Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Time Extension Issued For Work Contract For Wc24 For Singathakuruchi Ss11 At Alantha Feeder Under Hvds Scheme. Submission Date for this Tender is 05-10-2020. Feeder Pillar Tenders in TUTICORIN Tamil Nadu. Bidders can get complete Tender details and download the document.
WORK CONTRACT FOR Replacing THE EXISTING 415V LT LINE INTO 11KV LINE AND REPLACING THE HIGHER CAPACITY DT WITH LOWER CAPACITY DT (25/16KVA) AT SINGATHAKURUCHI SS 11 OF 11KV ALANTHA FEEDER UNDER HVDS SCHEME | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Loading & unloading of 9.0 mtr PSC pole | item 1 | 12 | E |
2 | 2 | Transporting of 9 mtr PSC Pole | item 2 | 12 | E |
3 | 3 | Excavation & Erection of 9 mtr PSC Pole | item 3 | 12 | E |
4 | 4 | Erection of V X arm | item 4 | 10 | E |
5 | 5 | Erection of Tapping channel X arm | item 5 | 3 | E |
6 | 6 | Erection of HT TI fitting | item 6 | 12 | E |
7 | 7 | Fixing of HT pin insulators | item 7 | 30 | E |
8 | 8 | Fixing of 11 KV Discs | item 8 | 9 | E |
9 | 9 | Erection of 3 Phase X Arm | item 9 | 13 | E |
10 | 10 | Erection of 1 Phase X Arm | item 10 | 7 | E |
11 | 11 | Dismantling and Re-Erection of LT TI fitting | item 11 | 4 | E |
12 | 12 | Fixing of LT pin insulators | item 12 | 42 | E |
13 | 13 | Fixing of LT shackles | item 13 | 39 | E |
14 | 14 | Erection of stay set (includes Excavation Stay Pit (1.00Mx0.5Mx1.5M) and Erection of Stay Set) | item 14 | 6 | Set |
15 | 15 | Erection of pole earthing | item 15 | 12 | Loc |
16 | 16 | Erection of pole concreting | item 16 | 12 | Loc |
17 | 17 | Erection of HT Line - Stringing, sagging, Pin-binding of conductor 7/3.15 AAAC (HT) without LC work | item 17 | 21 | Run |
18 | 18 | Erection of LT Line - Stringing, sagging, Pin-binding of conductor 7/2.59 ACSR(LT) without LC work | item 18 | 32 | Run |
19 | 19 | Alteration of clamps | item 19 | 3 | E |
20 | 20 | Dismantling of 3 Phase X Arm | item 20 | 13 | E |
21 | 21 | Dismantling of 1 Phase X Arm | item 21 | 7 | E |
22 | 22 | Dismantling of 7/2.59 ACSR | item 22 | 48 | Run |
23 | 23 | Dismantling and Reerection of S Ph SC wire | item 23 | 32 | E |
24 | 24 | Dismantling and Reerection of 3 Ph SC wire | item 24 | 5 | E |
25 | 25 | Dismantling of 7.5Mt/8Mt Pole - without damage | item 25 | 12 | E |
26 | 26 | Convertion of Pin Point to Cut Point (HT) | item 26 | 4 | Per Span |
27 | 27 | Convertion of Pin Point to Cut Point (LT) | item 27 | 12 | Per Span |
28 | 28 | Dismantling & Reerection of Stay set complete | item 28 | 11 | E |
29 | 29 | Transporting of Materials from Section office to work spot | item 29 | 5 | Trip |
30 | 30 | Dismantling and Re-erection of Street Light Switching Box Arrangements | item 30 | 3 | E |
31 | 31 | Dismantling and Re-erection of 1*40W Street Light Fixtures | item 31 | 14 | E |
32 | 32 | Drilling Holes less than 25mm (Including DT Erection) | item 32 | 120 | E |
33 | 33 | Drilling Slotted Holes (Including DT Erection) | item 33 | 185 | E |
34 | 34 | Dismantling of LT pin insulators | item 34 | 42 | E |
35 | 35 | Dismantling of LT shackles | item 35 | 24 | E |
36 | 36 | Erection of HT Line - Stringing, sagging, Pin-binding of conductor 7/3.15 AAAC (HT) with HT Line Clear work | item 36 | 18 | Run |
37 | 37 | Erection of LT Line - Stringing, sagging, Pin-binding of conductor 7/2.59 ACSR(LT) with LT Line Clear work | item 37 | 16 | Run |
38 | 38 | Loading & unloading of 9.0 mtr PSC square pole | item 38 | 4 | E |
39 | 39 | Transporting of 9 mtr PSC square Pole | item 39 | 4 | E |
40 | 40 | Excavation & Erection of 9 mtr PSC square Pole | item 40 | 4 | E |
41 | 41 | Fixing of HT pin insulators | item 41 | 12 | E |
42 | 42 | Erection of stay set | item 42 | 8 | Set |
43 | 43 | Erection of Single Pole TC Set | item 43 | 4 | E |
44 | 44 | Earthing Materials Pipe type for Grounding | item 44 | 4 | E |
45 | 45 | Concreting Materials | item 45 | 4 | E |
46 | 46 | Erection 11 KV Lighting Arrester | item 46 | 12 | E |
47 | 47 | Erection of HG Fuse 11KV solid core type | item 47 | 4 | E |
48 | 48 | Erection of 11 KV ,200 A, Single break GOS | item 48 | 4 | E |
49 | 49 | Fixing of Danger Board | item 49 | 4 | E |
50 | 50 | Erection Anti - Climbing Device | item 50 | 4 | E |
51 | 51 | Erection of 16 KVA/11KV/433 V DTr | item 51 | 3 | E |
52 | 52 | Erection of 25 KVA/11KV/433 V DTr | item 52 | 1 | E |
53 | 53 | Transporting of Materials from Section office to work spot | item 53 | 4 | Trip |
54 | 54 | Erection of LT open type | item 54 | 4 | E |
55 | 55 | Erection of DT Meter | item 55 | 4 | E |
56 | 56 | Painting of Distribution Transformer | item 56 | 4 | E |
57 | 57 | Loading and Unloading of Distribution Transformers | item 57 | 4 | E |
58 | 58 | Transporting of Distribution Transformers | item 58 | 4 | E |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail