Military Engineer Services-MES has published Repair And Painting To Steel Furniture Under Ge Nams At Nams. Submission Date for this Tender is 04-11-2020. Furnishing Work Tenders in NAMS CANTT Punjab. Bidders can get complete Tender details and download the document.
Name of Work : REPAIR & PAINTING TO STEEL FURNITURE UNDER GE NAMS AT NAMS. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | BOQ | |||
2 | 2 | ALMIRAH MED STEEL (FD-67) | |||
3 | 2.01 | Removing of unserviceable locks and supplying & fixing new brass locks 7 levers with duplicate keys complete all as specified and as directed. | 375 | Each | |
4 | 2.02 | Dismantling of unserviceable 3 way locking devices and supplying and new locking devices complete all as directed. | 250 | Each | |
5 | 2.03 | Removing of broken/unserviceable handle and supplying and fixing heavy duty new steel handle chromium plated of existing size complete all as specified as directed. | 375 | Each | |
6 | 2.04 | Removing of unserviceable foot rest and supplying and fixing new foot rest made out of PBI sheet 1mm thick of existing size, shape by welding at appropriate points complete all as specified as directed. | 250 | Each | |
7 | 2.05 | Removing of unserviceable shelves and supplying and fixing new made out of 0,9 mm thick PBI sheet of existing size, shape by welding at appropriate points complete all as directed by the Engr-in-Charge | 250 | Each | |
8 | 3 | ALMIRAH LARGE STEEL (FD-67) | |||
9 | 3.01 | Removing of unserviceable locks and supplying & fixing new brass locks 7 levers with duplicate keys complete all as specified and as directed. | 350 | Each | |
10 | 3.02 | Dismantling of unserviceable 3 way locking devices and supplying and fixing new locking devices complete all as specified and as directed | 200 | Each | |
11 | 3.03 | Removing of broken unserviceable handle and supplying and fixing heavy duty new steel handle chromium plated of existing size complete all as specified and as directed. | 200 | Each | |
12 | 3.04 | Removing of unserviceable foot rest and supplying and fixing new foot rest made out of PBI sheet 1 mm th of existing size, shape by welding at appropriate points complete all as specified and as directed. | 250 | Each | |
13 | 3.05 | Removing of unserviceable shelves and supplying and fixing new shelves made out of 0.9mm thick PBI sheet of existing size,shape by welding at appropriate points complete all as specified and as directed. | 250 | Each | |
14 | 4 | LOCKER STEEL (Fd-49 & FD-1029) | |||
15 | 4.01 | Removing of old u/s hasp and staples (locking device) and S & F new hasp and staples 75 mm long duly screwed/ welded of best quality as approved by GE complete all as specified and directed. | 250 | Each | |
16 | 4.02 | Removing of old u/s broken legs & S&F new legs made out of sheet PBI sheet 1mm thick complete all as specified shown on drg and as directed. | 200 | Each | |
17 | 5 | TABLE OFFICE CLERK STEEL | |||
18 | 5.01 | Removing of unserviceable drawer of table and supplying and fixing of new drawer made out of mild steel sheet not less than 1mm thick complete all as specified and as directed. | 95 | Each | |
19 | 5.02 | Removing of unserviceable MS Square pipe and supplying and fixing of new MS square pipe made out of 25 mm square 16 mm thick by welding to the pipe complete as all specified. and as directed. | 50 | Each | |
20 | 5.03 | Removal of unserviceable TOP and providing and fixing new TOP of size 1200mmx750mm as shown on drg made out of MDF board (Exterior grade) 18mm thick covered with plastic laminated sheet 1 mm thick on top and providing teak wood beading prior to lamination to cover lamination on beading also complete all as specified and as directed by Engineer-in Charge. | 95 | RM | |
21 | 6 | TABLE OFFICE OFFICER STEEL | |||
22 | 6.01 | Removing of unserviceable drawer of table and supplying and fixing of new drawer made out of mild steel sheet not less than 1mm thick complete all as specified and as directed. | 100 | Each | |
23 | 6.02 | Removing of unserviceable panel of cup board where required and supplying and fixing new panel of cup board made out of mild steel not less than 1 mm thick complete all as specified and as directed. | 25 | Each | |
24 | 6.03 | Removing of unserviceable MS Square pipe and supplying and fixing of new MS square pipe made out of 25 mm square 16 mm thick by welding to the pipe complete as all specified. and as directed. | 50 | RM | |
25 | 6.04 | Removal of unserviceable TOP and providing and fixing new TOP of size 1200mmx750mm as shown on drg made out of MDF board (Exterior grade) 18mm thick covered with plastic laminated sheet 1 mm thick on top and providing teak wood beading prior to lamination to cover lamination on beading also complete all as specified and as directed by Engineer-in Charge. | 65 | Each | |
26 | 7 | CHARPOY ORS STEEL FD/E6/MAP/11 | |||
27 | 7.01 | Replacement of unserviciable ply wood 12mm Make National,Greenply fixing at same plate with screw as per specified and directed | 400 | Each | |
28 | 8 | BED HARD STEEL | |||
29 | 8.01 | Replacement of unserviciable Planks Head rest and foot rest of 18mm both sides Pre laminated bd screw to MS strip arc welded to 18mm rectangular pipe asper specied and as directed. | 300 | Each | |
30 | 8.02 | Replacement of unserviciable ply wood 12mm complete all as specified and directed. | 250 | Each |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail