New Okhla Industrial Development Authority-NOIDA has published Maintenance Of Sewerage ( R/O 600 Mm Dia Rising Main Line Near Nala Bridge In Front Of Rto Office And Gijhore Crossing ) Noida .. Submission Date for this Tender is 29-10-2020. Pipe Laying Tenders in Noida Uttar Pradesh. Bidders can get complete Tender details and download the document.
Name of work :- M/o Sewerage (R/o 600 mm dia rising main line near Nala Bridge in front of RTO office and Gijhore crossing) Noida. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Earth work in excavation by mechanical means (hydraulic excavater)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 Sqm. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge. All kinds of soil. (DSR-16, I.No.-2.8.1/P-76) (TAC) | 204 | Cum. | |
2 | 2 | P/F MS specials such as Tee, Bends, Collars, Tapers, Gap pieces, including Flange Ends as required, Painting, Cutting, welding as per site requirement of MS pipe thickness etc complete in all respect as per direction of E/I. (NSI-1.7.00) | 14885.5 | Kg | |
3 | 3 | Hire charge of Mobile crane (DSR-18,Itm. Code. 0037. P-106,) | 6 | Day | |
4 | 4 | Hydraulic Excavator (3D) with driver and fuel (DSR-18, code No.-0020/P-73) | 6 | Day | |
5 | 5 | Hiring of Welding Set Running Time @ 6 Hrs (AOR) | 18 | day | |
6 | 6 | Hiring of Gas cutting Set with oxygen and LPG running time @ 6 Hrs. (AOR) | 18 | day | |
7 | 7 | Hire charge of 50 KVA Generator (including cost servive of operating staff, supply of lubricating oil and diesel etc. (AOR) | 36 | Hrs. | |
8 | 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) (DSR-18, I.No.-4.1.3/P-86) | 14.4 | Cum. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail