Rural Development And Panchayats Department has published Vellore District Tnrris 2020-21 Under Sfc ( Bp ) 2020-21 Strengthening Of 3 Roads In Pattu Sengundram Kallapadi Panchayat At Gudiyatam Block Package No . 24. Submission Date for this Tender is 28-10-2020. Road Repair Tenders in DRDA, VELLOR Tamil Nadu. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 01-Oct-2020 | vellore District TNRRIS 2020-21 under SFC (BP) 2020-21 Strengthening of 3 Roads in Pattu Sengundram Kallapadi panchayat at Gudiyatam Block Package No.24 | Date | 07-10-2020 |
2 | 07-Oct-2020 | vellore District TNRRIS 2020-21 under SFC (BP) 2020-21 Strengthening of 3 Roads in Pattu Sengundram Kallapadi panchayat at Gudiyatam Block Package No.24....... | Date | 13-10-2020 |
3 | 13-Oct-2020 | vellore District TNRRIS 2020-21 under SFC (BP) 2020-21 Strengthening of 3 Roads in Pattu Sengundram Kallapadi panchayat at Gudiyatam Block Package No.24 .. | Date | 16-10-2020 |
4 | 16-Oct-2020 | vellore District TNRRIS 2020-21 under SFC (BP) 2020-21 Strengthening of 3 Roads Pattu Sengundram Kallapadi panchayat at Gudiyatam Block Package No.24 | Date | 21-10-2020 |
5 | 21-Oct-2020 | vellore District TNRRIS 2020-21 under SFC (BP) 2020-21 Strengthening of 3 Roads in Pattu Sengundram Kallapadi panchayat at Gudiyatam Block Package No.24 ... | Date | 23-10-2020 |
6 | 23-Oct-2020 | vellore District TNRRIS 2020-21 under SFC (BP) 2020-21 Strengthening 3 Roads in Pattu Sengundram Kallapadi panchayat at Gudiyatam Block Package No.24 | Date | 28-10-2020 |
Name of Work: Vellore District Upgradation/ strengthening of roads under TNRRIS 2020-2021 at Gudiyatham block in Vellore district Package No.24 | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Maintenance of the Road from Kallapadi - Arasamara Street (Via) Nathalamedu Kaliyammankoil in Kallapadi Panchayat,Km 0/0 - 1/2(R329) | BI01010001010000000000000515BI0100001112 | ||
2 | 2 | Clearingthe Scrub jungle including cutting the scrubs and removing away from site etc.complete | BI01010001010000000000000515BI0100001112 | 1209.6 | sqm |
3 | 3 | Collection and supply of Gritty Gravel for basecourse and Sideberm including cost and conveyance of gravel from approved sources to work site including labour for spreading,watering and compacting by power roller to achieve the required proctor density at 100% compaction | BI01010001010000000000000515BI0100001112 | ||
4 | 4 | KM 0/0 - 1/200 | BI01010001010000000000000515BI0100001112 | 134.4 | Cum |
5 | 5 | Advance patch for making up the undulation in the exiting B.T surface to an average thickness of 50mm using 45mm metal IRC size HBG 44kg metal including cost and conveyance of all materials etc | BI01010001010000000000000515BI0100001112 | ||
6 | 6 | KM 0/0 - 1/0 | BI01010001010000000000000515BI0100001112 | 9.59 | sqm |
7 | 7 | KM 1/0 - 1/2 | BI01010001010000000000000515BI0100001112 | 3.7 | sqm |
8 | 8 | Advance patch for making up the undulation in the exiting B.T surface to an average thickness of 25mm using 13.20mm metal IRC size HBG 44kg metal including cost and conveyance of all materials etc | BI01010001010000000000000515BI0100001112 | ||
9 | 9 | KM 0/0 - 1/0 | BI01010001010000000000000515BI0100001112 | 4.7 | sqm |
10 | 10 | KM 1/0 - 1/2 | BI01010001010000000000000515BI0100001112 | 2.08 | sqm |
11 | 11 | Applying tackcoat over BT Surface using 3kgs of bitumen emulsion per 10sqm including cost of bitumen emulsion which will be supplied deparmentallyat section stores cost of which will be recovered at the issue rate as per the special condation for etc Complete | BI01010001010000000000000515BI0100001112 | ||
12 | 12 | KM 0/0 - 1/2 | BI01010001010000000000000515BI0100001112 | 3360 | sqm |
13 | 13 | Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials | BI01010001010000000000000515BI0100001112 | ||
14 | 14 | KM 0/0 - 1/0 | BI01010001010000000000000515BI0100001112 | 3000 | sqm |
15 | 15 | KM 1/0 - 1/2 | BI01010001010000000000000515BI0100001112 | 360 | sqm |
16 | 16 | Provision for HM stone | BI01010001010000000000000515BI0100001112 | 5 | Each |
17 | 17 | Provision for kM stone | BI01010001010000000000000515BI0100001112 | 1 | Each |
18 | 18 | Providing Sign board charges | BI01010001010000000000000515BI0100001112 | 1 | Ls |
19 | 19 | Providing Paver Block @ Ch 180m | BI01010001010000000000000515BI0100001112 | ||
20 | 20 | Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B | BI01010001010000000000000515BI0100001112 | 11.2 | Cum |
21 | 21 | Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete | BI01010001010000000000000515BI0100001112 | 99.9 | Cum |
22 | 22 | Cement Concrete 1:4:8 mix using 40 mm HBG metal including cost and conveyance of all materials and all labour charges etc complete. | BI01010001010000000000000515BI0100001112 | 5.6 | Cum |
23 | 23 | Supply and errecting of steel sheet centering labour charges etc complete | BI01010001010000000000000515BI0100001112 | 73.6 | Sqm |
24 | 24 | Cement Concrete 1:2:4 mix using 20 mm HBG metal including cost and conveyance of all materials and all labour charges etc complete. | BI01010001010000000000000515BI0100001112 | 8.46 | Sqm |
25 | 25 | Providing and laying of Interlocking concrete Block ( Surface textured) pavement having thickness 80mm and compacted over a thin bedding sand layer of 25mm thickness and joints shall be filled by fine sand of specified grading as per table 1500.6 of specification of Rural road 2014 and Technical Specification clause 1504. | BI01010001010000000000000515BI0100001112 | 263.2 | Sqm |
26 | 26 | Providing Name board charges | BI01010001010000000000000515BI0100001112 | 1 | Nos |
27 | 27 | Maintenance of the Road from P.P Salai to S.Krishnapuram in Sengungram Panchayat,Km 0/0 - 1/75(R146) | BI01010001010000000000000515BI0100001112 | ||
28 | 28 | Clearingthe Scrub jungle including cutting the scrubs and removing away from site etc.complete | BI01010001010000000000000515BI0100001112 | 3141 | sqm |
29 | 29 | Collection and supply of Gritty Gravel for basecourse and Sideberm including cost and conveyance of gravel from approved sources to work site including labour for spreading,watering and compacting by power roller to achieve the required proctor density at 100% compaction | BI01010001010000000000000515BI0100001112 | ||
30 | 30 | KM 0/0 - 1/75 | BI01010001010000000000000515BI0100001112 | 209.4 | Cum |
31 | 31 | Advance patch for making up the undulation in the exiting B.T surface to an average thickness of 50mm using 45mm metal IRC size HBG 44kg metal including cost and conveyance of all materials etc | BI01010001010000000000000515BI0100001112 | ||
32 | 32 | KM 0/0 - 1/0 | BI01010001010000000000000515BI0100001112 | 9.42 | sqm |
33 | 33 | KM 1/0 - 1/75 | BI01010001010000000000000515BI0100001112 | 8.01 | sqm |
34 | 34 | Advance patch for making up the undulation in the exiting B.T surface to an average thickness of 25mm using 13.20mm metal IRC size HBG 44kg metal including cost and conveyance of all materials etc | BI01010001010000000000000515BI0100001112 | ||
35 | 35 | KM 0/0 - 1/0 | BI01010001010000000000000515BI0100001112 | 4.8 | sqm |
36 | 36 | KM 1/0 - 1/75 | BI01010001010000000000000515BI0100001112 | 4.32 | sqm |
37 | 37 | Applying tackcoat over BT Surface using 3kgs of bitumen emulsion per 10sqm including cost of bitumen emulsion which will be supplied deparmentallyat section stores cost of which will be recovered at the issue rate as per the special condation for etc Complete | BI01010001010000000000000515BI0100001112 | ||
38 | 38 | KM 0/0 - 1/75 | BI01010001010000000000000515BI0100001112 | 5235 | sqm |
39 | 39 | Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials | BI01010001010000000000000515BI0100001112 | ||
40 | 40 | KM 0/0 - 1/0 | BI01010001010000000000000515BI0100001112 | 3000 | sqm |
41 | 41 | KM 1/0 - 1/75 | BI01010001010000000000000515BI0100001112 | 2235 | sqm |
42 | 42 | Provision for HM stone | BI01010001010000000000000515BI0100001112 | 7 | Each |
43 | 43 | Provision for kM stone | BI01010001010000000000000515BI0100001112 | 1 | Each |
44 | 44 | Providing Sign board charges | BI01010001010000000000000515BI0100001112 | 2 | Each |
45 | 45 | Providing Name board charges | BI01010001010000000000000515BI0100001112 | 1 | Nos |
46 | 46 | Maintenance of the Road from Pattu South Alathur Goodanagaram Ananganallore Salai to Nathamedu in Pattu Panchayat,Km 0/0 - 2/250 | BI01010001010000000000000515BI0100001112 | ||
47 | 47 | Clearingthe Scrub jungle including cutting the scrubs and removing away from site etc.complete | BI01010001010000000000000515BI0100001112 | 5304 | sqm |
48 | 48 | Collection and supply of Gritty Gravel for basecourse and Sideberm including cost and conveyance of gravel from approved sources to work site including labour for spreading,watering and compacting by power roller to achieve the required proctor density at 100% compaction | BI01010001010000000000000515BI0100001112 | ||
49 | 49 | KM 0/0 - 2/250 | BI01010001010000000000000515BI0100001112 | 287.3 | Cum |
50 | 50 | Advance patch for making up the undulation in the exiting B.T surface to an average thickness of 50mm using 45mm metal IRC size HBG 44kg metal including cost and conveyance of all materials etc | BI01010001010000000000000515BI0100001112 | ||
51 | 51 | KM 0/0 - 1/0 | BI01010001010000000000000515BI0100001112 | 13.57 | sqm |
52 | 52 | KM 1/0 - 2/0 | BI01010001010000000000000515BI0100001112 | 13.31 | sqm |
53 | 53 | KM 2/0 - 2/250 | BI01010001010000000000000515BI0100001112 | 3.06 | sqm |
54 | 54 | Advance patch for making up the undulation in the exiting B.T surface to an average thickness of 25mm using 13.20mm metal IRC size HBG 44kg metal including cost and conveyance of all materials etc | BI01010001010000000000000515BI0100001112 | ||
55 | 55 | KM 0/0 - 1/0 | BI01010001010000000000000515BI0100001112 | 8.33 | sqm |
56 | 56 | KM 1/0 - 2/0 | BI01010001010000000000000515BI0100001112 | 7.16 | sqm |
57 | 57 | KM 2/0 - 2/250 | BI01010001010000000000000515BI0100001112 | 1.71 | sqm |
58 | 58 | Applying tackcoat over BT Surface using 3kgs of bitumen emulsion per 10sqm including cost of bitumen emulsion which will be supplied deparmentallyat section stores cost of which will be recovered at the issue rate as per the special condation for etc Complete | BI01010001010000000000000515BI0100001112 | ||
59 | 59 | KM 0/0 - 2/250 | BI01010001010000000000000515BI0100001112 | 8287.5 | sqm |
60 | 60 | Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials | BI01010001010000000000000515BI0100001112 | ||
61 | 61 | KM 0/0 - 1/0 | BI01010001010000000000000515BI0100001112 | 3750 | sqm |
62 | 62 | KM 1/0 - 2/0 | BI01010001010000000000000515BI0100001112 | 3487.5 | sqm |
63 | 63 | KM 2/0 - 2/250 | BI01010001010000000000000515BI0100001112 | 1050 | sqm |
64 | 64 | Provision for HM stone | BI01010001010000000000000515BI0100001112 | 9 | Each |
65 | 65 | Provision for kM stone | BI01010001010000000000000515BI0100001112 | 2 | Each |
66 | 66 | Providing Sign board charges | BI01010001010000000000000515BI0100001112 | 4 | Each |
67 | 67 | Providing Name board charges | BI01010001010000000000000515BI0100001112 | 1 | Nos |
68 | 68 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package} | BI01010001010000000000000515BI0100001112 | 1 | GST Amount ( in Rupees) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail