Nsry/Com/1966/Concluding Repair Rate Contract For Repair/ Overhauling Of Coolers , Condensers , Atus And Ahus Of In Ships , Yardcraft And Fdns Concluding Repair Rate Contract For Repair And Overhauling Of Coolers , Condensers , Atus And Ahus Of In Sh, NAVAL SHIP REPAIR YARD,PORT BLAIR-Andaman And Nicobar Islands

Integrated Defence Staff has published Nsry/Com/1966/Concluding Repair Rate Contract For Repair/ Overhauling Of Coolers , Condensers , Atus And Ahus Of In Ships , Yardcraft And Fdns Concluding Repair Rate Contract For Repair And Overhauling Of Coolers , Condensers , Atus And Ahus Of In Sh. Submission Date for this Tender is 09-11-2020. Electrical Condenser Tenders in NAVAL SHIP REPAIR YARD,PORT BLAIR Andaman And Nicobar Islands. Bidders can get complete Tender details and download the document.




Tender Notice

25694212
Nsry/Com/1966/Concluding Repair Rate Contract For Repair/ Overhauling Of Coolers , Condensers , Atus And Ahus Of In Ships , Yardcraft And Fdns Concluding Repair Rate Contract For Repair And Overhauling Of Coolers , Condensers , Atus And Ahus Of In Sh
Open Tender
Indian
Andaman And Nicobar Islands
NAVAL SHIP REPAIR YARD,PORT BLAIR
09-11-2020

Tender Details

Nsry/Com/1966/Concluding Repair Rate Contract For Repair/ Overhauling Of Coolers , Condensers , Atus And Ahus Of In Ships , Yardcraft And Fdns Concluding Repair Rate Contract For Repair And Overhauling Of Coolers , Condensers , Atus And Ahus Of In Ships , Yardcraft And Fdns

Key Value

Document Fees
Refer document
EMD
INR 79000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: REPAIR RATE CONTRACT FOR REPAIR/ OVERHAULING OF COOLERS, CONDENSERS, ATU’s AND AHU’s OF IN SHIPS, YARDCRAFT AND FDNs
Sl. No. Description of Service / Spare HSN/ SAC Code Quantity Units
1 0.1 Note: Bidders are requested to quote GST in terms of % only. Example If GST is 18% fill 0.18 in the GST column
2 1 SERVICES
3 2 Cummins DA Fresh Water Coolers - LST (M)/ LCU MK IV
4 3 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 10 Per Cooler
5 4 Collection of cooler from the yard and shifting to firms workshop 10 Per Cooler
6 5 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 10 Per Cooler
7 6 Mechanical cleaning of cooler 10 Per Cooler
8 7 Highspeed flushing of cooler (see Note) 10 Per Cooler
9 8 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 10 Per Cooler
10 9 Weak Acid Rinse Chemical cleaning of cooler (See Note) 10 Per Cooler
11 10 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 10 Per Cooler
12 11 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 10 Per Cooler
13 12 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 10 Per Cooler
14 13 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 10 Per Plug
15 14 Blanking of tube by cold repair using belzona or equivalent repair compound 10 Per Tube
16 15 Repair of end cover by welding and brazing of cooler end cover 10 Per End Cover
17 16 Cold repair of end cover by belzona or steel putty or any other cold repair compound 10 Per sq inch
18 17 Renewal of joint / gasket (neoprene rubber for water cooler) 10 Per set
19 18 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 10 Per set
20 19 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 10 Per Fastener
21 20 Renewal of fastener (phospher bronze) 10 Per Fastener
22 21 Drilling/ Tapping (Per hole) 10 Per Hole
23 22 Fitment of cooler including associated system pipelines and proving the system 10 Per Cooler
24 23 Witnessing trials onboard whenever system trials take place 10 Per Cooler
25 24 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Per Cooler
26 25 Cummins DA (NT 743 MG) Lub Oil Coolers - LST (M)
27 26 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 10 Per Cooler
28 27 Collection of cooler from the yard and shifting to firms workshop 10 Per Cooler
29 28 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 10 Per Cooler
30 29 Mechanical cleaning of cooler 10 Per Cooler
31 30 Highspeed flushing of cooler (see Note) 10 Per Cooler
32 31 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 10 Per Cooler
33 32 Weak Acid Rinse Chemical cleaning of cooler (See Note) 10 Per Cooler
34 33 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 10 Per Cooler
35 34 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 10 Per Cooler
36 35 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 10 Per Cooler
37 36 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 10 Per plug
38 37 Blanking of tube by cold repair using belzona or equivalent repair compound 10 Per tube
39 38 Repair of end cover by welding and brazing of cooler end cover 10 Per end cover
40 39 Cold repair of end cover by belzona or steel putty or any other cold repair compound 10 Per sq inch
41 40 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 10 Per set
42 41 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 10 Per set
43 42 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 10 Per fastener
44 43 Renewal of fastener (phospher bronze) 10 Per fastener
45 44 Drilling/ Tapping (Per hole) 10 Per hole
46 45 Fitment of cooler including associated system pipelines and proving the system 10 Per Cooler
47 46 Witnessing trials onboard whenever system trials take place 10 Per Cooler
48 47 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Per Cooler
49 48 Main Engine Lub Oil Cooler - LST (M)
50 49 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 10 Per Cooler
51 50 Collection of cooler from the yard and shifting to firms workshop 10 Per Cooler
52 51 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 10 Per Cooler
53 52 Mechanical cleaning of cooler 10 Per Cooler
54 53 Highspeed flushing of cooler (see Note) 10 Per Cooler
55 54 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 10 Per Cooler
56 55 Weak Acid Rinse Chemical cleaning of cooler (See Note) 10 Per Cooler
57 56 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 10 Per Cooler
58 57 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 10 Per Cooler
59 58 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 10 Per Cooler
60 59 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 10 Per plug
61 60 Blanking of tube by cold repair using belzona or equivalent repair compound 10 Per tube
62 61 Repair of end cover by welding and brazing of cooler end cover 10 Per end cover
63 62 Cold repair of end cover by belzona or steel putty or any other cold repair compound 10 Per sq inch
64 63 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 10 Per set
65 64 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 10 Per set
66 65 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 10 Per fastener
67 66 Renewal of fastener (phospher bronze) 10 Per fastener
68 67 Drilling/ Tapping (Per hole) 10 Per hole
69 68 Fitment of cooler including associated system pipelines and proving the system 10 Per Cooler
70 69 Witnessing trials onboard whenever system trials take place 10 Per Cooler
71 70 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Per Cooler
72 71 Gear Box Lub Oil Coolers - LST (M)
73 72 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 5 Per Cooler
74 73 Collection of cooler from the yard and shifting to firms workshop 5 Per Cooler
75 74 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
76 75 Mechanical cleaning of cooler 5 Per Cooler
77 76 Highspeed flushing of cooler (see Note) 5 Per Cooler
78 77 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
79 78 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
80 79 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 5 Per Cooler
81 80 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 5 Per Cooler
82 81 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 5 Per Cooler
83 82 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
84 83 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
85 84 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
86 85 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
87 86 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 5 Per set
88 87 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
89 88 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
90 89 Renewal of fastener (phospher bronze) 5 Per fastener
91 90 Drilling/ Tapping (Per hole) 5 Per hole
92 91 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
93 92 Witnessing trials onboard whenever system trials take place 5 Per Cooler
94 93 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
95 94 Main Engine Lub oil Coolers - FAC/LCU MK IV
96 95 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 5 Per Cooler
97 96 Collection of cooler from the yard and shifting to firms workshop 5 Per Cooler
98 97 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
99 98 Mechanical cleaning of cooler 5 Per Cooler
100 99 Highspeed flushing of cooler (see Note) 5 Per Cooler
101 100 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
102 101 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
103 102 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 5 Per Cooler
104 103 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 5 Per Cooler
105 104 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 5 Per Cooler
106 105 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
107 106 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
108 107 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
109 108 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
110 109 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 5 Per set
111 110 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
112 111 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
113 112 Renewal of fastener (phospher bronze) 5 Per fastener
114 113 Drilling/ Tapping (Per hole) 5 Per hole
115 114 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
116 115 Witnessing trials onboard whenever system trials take place 5 Per Cooler
117 116 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
118 117 Main Engine Fresh Water Coolers - FAC/LCU MK IV
119 118 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 5 Per Cooler
120 119 Collection of cooler from the yard and shifting to firms workshop 5 Per Cooler
121 120 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
122 121 Mechanical cleaning of cooler 5 Per Cooler
123 122 Highspeed flushing of cooler (see Note) 5 Per Cooler
124 123 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
125 124 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
126 125 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 5 Per Cooler
127 126 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 5 Per Cooler
128 127 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 5 Per Cooler
129 128 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
130 129 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
131 130 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
132 131 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
133 132 Renewal of joint / gasket (neoprene rubber for water cooler) 5 Per set
134 133 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
135 134 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
136 135 Renewal of fastener (phospher bronze) 5 Per fastener
137 136 Drilling/ Tapping (Per hole) 5 Per hole
138 137 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
139 138 Witnessing trials onboard whenever system trials take place 5 Per Cooler
140 139 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
141 140 Gear Box Lub Oil Coolers - FAC/LCU MK
142 141 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 5 Per Cooler
143 142 Collection of cooler from the yard and shifting to firms workshop 5 Per Cooler
144 143 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
145 144 Mechanical cleaning of cooler 5 Per Cooler
146 145 Highspeed flushing of cooler (see Note) 5 Per Cooler
147 146 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
148 147 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
149 148 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 5 Per Cooler
150 149 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 5 Per Cooler
151 150 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 5 Per Cooler
152 151 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
153 152 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
154 153 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
155 154 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
156 155 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 5 Per set
157 156 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
158 157 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
159 158 Renewal of fastener (phospher bronze) 5 Per fastener
160 159 Drilling/ Tapping (Per hole) 5 Per hole
161 160 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
162 161 Witnessing trials onboard whenever system trials take place 5 Per Cooler
163 162 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
164 163 Main Engine Lub Oil Coolers - Yard Crafts
165 164 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 5 Per Cooler
166 165 Collection of cooler from the yard and shifting to firms workshop 5 Per Cooler
167 166 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
168 167 Mechanical cleaning of cooler 5 Per Cooler
169 168 Highspeed flushing of cooler (see Note) 5 Per Cooler
170 169 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
171 170 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
172 171 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 5 Per Cooler
173 172 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 5 Per Cooler
174 173 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 5 Per Cooler
175 174 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
176 175 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
177 176 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
178 177 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
179 178 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 5 Per set
180 179 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
181 180 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
182 181 Renewal of fastener (phospher bronze) 5 Per fastener
183 182 Drilling/ Tapping (Per hole) 5 Per hole
184 183 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
185 184 Witnessing trials onboard whenever system trials take place 5 Per Cooler
186 185 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
187 186 Main Engine Fresh Water Coolers - Yard Crafts
188 187 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 5 Per Cooler
189 188 Collection of cooler from the yard and shifting to firms workshop 5 Per Cooler
190 189 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
191 190 Mechanical cleaning of cooler 5 Per Cooler
192 191 Highspeed flushing of cooler (see Note) 5 Per Cooler
193 192 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
194 193 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
195 194 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 5 Per Cooler
196 195 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 5 Per Cooler
197 196 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 5 Per Cooler
198 197 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
199 198 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
200 199 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
201 200 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
202 201 Renewal of joint / gasket (neoprene rubber for water cooler) 5 Per set
203 202 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
204 203 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
205 204 Renewal of fastener (phospher bronze) 5 Per fastener
206 205 Drilling/ Tapping (Per hole) 5 Per hole
207 206 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
208 207 Witnessing trials onboard whenever system trials take place 5 Per Cooler
209 208 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
210 209 Main Engine Lub Oil Cooler - NOPV/LST (L)/Corvette/Visiting Ships
211 210 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 5 Per Cooler
212 211 Collection of cooler from the yard and shifting to firms workshop 5 Per Cooler
213 212 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
214 213 Mechanical cleaning of cooler 5 Per Cooler
215 214 Highspeed flushing of cooler (see Note) 5 Per Cooler
216 215 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
217 216 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
218 217 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 5 Per Cooler
219 218 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 5 Per Cooler
220 219 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 5 Per Cooler
221 220 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
222 221 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
223 222 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
224 223 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
225 224 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 5 Per set
226 225 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
227 226 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
228 227 Renewal of fastener (phospher bronze) 5 Per fastener
229 228 Drilling/ Tapping (Per hole) 5 Per hole
230 229 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
231 230 Witnessing trials onboard whenever system trials take place 5 Per Cooler
232 231 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
233 232 Main Engine Fresh Water Cooler - NOPV/LST (L)/Corvette/Visiting Ships
234 233 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 5 Per Cooler
235 234 Collection of cooler from the yard and shifting to firms workshop 5 Per Cooler
236 235 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
237 236 Mechanical cleaning of cooler 5 Per Cooler
238 237 Highspeed flushing of cooler (see Note) 5 Per Cooler
239 238 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
240 239 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
241 240 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 5 Per Cooler
242 241 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 5 Per Cooler
243 242 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 5 Per Cooler
244 243 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
245 244 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
246 245 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
247 246 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
248 247 Renewal of joint / gasket (neoprene rubber for water cooler) 5 Per set
249 248 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
250 249 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
251 250 Renewal of fastener (phospher bronze) 5 Per fastener
252 251 Drilling/ Tapping (Per hole) 5 Per hole
253 252 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
254 253 Witnessing trials onboard whenever system trials take place 5 Per Cooler
255 254 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
256 255 Gear Box Lub Oil Cooler - NOPV/LST (L)/Corvette/Visiting Ships
257 256 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 5 Per Cooler
258 257 Collection of cooler from the yard and shifting to firms workshop 5 Per Cooler
259 258 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
260 259 Mechanical cleaning of cooler 5 Per Cooler
261 260 Highspeed flushing of cooler (see Note) 5 Per Cooler
262 261 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
263 262 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
264 263 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 5 Per Cooler
265 264 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 5 Per Cooler
266 265 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 5 Per Cooler
267 266 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
268 267 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
269 268 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
270 269 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
271 270 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 5 Per set
272 271 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
273 272 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
274 273 Renewal of fastener (phospher bronze) 5 Per fastener
275 274 Drilling/ Tapping (Per hole) 5 Per hole
276 275 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
277 276 Witnessing trials onboard whenever system trials take place 5 Per Cooler
278 277 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
279 278 CPP Lub Oil Cooler - NOPV/LST (L)/Corvette/Visiting Ships
280 279 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 5 Per Cooler
281 280 Collection of cooler from the yard and shifting to firms workshop 5 Per Cooler
282 281 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
283 282 Mechanical cleaning of cooler 5 Per Cooler
284 283 Highspeed flushing of cooler (see Note) 5 Per Cooler
285 284 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
286 285 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
287 286 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 5 Per Cooler
288 287 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 5 Per Cooler
289 288 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 5 Per Cooler
290 289 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
291 290 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
292 291 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
293 292 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
294 293 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 5 Per set
295 294 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
296 295 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
297 296 Renewal of fastener (phospher bronze) 5 Per fastener
298 297 Drilling/ Tapping (Per hole) 5 Per hole
299 298 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
300 299 Witnessing trials onboard whenever system trials take place 5 Per Cooler
301 300 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
302 301 Cummins Fresh Water Cooler - NOPV/LST (L)/Corvette/Visiting Ships
303 302 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 10 Per Cooler
304 303 Collection of cooler from the yard and shifting to firms workshop 10 Per Cooler
305 304 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 10 Per Cooler
306 305 Mechanical cleaning of cooler 10 Per Cooler
307 306 Highspeed flushing of cooler (see Note) 10 Per Cooler
308 307 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 10 Per Cooler
309 308 Weak Acid Rinse Chemical cleaning of cooler (See Note) 10 Per Cooler
310 309 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 10 Per Cooler
311 310 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 10 Per Cooler
312 311 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 10 Per Cooler
313 312 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 10 Per plug
314 313 Blanking of tube by cold repair using belzona or equivalent repair compound 10 Per tube
315 314 Repair of end cover by welding and brazing of cooler end cover 10 Per end cover
316 315 Cold repair of end cover by belzona or steel putty or any other cold repair compound 10 Per sq inch
317 316 Renewal of joint / gasket (neoprene rubber for water cooler) 10 Per set
318 317 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 10 Per set
319 318 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 10 Per fastener
320 319 Renewal of fastener (phospher bronze) 10 Per fastener
321 320 Drilling/ Tapping (Per hole) 10 Per hole
322 321 Fitment of cooler including associated system pipelines and proving the system 10 Per Cooler
323 322 Witnessing trials onboard whenever system trials take place 10 Per Cooler
324 323 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Per Cooler
325 324 Cummins Lub Oil Cooler - NOPV/ LST (L)/ Corvette/ Visiting Ships
326 325 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 10 Per Cooler
327 326 Collection of cooler from the yard and shifting to firms workshop 10 Per Cooler
328 327 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 10 Per Cooler
329 328 Mechanical cleaning of cooler 10 Per Cooler
330 329 Highspeed flushing of cooler (see Note) 10 Per Cooler
331 330 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 10 Per Cooler
332 331 Weak Acid Rinse Chemical cleaning of cooler (See Note) 10 Per Cooler
333 332 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 10 Per Cooler
334 333 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 10 Per Cooler
335 334 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 10 Per Cooler
336 335 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 10 Per plug
337 336 Blanking of tube by cold repair using belzona or equivalent repair compound 10 Per tube
338 337 Repair of end cover by welding and brazing of cooler end cover 10 Per end cover
339 338 Cold repair of end cover by belzona or steel putty or any other cold repair compound 10 Per sq inch
340 339 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 10 Per set
341 340 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 10 Per set
342 341 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 10 Per fastener
343 342 Renewal of fastener (phospher bronze) 10 Per fastener
344 343 Drilling/ Tapping (Per hole) 10 Per hole
345 344 Fitment of cooler including associated system pipelines and proving the system 10 Per Cooler
346 345 Witnessing trials onboard whenever system trials take place 10 Per Cooler
347 346 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Per Cooler
348 347 FIN TYPE COOLER CLEANING/ ALTERNATOR - NOPV/ LST(L)/ Corvette/ Visiting Ships
349 348 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 10 Per Cooler
350 349 Collection of cooler from the yard and shifting to firms workshop 10 Per Cooler
351 350 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 10 Per Cooler
352 351 Mechanical cleaning of cooler 10 Per Cooler
353 352 Highspeed flushing of cooler (see Note) 10 Per Cooler
354 353 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 10 Per Cooler
355 354 Weak Acid Rinse Chemical cleaning of cooler (See Note) 10 Per Cooler
356 355 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 10 Per Cooler
357 356 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 10 Per Cooler
358 357 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 10 Per Cooler
359 358 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 10 Per plug
360 359 Blanking of tube by cold repair using belzona or equivalent repair compound 10 Per tube
361 360 Repair of end cover by welding and brazing of cooler end cover 10 Per end cover
362 361 Cold repair of end cover by belzona or steel putty or any other cold repair compound 10 Per sq inch
363 362 Renewal of joint / gasket (steam joint for charge air cooler and radiator) 10 Per set
364 363 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 10 Per set
365 364 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 10 Per fastener
366 365 Renewal of fastener (phospher bronze) 10 Per fastener
367 366 Drilling/ Tapping (Per hole) 10 Per hole
368 367 Fitment of cooler including associated system pipelines and proving the system 10 Per Cooler
369 368 Witnessing trials onboard whenever system trials take place 10 Per Cooler
370 369 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Per Cooler
371 370 Steering Gear Oil Cooler - LST (L)
372 371 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 5 Per Cooler
373 372 Collection of cooler from the yard and shifting to firms workshop 5 Per Cooler
374 373 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
375 374 Mechanical cleaning of cooler 5 Per Cooler
376 375 Highspeed flushing of cooler (see Note) 5 Per Cooler
377 376 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
378 377 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
379 378 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 5 Per Cooler
380 379 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 5 Per Cooler
381 380 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 5 Per Cooler
382 381 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
383 382 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
384 383 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
385 384 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
386 385 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 5 Per set
387 386 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
388 387 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
389 388 Renewal of fastener (phospher bronze) 5 Per fastener
390 389 Drilling/ Tapping (Per hole) 5 Per hole
391 390 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
392 391 Witnessing trials onboard whenever system trials take place 5 Per Cooler
393 392 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
394 393 HP Air Compressor Cooling Coil
395 394 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 5 Per Cooler
396 395 Collection of cooler from the yard and shifting to firms workshop 5 Per Cooler
397 396 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
398 397 Mechanical cleaning of cooler 5 Per Cooler
399 398 Highspeed flushing of cooler (see Note) 5 Per Cooler
400 399 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
401 400 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
402 401 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 5 Per Cooler
403 402 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 5 Per Cooler
404 403 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 5 Per Cooler
405 404 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
406 405 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
407 406 Renewal of joint / gasket (steam joint for charge air cooler and radiator) 5 Per set
408 407 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
409 408 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
410 409 Renewal of fastener (phospher bronze) 5 Per fastener
411 410 Drilling/ Tapping (Per hole) 5 Per hole
412 411 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
413 412 Witnessing trials onboard whenever system trials take place 5 Per Cooler
414 413 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
415 414 A/C Condenser (upto 5 TR) - All Ships
416 415 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 5 Per Cooler
417 416 Collection of cooler from the yard and shifting to firms workshop 5 Per Cooler
418 417 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
419 418 Mechanical cleaning of cooler 5 Per Cooler
420 419 Highspeed flushing of cooler (see Note) 5 Per Cooler
421 420 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
422 421 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
423 422 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 5 Per Cooler
424 423 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 5 Per Cooler
425 424 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 5 Per Cooler
426 425 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
427 426 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
428 427 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
429 428 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
430 429 Renewal of joint / gasket (neoprene rubber for water cooler) 5 Per set
431 430 Renewal of joint / gasket (steam joint for charge air cooler and radiator) 5 Per set
432 431 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
433 432 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
434 433 Renewal of fastener (phospher bronze) 5 Per fastener
435 434 Manufacturing of retainer stud ( material SS TO AISI 304, SS 316) 5 Per Stud
436 435 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
437 436 Witnessing trials onboard whenever system trials take place 5 Per Cooler
438 437 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
439 438 A/C Condenser (6 to 10 TR) - All Ships
440 439 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 10 Per Cooler
441 440 Collection of cooler from the yard and shifting to firms workshop 10 Per Cooler
442 441 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 10 Per Cooler
443 442 Mechanical cleaning of cooler 10 Per Cooler
444 443 Highspeed flushing of cooler (see Note) 10 Per Cooler
445 444 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 10 Per Cooler
446 445 Weak Acid Rinse Chemical cleaning of cooler (See Note) 10 Per Cooler
447 446 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 10 Per Cooler
448 447 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 10 Per Cooler
449 448 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 10 Per Cooler
450 449 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 10 Per plug
451 450 Blanking of tube by cold repair using belzona or equivalent repair compound 10 Per tube
452 451 Repair of end cover by welding and brazing of cooler end cover 10 Per end cover
453 452 Cold repair of end cover by belzona or steel putty or any other cold repair compound 10 Per sq inch
454 453 Renewal of joint / gasket (neoprene rubber for water cooler) 10 Per set
455 454 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 10 Per set
456 455 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 10 Per fastener
457 456 Renewal of fastener (phospher bronze) 10 Per fastener
458 457 Drilling/ Tapping (Per hole) 10 Per hole
459 458 Fitment of cooler including associated system pipelines and proving the system 10 Per Cooler
460 459 Witnessing trials onboard whenever system trials take place 10 Per Cooler
461 460 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Per Cooler
462 461 A/C Condenser (11 to 20 TR) - All Ships
463 462 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 10 Per Cooler
464 463 Collection of cooler from the yard and shifting to firms workshop 10 Per Cooler
465 464 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 10 Per Cooler
466 465 Mechanical cleaning of cooler 10 Per Cooler
467 466 Highspeed flushing of cooler (see Note) 10 Per Cooler
468 467 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 10 Per Cooler
469 468 Weak Acid Rinse Chemical cleaning of cooler (See Note) 10 Per Cooler
470 469 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 10 Per Cooler
471 470 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 10 Per Cooler
472 471 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 10 Per Cooler
473 472 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 10 Per plug
474 473 Blanking of tube by cold repair using belzona or equivalent repair compound 10 Per tube
475 474 Repair of end cover by welding and brazing of cooler end cover 10 Per end cover
476 475 Cold repair of end cover by belzona or steel putty or any other cold repair compound 10 Per sq inch
477 476 Renewal of joint / gasket (neoprene rubber for water cooler) 10 Per set
478 477 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 10 Per set
479 478 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 10 Per fastener
480 479 Renewal of fastener (phospher bronze) 10 Per fastener
481 480 Drilling/ Tapping (Per hole) 10 Per hole
482 481 Fitment of cooler including associated system pipelines and proving the system 10 Per Cooler
483 482 Witnessing trials onboard whenever system trials take place 10 Per Cooler
484 483 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Per Cooler
485 484 A/C Condenser (21 to 60 TR) - All Ships
486 485 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 5 Per Cooler
487 486 Collection of cooler from the yard and shifting to firms workshop 5 Per Cooler
488 487 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
489 488 Mechanical cleaning of cooler 5 Per Cooler
490 489 Highspeed flushing of cooler (see Note) 5 Per Cooler
491 490 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
492 491 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
493 492 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 5 Per Cooler
494 493 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 5 Per Cooler
495 494 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 5 Per Cooler
496 495 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
497 496 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
498 497 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
499 498 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
500 499 Renewal of joint / gasket (neoprene rubber for water cooler) 5 Per set
501 500 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
502 501 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
503 502 Renewal of fastener (phospher bronze) 5 Per fastener
504 503 Drilling/ Tapping (Per hole) 5 Per hole
505 504 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
506 505 Witnessing trials onboard whenever system trials take place 5 Per Cooler
507 506 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
508 507 Miscellanious Coolers of Visiting Ships - All Ships
509 508 Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. 5 Per Cooler
510 509 Collection of cooler from the yard and shifting to firms workshop 5 Per Cooler
511 510 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
512 511 Mechanical cleaning of cooler 5 Per Cooler
513 512 Highspeed flushing of cooler (see Note) 5 Per Cooler
514 513 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
515 514 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
516 515 Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) 5 Per Cooler
517 516 Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). 5 Per Cooler
518 517 Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) 5 Per Cooler
519 518 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
520 519 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
521 520 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
522 521 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
523 522 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 5 Per set
524 523 Renewal of joint / gasket (neoprene rubber for water cooler) 5 Per set
525 524 Renewal of joint / gasket (steam joint for charge air cooler and radiator) 5 Per set
526 525 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
527 526 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
528 527 Renewal of fastener (phospher bronze) 5 Per fastener
529 528 Drilling/ Tapping (Per hole) 5 Per hole
530 529 Repair of retainer stud by metal build up and machineing/ straightening of stud 5 Per Stud
531 530 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
532 531 Witnessing trials onboard whenever system trials take place 5 Per Cooler
533 532 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
534 533 ATUs (Up to 5 TR) - All Ships
535 534 Removal of complete ATU including delagging, disconnecting associated pipelines 10 Per ATU
536 535 Removal of only ATU filters, filters for cleaning 10 Per ATU
537 536 Mechanical cleaning - Air side 10 Per ATU
538 537 Chemical cleaning - Air side (see note) 10 Per ATU
539 538 Chemical cleaning - Water side (see note) 10 Per ATU
540 539 Onboard Chemical cleaning - water side (see note) 10 Per ATU
541 540 Shifting of temporary circulation jig onboard with necessary fittings and hoses 10 Job
542 541 Pressure Testing upto 1.5 times working pressure /as recommended by OEM. 10 Per ATU
543 542 Shifting of pressure testing equipment and necessary fittings onboard (in case of 4 (b)) 10 Job
544 543 Renewal of joint/gasket (MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) 10 Per set
545 544 Renewal of fasteners and washers as required ( Phospated MS to IS 226) 10 Per Fastener
546 545 Renewal of fasteners and washers as required (SS) 10 Per Fastener
547 546 Renewal of flange (GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) THICKNESS 05 MM TO 08 MM, HOLES DRILLED AS PER PCD OF MATING FLAGE 10 Per flange
548 547 Repair of flange/ end cover by metal building by welding and brazing of ATU/HE end cover 10 Per flange
549 548 Repair of flange/end cover by Cold repair by Putty (Devcon/Belzona) 10 Per cover
550 549 Renewal of packing to arrest air leakages from ATU filter 10 Per ATU
551 550 Plugging of tube including manufacture of plug GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102, Copper) 10 Per Plug
552 551 Fitment of ATU including associated system pipeline 10 Job
553 552 Fitment of ATU filters including associated system pipeline 10 Job
554 553 Repair of drain plug 10 Job
555 554 Renewal of drain plug 10 Job
556 555 Photography of ATU to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Job
557 556 ATUs (6 to 10 TR) - All Ships
558 557 Removal of complete ATU including delagging, disconnecting associated pipelines 10 Per ATU
559 558 Removal of only ATU filters, filters for cleaning 10 Per ATU
560 559 Mechanical cleaning - Air side 10 Per ATU
561 560 Chemical cleaning - Air side (see note) 10 Per ATU
562 561 Chemical cleaning - Water side (see note) 10 Per ATU
563 562 Onboard Chemical cleaning - water side (see note) 10 Per ATU
564 563 Shifting of temporary circulation jig onboard with necessary fittings and hoses 10 Job
565 564 Pressure Testing upto 1.5 times working pressure /as recommended by OEM. 10 Per ATU
566 565 Shifting of pressure testing equipment and necessary fittings onboard (in case of 4 (b)) 10 Job
567 566 Renewal of joint/gasket (MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) 10 Per set
568 567 Renewal of fasteners and washers as required ( Phospated MS to IS 226) 10 Per Fastener
569 568 Renewal of fasteners and washers as required (SS) 10 Per Fastener
570 569 Renewal of flange (GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) THICKNESS 05 MM TO 08 MM, HOLES DRILLED AS PER PCD OF MATING FLAGE 10 Per flange
571 570 Repair of flange/ end cover by metal building by welding and brazing of ATU/HE end cover 10 Per flange
572 571 Repair of flange/end cover by Cold repair by Putty (Devcon/Belzona) 10 Per cover
573 572 Renewal of packing to arrest air leakages from ATU filter 10 Per ATU
574 573 Plugging of tube including manufacture of plug GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102, Copper) 10 Per Plug
575 574 Fitment of ATU including associated system pipeline 10 Job
576 575 Fitment of ATU filters including associated system pipeline 10 Job
577 576 Repair of drain plug 10 Job
578 577 Renewal of drain plug 10 Job
579 578 Photography of ATU to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Job
580 579 ATUs (above 10 TR) - All Ships
581 580 Removal of complete ATU including delagging, disconnecting associated pipelines 10 Per ATU
582 581 Removal of only ATU filters, filters for cleaning 10 Per ATU
583 582 Mechanical cleaning - Air side 10 Per ATU
584 583 Chemical cleaning - Air side (see note) 10 Per ATU
585 584 Chemical cleaning - Water side (see note) 10 Per ATU
586 585 Onboard Chemical cleaning - water side (see note) 10 Per ATU
587 586 Shifting of temporary circulation jig onboard with necessary fittings and hoses 10 Job
588 587 Pressure Testing upto 1.5 times working pressure /as recommended by OEM. 10 Per ATU
589 588 Shifting of pressure testing equipment and necessary fittings onboard (in case of 4 (b)) 10 Job
590 589 Renewal of joint/gasket (MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) 10 Per set
591 590 Renewal of fasteners and washers as required ( Phospated MS to IS 226) 10 Per Fastener
592 591 Renewal of fasteners and washers as required (SS) 10 Per Fastener
593 592 Renewal of flange (GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) THICKNESS 05 MM TO 08 MM, HOLES DRILLED AS PER PCD OF MATING FLAGE 10 Per flange
594 593 Repair of flange/ end cover by metal building by welding and brazing of ATU/HE end cover 10 Per flange
595 594 Repair of flange/end cover by Cold repair by Putty (Devcon/Belzona) 10 Per cover
596 595 Renewal of packing to arrest air leakages from ATU filter 10 Per ATU
597 596 Plugging of tube including manufacture of plug GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102, Copper) 10 Per Plug
598 597 Fitment of ATU including associated system pipeline 10 Job
599 598 Fitment of ATU filters including associated system pipeline 10 Job
600 599 Repair of drain plug 10 Job
601 600 Renewal of drain plug 10 Job
602 601 Photography of ATU to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Job
603 602 AHUs - ALL Ships
604 603 Removal of complete ATU including delagging, disconnecting associated pipelines 5 Per ATU
605 604 Removal of only ATU filters, filters for cleaning 5 Per ATU
606 605 Mechanical cleaning - Air side 5 Per ATU
607 606 Chemical cleaning - Air side (see note) 5 Per ATU
608 607 Chemical cleaning - Water side (see note) 5 Per ATU
609 608 Onboard Chemical cleaning - water side (see note) 5 Per ATU
610 609 Shifting of temporary circulation jig onboard with necessary fittings and hoses 5 Job
611 610 Pressure Testing upto 1.5 times working pressure /as recommended by OEM. 5 Per ATU
612 611 Shifting of pressure testing equipment and necessary fittings onboard (in case of 4 (b)) 5 Job
613 612 Renewal of joint/gasket (MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) 5 Per set
614 613 Renewal of fasteners and washers as required ( Phospated MS to IS 226) 5 Per Fastener
615 614 Renewal of fasteners and washers as required (SS) 5 Per Fastener
616 615 Renewal of flange (GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) THICKNESS 05 MM TO 08 MM, HOLES DRILLED AS PER PCD OF MATING FLAGE 5 Per flange
617 616 Repair of flange/ end cover by metal building by welding and brazing of ATU/HE end cover 5 Per flange
618 617 Repair of flange/end cover by Cold repair by Putty (Devcon/Belzona) 5 Per cover
619 618 Renewal of packing to arrest air leakages from ATU filter 5 Per ATU
620 619 Plugging of tube including manufacture of plug GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102, Copper) 5 Per Plug
621 620 Fitment of ATU including associated system pipeline 5 Job
622 621 Fitment of ATU filters including associated system pipeline 5 Job
623 622 Repair of drain plug 5 Job
624 623 Renewal of drain plug 5 Job
625 624 Photography of ATU to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Job
626 625 MATERIAL
627 626 Cummins DA Fresh Water Coolers - LST (M)/ LCU MK IV
628 627 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 10 Per Cooler
629 628 Mechanical cleaning of cooler 10 Per Cooler
630 629 Highspeed flushing of cooler (see Note) 10 Per Cooler
631 630 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 10 Per Cooler
632 631 Weak Acid Rinse Chemical cleaning of cooler (See Note) 10 Per Cooler
633 632 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 10 Per plug
634 633 Blanking of tube by cold repair using belzona or equivalent repair compound 10 Per tube
635 634 Repair of end cover by welding and brazing of cooler end cover 10 Per end cover
636 635 Cold repair of end cover by belzona or steel putty or any other cold repair compound 10 Per sq inch
637 636 Renewal of joint / gasket (neoprene rubber for water cooler) 10 Per set
638 637 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 10 Per set
639 638 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 10 Per fastener
640 639 Renewal of fastener (phospher bronze) 10 Per fastener
641 640 Drilling/ Tapping (Per hole) 10 Per hole
642 641 Fitment of cooler including associated system pipelines and proving the system 10 Per Cooler
643 642 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Per Cooler
644 643 Cummins DA (NT 743 MG) Lub Oil Coolers - LST (M)
645 644 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 10 Per Cooler
646 645 Mechanical cleaning of cooler 10 Per Cooler
647 646 Highspeed flushing of cooler (see Note) 10 Per Cooler
648 647 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 10 Per Cooler
649 648 Weak Acid Rinse Chemical cleaning of cooler (See Note) 10 Per Cooler
650 649 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 10 Per plug
651 650 Blanking of tube by cold repair using belzona or equivalent repair compound 10 Per tube
652 651 Repair of end cover by welding and brazing of cooler end cover 10 Per end cover
653 652 Cold repair of end cover by belzona or steel putty or any other cold repair compound 10 Per sq inch
654 653 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 10 Per set
655 654 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 10 Per set
656 655 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 10 Per fastener
657 656 Renewal of fastener (phospher bronze) 10 Per fastener
658 657 Drilling/ Tapping (Per hole) 10 Per hole
659 658 Fitment of cooler including associated system pipelines and proving the system 10 Per Cooler
660 659 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Per Cooler
661 660 Main Engine Lub Oil Cooler - LST (M)
662 661 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 10 Per Cooler
663 662 Mechanical cleaning of cooler 10 Per Cooler
664 663 Highspeed flushing of cooler (see Note) 10 Per Cooler
665 664 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 10 Per Cooler
666 665 Weak Acid Rinse Chemical cleaning of cooler (See Note) 10 Per Cooler
667 666 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 10 Per plug
668 667 Blanking of tube by cold repair using belzona or equivalent repair compound 10 Per tube
669 668 Repair of end cover by welding and brazing of cooler end cover 10 Per end cover
670 669 Cold repair of end cover by belzona or steel putty or any other cold repair compound 10 Per sq inch
671 670 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 10 Per set
672 671 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 10 Per set
673 672 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 10 Per fastener
674 673 Renewal of fastener (phospher bronze) 10 Per fastener
675 674 Drilling/ Tapping (Per hole) 10 Per hole
676 675 Fitment of cooler including associated system pipelines and proving the system 10 Per Cooler
677 676 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Per Cooler
678 677 Gear Box Lub Oil Coolers - LST (M)
679 678 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
680 679 Mechanical cleaning of cooler 5 Per Cooler
681 680 Highspeed flushing of cooler (see Note) 5 Per Cooler
682 681 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
683 682 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
684 683 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
685 684 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
686 685 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
687 686 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
688 687 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 5 Per set
689 688 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
690 689 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
691 690 Renewal of fastener (phospher bronze) 5 Per fastener
692 691 Drilling/ Tapping (Per hole) 5 Per hole
693 692 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
694 693 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
695 694 Main Engine Lub oil Coolers - FAC/LCU MK IV
696 695 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
697 696 Mechanical cleaning of cooler 5 Per Cooler
698 697 Highspeed flushing of cooler (see Note) 5 Per Cooler
699 698 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
700 699 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
701 700 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
702 701 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
703 702 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
704 703 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
705 704 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 5 Per set
706 705 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
707 706 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
708 707 Renewal of fastener (phospher bronze) 5 Per fastener
709 708 Drilling/ Tapping (Per hole) 5 Per hole
710 709 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
711 710 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
712 711 Main Engine Fresh Water Coolers - FAC/LCU MK IV
713 712 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
714 713 Mechanical cleaning of cooler 5 Per Cooler
715 714 Highspeed flushing of cooler (see Note) 5 Per Cooler
716 715 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
717 716 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
718 717 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
719 718 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
720 719 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
721 720 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
722 721 Renewal of joint / gasket (neoprene rubber for water cooler) 5 Per set
723 722 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
724 723 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
725 724 Renewal of fastener (phospher bronze) 5 Per fastener
726 725 Drilling/ Tapping (Per hole) 5 Per hole
727 726 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
728 727 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
729 728 Gear Box Lub Oil Coolers - FAC/LCU MK
730 729 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
731 730 Mechanical cleaning of cooler 5 Per Cooler
732 731 Highspeed flushing of cooler (see Note) 5 Per Cooler
733 732 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
734 733 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
735 734 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
736 735 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
737 736 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
738 737 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
739 738 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 5 Per set
740 739 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
741 740 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
742 741 Renewal of fastener (phospher bronze) 5 Per fastener
743 742 Drilling/ Tapping (Per hole) 5 Per hole
744 743 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
745 744 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
746 745 Main Engine Lub Oil Coolers - Yard Crafts
747 746 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
748 747 Mechanical cleaning of cooler 5 Per Cooler
749 748 Highspeed flushing of cooler (see Note) 5 Per Cooler
750 749 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
751 750 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
752 751 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
753 752 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
754 753 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
755 754 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
756 755 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 5 Per set
757 756 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
758 757 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
759 758 Renewal of fastener (phospher bronze) 5 Per fastener
760 759 Drilling/ Tapping (Per hole) 5 Per hole
761 760 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
762 761 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
763 762 Main Engine Fresh Water Coolers - Yard Crafts
764 763 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
765 764 Mechanical cleaning of cooler 5 Per Cooler
766 765 Highspeed flushing of cooler (see Note) 5 Per Cooler
767 766 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
768 767 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
769 768 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
770 769 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
771 770 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
772 771 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
773 772 Renewal of joint / gasket (neoprene rubber for water cooler) 5 Per set
774 773 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
775 774 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
776 775 Renewal of fastener (phospher bronze) 5 Per fastener
777 776 Drilling/ Tapping (Per hole) 5 Per hole
778 777 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
779 778 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
780 779 Main Engine Lub Oil Cooler - NOPV/LST (L)/Corvette/Visiting Ships
781 780 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
782 781 Mechanical cleaning of cooler 5 Per Cooler
783 782 Highspeed flushing of cooler (see Note) 5 Per Cooler
784 783 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
785 784 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
786 785 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
787 786 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
788 787 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
789 788 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
790 789 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 5 Per set
791 790 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
792 791 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
793 792 Renewal of fastener (phospher bronze) 5 Per fastener
794 793 Drilling/ Tapping (Per hole) 5 Per hole
795 794 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
796 795 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
797 796 Main Engine Fresh Water Cooler - NOPV/LST (L)/Corvette/Visiting Ships
798 797 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
799 798 Mechanical cleaning of cooler 5 Per Cooler
800 799 Highspeed flushing of cooler (see Note) 5 Per Cooler
801 800 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
802 801 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
803 802 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
804 803 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
805 804 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
806 805 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
807 806 Renewal of joint / gasket (neoprene rubber for water cooler) 5 Per set
808 807 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
809 808 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
810 809 Renewal of fastener (phospher bronze) 5 Per fastener
811 810 Drilling/ Tapping (Per hole) 5 Per hole
812 811 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
813 812 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
814 813 Gear Box Lub Oil Cooler - NOPV/LST (L)/Corvette/Visiting Ships
815 814 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
816 815 Mechanical cleaning of cooler 5 Per Cooler
817 816 Highspeed flushing of cooler (see Note) 5 Per Cooler
818 817 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
819 818 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
820 819 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
821 820 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
822 821 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
823 822 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
824 823 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 5 Per set
825 824 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
826 825 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
827 826 Renewal of fastener (phospher bronze) 5 Per fastener
828 827 Drilling/ Tapping (Per hole) 5 Per hole
829 828 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
830 829 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
831 830 CPP Lub Oil Cooler - NOPV/LST (L)/Corvette/Visiting Ships
832 831 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
833 832 Mechanical cleaning of cooler 5 Per Cooler
834 833 Highspeed flushing of cooler (see Note) 5 Per Cooler
835 834 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
836 835 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
837 836 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
838 837 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
839 838 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
840 839 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
841 840 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 5 Per set
842 841 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
843 842 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
844 843 Renewal of fastener (phospher bronze) 5 Per fastener
845 844 Drilling/ Tapping (Per hole) 5 Per hole
846 845 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
847 846 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
848 847 Cummins Fresh Water Cooler - NOPV/LST (L)/Corvette/Visiting Ships
849 848 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 10 Per Cooler
850 849 Mechanical cleaning of cooler 10 Per Cooler
851 850 Highspeed flushing of cooler (see Note) 10 Per Cooler
852 851 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 10 Per Cooler
853 852 Weak Acid Rinse Chemical cleaning of cooler (See Note) 10 Per Cooler
854 853 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 10 Per plug
855 854 Blanking of tube by cold repair using belzona or equivalent repair compound 10 Per tube
856 855 Repair of end cover by welding and brazing of cooler end cover 10 Per end cover
857 856 Cold repair of end cover by belzona or steel putty or any other cold repair compound 10 Per sq inch
858 857 Renewal of joint / gasket (neoprene rubber for water cooler) 10 Per set
859 858 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 10 Per set
860 859 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 10 Per fastener
861 860 Renewal of fastener (phospher bronze) 10 Per fastener
862 861 Drilling/ Tapping (Per hole) 10 Per hole
863 862 Fitment of cooler including associated system pipelines and proving the system 10 Per Cooler
864 863 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Per Cooler
865 864 Cummins Lub Oil Cooler - NOPV/ LST (L)/ Corvette/ Visiting Ships
866 865 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 10 Per Cooler
867 866 Mechanical cleaning of cooler 10 Per Cooler
868 867 Highspeed flushing of cooler (see Note) 10 Per Cooler
869 868 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 10 Per Cooler
870 869 Weak Acid Rinse Chemical cleaning of cooler (See Note) 10 Per Cooler
871 870 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 10 Per plug
872 871 Blanking of tube by cold repair using belzona or equivalent repair compound 10 Per tube
873 872 Repair of end cover by welding and brazing of cooler end cover 10 Per end cover
874 873 Cold repair of end cover by belzona or steel putty or any other cold repair compound 10 Per sq inch
875 874 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 10 Per set
876 875 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 10 Per set
877 876 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 10 Per fastener
878 877 Renewal of fastener (phospher bronze) 10 Per fastener
879 878 Drilling/ Tapping (Per hole) 10 Per hole
880 879 Fitment of cooler including associated system pipelines and proving the system 10 Per Cooler
881 880 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Per Cooler
882 881 FIN TYPE COOLER CLEANING/ ALTERNATOR - NOPV/ LST(L)/ Corvette/ Visiting Ships
883 882 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 10 Per Cooler
884 883 Mechanical cleaning of cooler 10 Per Cooler
885 884 Highspeed flushing of cooler (see Note) 10 Per Cooler
886 885 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 10 Per Cooler
887 886 Weak Acid Rinse Chemical cleaning of cooler (See Note) 10 Per Cooler
888 887 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 10 Per plug
889 888 Blanking of tube by cold repair using belzona or equivalent repair compound 10 Per tube
890 889 Repair of end cover by welding and brazing of cooler end cover 10 Per end cover
891 890 Cold repair of end cover by belzona or steel putty or any other cold repair compound 10 Per sq inch
892 891 Renewal of joint / gasket (steam joint for charge air cooler and radiator) 10 Per set
893 892 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 10 Per set
894 893 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 10 Per fastener
895 894 Renewal of fastener (phospher bronze) 10 Per fastener
896 895 Drilling/ Tapping (Per hole) 10 Per hole
897 896 Fitment of cooler including associated system pipelines and proving the system 10 Per Cooler
898 897 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Per Cooler
899 898 Steering Gear Oil Cooler - LST (L)
900 899 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
901 900 Mechanical cleaning of cooler 5 Per Cooler
902 901 Highspeed flushing of cooler (see Note) 5 Per Cooler
903 902 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
904 903 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
905 904 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
906 905 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
907 906 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
908 907 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
909 908 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 5 Per set
910 909 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
911 910 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
912 911 Renewal of fastener (phospher bronze) 5 Per fastener
913 912 Drilling/ Tapping (Per hole) 5 Per hole
914 913 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
915 914 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
916 915 HP Air Compressor Cooling Coil
917 916 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
918 917 Mechanical cleaning of cooler 5 Per Cooler
919 918 Highspeed flushing of cooler (see Note) 5 Per Cooler
920 919 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
921 920 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
922 921 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
923 922 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
924 923 Renewal of joint / gasket (steam joint for charge air cooler and radiator) 5 Per set
925 924 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
926 925 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
927 926 Renewal of fastener (phospher bronze) 5 Per fastener
928 927 Drilling/ Tapping (Per hole) 5 Per hole
929 928 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
930 929 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
931 930 A/C Condenser (upto 5 TR) - All Ships
932 931 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
933 932 Mechanical cleaning of cooler 5 Per Cooler
934 933 Highspeed flushing of cooler (see Note) 5 Per Cooler
935 934 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
936 935 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
937 936 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
938 937 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
939 938 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
940 939 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
941 940 Renewal of joint / gasket (neoprene rubber for water cooler) 5 Per set
942 941 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
943 942 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
944 943 Renewal of fastener (phospher bronze) 5 Per fastener
945 944 Drilling/ Tapping (Per hole) 5 Per hole
946 945 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
947 946 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
948 947 A/C Condenser (6 to 10 TR) - All Ships
949 948 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 10 Per Cooler
950 949 Mechanical cleaning of cooler 10 Per Cooler
951 950 Highspeed flushing of cooler (see Note) 10 Per Cooler
952 951 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 10 Per Cooler
953 952 Weak Acid Rinse Chemical cleaning of cooler (See Note) 10 Per Cooler
954 953 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 10 Per plug
955 954 Blanking of tube by cold repair using belzona or equivalent repair compound 10 Per tube
956 955 Repair of end cover by welding and brazing of cooler end cover 10 Per end cover
957 956 Cold repair of end cover by belzona or steel putty or any other cold repair compound 10 Per sq inch
958 957 Renewal of joint / gasket (neoprene rubber for water cooler) 10 Per set
959 958 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 10 Per set
960 959 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 10 Per fastener
961 960 Renewal of fastener (phospher bronze) 10 Per fastener
962 961 Drilling/ Tapping (Per hole) 10 Per hole
963 962 Fitment of cooler including associated system pipelines and proving the system 10 Per Cooler
964 963 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Per Cooler
965 964 A/C Condenser (11 to 20 TR) - All Ships
966 965 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 10 Per Cooler
967 966 Mechanical cleaning of cooler 10 Per Cooler
968 967 Highspeed flushing of cooler (see Note) 10 Per Cooler
969 968 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 10 Per Cooler
970 969 Weak Acid Rinse Chemical cleaning of cooler (See Note) 10 Per Cooler
971 970 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 10 Per plug
972 971 Blanking of tube by cold repair using belzona or equivalent repair compound 10 Per tube
973 972 Repair of end cover by welding and brazing of cooler end cover 10 Per end cover
974 973 Cold repair of end cover by belzona or steel putty or any other cold repair compound 10 Per sq inch
975 974 Renewal of joint / gasket (neoprene rubber for water cooler) 10 Per set
976 975 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 10 Per set
977 976 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 10 Per fastener
978 977 Renewal of fastener (phospher bronze) 10 Per fastener
979 978 Drilling/ Tapping (Per hole) 10 Per hole
980 979 Fitment of cooler including associated system pipelines and proving the system 10 Per Cooler
981 980 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Per Cooler
982 981 A/C Condenser (21 to 60 TR) - All Ships
983 982 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
984 983 Mechanical cleaning of cooler 5 Per Cooler
985 984 Highspeed flushing of cooler (see Note) 5 Per Cooler
986 985 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
987 986 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
988 987 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
989 988 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
990 989 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
991 990 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
992 991 Renewal of joint / gasket (neoprene rubber for water cooler) 5 Per set
993 992 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
994 993 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
995 994 Renewal of fastener (phospher bronze) 5 Per fastener
996 995 Drilling/ Tapping (Per hole) 5 Per hole
997 996 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
998 997 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
999 998 Miscellanious Coolers of Visiting Ships - All Ships
1000 999 Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. 5 Per Cooler
1001 1000 Mechanical cleaning of cooler 5 Per Cooler
1002 1001 Highspeed flushing of cooler (see Note) 5 Per Cooler
1003 1002 Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) 5 Per Cooler
1004 1003 Weak Acid Rinse Chemical cleaning of cooler (See Note) 5 Per Cooler
1005 1004 Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) 5 Per plug
1006 1005 Blanking of tube by cold repair using belzona or equivalent repair compound 5 Per tube
1007 1006 Repair of end cover by welding and brazing of cooler end cover 5 Per end cover
1008 1007 Cold repair of end cover by belzona or steel putty or any other cold repair compound 5 Per sq inch
1009 1008 Renewal of joint / gasket (as per specification oil joint for lub oil cooler) 5 Per set
1010 1009 Renewal of joint / gasket (neoprene rubber for water cooler) 5 Per set
1011 1010 Renewal of joint / gasket (steam joint for charge air cooler and radiator) 5 Per set
1012 1011 Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required 5 Per set
1013 1012 RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) 5 Per fastener
1014 1013 Renewal of fastener (phospher bronze) 5 Per fastener
1015 1014 Drilling/ Tapping (Per hole) 5 Per hole
1016 1015 Repair of retainer stud by metal build up and machineing/ straightening of stud 5 Per Stud
1017 1016 Fitment of cooler including associated system pipelines and proving the system 5 Per Cooler
1018 1017 Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Per Cooler
1019 1018 ATUs (Up to 5 TR) - All Ships
1020 1019 Mechanical cleaning - Air side 10 Per ATU
1021 1020 Chemical cleaning - Air side (see note) 10 Per ATU
1022 1021 Chemical cleaning - Water side (see note) 10 Per ATU
1023 1022 Onboard Chemical cleaning - water side (see note) 10 Per ATU
1024 1023 Renewal of joint/gasket (MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) 10 Per set
1025 1024 Renewal of fasteners and washers as required ( Phospated MS to IS 226) 10 Per Fastener
1026 1025 Renewal of fasteners and washers as required (SS) 10 Per Fastener
1027 1026 Renewal of flange (GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) THICKNESS 05 MM TO 08 MM, HOLES DRILLED AS PER PCD OF MATING FLAGE 10 Per flange
1028 1027 Repair of flange/ end cover by metal building by welding and brazing of ATU/HE end cover 10 Per flange
1029 1028 Repair of flange/end cover by Cold repair by Putty (Devcon/Belzona) 10 Per cover
1030 1029 Renewal of packing to arrest air leakages from ATU filter 10 Per ATU
1031 1030 Plugging of tube including manufacture of plug GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102, Copper) 10 Per Plug
1032 1031 Fitment of ATU including associated system pipeline 10 Job
1033 1032 Fitment of ATU filters including associated system pipeline 10 Job
1034 1033 Repair of drain plug 10 Job
1035 1034 Renewal of drain plug 10 Job
1036 1035 Photography of ATU to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Job
1037 1036 ATUs (6 to 10 TR) - All Ships
1038 1037 Mechanical cleaning - Air side 10 Per ATU
1039 1038 Chemical cleaning - Air side (see note) 10 Per ATU
1040 1039 Chemical cleaning - Water side (see note) 10 Per ATU
1041 1040 Onboard Chemical cleaning - water side (see note) 10 Per ATU
1042 1041 Renewal of joint/gasket (MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) 10 Per set
1043 1042 Renewal of fasteners and washers as required ( Phospated MS to IS 226) 10 Per Fastener
1044 1043 Renewal of fasteners and washers as required (SS) 10 Per Fastener
1045 1044 Renewal of flange (GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) THICKNESS 05 MM TO 08 MM, HOLES DRILLED AS PER PCD OF MATING FLAGE 10 Per flange
1046 1045 Repair of flange/ end cover by metal building by welding and brazing of ATU/HE end cover 10 Per flange
1047 1046 Repair of flange/end cover by Cold repair by Putty (Devcon/Belzona) 10 Per cover
1048 1047 Renewal of packing to arrest air leakages from ATU filter 10 Per ATU
1049 1048 Plugging of tube including manufacture of plug GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102, Copper) 10 Per Plug
1050 1049 Fitment of ATU including associated system pipeline 10 Job
1051 1050 Fitment of ATU filters including associated system pipeline 10 Job
1052 1051 Repair of drain plug 10 Job
1053 1052 Renewal of drain plug 10 Job
1054 1053 Photography of ATU to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Job
1055 1054 ATUs (above 10 TR) - All Ships
1056 1055 Mechanical cleaning - Air side 10 Per ATU
1057 1056 Chemical cleaning - Air side (see note) 10 Per ATU
1058 1057 Chemical cleaning - Water side (see note) 10 Per ATU
1059 1058 Onboard Chemical cleaning - water side (see note) 10 Per ATU
1060 1059 Renewal of joint/gasket (MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) 10 Per set
1061 1060 Renewal of fasteners and washers as required ( Phospated MS to IS 226) 10 Per Fastener
1062 1061 Renewal of fasteners and washers as required (SS) 10 Per Fastener
1063 1062 Renewal of flange (GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) THICKNESS 05 MM TO 08 MM, HOLES DRILLED AS PER PCD OF MATING FLAGE 10 Per flange
1064 1063 Repair of flange/ end cover by metal building by welding and brazing of ATU/HE end cover 10 Per flange
1065 1064 Repair of flange/end cover by Cold repair by Putty (Devcon/Belzona) 10 Per cover
1066 1065 Renewal of packing to arrest air leakages from ATU filter 10 Per ATU
1067 1066 Plugging of tube including manufacture of plug GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102, Copper) 10 Per Plug
1068 1067 Fitment of ATU including associated system pipeline 10 Job
1069 1068 Fitment of ATU filters including associated system pipeline 10 Job
1070 1069 Repair of drain plug 10 Job
1071 1070 Renewal of drain plug 10 Job
1072 1071 Photography of ATU to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 10 Job
1073 1072 AHUs - ALL Ships
1074 1073 Mechanical cleaning - Air side 5 Per ATU
1075 1074 Chemical cleaning - Air side (see note) 5 Per ATU
1076 1075 Chemical cleaning - Water side (see note) 5 Per ATU
1077 1076 Onboard Chemical cleaning - water side (see note) 5 Per ATU
1078 1077 Renewal of joint/gasket (MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) 5 Per set
1079 1078 Renewal of fasteners and washers as required ( Phospated MS to IS 226) 5 Per Fastener
1080 1079 Renewal of fasteners and washers as required (SS) 5 Per Fastener
1081 1080 Renewal of flange (GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) THICKNESS 05 MM TO 08 MM, HOLES DRILLED AS PER PCD OF MATING FLAGE 5 Per flange
1082 1081 Repair of flange/ end cover by metal building by welding and brazing of ATU/HE end cover 5 Per flange
1083 1082 Repair of flange/end cover by Cold repair by Putty (Devcon/Belzona) 5 Per cover
1084 1083 Renewal of packing to arrest air leakages from ATU filter 5 Per ATU
1085 1084 Plugging of tube including manufacture of plug GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102, Copper) 5 Per Plug
1086 1085 Fitment of ATU including associated system pipeline 5 Job
1087 1086 Fitment of ATU filters including associated system pipeline 5 Job
1088 1087 Repair of drain plug 5 Job
1089 1088 Renewal of drain plug 5 Job
1090 1089 Photography of ATU to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) 5 Job
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail