Repair To Sewage Lines , Cleaning Of Septic Tanks , Manholes And External Services , Other Misc Work At Chubattia Under Ge Ranikhet, At Chaubattia under GE Ranikhet-Uttarakhand

Military Engineer Services-MES has published Repair To Sewage Lines , Cleaning Of Septic Tanks , Manholes And External Services , Other Misc Work At Chubattia Under Ge Ranikhet. Submission Date for this Tender is 29-10-2020. Sewerage Construction Tenders in At Chaubattia under GE Ranikhet Uttarakhand. Bidders can get complete Tender details and download the document.




Tender Notice

25680919
Repair To Sewage Lines , Cleaning Of Septic Tanks , Manholes And External Services , Other Misc Work At Chubattia Under Ge Ranikhet
Open Tender
Indian
Uttarakhand
At Chaubattia under GE Ranikhet
29-10-2020

Tender Details

Repair To Sewage Lines , Cleaning Of Septic Tanks , Manholes And External Services , Other Misc Work At Chubattia Under Ge Ranikhet

Key Value

Document Fees
INR 500 /-
EMD
INR 30000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Repair to sewage lines, cleaning of septic tank , manholes and external services , other misc work at Chaudattia under GE Ranikhet.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 BOQ ( Sch 'A') B/R items\nExcavating in trenches in hard / dense soil not exceeding 1.50 m wide and not exceeding 1.50 m in depth for foundation for pipes, walls, cesspits, manholes, pier holes, cables etc not exceeding 10 Sqm on plan and not exceeding 1.50 m in depth and getting out complete all as specified. 45 Cubic Metre
2 2 Returning, filling in, spreading, leveling, watering and well ramming in layers not exceeding 25cm thick each complete all as specified. 40 Cubic Metre
3 3 Removal of excavated spoil to a distance not exc. 50m and depositing where directed at a level not exc. 1.5m above the starting point complete all as specified. 5 Cubic Metre
4 4 Eacavation in post holes( or similar holes) each n exc 0.5cu.m, getting out, retruning, filling, in and ramming earth or broken rubble mixed with earth around, in layers not exceeding in soft / loose soil complete all as specified and directed. 80 Each
5 5 Cleaning of blocked sewage lines (SGSW/RCC/CI PIPE) 100MM/150MM/200MM Bore dia. systematically using necessary tools mechanically and /or manually such as by rodding, passing rope knots, bamboo fanti and disc of required size (with safety measure such as dirt and gas etc), flushing the pipe well with water till clear flow of sewage from both side between two adjacent manhole/gully traps of any depth, taking out sludge in semi liquid stage including all water effluences etc and removing all materials from site of work upto a distance not exceeding 50m and depositing in earth pit of suitable size including supply and sprinkling bleaching powder and covering sludge with earth after removal of blockage etc complete all as specified and directed. 1250 Running Metre
6 6 Taking out [desilting] silt, bricks bats, debris, liquid waste, sludge in solid / semisolid state from the manholes of depth not exceeding 1.00 meter including pumping out sludge wherever necessary, slugging, diverting the flow in the drain, if necessary and staking the removed silt/sludge in deposit away from the edge of manholes as directed including use of safety belt, dry cells torch for lighting in side the man hole and taking similar safety measures and removing the sludge to a distance exceeding 250 m but not exceeding 500 m and cleaning the manholes with clean water etc complete all as directed. 150 Each
7 7 All as per item No 6 but depth of manholes exceeding 1.00 meter but not exceeding 2.00 meter 60 Each
8 8 Taking off existing covers of septic tanks & cleaning of septic tank of any size/capacity by dewatering and taking out sludge in liquid mud, silt or in solid state after emptying the solid/waster water by manual or by mechanical means and removing the sludge to a distance n exc 50m and burying the sludge in newly excavated pit of suitable sizes and covering and covering the same with excavated earth and placing in position the removed covers complete all specified and directed. 300 Cubic Metre
9 9 Cleaning of manhole blockages(including WC,Urinal,Kitchen and bathrooms) systematically using necessary tools mechanically and /or manually such as by rodding,bamboo fanti and disc of required size(with safety measure gas etc) flushing the pipe well with water till clear the flow of sewage from both side between two adjacent manholes/gully traps or WC/NT of any size or depth, taking out sludge in semi liquid stage/roots of tree etc including all water effluences etc and removing all materials from the site of work upto distance not exceeding 50m and depositing in earth pit of suitable size including supply and sprinkling bleaching powder and covering sludge with earth after removal of blockage etc complete all as specified and directed \nNote:-1.These complaints are to be attended on day to day basis with sufficient manpower and tools. Complaint shall be received by contractor / by auth rap from Office at 9 A:M .\n \n\n 500 Each
10 10 Material & Labour for cutting into existing manholes for connecting new drains, making good to pipe and rendering cutting out exiting benching for and forming brancg channel (1/2 round or 3/4 section) in cement concrete 1:2:4 type B1 using 20mm graded crushed aggregate smooth finishing, and reforming benching as required 150 mm dia of pipe complete all as specified and directed. 5 Each Pipe
11 11 Material & Labour for plain cement concrete 1:4:8 type D-2 (using 40 mm graded stone aggregate) as in foundation, filling mass concrete complete all as specified and directed. 9.5 Cubic Metre
12 12 Material and labour PCC 1:3:6 type C-1 using 20mm graded crushed stone aggregate as in seismic and other similar bands, coping, bed block, hold fast or similar work etc incuding necessary form work complete all as specified. 2.7 Cubic Metre
13 13 Material & Labour for cement concrete 1:3:6 type C-1 (using 20mm graded crushed stone agg) as in surface channels and drains including necessary form work complete all as specified and directed. 4 Cubic \nMetre
14 14 Extra for forming fair finished drain or channels 30cm inner girth in cement concrete using extra cement including forms, moulds mitred/stopped ends etc all as specified and directed. 80 Running\nMetre
15 15 Material & Labour for 75mm thick cement concrete 1:3:6 type C-2 (using 40mm graded crushed stone agg) as in path/ floor/ sub base with finishing in cement concrete surface even and rough to receive screed bed/ floor finishes complete all as specified and directed. including necessary form work complete all as specified and directed. 75 Square \nMetre
16 16 Demolition of brick work or stone masonry precast PCC block walling built in cement mortar complete all as specified and directed. 50 Cubic \nMetre
17 17 Material & Labour for brick work with sub class 'B' bricks using old size bricks straight or curved on plan exc 6 mtr mean radius, built in CM 1:4 complete all as specified and directed. 3 Cubic \nMetre
18 18 Material & Labour for precast cement concrete block masonry with solid block of cement concrete 1:3:6 type C-1 ( using 20 mm graded crushed stone aggregate) exc 10 cm in width and setting in CM 1:6complete all as specified and directed by Engg-in- Charge. 47 Cubic \nMetre
19 19 Taking down cement or cement lime plaster of any description on brick or stone wall or concrete surface etc including raking out joints, hacking for keys, scrubbing down with water etc complete all as specified and directed. 180 Square \nMetre
20 20 Material and labour for 15mm thick cement plaster in CM (1:4) on fair faces of brick or concrete surfaces using WPC where ever required as per manufacturerer's instructions and finishing the surface fair and even (without using extra cement) etc. complete all as specified NOTE -WPC shall be measured and paid separetely. 100 Square \nMetre
21 21 Material and labour for 15mm thick cement plaster in CM (1:6) on stone masonary or surface than fair face of brick work and finishing the surface fair and even (without using extra cement) etc. complete all as specified 80 Square \nMetre
22 22 Supply only WPC complete all as specified and directed. 2 Kilogram
23 23 Material & Labour for preparing newly plastered surfaces of wall and applying two coats of oil bound distemper complete all as specified and directed. . 80 Square \nMetre
24 24 Material & Labour for preparing newly plastered surfaces of wall and applying two coats of cement base paint over a coat of primer complete all as specified and directed. . 100 Square \nMetre
25 25 Demolition and breaking up existing drain pips 150 mm bore(SWG,A.C., or R.C.C.) set in cement mortar including cement concrete bedding haunching etc and removing from site to a distance not exc. 50 mtr complete all as specified and directed. 300 Running\nMetre
26 26 Material & Labour Salt Glazed stone ware drain pipes Grade 'A' laid in trenches and jointed in cement mortar 1:1 with spun yarn as specifed 150mm internal dia of pipe complete all as specified 310 Running\nMetre
27 27 Material & labour for cement concrete (1:4:8) type D-2 using 40mm graded crushed stone aggregate, concrete bed laid to falls in trenches in any depth including packing under and haunching against the sides of SGSW pipes 150mm bore after the pipes have been laid and tested all as specified (SGSW pipes shall be measured and paid separately) 300 Running\nMetre
28 28 Material and labour PCC 1:2:4 type B-1 using 20mm graded crushed stone aggregate as in benching and channel of manholes, rounded or chamfered on edges and like including weathering, slightly rounded or chamfered angles and throating etc incuding necessary form work complete all as specified. 0.5 Cubic Metre
29 29 Demolition of reinforced cement concrete of any description and in any position not otherwise specifically provided for (reinforcement cut as required to facilitate demolition) and disposal of unserviceable materials, debris and rubish to a distance not exc 50m as directed by Engr-in-Charge complete all as specified. 8.5 Cubic Metre
30 30 Material & labour mild steel reinforcement TMT bars 10mm dia and over cut to length, bent to shape required including cranking, bending, spirally for hooping for columns, hooking ends and binding with and including MS wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified. 78 Kilogram
31 31 All per item No 30 herein bebore but 6mm to 8mm dia 350 Kilogram
32 32 Material and Labour Precast reinforced cement concrete 1:2:4 type B-1 using 20mm graded stone aggregate in cover slabs (for manholes etc), shelves and similar articles with plain faces and setting in cement mortar 1:6 including necessary form work complete all as specified and directed. (reinforcement to be measured separately) 8.5 Cubic Metre
33 33 Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. 55 Square \nMetre
34 34 Material & Labour for coloured/ printed non skid ceramic tiles 7 to 8 mm thick ( square/ rectangular) area of each tiles exc. 0.11 sqm but n.exc. 0.18 sqm as in floors etc set and jointed in neat cement slurry and pointed in white cement with colour pigment over and including 15mm thick bedding layer in CM 1:6 complete all as specified and directed. 55 Square \nMetre
35 35 Material & Labour for Dard shade non skid ceramic heavy duty floor tiles of size 300x300x10 mm thick as in floors etc set and jointed in neat cement slurry and pointed in white cement with colour pigment over and including 15mm thick bedding layer in CM 1:6 complete all as specified and directed. 50 Square \nMetre
36 36 Material & Labour 80mm thick machine pressed precast concrete interlocking , glossy finish paver block any shape and size confirming to IS-15658-2006 M-40 grade ouer and including 40 mm thick sand cushion complete all as directed. 25 Square \nMetre
37 37 Demolition of cement concrete (unreinforced) in ground floors and pavings n.exc 15cm thickness (below or above ground level) and disposal of unserviceable materials, debris and rubish to a distance not exc 50m as directed by Engr-in-Charge complete all as specified. 10.48 Cubic \nMetre
38 38 Taking up or down 15mm dia steel tubing and connections by disconnecting fittings/tubing from existing tubing including cleaning for refixing or removal from site complete all as specified and directed. 11 Running Metre
39 39 Taking up or down 20mm dia steel tubing and connections by disconnecting fittings/tubing from existing tubing including cleaning for refixing or removal from site complete all as specified and directed. 7 Running Metre
40 40 Material & Labour for 15mm bore GI tubing, medium grade, galvanised with and including all GI fittings and fixed complete to walls and ceiling or laid in floors complete all as specified and directed. 6 Running Metre
41 41 All as per Item No 40 here-in-before but fixing only with new fittings Note: Serviceable GI pipe retrievd from srl item No 38 will be reused. 5 Running Metre
42 42 Material & Labour for 20 mm bore GI tubing, medium grade, galvanised with and including all GI fittings and fixed complete to walls and ceiling or laid in floors complete all as specified and directed. 5 Running Metre
43 43 All as per Item No 42 here-in-before but fixing only with new fittings Note: Serviceable GI pipe retrievd from srl item No 39 will be reused. 2 Running Metre
44 44 Supply and fixing in repair PVC connection 450mm long of 15mm size with PTMT nuts on both sides complete all as specified. 20 Each
45 45 Supply and fixing in repair pillar tap 15mm dia cast copper alloy with capstan head chromium plated fancy type, screwed down high pressure, with or without letters ‘Hot’ or ‘Cold’ with long screwed shanks and fly-nuts, screwed for iron pipe complete all as specified . 10 Each
46 46 Supply & Fixing vitreous china squatting pan Orrissa pattern size 580 x 440 mm white with intregal foot rests, with & including P or S trap (excluding material & labour of flushing cistern and flush pipe) including conection to trap and to flush pipe etc complete including making good to floor complete all as specified and directed fixed in repairs complete all as specified and directed. 13 Each
47 47 Supplying and fixing white PVC valve less syphonic action type low level flushing cistern of 10 ltrs capacity with inlet ball valve, float valve, handle including pipe 32mm dia of high density polythylene pipe (HDPE) flush pipe including brackets completeall as specified. 15 Running\nMetre
48 48 Supply & Fixing vitreous china wash basin, white, flat back, size 550mm x 400mm, including brackets and cutting for and pinning in ends of brackets or erecting stand, fixed in repairs complete all as specified and directed. 10 Each
49 49 Dismantling of 75mm to 110mm bore PVC (SWR) pipe jointed in cement mortar and taking out from trenches or from wall and any position as required complete all as specified and directed. 95 Running\nMetre
50 50 Supply and Fixing 110 mm bore PVC (SWR) soil, waste & vent pipe single socketed in any length with rubber ring joints fixed to walls with and including clamps, nut bolts etc complete all as specified. 60 Running\nMetre
51 51 Supply and Fixing 75 mm bore PVC (SWR) soil, waste & vent pipe single socketed in any length with rubber ring joints fixed to walls with and including clamps, nut bolts etc complete all as specified. 35 Running\nMetre
52 52 Supply and Fixing PVC (SWR) bends any radius 110 mm complete all as specified. 10 Each
53 53 Supply and Fixing PVC (SWR) bends any radius 75 mm complete all as specified. 6 Each
54 54 Supply and Fixing 110 mm bore PVC (SWR) branch piece , double, (double Y) equal or unequal complete all as specified and directed. 5 Each
55 55 Supply and Fixing 110 mm bore PVC (SWR) vent cowl complete all as specified and directed. 5 Each
56 56 Supply and Fixing 75 mm bore PVC (SWR) vent cowl complete all as specified and directed. 5 Each
57 57 Material & Labour for 75mm dia PVC multy floor trap plain with grating including jointing with solvent cement complete all as specified and directed. 2 Each
58 58 Taking down chowkats or frames n.exc 1.5 Sqm each with shutters (without taking off shutters from the frame) and removed by the contractor complete all as specified and directed. 10 Each
59 59 Taking down chowkats or frames exc 1.5 Sqm but not exc 4 Sqm each with shutters (without taking off shutters from the frame) and removed by the contractor complete all as specified and directed. 4 Each
60 60 Supply & Fixing of factory made soild PVC door frame of size 50mmx47mm made out of 5mm thick plain colour PVC sheet reinforced with mild steel square tube and fixing as per specification and drawing given on MES schedule Part-II (2010) complete all as specified & directed. 56 Running Metre
61 61 Supply & fixing factory made solid panel PVC door shutter 30mm thick (style) consisting of frame work made out of MS tubes for top or bottom rail MS frame shall be covered with heat moulded plain colour PVC 'C' channel having a PVC sheet for strip of 20mm width stuck inside with solvent cement for stiles and plain colour PVC sheets for top rail, lock rail, and bottom rail on either side & as gap insert for top & bottom rail panelling of plain colour PVC sheet to be fitted in the MS frame welded/sealed to stiles and rail with suitable PVC sheets beading and jointed together with solvent cement supplying and fixing in the frame at site as specified in cluase No 8B.2.1 B.of SSR Part-II 2010. thickness of inserted panel not less than 10mm thick complete all as specified and directed. 20 Square \nMetre
62 62 Supply & Fixing 100mm size MS butt hinges, medium weight, cold rolled complete all as specified and directed. 42 Each
63 63 Supply & Fixing 150mm long Aluminium anodised barrel tower bolt of extruded section complete all as specified and directed. 28 Each
64 64 Supply & Fixing 125 mm size Extruded aluminium alloy handle fabricated type anodised complete all as specified and directed. 28 Each
65 65 Dismantling post or struts ( wood, steel or R.C.C) any section, including taking out embedded portion and making good distrubed ground, posts embeded in concrete, brick work, masonry ,etc complete all as specified. 125 Running Metre
66 66 Material and labour for Mild steel work as in fencing posts, struts in fencing embedding in concrete and screwing etc. including cutting tops to shape as directed, drilling holes, notching for wire, etc, flat iron fillets (for securing wire mesh etc) including all necessary drilling, nolting or riveting, etc. and similar work conforming to Fe-290 Gde E-165.complete all as specified. 750 Kilogram
67 67 Supply & fixing in repair galvanized 2 strand steel barbed wire 2.24mm dia barbed with 2mm dia barbs at 75mm spacing and straining and fixing to any type of standard rails straining bolts including securing or tying at cross with and provision of galvanized mild steel wire, staples or steel pins etc including dismantling of old barbed wire complete all as specified.\nNote: Each line of wire to be measured separately.\n 11.5 100 Running Metre
68 68 All as per Item No 67 here-in-before but fixing only in repair including dismantling of old barbed wire 12.5 100 Running Metre
69 69 Supply & fixing 4mm dia mild steel galvanised wire, chain link fencing, 100x100mm size mesh and fixed to steel members complete all as specified.\n 225 Square \nMetre
70 70 Supply & fixing mild steel round bars 10mm dia and over cut to length, bent to shape required including cranking, bending, fixed to chain link fencing as guard bar, tightening of fencing complete all as specified.\n 150 Kilogram
71 71 Material and labour for preparation of new steel and iron surfaces of any description, over 10cm in width or girth, not otherwise described and applying two coats of synthetic enamel paint over a coat of red oxide, zinc chrome primer complete all as specified. 12 Square \nMetre
72 72 Material and labour for preparation of new steel and iron surfaces of any description, n exc 10cm in width or girth when connected with other painting or when painted in a different tint and applying two coats of synthetic enamel paint over a coat of red oxide, zinc chrome primer complete all as specified. 15 10 Running Metre
73 73 Supply & fixing mild steel bolts, machine made, with hexagonal or square head one end and screwed the other, or screwed both ends, each srewed end to be fitted with washers and one hexagonal or square nut , no exc 5cm long, diameter of neck exc 11 but n exc 15mm complete all as specified and directed. 12.5 Kilogram
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail