Execution Of Strengthening Works Erection Of Dp Structure Etc In Kallidaikurichi Division, Tirunelveli-Tamil Nadu

Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Execution Of Strengthening Works Erection Of Dp Structure Etc In Kallidaikurichi Division. Submission Date for this Tender is 02-11-2020. Structural Work Tenders in Tirunelveli Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

25716263
Execution Of Strengthening Works Erection Of Dp Structure Etc In Kallidaikurichi Division
Open Tender
Indian
Tamil Nadu
Tirunelveli
02-11-2020

Tender Details

Execution Of Strengthening Works Erection Of Dp Structure Etc In Kallidaikurichi Division

Key Value

Document Fees
Refer document
EMD
INR 25000.0 /-
Tender Value
INR 25 Lakhs /-

BOQ Items

Name of the work: Provsision of DP Structure in exsiting 11 KV Mukkudal feeder in Pappakudi section, Strengthening of Mukkudal feeder main line of 110/11KV O'Thulukkapatti SS in Pappakudi Section, Provision of 11 KV Ramanadhi Dam feeder from Kadayam SS for bifurcation of load from 11 KV Kadayam feeder, Strengthening of existing 7/3.35 ACSR to 7/4.09 ACSR in 11 KV Avudayanoor feeder from Kadayam SS at Kadayam section, Strengthening of existing 7/3.35 ACSR to 7/4.09 ACSR in 11 KV Kadayam feeder from Kadayam SS at Kadayam section, Erection of breaker in the proposed 11 KV Ramanathi Dam feeder in 110/11 KV Kadayam SS in Kallidaikurichi Division under UDAY Scheme.
Sl. No. Item Description Item Code / Make Quantity Units
1 1.01 Excavation of pole pit upto 9 mtr Pole by using JCB or manual 292 Each pit
2 1.02 Erection of 9 mtr PSC poles by using JCB or maual 292 Each pole
3 1.03 Loading & Unloading of 9 mtr Poles 292 Each
4 1.04 Transporting of 9.0mt poles from road site to pole pit including loading and unloading of poles by using JCB or manual 292 Each pole
5 1.06 Erection of Tapping Structure - Excavation of structure pole pit. 7 Each
6 1.07 Erection of Tapping Structure -Erection of structure pole. 7 Each
7 1.08 Erection of Tapping Structure -Excavation of stay pit. 7 Each
8 1.09 Erection of Tapping Structure -Erection of stay set. 7 Each
9 1.1 Erection of Tapping Structure -Concreting of pole. 7 Each
10 1.11 Erection of Tapping Structure -Concreting of stay. 7 Each
11 1.12 Erection of Tapping Structure -Base Concreting. 7 Each
12 1.13 Erection of Tapping Structure -Erection of Structure Materials-Top channel 7 Each
13 1.14 Erection of Tapping Structure -Erection of Structure Materials-AB switch (complete) 7 Per
14 1.15 Erection of Tapping Structure -Erection of Structure Materials-Erection of Tapping Structure -Assemble, operating pipe fixing etc., fixing of cross bracing 7 Per/Span/ Run
15 1.16 Erection of Tapping Structure -Excavation of 1 No. earth pits Excavation of earth wire trench and paving of earth wire, Erection of 1 No. earth pipe and giving earth connection, Earthing of all metal parts, for tapping structure. 7 Per pole
16 1.17 Erection of Tapping Structure -Mason works for earth pit (including material) 7 Per Str.
17 1.18 Erection of Tapping Structure -Colour coating on poles with iron materials including paint and distember. 7 Per Tonne
18 1.19 Erection of Tapping Structure -For ordy. Tree clearence and Throng bushes & trees 7 Each Labour
19 1.2 Erection of Tapping Structure -Alteration of clamps 28 Each
20 1.21 Erection of Tapping Structure -Drilling / Less than 23mm holes per hole /slotted holes 84 Each
21 1.22 Fixing of V cross arm 3 1/2 381 Each
22 1.23 Fixing of insulator (per location) 440 Each
23 1.24 HT / LT TI fitting 283 Each
24 1.25 HT lines - Stringing, Sagging, binding including transporting of materials from road side to site for 7/4.09 ACSR 1776 1 Run
25 1.26 Dismandling of 7/2.59 ACSR to be payable is 50% of erection of line works. 999 1 Run
26 1.27 Dismandling of 7/3.35 ACSR to be payable is 50% of erection of line works. 210 1 Run
27 1.28 Concreting of pole as per Board Standards (2'*2'*5'). The material such as sand, jelly, etc., have to be supplied by the contractor except Cement supplied by contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.complete. 362 1 LOC
28 1.29 Coil earthing per pole & pole earthing 362 1 LOC
29 1.3 Tree Cutting 123 Each Labour
30 1.31 Alteration of clamps 267 Each
31 1.32 Drilling of holes 353 Each
32 1.33 Changing of pin point to cut point - HT 67 1 Pole
33 1.34 Excavation of stay pit (1.00m * 0.5m*1.5m) 27 1 LOC
34 1.35 Erection of stay pit (1.00m * 0.5m*1.5m) 27 1 LOC
35 1.36 Excavation of 36' RSJ Poles 70 1 LOC
36 1.37 Erection of 36' RSJ Poles 70 1 LOC
37 1.38 Transporting of poles from road side to pole pit 36' RSJ Poles 70 1 Pole
38 1.39 Loading and Unloading of RSJ poles 70 1 Pole
39 1.4 Fixing of 4 1/2 V cross arm and insulator including transporting of materials from road side to site 118 Each
40 1.41 Guarding per span length - Flat Guarding (4 wires) 9 1 LOC
41 1.42 Transporting of materials from road side to site 172 Per Tonne
42 1.43 Dismantling of 36' RSJ Poles, RCC, Rail Poles 27 Each
43 1.44 Dismantling of 8.0m poles 27 Each
44 1.45 Dismantling of Single Phase Cross Arm 12 Each
45 1.46 Erection of LT 3 phase cross arm 7 Each
46 1.47 Erection of LT Single Phase Cross Arm 14 Each
47 1.48 Erection of Centre Rotating Switch 2 Each
48 1.49 Erection of 11 KV Outdoor VCB by using Board crane 1 Each
49 1.5 Erection of 11 KV Current Transformers 3 Each
50 1.51 Erection of Control and Relay Panel 1 Each
51 1.52 Fixing of fabricated steel structure 1 Each
52 1.53 Erection of Bus Bar arrangements 1 Each
53 1.54 Erection of Plingth for Breaker with jelly, brick,sand etc., 1 Each
54 1.55 Earthwork excavation of all soils including slush and slit under water requiring the aid of basket and vessels forming cable trench and cable duct 60cm wide and 120cm deep including cost of sign boards, danger lights indication arrangements whereever necessary and providing shoring and strutting arrangement wherever necessary all lead, lift labour, tools and plants etc., 16 CUM
55 1.56 Transporting and clearing the excess excavated earth and derbis then and there immediately to avoid and hinderance to normal flow of traffic and public beyond a distance of 5Km from the work spot as per the direction of Engineer inchrge including loading and unloading charges. 1 Loc
56 1.57 Refilling with fitting sand in layers well consolidated as per standard specification including cost of all materials, lead, lift etc., complete. 1 Loc
57 1.58 Laying of cement V trough 20 Each
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail