Kerala State Electricity Board-KSEB has published Drawing New 11Kv Abc Feeder From 110Kv Substation Guruvayur To Chavakkd Section Part 3 Under Electrical Section Guruvayur. Submission Date for this Tender is 30-10-2020. Feeder Pillar Tenders in Guruvayur Kerala. Bidders can get complete Tender details and download the document.
Name of Work: Drawing new 11kV ABC feeder from 110kV substation Guruvayur to Chavakkd section [Part-3] under Electrical Section, Guruvayur | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). | 28 | No | |
2 | 2 | Loading HT 'A' type pole from the stacking place and unloading the same at work site (transport by vehicle). | 2 | No | |
3 | 3 | Transporting poles by hired vehicle to a distance upto5km and carrying upto 4 poles excluding loading &unloading. | 8 | Trip | |
4 | 4 | Drilling hole of various sizes on existing Channel/CrossArm. | 20 | No | |
5 | 5 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. | 12 | No | |
6 | 6 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. | 4 | No | |
7 | 7 | Insertion of one HT 'A' type pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc. | 2 | No | |
8 | 8 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. | 2 | No | |
9 | 9 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. | 1 | No | |
10 | 10 | Providing one Driven Earth using GI earth pipe at standard distance away from the pole/structure in loose soil. | 60 | No | |
11 | 11 | Fitting one set (3No.) 11kV LA and giving connections excluding earthing. | 2 | No | |
12 | 12 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. | 14 | No | |
13 | 13 | Insertion of one HT PSC pole in existing HT/LT line incl. digging & back filling pit, fitting cross arm, insulator, binding etc. | 4 | No | |
14 | 14 | Transferring LT 3ph 4/5 wire OH line to newly erectedHT/LT pole and refitting all items to the new pole. | 2 | No | |
15 | 15 | Cutting trees beyond 30cm but upto and incl. 60cm girth, cutting of trunks/branches, removing the root completely and stacking. | 20 | No | |
16 | 16 | Cutting trees beyond 60cm but upto and incl. 120cm girth, cutting of trunks/branches, removing the root completely and stacking. | 10 | No | |
17 | 17 | Cutting trees beyond 120cm but upto and incl. 180cm girth, cutting of trunks/branches, removing the root completely and stacking. | 5 | No | |
18 | 18 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). | 2 | No | |
19 | 19 | Stringing of 11 kV Ariel bunched cable XLPE insulated of size 3 x 150+ 1 x 120 sqmm with bare/insulated Messenger | 5272 | Mtr | |
20 | 20 | Erection of Anchor clamp / dead end clamp of 11 KV ABC suitable for 70 to 120 sqmm bare/insulated Messenger | 160 | Nos. | |
21 | 21 | Erection of suspension clamp of 11KV ABC suitable for 70 to 120 sq mm bare/insulated messenger | 225 | Nos. | |
22 | 22 | Providing of Eye hooks flat | 160 | Nos | |
23 | 23 | Erection of Stainless Steel Strap and Buckles | 350 | Nos | |
24 | 24 | Providing Cable Tie | 400 | Nos | |
25 | 25 | Providing End Caps | 50 | Nos | |
26 | 26 | 11 KV AB Cable T- joint instalation for 3 Core | 30 | Nos | |
27 | 27 | 11 KV AB Cable Termination instalation for 3 Core | 28 | Nos | |
28 | 28 | Providing earth connector | 20 | Nos | |
29 | Total in Figures |