Construction Of Lining Wall And Two Tractor Crossings On Humri Canal Near Crpf Camp Magam . Amount Of Work . 10 . 85 Lacs ( Including Deptt Supply ) , Budgam-Jammu And Kashmir

Irrigation And Flood Control Department-IFCD has published Construction Of Lining Wall And Two Tractor Crossings On Humri Canal Near Crpf Camp Magam . Amount Of Work . 10 . 85 Lacs ( Including Deptt Supply ) . Submission Date for this Tender is 01-10-2020. Canal Construction Tenders in Budgam Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

25506099
Construction Of Lining Wall And Two Tractor Crossings On Humri Canal Near Crpf Camp Magam . Amount Of Work . 10 . 85 Lacs ( Including Deptt Supply )
Open Tender
Indian
Jammu And Kashmir
Budgam
01-10-2020

Tender Details

Construction Of Lining Wall And Two Tractor Crossings On Humri Canal Near Crpf Camp Magam . Amount Of Work . 10 . 85 Lacs ( Including Deptt Supply )

Key Value

Document Fees
INR 1200 /-
EMD
INR 21700.0 /-
Tender Value
INR 10.85 Lakhs /-

BOQ Items

Name of Work: Construction of Lining wall and two tractor crossihngs on Humri canal near CRPF camp Magam. Amount of work. 10.85lacs (Including deptt supply) Amount of work.26.46 lacs (Including deptt supply)
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Earth work in bulk excavation by manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.\nAll kinds of soil : BI01010001010000000000000515BI0100001113 116.7 cum
2 2 Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by\nEngineer-in-Charge.\nAll kinds of soil : BI01010001010000000000000515BI0100001114 116.7 cum
3 3 Dumping or filling stone or spalls on level hand packed excluding cost of stones Boulders. BI01010001010000000000000515BI0100001115 43.35 cum
4 4 Supply of stone boulders BI01010001010000000000000515BI0100001116 43.35 cum
5 5 Providing and laying in position cement concrete of specified grade including curing but\nexcluding the cost of centring and shuttering. All work upto plinth level with:\na)1:3:6 (1 cement : 3 coarse sand: 6 graded stone agg.20mm nominal size ) . BI01010001010000000000000515BI0100001117 94.5 cum
6 6 Providing and laying in position specified grade of reinforced cement concrete including\ncuring but excluding the cost of centering, shuttering, finishing and reinforcement. All\nworks upto plinth level\na) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) BI01010001010000000000000515BI0100001118 3.67 cum
7 7 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in\nposition and binding all complete upto plinth level\na) Mild steel and medium tensile steel bars BI01010001010000000000000515BI0100001119 427.86 cum
8 8 Centering and shuttering including strutting, propping etc. and removal of form for:\na)Walls (any thickness) including attached pilasters, buttresses, plinth and\nstring courses etc.. BI01010001010000000000000515BI0100001120 420 sqm
9 8.1 b) Suspended floors, roofs, landings, balconies and access platforms. BI01010001010000000000000515BI0100001121 14.77 sqm
10 8.2 c) Weather shades, chajjas, corbels etc. including edges. BI01010001010000000000000515BI0100001122 6.85 sqm
11 9 12mm Cement plaster of mix:\na) 1 : 4 ( 1 cement : 4 fine sand) BI01010001010000000000000515BI0100001123 252 sqm
12 10 Filling with available fly ash and earth (excluding rock) in trenches or embankment inlayers (each layer should not exceed 15 cm), with intermediate layer of compactedearth (Soil density of 98%) after every four layers of compacted depth of fly ash, sides& top layer of filling shall be done with earth having total minimum compactedthickness 30 cm or as decided by Engineer -in-charge, including compacting each layer by rolling/ ramming and watering, all complete as per drawing and direction ofEngineer -in - charge. BI01010001010000000000000515BI0100001124 70.02 cum
13 11 Carriage of Materials upto road site of work by Mechanical transport including cost of loading unloading and stacking \n a)20mm agg from kunzar Av. 10 Km BI01010001010000000000000515BI0100001125 88.31 cum
14 11.1 b) sand from Shilvat av. 40km. BI01010001010000000000000515BI0100001126 49.48 cum
15 11.2 c) cement/steel from division store av. 30km BI01010001010000000000000515BI0100001127 22.32 MT
16 11.3 d)Stone /Nallah Boulders from Kunzar Av. 10 km BI01010001010000000000000515BI0100001128 43.35 cum
17 12 Extra Carriage of Materials from road site to site of work by Mannual laboour/ponies including cost of loading unloading and stacking av. 200mtrs. . a)20mm agg BI01010001010000000000000515BI0100001129 88.31 cum
18 12.1 b) sand BI01010001010000000000000515BI0100001130 49.48 cum
19 12.2 c) cement BI01010001010000000000000515BI0100001131 21.9 cum
20 12.3 d) steel BI01010001010000000000000515BI0100001132 0.43 MT
21 12.4 e)Stone/Nallah Boulders BI01010001010000000000000515BI0100001133 43.35 cum
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail