Integrated Defence Staff has published Nsry/Com/1966/Concluding Repair Rate Contract For Repair/ Overhauling Of Coolers , Condensers , Atus And Ahus Of In Ships , Yardcraft And Fdns Concluding Repair Rate Contract For Repair And Overhauling Of Coolers , Condensers , Atus And Ahus Of In Sh. Submission Date for this Tender is 09-11-2020. Electrical Condenser Tenders in NAVAL SHIP REPAIR YARD,PORT BLAIR Andaman And Nicobar Islands. Bidders can get complete Tender details and download the document.
Name of Work: REPAIR RATE CONTRACT FOR REPAIR/ OVERHAULING OF COOLERS, CONDENSERS, ATU’s AND AHU’s OF IN SHIPS, YARDCRAFT AND FDNs | |||||
---|---|---|---|---|---|
Sl. No. | Description of Service / Spare | HSN/ SAC Code | Quantity | Units | |
1 | 0.1 | Note: Bidders are requested to quote GST in terms of % only. Example If GST is 18% fill 0.18 in the GST column | |||
2 | 1 | SERVICES | |||
3 | 2 | Cummins DA Fresh Water Coolers - LST (M)/ LCU MK IV | |||
4 | 3 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 10 | Per Cooler | |
5 | 4 | Collection of cooler from the yard and shifting to firms workshop | 10 | Per Cooler | |
6 | 5 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 10 | Per Cooler | |
7 | 6 | Mechanical cleaning of cooler | 10 | Per Cooler | |
8 | 7 | Highspeed flushing of cooler (see Note) | 10 | Per Cooler | |
9 | 8 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 10 | Per Cooler | |
10 | 9 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 10 | Per Cooler | |
11 | 10 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 10 | Per Cooler | |
12 | 11 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 10 | Per Cooler | |
13 | 12 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 10 | Per Cooler | |
14 | 13 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 10 | Per Plug | |
15 | 14 | Blanking of tube by cold repair using belzona or equivalent repair compound | 10 | Per Tube | |
16 | 15 | Repair of end cover by welding and brazing of cooler end cover | 10 | Per End Cover | |
17 | 16 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 10 | Per sq inch | |
18 | 17 | Renewal of joint / gasket (neoprene rubber for water cooler) | 10 | Per set | |
19 | 18 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 10 | Per set | |
20 | 19 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 10 | Per Fastener | |
21 | 20 | Renewal of fastener (phospher bronze) | 10 | Per Fastener | |
22 | 21 | Drilling/ Tapping (Per hole) | 10 | Per Hole | |
23 | 22 | Fitment of cooler including associated system pipelines and proving the system | 10 | Per Cooler | |
24 | 23 | Witnessing trials onboard whenever system trials take place | 10 | Per Cooler | |
25 | 24 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Per Cooler | |
26 | 25 | Cummins DA (NT 743 MG) Lub Oil Coolers - LST (M) | |||
27 | 26 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 10 | Per Cooler | |
28 | 27 | Collection of cooler from the yard and shifting to firms workshop | 10 | Per Cooler | |
29 | 28 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 10 | Per Cooler | |
30 | 29 | Mechanical cleaning of cooler | 10 | Per Cooler | |
31 | 30 | Highspeed flushing of cooler (see Note) | 10 | Per Cooler | |
32 | 31 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 10 | Per Cooler | |
33 | 32 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 10 | Per Cooler | |
34 | 33 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 10 | Per Cooler | |
35 | 34 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 10 | Per Cooler | |
36 | 35 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 10 | Per Cooler | |
37 | 36 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 10 | Per plug | |
38 | 37 | Blanking of tube by cold repair using belzona or equivalent repair compound | 10 | Per tube | |
39 | 38 | Repair of end cover by welding and brazing of cooler end cover | 10 | Per end cover | |
40 | 39 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 10 | Per sq inch | |
41 | 40 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 10 | Per set | |
42 | 41 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 10 | Per set | |
43 | 42 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 10 | Per fastener | |
44 | 43 | Renewal of fastener (phospher bronze) | 10 | Per fastener | |
45 | 44 | Drilling/ Tapping (Per hole) | 10 | Per hole | |
46 | 45 | Fitment of cooler including associated system pipelines and proving the system | 10 | Per Cooler | |
47 | 46 | Witnessing trials onboard whenever system trials take place | 10 | Per Cooler | |
48 | 47 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Per Cooler | |
49 | 48 | Main Engine Lub Oil Cooler - LST (M) | |||
50 | 49 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 10 | Per Cooler | |
51 | 50 | Collection of cooler from the yard and shifting to firms workshop | 10 | Per Cooler | |
52 | 51 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 10 | Per Cooler | |
53 | 52 | Mechanical cleaning of cooler | 10 | Per Cooler | |
54 | 53 | Highspeed flushing of cooler (see Note) | 10 | Per Cooler | |
55 | 54 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 10 | Per Cooler | |
56 | 55 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 10 | Per Cooler | |
57 | 56 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 10 | Per Cooler | |
58 | 57 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 10 | Per Cooler | |
59 | 58 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 10 | Per Cooler | |
60 | 59 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 10 | Per plug | |
61 | 60 | Blanking of tube by cold repair using belzona or equivalent repair compound | 10 | Per tube | |
62 | 61 | Repair of end cover by welding and brazing of cooler end cover | 10 | Per end cover | |
63 | 62 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 10 | Per sq inch | |
64 | 63 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 10 | Per set | |
65 | 64 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 10 | Per set | |
66 | 65 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 10 | Per fastener | |
67 | 66 | Renewal of fastener (phospher bronze) | 10 | Per fastener | |
68 | 67 | Drilling/ Tapping (Per hole) | 10 | Per hole | |
69 | 68 | Fitment of cooler including associated system pipelines and proving the system | 10 | Per Cooler | |
70 | 69 | Witnessing trials onboard whenever system trials take place | 10 | Per Cooler | |
71 | 70 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Per Cooler | |
72 | 71 | Gear Box Lub Oil Coolers - LST (M) | |||
73 | 72 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 5 | Per Cooler | |
74 | 73 | Collection of cooler from the yard and shifting to firms workshop | 5 | Per Cooler | |
75 | 74 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
76 | 75 | Mechanical cleaning of cooler | 5 | Per Cooler | |
77 | 76 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
78 | 77 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
79 | 78 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
80 | 79 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 5 | Per Cooler | |
81 | 80 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 5 | Per Cooler | |
82 | 81 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 5 | Per Cooler | |
83 | 82 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
84 | 83 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
85 | 84 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
86 | 85 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
87 | 86 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 5 | Per set | |
88 | 87 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
89 | 88 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
90 | 89 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
91 | 90 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
92 | 91 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
93 | 92 | Witnessing trials onboard whenever system trials take place | 5 | Per Cooler | |
94 | 93 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
95 | 94 | Main Engine Lub oil Coolers - FAC/LCU MK IV | |||
96 | 95 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 5 | Per Cooler | |
97 | 96 | Collection of cooler from the yard and shifting to firms workshop | 5 | Per Cooler | |
98 | 97 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
99 | 98 | Mechanical cleaning of cooler | 5 | Per Cooler | |
100 | 99 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
101 | 100 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
102 | 101 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
103 | 102 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 5 | Per Cooler | |
104 | 103 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 5 | Per Cooler | |
105 | 104 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 5 | Per Cooler | |
106 | 105 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
107 | 106 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
108 | 107 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
109 | 108 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
110 | 109 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 5 | Per set | |
111 | 110 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
112 | 111 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
113 | 112 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
114 | 113 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
115 | 114 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
116 | 115 | Witnessing trials onboard whenever system trials take place | 5 | Per Cooler | |
117 | 116 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
118 | 117 | Main Engine Fresh Water Coolers - FAC/LCU MK IV | |||
119 | 118 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 5 | Per Cooler | |
120 | 119 | Collection of cooler from the yard and shifting to firms workshop | 5 | Per Cooler | |
121 | 120 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
122 | 121 | Mechanical cleaning of cooler | 5 | Per Cooler | |
123 | 122 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
124 | 123 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
125 | 124 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
126 | 125 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 5 | Per Cooler | |
127 | 126 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 5 | Per Cooler | |
128 | 127 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 5 | Per Cooler | |
129 | 128 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
130 | 129 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
131 | 130 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
132 | 131 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
133 | 132 | Renewal of joint / gasket (neoprene rubber for water cooler) | 5 | Per set | |
134 | 133 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
135 | 134 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
136 | 135 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
137 | 136 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
138 | 137 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
139 | 138 | Witnessing trials onboard whenever system trials take place | 5 | Per Cooler | |
140 | 139 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
141 | 140 | Gear Box Lub Oil Coolers - FAC/LCU MK | |||
142 | 141 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 5 | Per Cooler | |
143 | 142 | Collection of cooler from the yard and shifting to firms workshop | 5 | Per Cooler | |
144 | 143 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
145 | 144 | Mechanical cleaning of cooler | 5 | Per Cooler | |
146 | 145 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
147 | 146 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
148 | 147 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
149 | 148 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 5 | Per Cooler | |
150 | 149 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 5 | Per Cooler | |
151 | 150 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 5 | Per Cooler | |
152 | 151 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
153 | 152 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
154 | 153 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
155 | 154 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
156 | 155 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 5 | Per set | |
157 | 156 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
158 | 157 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
159 | 158 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
160 | 159 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
161 | 160 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
162 | 161 | Witnessing trials onboard whenever system trials take place | 5 | Per Cooler | |
163 | 162 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
164 | 163 | Main Engine Lub Oil Coolers - Yard Crafts | |||
165 | 164 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 5 | Per Cooler | |
166 | 165 | Collection of cooler from the yard and shifting to firms workshop | 5 | Per Cooler | |
167 | 166 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
168 | 167 | Mechanical cleaning of cooler | 5 | Per Cooler | |
169 | 168 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
170 | 169 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
171 | 170 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
172 | 171 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 5 | Per Cooler | |
173 | 172 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 5 | Per Cooler | |
174 | 173 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 5 | Per Cooler | |
175 | 174 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
176 | 175 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
177 | 176 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
178 | 177 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
179 | 178 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 5 | Per set | |
180 | 179 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
181 | 180 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
182 | 181 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
183 | 182 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
184 | 183 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
185 | 184 | Witnessing trials onboard whenever system trials take place | 5 | Per Cooler | |
186 | 185 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
187 | 186 | Main Engine Fresh Water Coolers - Yard Crafts | |||
188 | 187 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 5 | Per Cooler | |
189 | 188 | Collection of cooler from the yard and shifting to firms workshop | 5 | Per Cooler | |
190 | 189 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
191 | 190 | Mechanical cleaning of cooler | 5 | Per Cooler | |
192 | 191 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
193 | 192 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
194 | 193 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
195 | 194 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 5 | Per Cooler | |
196 | 195 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 5 | Per Cooler | |
197 | 196 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 5 | Per Cooler | |
198 | 197 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
199 | 198 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
200 | 199 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
201 | 200 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
202 | 201 | Renewal of joint / gasket (neoprene rubber for water cooler) | 5 | Per set | |
203 | 202 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
204 | 203 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
205 | 204 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
206 | 205 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
207 | 206 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
208 | 207 | Witnessing trials onboard whenever system trials take place | 5 | Per Cooler | |
209 | 208 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
210 | 209 | Main Engine Lub Oil Cooler - NOPV/LST (L)/Corvette/Visiting Ships | |||
211 | 210 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 5 | Per Cooler | |
212 | 211 | Collection of cooler from the yard and shifting to firms workshop | 5 | Per Cooler | |
213 | 212 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
214 | 213 | Mechanical cleaning of cooler | 5 | Per Cooler | |
215 | 214 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
216 | 215 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
217 | 216 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
218 | 217 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 5 | Per Cooler | |
219 | 218 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 5 | Per Cooler | |
220 | 219 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 5 | Per Cooler | |
221 | 220 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
222 | 221 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
223 | 222 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
224 | 223 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
225 | 224 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 5 | Per set | |
226 | 225 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
227 | 226 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
228 | 227 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
229 | 228 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
230 | 229 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
231 | 230 | Witnessing trials onboard whenever system trials take place | 5 | Per Cooler | |
232 | 231 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
233 | 232 | Main Engine Fresh Water Cooler - NOPV/LST (L)/Corvette/Visiting Ships | |||
234 | 233 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 5 | Per Cooler | |
235 | 234 | Collection of cooler from the yard and shifting to firms workshop | 5 | Per Cooler | |
236 | 235 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
237 | 236 | Mechanical cleaning of cooler | 5 | Per Cooler | |
238 | 237 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
239 | 238 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
240 | 239 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
241 | 240 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 5 | Per Cooler | |
242 | 241 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 5 | Per Cooler | |
243 | 242 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 5 | Per Cooler | |
244 | 243 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
245 | 244 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
246 | 245 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
247 | 246 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
248 | 247 | Renewal of joint / gasket (neoprene rubber for water cooler) | 5 | Per set | |
249 | 248 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
250 | 249 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
251 | 250 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
252 | 251 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
253 | 252 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
254 | 253 | Witnessing trials onboard whenever system trials take place | 5 | Per Cooler | |
255 | 254 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
256 | 255 | Gear Box Lub Oil Cooler - NOPV/LST (L)/Corvette/Visiting Ships | |||
257 | 256 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 5 | Per Cooler | |
258 | 257 | Collection of cooler from the yard and shifting to firms workshop | 5 | Per Cooler | |
259 | 258 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
260 | 259 | Mechanical cleaning of cooler | 5 | Per Cooler | |
261 | 260 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
262 | 261 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
263 | 262 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
264 | 263 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 5 | Per Cooler | |
265 | 264 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 5 | Per Cooler | |
266 | 265 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 5 | Per Cooler | |
267 | 266 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
268 | 267 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
269 | 268 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
270 | 269 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
271 | 270 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 5 | Per set | |
272 | 271 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
273 | 272 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
274 | 273 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
275 | 274 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
276 | 275 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
277 | 276 | Witnessing trials onboard whenever system trials take place | 5 | Per Cooler | |
278 | 277 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
279 | 278 | CPP Lub Oil Cooler - NOPV/LST (L)/Corvette/Visiting Ships | |||
280 | 279 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 5 | Per Cooler | |
281 | 280 | Collection of cooler from the yard and shifting to firms workshop | 5 | Per Cooler | |
282 | 281 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
283 | 282 | Mechanical cleaning of cooler | 5 | Per Cooler | |
284 | 283 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
285 | 284 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
286 | 285 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
287 | 286 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 5 | Per Cooler | |
288 | 287 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 5 | Per Cooler | |
289 | 288 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 5 | Per Cooler | |
290 | 289 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
291 | 290 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
292 | 291 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
293 | 292 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
294 | 293 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 5 | Per set | |
295 | 294 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
296 | 295 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
297 | 296 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
298 | 297 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
299 | 298 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
300 | 299 | Witnessing trials onboard whenever system trials take place | 5 | Per Cooler | |
301 | 300 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
302 | 301 | Cummins Fresh Water Cooler - NOPV/LST (L)/Corvette/Visiting Ships | |||
303 | 302 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 10 | Per Cooler | |
304 | 303 | Collection of cooler from the yard and shifting to firms workshop | 10 | Per Cooler | |
305 | 304 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 10 | Per Cooler | |
306 | 305 | Mechanical cleaning of cooler | 10 | Per Cooler | |
307 | 306 | Highspeed flushing of cooler (see Note) | 10 | Per Cooler | |
308 | 307 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 10 | Per Cooler | |
309 | 308 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 10 | Per Cooler | |
310 | 309 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 10 | Per Cooler | |
311 | 310 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 10 | Per Cooler | |
312 | 311 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 10 | Per Cooler | |
313 | 312 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 10 | Per plug | |
314 | 313 | Blanking of tube by cold repair using belzona or equivalent repair compound | 10 | Per tube | |
315 | 314 | Repair of end cover by welding and brazing of cooler end cover | 10 | Per end cover | |
316 | 315 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 10 | Per sq inch | |
317 | 316 | Renewal of joint / gasket (neoprene rubber for water cooler) | 10 | Per set | |
318 | 317 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 10 | Per set | |
319 | 318 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 10 | Per fastener | |
320 | 319 | Renewal of fastener (phospher bronze) | 10 | Per fastener | |
321 | 320 | Drilling/ Tapping (Per hole) | 10 | Per hole | |
322 | 321 | Fitment of cooler including associated system pipelines and proving the system | 10 | Per Cooler | |
323 | 322 | Witnessing trials onboard whenever system trials take place | 10 | Per Cooler | |
324 | 323 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Per Cooler | |
325 | 324 | Cummins Lub Oil Cooler - NOPV/ LST (L)/ Corvette/ Visiting Ships | |||
326 | 325 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 10 | Per Cooler | |
327 | 326 | Collection of cooler from the yard and shifting to firms workshop | 10 | Per Cooler | |
328 | 327 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 10 | Per Cooler | |
329 | 328 | Mechanical cleaning of cooler | 10 | Per Cooler | |
330 | 329 | Highspeed flushing of cooler (see Note) | 10 | Per Cooler | |
331 | 330 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 10 | Per Cooler | |
332 | 331 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 10 | Per Cooler | |
333 | 332 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 10 | Per Cooler | |
334 | 333 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 10 | Per Cooler | |
335 | 334 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 10 | Per Cooler | |
336 | 335 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 10 | Per plug | |
337 | 336 | Blanking of tube by cold repair using belzona or equivalent repair compound | 10 | Per tube | |
338 | 337 | Repair of end cover by welding and brazing of cooler end cover | 10 | Per end cover | |
339 | 338 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 10 | Per sq inch | |
340 | 339 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 10 | Per set | |
341 | 340 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 10 | Per set | |
342 | 341 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 10 | Per fastener | |
343 | 342 | Renewal of fastener (phospher bronze) | 10 | Per fastener | |
344 | 343 | Drilling/ Tapping (Per hole) | 10 | Per hole | |
345 | 344 | Fitment of cooler including associated system pipelines and proving the system | 10 | Per Cooler | |
346 | 345 | Witnessing trials onboard whenever system trials take place | 10 | Per Cooler | |
347 | 346 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Per Cooler | |
348 | 347 | FIN TYPE COOLER CLEANING/ ALTERNATOR - NOPV/ LST(L)/ Corvette/ Visiting Ships | |||
349 | 348 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 10 | Per Cooler | |
350 | 349 | Collection of cooler from the yard and shifting to firms workshop | 10 | Per Cooler | |
351 | 350 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 10 | Per Cooler | |
352 | 351 | Mechanical cleaning of cooler | 10 | Per Cooler | |
353 | 352 | Highspeed flushing of cooler (see Note) | 10 | Per Cooler | |
354 | 353 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 10 | Per Cooler | |
355 | 354 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 10 | Per Cooler | |
356 | 355 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 10 | Per Cooler | |
357 | 356 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 10 | Per Cooler | |
358 | 357 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 10 | Per Cooler | |
359 | 358 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 10 | Per plug | |
360 | 359 | Blanking of tube by cold repair using belzona or equivalent repair compound | 10 | Per tube | |
361 | 360 | Repair of end cover by welding and brazing of cooler end cover | 10 | Per end cover | |
362 | 361 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 10 | Per sq inch | |
363 | 362 | Renewal of joint / gasket (steam joint for charge air cooler and radiator) | 10 | Per set | |
364 | 363 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 10 | Per set | |
365 | 364 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 10 | Per fastener | |
366 | 365 | Renewal of fastener (phospher bronze) | 10 | Per fastener | |
367 | 366 | Drilling/ Tapping (Per hole) | 10 | Per hole | |
368 | 367 | Fitment of cooler including associated system pipelines and proving the system | 10 | Per Cooler | |
369 | 368 | Witnessing trials onboard whenever system trials take place | 10 | Per Cooler | |
370 | 369 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Per Cooler | |
371 | 370 | Steering Gear Oil Cooler - LST (L) | |||
372 | 371 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 5 | Per Cooler | |
373 | 372 | Collection of cooler from the yard and shifting to firms workshop | 5 | Per Cooler | |
374 | 373 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
375 | 374 | Mechanical cleaning of cooler | 5 | Per Cooler | |
376 | 375 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
377 | 376 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
378 | 377 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
379 | 378 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 5 | Per Cooler | |
380 | 379 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 5 | Per Cooler | |
381 | 380 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 5 | Per Cooler | |
382 | 381 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
383 | 382 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
384 | 383 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
385 | 384 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
386 | 385 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 5 | Per set | |
387 | 386 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
388 | 387 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
389 | 388 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
390 | 389 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
391 | 390 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
392 | 391 | Witnessing trials onboard whenever system trials take place | 5 | Per Cooler | |
393 | 392 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
394 | 393 | HP Air Compressor Cooling Coil | |||
395 | 394 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 5 | Per Cooler | |
396 | 395 | Collection of cooler from the yard and shifting to firms workshop | 5 | Per Cooler | |
397 | 396 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
398 | 397 | Mechanical cleaning of cooler | 5 | Per Cooler | |
399 | 398 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
400 | 399 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
401 | 400 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
402 | 401 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 5 | Per Cooler | |
403 | 402 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 5 | Per Cooler | |
404 | 403 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 5 | Per Cooler | |
405 | 404 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
406 | 405 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
407 | 406 | Renewal of joint / gasket (steam joint for charge air cooler and radiator) | 5 | Per set | |
408 | 407 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
409 | 408 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
410 | 409 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
411 | 410 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
412 | 411 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
413 | 412 | Witnessing trials onboard whenever system trials take place | 5 | Per Cooler | |
414 | 413 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
415 | 414 | A/C Condenser (upto 5 TR) - All Ships | |||
416 | 415 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 5 | Per Cooler | |
417 | 416 | Collection of cooler from the yard and shifting to firms workshop | 5 | Per Cooler | |
418 | 417 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
419 | 418 | Mechanical cleaning of cooler | 5 | Per Cooler | |
420 | 419 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
421 | 420 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
422 | 421 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
423 | 422 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 5 | Per Cooler | |
424 | 423 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 5 | Per Cooler | |
425 | 424 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 5 | Per Cooler | |
426 | 425 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
427 | 426 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
428 | 427 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
429 | 428 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
430 | 429 | Renewal of joint / gasket (neoprene rubber for water cooler) | 5 | Per set | |
431 | 430 | Renewal of joint / gasket (steam joint for charge air cooler and radiator) | 5 | Per set | |
432 | 431 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
433 | 432 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
434 | 433 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
435 | 434 | Manufacturing of retainer stud ( material SS TO AISI 304, SS 316) | 5 | Per Stud | |
436 | 435 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
437 | 436 | Witnessing trials onboard whenever system trials take place | 5 | Per Cooler | |
438 | 437 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
439 | 438 | A/C Condenser (6 to 10 TR) - All Ships | |||
440 | 439 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 10 | Per Cooler | |
441 | 440 | Collection of cooler from the yard and shifting to firms workshop | 10 | Per Cooler | |
442 | 441 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 10 | Per Cooler | |
443 | 442 | Mechanical cleaning of cooler | 10 | Per Cooler | |
444 | 443 | Highspeed flushing of cooler (see Note) | 10 | Per Cooler | |
445 | 444 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 10 | Per Cooler | |
446 | 445 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 10 | Per Cooler | |
447 | 446 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 10 | Per Cooler | |
448 | 447 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 10 | Per Cooler | |
449 | 448 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 10 | Per Cooler | |
450 | 449 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 10 | Per plug | |
451 | 450 | Blanking of tube by cold repair using belzona or equivalent repair compound | 10 | Per tube | |
452 | 451 | Repair of end cover by welding and brazing of cooler end cover | 10 | Per end cover | |
453 | 452 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 10 | Per sq inch | |
454 | 453 | Renewal of joint / gasket (neoprene rubber for water cooler) | 10 | Per set | |
455 | 454 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 10 | Per set | |
456 | 455 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 10 | Per fastener | |
457 | 456 | Renewal of fastener (phospher bronze) | 10 | Per fastener | |
458 | 457 | Drilling/ Tapping (Per hole) | 10 | Per hole | |
459 | 458 | Fitment of cooler including associated system pipelines and proving the system | 10 | Per Cooler | |
460 | 459 | Witnessing trials onboard whenever system trials take place | 10 | Per Cooler | |
461 | 460 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Per Cooler | |
462 | 461 | A/C Condenser (11 to 20 TR) - All Ships | |||
463 | 462 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 10 | Per Cooler | |
464 | 463 | Collection of cooler from the yard and shifting to firms workshop | 10 | Per Cooler | |
465 | 464 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 10 | Per Cooler | |
466 | 465 | Mechanical cleaning of cooler | 10 | Per Cooler | |
467 | 466 | Highspeed flushing of cooler (see Note) | 10 | Per Cooler | |
468 | 467 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 10 | Per Cooler | |
469 | 468 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 10 | Per Cooler | |
470 | 469 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 10 | Per Cooler | |
471 | 470 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 10 | Per Cooler | |
472 | 471 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 10 | Per Cooler | |
473 | 472 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 10 | Per plug | |
474 | 473 | Blanking of tube by cold repair using belzona or equivalent repair compound | 10 | Per tube | |
475 | 474 | Repair of end cover by welding and brazing of cooler end cover | 10 | Per end cover | |
476 | 475 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 10 | Per sq inch | |
477 | 476 | Renewal of joint / gasket (neoprene rubber for water cooler) | 10 | Per set | |
478 | 477 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 10 | Per set | |
479 | 478 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 10 | Per fastener | |
480 | 479 | Renewal of fastener (phospher bronze) | 10 | Per fastener | |
481 | 480 | Drilling/ Tapping (Per hole) | 10 | Per hole | |
482 | 481 | Fitment of cooler including associated system pipelines and proving the system | 10 | Per Cooler | |
483 | 482 | Witnessing trials onboard whenever system trials take place | 10 | Per Cooler | |
484 | 483 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Per Cooler | |
485 | 484 | A/C Condenser (21 to 60 TR) - All Ships | |||
486 | 485 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 5 | Per Cooler | |
487 | 486 | Collection of cooler from the yard and shifting to firms workshop | 5 | Per Cooler | |
488 | 487 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
489 | 488 | Mechanical cleaning of cooler | 5 | Per Cooler | |
490 | 489 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
491 | 490 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
492 | 491 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
493 | 492 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 5 | Per Cooler | |
494 | 493 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 5 | Per Cooler | |
495 | 494 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 5 | Per Cooler | |
496 | 495 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
497 | 496 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
498 | 497 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
499 | 498 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
500 | 499 | Renewal of joint / gasket (neoprene rubber for water cooler) | 5 | Per set | |
501 | 500 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
502 | 501 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
503 | 502 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
504 | 503 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
505 | 504 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
506 | 505 | Witnessing trials onboard whenever system trials take place | 5 | Per Cooler | |
507 | 506 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
508 | 507 | Miscellanious Coolers of Visiting Ships - All Ships | |||
509 | 508 | Removal of cooler including associated system pipeline from ship, if decided by NSRY(PBR) and shifting to firms workshop. | 5 | Per Cooler | |
510 | 509 | Collection of cooler from the yard and shifting to firms workshop | 5 | Per Cooler | |
511 | 510 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
512 | 511 | Mechanical cleaning of cooler | 5 | Per Cooler | |
513 | 512 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
514 | 513 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
515 | 514 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
516 | 515 | Shifting of temporary flushing/cleaning jig onboard, for onboard cleaning in case of 1(c ) | 5 | Per Cooler | |
517 | 516 | Shifting of Pressure testing testing jig for instu pressure testing onboard in case of 1(c ). | 5 | Per Cooler | |
518 | 517 | Pressure testing of cooler upto 1.5 times of working pressure or as specified by OEM manual or as intructed by NSRY(PBR) | 5 | Per Cooler | |
519 | 518 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
520 | 519 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
521 | 520 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
522 | 521 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
523 | 522 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 5 | Per set | |
524 | 523 | Renewal of joint / gasket (neoprene rubber for water cooler) | 5 | Per set | |
525 | 524 | Renewal of joint / gasket (steam joint for charge air cooler and radiator) | 5 | Per set | |
526 | 525 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
527 | 526 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
528 | 527 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
529 | 528 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
530 | 529 | Repair of retainer stud by metal build up and machineing/ straightening of stud | 5 | Per Stud | |
531 | 530 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
532 | 531 | Witnessing trials onboard whenever system trials take place | 5 | Per Cooler | |
533 | 532 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
534 | 533 | ATUs (Up to 5 TR) - All Ships | |||
535 | 534 | Removal of complete ATU including delagging, disconnecting associated pipelines | 10 | Per ATU | |
536 | 535 | Removal of only ATU filters, filters for cleaning | 10 | Per ATU | |
537 | 536 | Mechanical cleaning - Air side | 10 | Per ATU | |
538 | 537 | Chemical cleaning - Air side (see note) | 10 | Per ATU | |
539 | 538 | Chemical cleaning - Water side (see note) | 10 | Per ATU | |
540 | 539 | Onboard Chemical cleaning - water side (see note) | 10 | Per ATU | |
541 | 540 | Shifting of temporary circulation jig onboard with necessary fittings and hoses | 10 | Job | |
542 | 541 | Pressure Testing upto 1.5 times working pressure /as recommended by OEM. | 10 | Per ATU | |
543 | 542 | Shifting of pressure testing equipment and necessary fittings onboard (in case of 4 (b)) | 10 | Job | |
544 | 543 | Renewal of joint/gasket (MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) | 10 | Per set | |
545 | 544 | Renewal of fasteners and washers as required ( Phospated MS to IS 226) | 10 | Per Fastener | |
546 | 545 | Renewal of fasteners and washers as required (SS) | 10 | Per Fastener | |
547 | 546 | Renewal of flange (GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) THICKNESS 05 MM TO 08 MM, HOLES DRILLED AS PER PCD OF MATING FLAGE | 10 | Per flange | |
548 | 547 | Repair of flange/ end cover by metal building by welding and brazing of ATU/HE end cover | 10 | Per flange | |
549 | 548 | Repair of flange/end cover by Cold repair by Putty (Devcon/Belzona) | 10 | Per cover | |
550 | 549 | Renewal of packing to arrest air leakages from ATU filter | 10 | Per ATU | |
551 | 550 | Plugging of tube including manufacture of plug GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102, Copper) | 10 | Per Plug | |
552 | 551 | Fitment of ATU including associated system pipeline | 10 | Job | |
553 | 552 | Fitment of ATU filters including associated system pipeline | 10 | Job | |
554 | 553 | Repair of drain plug | 10 | Job | |
555 | 554 | Renewal of drain plug | 10 | Job | |
556 | 555 | Photography of ATU to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Job | |
557 | 556 | ATUs (6 to 10 TR) - All Ships | |||
558 | 557 | Removal of complete ATU including delagging, disconnecting associated pipelines | 10 | Per ATU | |
559 | 558 | Removal of only ATU filters, filters for cleaning | 10 | Per ATU | |
560 | 559 | Mechanical cleaning - Air side | 10 | Per ATU | |
561 | 560 | Chemical cleaning - Air side (see note) | 10 | Per ATU | |
562 | 561 | Chemical cleaning - Water side (see note) | 10 | Per ATU | |
563 | 562 | Onboard Chemical cleaning - water side (see note) | 10 | Per ATU | |
564 | 563 | Shifting of temporary circulation jig onboard with necessary fittings and hoses | 10 | Job | |
565 | 564 | Pressure Testing upto 1.5 times working pressure /as recommended by OEM. | 10 | Per ATU | |
566 | 565 | Shifting of pressure testing equipment and necessary fittings onboard (in case of 4 (b)) | 10 | Job | |
567 | 566 | Renewal of joint/gasket (MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) | 10 | Per set | |
568 | 567 | Renewal of fasteners and washers as required ( Phospated MS to IS 226) | 10 | Per Fastener | |
569 | 568 | Renewal of fasteners and washers as required (SS) | 10 | Per Fastener | |
570 | 569 | Renewal of flange (GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) THICKNESS 05 MM TO 08 MM, HOLES DRILLED AS PER PCD OF MATING FLAGE | 10 | Per flange | |
571 | 570 | Repair of flange/ end cover by metal building by welding and brazing of ATU/HE end cover | 10 | Per flange | |
572 | 571 | Repair of flange/end cover by Cold repair by Putty (Devcon/Belzona) | 10 | Per cover | |
573 | 572 | Renewal of packing to arrest air leakages from ATU filter | 10 | Per ATU | |
574 | 573 | Plugging of tube including manufacture of plug GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102, Copper) | 10 | Per Plug | |
575 | 574 | Fitment of ATU including associated system pipeline | 10 | Job | |
576 | 575 | Fitment of ATU filters including associated system pipeline | 10 | Job | |
577 | 576 | Repair of drain plug | 10 | Job | |
578 | 577 | Renewal of drain plug | 10 | Job | |
579 | 578 | Photography of ATU to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Job | |
580 | 579 | ATUs (above 10 TR) - All Ships | |||
581 | 580 | Removal of complete ATU including delagging, disconnecting associated pipelines | 10 | Per ATU | |
582 | 581 | Removal of only ATU filters, filters for cleaning | 10 | Per ATU | |
583 | 582 | Mechanical cleaning - Air side | 10 | Per ATU | |
584 | 583 | Chemical cleaning - Air side (see note) | 10 | Per ATU | |
585 | 584 | Chemical cleaning - Water side (see note) | 10 | Per ATU | |
586 | 585 | Onboard Chemical cleaning - water side (see note) | 10 | Per ATU | |
587 | 586 | Shifting of temporary circulation jig onboard with necessary fittings and hoses | 10 | Job | |
588 | 587 | Pressure Testing upto 1.5 times working pressure /as recommended by OEM. | 10 | Per ATU | |
589 | 588 | Shifting of pressure testing equipment and necessary fittings onboard (in case of 4 (b)) | 10 | Job | |
590 | 589 | Renewal of joint/gasket (MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) | 10 | Per set | |
591 | 590 | Renewal of fasteners and washers as required ( Phospated MS to IS 226) | 10 | Per Fastener | |
592 | 591 | Renewal of fasteners and washers as required (SS) | 10 | Per Fastener | |
593 | 592 | Renewal of flange (GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) THICKNESS 05 MM TO 08 MM, HOLES DRILLED AS PER PCD OF MATING FLAGE | 10 | Per flange | |
594 | 593 | Repair of flange/ end cover by metal building by welding and brazing of ATU/HE end cover | 10 | Per flange | |
595 | 594 | Repair of flange/end cover by Cold repair by Putty (Devcon/Belzona) | 10 | Per cover | |
596 | 595 | Renewal of packing to arrest air leakages from ATU filter | 10 | Per ATU | |
597 | 596 | Plugging of tube including manufacture of plug GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102, Copper) | 10 | Per Plug | |
598 | 597 | Fitment of ATU including associated system pipeline | 10 | Job | |
599 | 598 | Fitment of ATU filters including associated system pipeline | 10 | Job | |
600 | 599 | Repair of drain plug | 10 | Job | |
601 | 600 | Renewal of drain plug | 10 | Job | |
602 | 601 | Photography of ATU to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Job | |
603 | 602 | AHUs - ALL Ships | |||
604 | 603 | Removal of complete ATU including delagging, disconnecting associated pipelines | 5 | Per ATU | |
605 | 604 | Removal of only ATU filters, filters for cleaning | 5 | Per ATU | |
606 | 605 | Mechanical cleaning - Air side | 5 | Per ATU | |
607 | 606 | Chemical cleaning - Air side (see note) | 5 | Per ATU | |
608 | 607 | Chemical cleaning - Water side (see note) | 5 | Per ATU | |
609 | 608 | Onboard Chemical cleaning - water side (see note) | 5 | Per ATU | |
610 | 609 | Shifting of temporary circulation jig onboard with necessary fittings and hoses | 5 | Job | |
611 | 610 | Pressure Testing upto 1.5 times working pressure /as recommended by OEM. | 5 | Per ATU | |
612 | 611 | Shifting of pressure testing equipment and necessary fittings onboard (in case of 4 (b)) | 5 | Job | |
613 | 612 | Renewal of joint/gasket (MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) | 5 | Per set | |
614 | 613 | Renewal of fasteners and washers as required ( Phospated MS to IS 226) | 5 | Per Fastener | |
615 | 614 | Renewal of fasteners and washers as required (SS) | 5 | Per Fastener | |
616 | 615 | Renewal of flange (GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) THICKNESS 05 MM TO 08 MM, HOLES DRILLED AS PER PCD OF MATING FLAGE | 5 | Per flange | |
617 | 616 | Repair of flange/ end cover by metal building by welding and brazing of ATU/HE end cover | 5 | Per flange | |
618 | 617 | Repair of flange/end cover by Cold repair by Putty (Devcon/Belzona) | 5 | Per cover | |
619 | 618 | Renewal of packing to arrest air leakages from ATU filter | 5 | Per ATU | |
620 | 619 | Plugging of tube including manufacture of plug GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102, Copper) | 5 | Per Plug | |
621 | 620 | Fitment of ATU including associated system pipeline | 5 | Job | |
622 | 621 | Fitment of ATU filters including associated system pipeline | 5 | Job | |
623 | 622 | Repair of drain plug | 5 | Job | |
624 | 623 | Renewal of drain plug | 5 | Job | |
625 | 624 | Photography of ATU to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Job | |
626 | 625 | MATERIAL | |||
627 | 626 | Cummins DA Fresh Water Coolers - LST (M)/ LCU MK IV | |||
628 | 627 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 10 | Per Cooler | |
629 | 628 | Mechanical cleaning of cooler | 10 | Per Cooler | |
630 | 629 | Highspeed flushing of cooler (see Note) | 10 | Per Cooler | |
631 | 630 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 10 | Per Cooler | |
632 | 631 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 10 | Per Cooler | |
633 | 632 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 10 | Per plug | |
634 | 633 | Blanking of tube by cold repair using belzona or equivalent repair compound | 10 | Per tube | |
635 | 634 | Repair of end cover by welding and brazing of cooler end cover | 10 | Per end cover | |
636 | 635 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 10 | Per sq inch | |
637 | 636 | Renewal of joint / gasket (neoprene rubber for water cooler) | 10 | Per set | |
638 | 637 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 10 | Per set | |
639 | 638 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 10 | Per fastener | |
640 | 639 | Renewal of fastener (phospher bronze) | 10 | Per fastener | |
641 | 640 | Drilling/ Tapping (Per hole) | 10 | Per hole | |
642 | 641 | Fitment of cooler including associated system pipelines and proving the system | 10 | Per Cooler | |
643 | 642 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Per Cooler | |
644 | 643 | Cummins DA (NT 743 MG) Lub Oil Coolers - LST (M) | |||
645 | 644 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 10 | Per Cooler | |
646 | 645 | Mechanical cleaning of cooler | 10 | Per Cooler | |
647 | 646 | Highspeed flushing of cooler (see Note) | 10 | Per Cooler | |
648 | 647 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 10 | Per Cooler | |
649 | 648 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 10 | Per Cooler | |
650 | 649 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 10 | Per plug | |
651 | 650 | Blanking of tube by cold repair using belzona or equivalent repair compound | 10 | Per tube | |
652 | 651 | Repair of end cover by welding and brazing of cooler end cover | 10 | Per end cover | |
653 | 652 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 10 | Per sq inch | |
654 | 653 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 10 | Per set | |
655 | 654 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 10 | Per set | |
656 | 655 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 10 | Per fastener | |
657 | 656 | Renewal of fastener (phospher bronze) | 10 | Per fastener | |
658 | 657 | Drilling/ Tapping (Per hole) | 10 | Per hole | |
659 | 658 | Fitment of cooler including associated system pipelines and proving the system | 10 | Per Cooler | |
660 | 659 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Per Cooler | |
661 | 660 | Main Engine Lub Oil Cooler - LST (M) | |||
662 | 661 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 10 | Per Cooler | |
663 | 662 | Mechanical cleaning of cooler | 10 | Per Cooler | |
664 | 663 | Highspeed flushing of cooler (see Note) | 10 | Per Cooler | |
665 | 664 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 10 | Per Cooler | |
666 | 665 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 10 | Per Cooler | |
667 | 666 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 10 | Per plug | |
668 | 667 | Blanking of tube by cold repair using belzona or equivalent repair compound | 10 | Per tube | |
669 | 668 | Repair of end cover by welding and brazing of cooler end cover | 10 | Per end cover | |
670 | 669 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 10 | Per sq inch | |
671 | 670 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 10 | Per set | |
672 | 671 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 10 | Per set | |
673 | 672 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 10 | Per fastener | |
674 | 673 | Renewal of fastener (phospher bronze) | 10 | Per fastener | |
675 | 674 | Drilling/ Tapping (Per hole) | 10 | Per hole | |
676 | 675 | Fitment of cooler including associated system pipelines and proving the system | 10 | Per Cooler | |
677 | 676 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Per Cooler | |
678 | 677 | Gear Box Lub Oil Coolers - LST (M) | |||
679 | 678 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
680 | 679 | Mechanical cleaning of cooler | 5 | Per Cooler | |
681 | 680 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
682 | 681 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
683 | 682 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
684 | 683 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
685 | 684 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
686 | 685 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
687 | 686 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
688 | 687 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 5 | Per set | |
689 | 688 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
690 | 689 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
691 | 690 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
692 | 691 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
693 | 692 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
694 | 693 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
695 | 694 | Main Engine Lub oil Coolers - FAC/LCU MK IV | |||
696 | 695 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
697 | 696 | Mechanical cleaning of cooler | 5 | Per Cooler | |
698 | 697 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
699 | 698 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
700 | 699 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
701 | 700 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
702 | 701 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
703 | 702 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
704 | 703 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
705 | 704 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 5 | Per set | |
706 | 705 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
707 | 706 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
708 | 707 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
709 | 708 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
710 | 709 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
711 | 710 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
712 | 711 | Main Engine Fresh Water Coolers - FAC/LCU MK IV | |||
713 | 712 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
714 | 713 | Mechanical cleaning of cooler | 5 | Per Cooler | |
715 | 714 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
716 | 715 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
717 | 716 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
718 | 717 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
719 | 718 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
720 | 719 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
721 | 720 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
722 | 721 | Renewal of joint / gasket (neoprene rubber for water cooler) | 5 | Per set | |
723 | 722 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
724 | 723 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
725 | 724 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
726 | 725 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
727 | 726 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
728 | 727 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
729 | 728 | Gear Box Lub Oil Coolers - FAC/LCU MK | |||
730 | 729 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
731 | 730 | Mechanical cleaning of cooler | 5 | Per Cooler | |
732 | 731 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
733 | 732 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
734 | 733 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
735 | 734 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
736 | 735 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
737 | 736 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
738 | 737 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
739 | 738 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 5 | Per set | |
740 | 739 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
741 | 740 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
742 | 741 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
743 | 742 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
744 | 743 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
745 | 744 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
746 | 745 | Main Engine Lub Oil Coolers - Yard Crafts | |||
747 | 746 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
748 | 747 | Mechanical cleaning of cooler | 5 | Per Cooler | |
749 | 748 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
750 | 749 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
751 | 750 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
752 | 751 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
753 | 752 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
754 | 753 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
755 | 754 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
756 | 755 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 5 | Per set | |
757 | 756 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
758 | 757 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
759 | 758 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
760 | 759 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
761 | 760 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
762 | 761 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
763 | 762 | Main Engine Fresh Water Coolers - Yard Crafts | |||
764 | 763 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
765 | 764 | Mechanical cleaning of cooler | 5 | Per Cooler | |
766 | 765 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
767 | 766 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
768 | 767 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
769 | 768 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
770 | 769 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
771 | 770 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
772 | 771 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
773 | 772 | Renewal of joint / gasket (neoprene rubber for water cooler) | 5 | Per set | |
774 | 773 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
775 | 774 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
776 | 775 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
777 | 776 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
778 | 777 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
779 | 778 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
780 | 779 | Main Engine Lub Oil Cooler - NOPV/LST (L)/Corvette/Visiting Ships | |||
781 | 780 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
782 | 781 | Mechanical cleaning of cooler | 5 | Per Cooler | |
783 | 782 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
784 | 783 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
785 | 784 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
786 | 785 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
787 | 786 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
788 | 787 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
789 | 788 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
790 | 789 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 5 | Per set | |
791 | 790 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
792 | 791 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
793 | 792 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
794 | 793 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
795 | 794 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
796 | 795 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
797 | 796 | Main Engine Fresh Water Cooler - NOPV/LST (L)/Corvette/Visiting Ships | |||
798 | 797 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
799 | 798 | Mechanical cleaning of cooler | 5 | Per Cooler | |
800 | 799 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
801 | 800 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
802 | 801 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
803 | 802 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
804 | 803 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
805 | 804 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
806 | 805 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
807 | 806 | Renewal of joint / gasket (neoprene rubber for water cooler) | 5 | Per set | |
808 | 807 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
809 | 808 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
810 | 809 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
811 | 810 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
812 | 811 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
813 | 812 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
814 | 813 | Gear Box Lub Oil Cooler - NOPV/LST (L)/Corvette/Visiting Ships | |||
815 | 814 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
816 | 815 | Mechanical cleaning of cooler | 5 | Per Cooler | |
817 | 816 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
818 | 817 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
819 | 818 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
820 | 819 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
821 | 820 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
822 | 821 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
823 | 822 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
824 | 823 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 5 | Per set | |
825 | 824 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
826 | 825 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
827 | 826 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
828 | 827 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
829 | 828 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
830 | 829 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
831 | 830 | CPP Lub Oil Cooler - NOPV/LST (L)/Corvette/Visiting Ships | |||
832 | 831 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
833 | 832 | Mechanical cleaning of cooler | 5 | Per Cooler | |
834 | 833 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
835 | 834 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
836 | 835 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
837 | 836 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
838 | 837 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
839 | 838 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
840 | 839 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
841 | 840 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 5 | Per set | |
842 | 841 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
843 | 842 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
844 | 843 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
845 | 844 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
846 | 845 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
847 | 846 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
848 | 847 | Cummins Fresh Water Cooler - NOPV/LST (L)/Corvette/Visiting Ships | |||
849 | 848 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 10 | Per Cooler | |
850 | 849 | Mechanical cleaning of cooler | 10 | Per Cooler | |
851 | 850 | Highspeed flushing of cooler (see Note) | 10 | Per Cooler | |
852 | 851 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 10 | Per Cooler | |
853 | 852 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 10 | Per Cooler | |
854 | 853 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 10 | Per plug | |
855 | 854 | Blanking of tube by cold repair using belzona or equivalent repair compound | 10 | Per tube | |
856 | 855 | Repair of end cover by welding and brazing of cooler end cover | 10 | Per end cover | |
857 | 856 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 10 | Per sq inch | |
858 | 857 | Renewal of joint / gasket (neoprene rubber for water cooler) | 10 | Per set | |
859 | 858 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 10 | Per set | |
860 | 859 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 10 | Per fastener | |
861 | 860 | Renewal of fastener (phospher bronze) | 10 | Per fastener | |
862 | 861 | Drilling/ Tapping (Per hole) | 10 | Per hole | |
863 | 862 | Fitment of cooler including associated system pipelines and proving the system | 10 | Per Cooler | |
864 | 863 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Per Cooler | |
865 | 864 | Cummins Lub Oil Cooler - NOPV/ LST (L)/ Corvette/ Visiting Ships | |||
866 | 865 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 10 | Per Cooler | |
867 | 866 | Mechanical cleaning of cooler | 10 | Per Cooler | |
868 | 867 | Highspeed flushing of cooler (see Note) | 10 | Per Cooler | |
869 | 868 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 10 | Per Cooler | |
870 | 869 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 10 | Per Cooler | |
871 | 870 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 10 | Per plug | |
872 | 871 | Blanking of tube by cold repair using belzona or equivalent repair compound | 10 | Per tube | |
873 | 872 | Repair of end cover by welding and brazing of cooler end cover | 10 | Per end cover | |
874 | 873 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 10 | Per sq inch | |
875 | 874 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 10 | Per set | |
876 | 875 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 10 | Per set | |
877 | 876 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 10 | Per fastener | |
878 | 877 | Renewal of fastener (phospher bronze) | 10 | Per fastener | |
879 | 878 | Drilling/ Tapping (Per hole) | 10 | Per hole | |
880 | 879 | Fitment of cooler including associated system pipelines and proving the system | 10 | Per Cooler | |
881 | 880 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Per Cooler | |
882 | 881 | FIN TYPE COOLER CLEANING/ ALTERNATOR - NOPV/ LST(L)/ Corvette/ Visiting Ships | |||
883 | 882 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 10 | Per Cooler | |
884 | 883 | Mechanical cleaning of cooler | 10 | Per Cooler | |
885 | 884 | Highspeed flushing of cooler (see Note) | 10 | Per Cooler | |
886 | 885 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 10 | Per Cooler | |
887 | 886 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 10 | Per Cooler | |
888 | 887 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 10 | Per plug | |
889 | 888 | Blanking of tube by cold repair using belzona or equivalent repair compound | 10 | Per tube | |
890 | 889 | Repair of end cover by welding and brazing of cooler end cover | 10 | Per end cover | |
891 | 890 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 10 | Per sq inch | |
892 | 891 | Renewal of joint / gasket (steam joint for charge air cooler and radiator) | 10 | Per set | |
893 | 892 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 10 | Per set | |
894 | 893 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 10 | Per fastener | |
895 | 894 | Renewal of fastener (phospher bronze) | 10 | Per fastener | |
896 | 895 | Drilling/ Tapping (Per hole) | 10 | Per hole | |
897 | 896 | Fitment of cooler including associated system pipelines and proving the system | 10 | Per Cooler | |
898 | 897 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Per Cooler | |
899 | 898 | Steering Gear Oil Cooler - LST (L) | |||
900 | 899 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
901 | 900 | Mechanical cleaning of cooler | 5 | Per Cooler | |
902 | 901 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
903 | 902 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
904 | 903 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
905 | 904 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
906 | 905 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
907 | 906 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
908 | 907 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
909 | 908 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 5 | Per set | |
910 | 909 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
911 | 910 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
912 | 911 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
913 | 912 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
914 | 913 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
915 | 914 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
916 | 915 | HP Air Compressor Cooling Coil | |||
917 | 916 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
918 | 917 | Mechanical cleaning of cooler | 5 | Per Cooler | |
919 | 918 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
920 | 919 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
921 | 920 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
922 | 921 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
923 | 922 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
924 | 923 | Renewal of joint / gasket (steam joint for charge air cooler and radiator) | 5 | Per set | |
925 | 924 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
926 | 925 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
927 | 926 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
928 | 927 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
929 | 928 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
930 | 929 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
931 | 930 | A/C Condenser (upto 5 TR) - All Ships | |||
932 | 931 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
933 | 932 | Mechanical cleaning of cooler | 5 | Per Cooler | |
934 | 933 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
935 | 934 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
936 | 935 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
937 | 936 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
938 | 937 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
939 | 938 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
940 | 939 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
941 | 940 | Renewal of joint / gasket (neoprene rubber for water cooler) | 5 | Per set | |
942 | 941 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
943 | 942 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
944 | 943 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
945 | 944 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
946 | 945 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
947 | 946 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
948 | 947 | A/C Condenser (6 to 10 TR) - All Ships | |||
949 | 948 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 10 | Per Cooler | |
950 | 949 | Mechanical cleaning of cooler | 10 | Per Cooler | |
951 | 950 | Highspeed flushing of cooler (see Note) | 10 | Per Cooler | |
952 | 951 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 10 | Per Cooler | |
953 | 952 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 10 | Per Cooler | |
954 | 953 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 10 | Per plug | |
955 | 954 | Blanking of tube by cold repair using belzona or equivalent repair compound | 10 | Per tube | |
956 | 955 | Repair of end cover by welding and brazing of cooler end cover | 10 | Per end cover | |
957 | 956 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 10 | Per sq inch | |
958 | 957 | Renewal of joint / gasket (neoprene rubber for water cooler) | 10 | Per set | |
959 | 958 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 10 | Per set | |
960 | 959 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 10 | Per fastener | |
961 | 960 | Renewal of fastener (phospher bronze) | 10 | Per fastener | |
962 | 961 | Drilling/ Tapping (Per hole) | 10 | Per hole | |
963 | 962 | Fitment of cooler including associated system pipelines and proving the system | 10 | Per Cooler | |
964 | 963 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Per Cooler | |
965 | 964 | A/C Condenser (11 to 20 TR) - All Ships | |||
966 | 965 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 10 | Per Cooler | |
967 | 966 | Mechanical cleaning of cooler | 10 | Per Cooler | |
968 | 967 | Highspeed flushing of cooler (see Note) | 10 | Per Cooler | |
969 | 968 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 10 | Per Cooler | |
970 | 969 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 10 | Per Cooler | |
971 | 970 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 10 | Per plug | |
972 | 971 | Blanking of tube by cold repair using belzona or equivalent repair compound | 10 | Per tube | |
973 | 972 | Repair of end cover by welding and brazing of cooler end cover | 10 | Per end cover | |
974 | 973 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 10 | Per sq inch | |
975 | 974 | Renewal of joint / gasket (neoprene rubber for water cooler) | 10 | Per set | |
976 | 975 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 10 | Per set | |
977 | 976 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 10 | Per fastener | |
978 | 977 | Renewal of fastener (phospher bronze) | 10 | Per fastener | |
979 | 978 | Drilling/ Tapping (Per hole) | 10 | Per hole | |
980 | 979 | Fitment of cooler including associated system pipelines and proving the system | 10 | Per Cooler | |
981 | 980 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Per Cooler | |
982 | 981 | A/C Condenser (21 to 60 TR) - All Ships | |||
983 | 982 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
984 | 983 | Mechanical cleaning of cooler | 5 | Per Cooler | |
985 | 984 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
986 | 985 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
987 | 986 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
988 | 987 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
989 | 988 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
990 | 989 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
991 | 990 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
992 | 991 | Renewal of joint / gasket (neoprene rubber for water cooler) | 5 | Per set | |
993 | 992 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
994 | 993 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
995 | 994 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
996 | 995 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
997 | 996 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
998 | 997 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
999 | 998 | Miscellanious Coolers of Visiting Ships - All Ships | |||
1000 | 999 | Removal of associated pipeline and connecting temporary chemical cleaning jig onboard for insitu cleaning. | 5 | Per Cooler | |
1001 | 1000 | Mechanical cleaning of cooler | 5 | Per Cooler | |
1002 | 1001 | Highspeed flushing of cooler (see Note) | 5 | Per Cooler | |
1003 | 1002 | Degrease/Biological Decontamination - An alkaline degreasant and biocide/biofilm removal agent is to be added and circulated for a period. Water may be heated to a maximum temperature of 50 C if required for this process. (See Note) | 5 | Per Cooler | |
1004 | 1003 | Weak Acid Rinse Chemical cleaning of cooler (See Note) | 5 | Per Cooler | |
1005 | 1004 | Plugging of tubes including manuracturing of plugs (Material - GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) | 5 | Per plug | |
1006 | 1005 | Blanking of tube by cold repair using belzona or equivalent repair compound | 5 | Per tube | |
1007 | 1006 | Repair of end cover by welding and brazing of cooler end cover | 5 | Per end cover | |
1008 | 1007 | Cold repair of end cover by belzona or steel putty or any other cold repair compound | 5 | Per sq inch | |
1009 | 1008 | Renewal of joint / gasket (as per specification oil joint for lub oil cooler) | 5 | Per set | |
1010 | 1009 | Renewal of joint / gasket (neoprene rubber for water cooler) | 5 | Per set | |
1011 | 1010 | Renewal of joint / gasket (steam joint for charge air cooler and radiator) | 5 | Per set | |
1012 | 1011 | Renewal of O ring ( Mat: MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) wherever required | 5 | Per set | |
1013 | 1012 | RENEWAL OF FASTENERS (Mat:- Phospated MS to IS 226), WASHERS (MAT COPPER) | 5 | Per fastener | |
1014 | 1013 | Renewal of fastener (phospher bronze) | 5 | Per fastener | |
1015 | 1014 | Drilling/ Tapping (Per hole) | 5 | Per hole | |
1016 | 1015 | Repair of retainer stud by metal build up and machineing/ straightening of stud | 5 | Per Stud | |
1017 | 1016 | Fitment of cooler including associated system pipelines and proving the system | 5 | Per Cooler | |
1018 | 1017 | Photography of coolers to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Per Cooler | |
1019 | 1018 | ATUs (Up to 5 TR) - All Ships | |||
1020 | 1019 | Mechanical cleaning - Air side | 10 | Per ATU | |
1021 | 1020 | Chemical cleaning - Air side (see note) | 10 | Per ATU | |
1022 | 1021 | Chemical cleaning - Water side (see note) | 10 | Per ATU | |
1023 | 1022 | Onboard Chemical cleaning - water side (see note) | 10 | Per ATU | |
1024 | 1023 | Renewal of joint/gasket (MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) | 10 | Per set | |
1025 | 1024 | Renewal of fasteners and washers as required ( Phospated MS to IS 226) | 10 | Per Fastener | |
1026 | 1025 | Renewal of fasteners and washers as required (SS) | 10 | Per Fastener | |
1027 | 1026 | Renewal of flange (GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) THICKNESS 05 MM TO 08 MM, HOLES DRILLED AS PER PCD OF MATING FLAGE | 10 | Per flange | |
1028 | 1027 | Repair of flange/ end cover by metal building by welding and brazing of ATU/HE end cover | 10 | Per flange | |
1029 | 1028 | Repair of flange/end cover by Cold repair by Putty (Devcon/Belzona) | 10 | Per cover | |
1030 | 1029 | Renewal of packing to arrest air leakages from ATU filter | 10 | Per ATU | |
1031 | 1030 | Plugging of tube including manufacture of plug GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102, Copper) | 10 | Per Plug | |
1032 | 1031 | Fitment of ATU including associated system pipeline | 10 | Job | |
1033 | 1032 | Fitment of ATU filters including associated system pipeline | 10 | Job | |
1034 | 1033 | Repair of drain plug | 10 | Job | |
1035 | 1034 | Renewal of drain plug | 10 | Job | |
1036 | 1035 | Photography of ATU to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Job | |
1037 | 1036 | ATUs (6 to 10 TR) - All Ships | |||
1038 | 1037 | Mechanical cleaning - Air side | 10 | Per ATU | |
1039 | 1038 | Chemical cleaning - Air side (see note) | 10 | Per ATU | |
1040 | 1039 | Chemical cleaning - Water side (see note) | 10 | Per ATU | |
1041 | 1040 | Onboard Chemical cleaning - water side (see note) | 10 | Per ATU | |
1042 | 1041 | Renewal of joint/gasket (MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) | 10 | Per set | |
1043 | 1042 | Renewal of fasteners and washers as required ( Phospated MS to IS 226) | 10 | Per Fastener | |
1044 | 1043 | Renewal of fasteners and washers as required (SS) | 10 | Per Fastener | |
1045 | 1044 | Renewal of flange (GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) THICKNESS 05 MM TO 08 MM, HOLES DRILLED AS PER PCD OF MATING FLAGE | 10 | Per flange | |
1046 | 1045 | Repair of flange/ end cover by metal building by welding and brazing of ATU/HE end cover | 10 | Per flange | |
1047 | 1046 | Repair of flange/end cover by Cold repair by Putty (Devcon/Belzona) | 10 | Per cover | |
1048 | 1047 | Renewal of packing to arrest air leakages from ATU filter | 10 | Per ATU | |
1049 | 1048 | Plugging of tube including manufacture of plug GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102, Copper) | 10 | Per Plug | |
1050 | 1049 | Fitment of ATU including associated system pipeline | 10 | Job | |
1051 | 1050 | Fitment of ATU filters including associated system pipeline | 10 | Job | |
1052 | 1051 | Repair of drain plug | 10 | Job | |
1053 | 1052 | Renewal of drain plug | 10 | Job | |
1054 | 1053 | Photography of ATU to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Job | |
1055 | 1054 | ATUs (above 10 TR) - All Ships | |||
1056 | 1055 | Mechanical cleaning - Air side | 10 | Per ATU | |
1057 | 1056 | Chemical cleaning - Air side (see note) | 10 | Per ATU | |
1058 | 1057 | Chemical cleaning - Water side (see note) | 10 | Per ATU | |
1059 | 1058 | Onboard Chemical cleaning - water side (see note) | 10 | Per ATU | |
1060 | 1059 | Renewal of joint/gasket (MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) | 10 | Per set | |
1061 | 1060 | Renewal of fasteners and washers as required ( Phospated MS to IS 226) | 10 | Per Fastener | |
1062 | 1061 | Renewal of fasteners and washers as required (SS) | 10 | Per Fastener | |
1063 | 1062 | Renewal of flange (GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) THICKNESS 05 MM TO 08 MM, HOLES DRILLED AS PER PCD OF MATING FLAGE | 10 | Per flange | |
1064 | 1063 | Repair of flange/ end cover by metal building by welding and brazing of ATU/HE end cover | 10 | Per flange | |
1065 | 1064 | Repair of flange/end cover by Cold repair by Putty (Devcon/Belzona) | 10 | Per cover | |
1066 | 1065 | Renewal of packing to arrest air leakages from ATU filter | 10 | Per ATU | |
1067 | 1066 | Plugging of tube including manufacture of plug GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102, Copper) | 10 | Per Plug | |
1068 | 1067 | Fitment of ATU including associated system pipeline | 10 | Job | |
1069 | 1068 | Fitment of ATU filters including associated system pipeline | 10 | Job | |
1070 | 1069 | Repair of drain plug | 10 | Job | |
1071 | 1070 | Renewal of drain plug | 10 | Job | |
1072 | 1071 | Photography of ATU to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 10 | Job | |
1073 | 1072 | AHUs - ALL Ships | |||
1074 | 1073 | Mechanical cleaning - Air side | 5 | Per ATU | |
1075 | 1074 | Chemical cleaning - Air side (see note) | 5 | Per ATU | |
1076 | 1075 | Chemical cleaning - Water side (see note) | 5 | Per ATU | |
1077 | 1076 | Onboard Chemical cleaning - water side (see note) | 5 | Per ATU | |
1078 | 1077 | Renewal of joint/gasket (MATERIAL SYNTHETIC RUBBER TO DTD 5509 GR B OF BS 2751 GR BA 70) | 5 | Per set | |
1079 | 1078 | Renewal of fasteners and washers as required ( Phospated MS to IS 226) | 5 | Per Fastener | |
1080 | 1079 | Renewal of fasteners and washers as required (SS) | 5 | Per Fastener | |
1081 | 1080 | Renewal of flange (GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102) THICKNESS 05 MM TO 08 MM, HOLES DRILLED AS PER PCD OF MATING FLAGE | 5 | Per flange | |
1082 | 1081 | Repair of flange/ end cover by metal building by welding and brazing of ATU/HE end cover | 5 | Per flange | |
1083 | 1082 | Repair of flange/end cover by Cold repair by Putty (Devcon/Belzona) | 5 | Per cover | |
1084 | 1083 | Renewal of packing to arrest air leakages from ATU filter | 5 | Per ATU | |
1085 | 1084 | Plugging of tube including manufacture of plug GM TO BS 1400 LG4, PHOSPHATED BRONZE BS 2874 DGS 376 - PB102, Copper) | 5 | Per Plug | |
1086 | 1085 | Fitment of ATU including associated system pipeline | 5 | Job | |
1087 | 1086 | Fitment of ATU filters including associated system pipeline | 5 | Job | |
1088 | 1087 | Repair of drain plug | 5 | Job | |
1089 | 1088 | Renewal of drain plug | 5 | Job | |
1090 | 1089 | Photography of ATU to facilitate record of repairs (Photography before and after repairs with four exposures. One soft copy photographs of two sets of hard copies to be handed over along with inspection and test certificate) | 5 | Job |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail