Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Work Contract For Implementation Of Hvds In 11 Kv Vadhampacheri Feeder Of 110/11 Kv Malayadipalayam Ss In Sulthanpet Section Of Negamam Division Work Contract For Implementation OfHvds In 11 Kv VadhampacheriFeeder Of 110/11 KvMalayadipalayam Ss In S. Submission Date for this Tender is 16-10-2020. Feeder Pillar Tenders in Tatabad,coimbatore Tamil Nadu. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 30-Sep-2020 | TIME EXTENSION | Date | 08-10-2020 |
2 | 08-Oct-2020 | TIME EXTENSION2 | Date | 16-10-2020 |
Name of Work: Work Contract for Implementation of HVDS in 11 KV Vadhampacheri feeder of 110/11 KV Malayadipalayam SS in Sulthanpet section of Negamam Division | |||||
---|---|---|---|---|---|
Sl. No. | Description of Work | Item Code / Make | Quantity | Units | |
1 | 1 | Loading & Unloading of 9mtr Square Pole | Item 1 | 48 | E |
2 | 2 | Excavation of Pole Pit,Loading & Unloading of PSC 9 mtr Pole,Transportation of Pole From road to Pit & Erection | Item 2 | 10 | E |
3 | 3 | Excavation of Pole Pit,Loading & Unloading of PSC 8 mtr Pole,Transportation of Pole From road to Pit & Erection | Item 3 | 9 | E |
4 | 4 | Fixing of V X Arm | Item 4 | 164 | E |
5 | 5 | Fixing of Tapping Channel | Item 5 | 95 | E |
6 | 6 | Fixing of HT TI Fitting | Item 6 | 222 | E |
7 | 7 | Fixing of 11 KV Disc | Item 7 | 546 | E |
8 | 8 | Fixing of 11 KV Pin Insulator | Item 8 | 142 | E |
9 | 9 | Pole Earthing | Item 9 | 19 | E |
10 | 10 | Excavation of Stay Pit & Erection of Stay Set Complete | Item 10 | 44 | E |
11 | 11 | Fixing of LT Three Phase X Aram | Item 11 | 59 | E |
12 | 12 | Fixing of LT Shackle | Item 12 | 276 | E |
13 | 13 | Paving of AAAC 7/2.50 Sq mm(5.657+18.468) | Item 13 | 24.125 | E |
14 | 14 | Pole Concretting with material | Item 14 | 19 | E |
15 | 15 | Stay Concretting | Item 15 | 44 | E |
16 | 16 | Pole Numbering | Item 16 | 19 | E |
17 | 17 | Erection of Single Pole Structure | Item 17 | 48 | E |
18 | 18 | Loading & Unloading of Transformer | Item 18 | 54 | E |
19 | 19 | Transporting of Transformer | Item 19 | 54 | E |
20 | 20 | Erection of Transformer | Item 20 | 54 | E |
21 | 21 | Transporting of Line Materials | Item 21 | 6 | Ton |
22 | 22 | Erection of DT Metering (Whole current 10-60 & 50-100 A ) | Item 22 | 54 | E |
23 | 23 | Dismantling of AAAC 7/3.15 Sq mm | Item 23 | 4.224 | E |
24 | 24 | Dismantling of AAAC 7/2.5 Sq mm(8.100) | Item 24 | 8.1 | E |
25 | 25 | Dismantling of AAAC 7/2.5 Sq mm(18.468) for re erection | Item 25 | 18.468 | E |
26 | 26 | Dismantling of LT Pin Insulator | Item 26 | 588 | E |
27 | 27 | Dismantling of LT Shackle | Item 27 | 285 | E |
28 | 28 | Dismantling of Alu Knob | Item 28 | 70 | E |
29 | 29 | Dismantling of LT Three Phase X Arm | Item 29 | 247 | E |
30 | 30 | Dismantling of PSC 8 mtr Pole | Item 30 | 18 | E |
31 | 31 | Dismantling of Transformer | Item 31 | 10 | E |
32 | 32 | Dismantling of Structure Materials | Item 32 | 4 | E |
33 | 33 | Loading & Unloading of DTs for devolution | Item 33 | 10 | E |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail