Department Of Local Bodies has published Construction Of Protection Gate -Chandrashekher Azad Nagar Ward No . 17 Me Surksha Dwar Nirman Karya. Submission Date for this Tender is 26-10-2020. Civil Work Tenders in Bhilwara Rajasthan. Bidders can get complete Tender details and download the document.
Name of Work: ?????????? ???? ??? ????? ??. 17 ?? ??????? ????? ??????? ?????? | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 252 | Cum | |
2 | 2 | Carriage of Materials by mechanical transport including loading, unloading and stacking 5 km. | 252 | Cum | |
3 | 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 18.9 | Cum | |
4 | 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 220.5 | Cum | |
5 | 5 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.As Per Plan 1 Gate Total Steel @ 730.21 Kg | 30668.8 | Kg | |
6 | 6 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand or manufacture As Per Plan 1 Gate Total paint Area @ 22.68 Sqm | 952.56 | Sqm |