\n | BI01010001010000000000000515BI0100001120 | 86.08 | Per Cum. |
9 | 9 | (d) 8 mm thik cement plaster in cement mortar (1:6) as per design and specification including cost of all materials including mechanical mixing of mortar with all leads & lifts and stacking etc. Complete in all respect. | BI01010001010000000000000515BI0100001121 | 336.62 | Per 10 Sqm. |
10 | 10 | (e) 10 mm thick cement plaster in cement mortar (1:4) as per design and specification including cost of all materials except cement with all leads & lifts, stacking etc. with curring for specified period complete in all respect (Including cost of cement) | 44.2 | Per 10 Sqm. | |
11 | 11 | (f) S/F of R.C.C. Naka Frames &Fixing | BI01010001010000000000000515BI0100001122 | 39 | Each |
12 | 12 | (g) Supply of R.C.C. Naka Shutter | BI01010001010000000000000515BI0100001123 | 24 | Each |
13 | 13 | (h) S/F of R.C.C. Hume Pipe (Np-3) in syphon \nculvert | 10 | Each |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail