Construction Of Check Dams / Anicuts Across Musi River (6 Nos.) In Suryapet Mandal, (6 Nos.) In Penpahad Mandal & (7 Nos.) Across Palair Vagu In Athmakur(S) Mandal, Suryapet District., SURYAPET-Telangana

Irrigation And Cad Department has published Construction Of Check Dams / Anicuts Across Musi River (6 Nos.) In Suryapet Mandal, (6 Nos.) In Penpahad Mandal & (7 Nos.) Across Palair Vagu In Athmakur(S) Mandal, Suryapet District.. Submission Date for this Tender is 28-09-2020. Check Dam Tenders in SURYAPET Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

25417503
Construction Of Check Dams / Anicuts Across Musi River (6 Nos.) In Suryapet Mandal, (6 Nos.) In Penpahad Mandal & (7 Nos.) Across Palair Vagu In Athmakur(S) Mandal, Suryapet District.
Open Tender
Indian
Telangana
SURYAPET
28-09-2020

Tender Details

Construction Of Check Dams / Anicuts Across Musi River ( 6 Nos. ) In Suryapet Mandal, ( 6 Nos. ) In Penpahad Mandal & ( 7 Nos. ) Across Palair Vagu In Athmakur ( S ) Mandal, Suryapet District.

Key Value

Document Fees
Refer document
EMD
INR 10041800.0 /-
Tender Value
INR 100.41 Crore /-

BOQ Items

S.No Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)
1 19.Construction of Check Dam Anicut across Palair Vagu at Gangamma Ene Kinda, Makthakothagudem(V) Special Specification 318.00 Each 961.80 305852.00
Providing and fixing 25 mm dia 3 m long cold twisted deformed steel dowel bars with one end driven into 45 to 50 mm diameter 1.50 m deep hole drilled in bed rock and other end provided with L-bend for embedding in concrete / masonry of over flow / non-over flow blocks and other appertenant works including cost of drilling and cleaning hole, filling hole with cement mortar 1 : 1 proportion, driving anchor rod, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
2 19.Construction of Check Dam Anicut across Palair Vagu at Gangamma Ene Kinda, Makthakothagudem(V) SS 9.8 & Special Specification 1188.60 Rmt 430.70 511930.00
Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
3 19.Construction of Check Dam Anicut across Palair Vagu at Gangamma Ene Kinda, Makthakothagudem(V) APSS No. 201, 303 & SS 3.2 22353.00 Cum 153.60 3433421.00
Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
4 19.Construction of Check Dam Anicut across Palair Vagu at Gangamma Ene Kinda, Makthakothagudem(V) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 2160.00 Cum 58.90 127224.00
Excavation in all kinds of soil including boulders upto 0.30 m dia for field channels, seating of embankment for field channels etc., including dressing of bed and sides to required profile, cost of all materials, machinery, labour, placing the excavated stuff for formation of service road / embankment etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
5 19.Construction of Check Dam Anicut across Palair Vagu at Gangamma Ene Kinda, Makthakothagudem(V) APSS No. 106, 619 & SS 9.2 2790.00 Sqm 425.10 1186029.00
Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing (with no pin headers)( rubble stones : 0.33 cum/sqm) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
6 19.Construction of Check Dam Anicut across Palair Vagu at Gangamma Ene Kinda, Makthakothagudem(V) Special Specification 42.00 Rmt 682.10 28648.00
Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
7 19.Construction of Check Dam Anicut across Palair Vagu at Gangamma Ene Kinda, Makthakothagudem(V) APSS No. 402 & SS 4 of PS to APSS 210.60 Cum 5304.60 1117149.00
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
8 19.Construction of Check Dam Anicut across Palair Vagu at Gangamma Ene Kinda, Makthakothagudem(V) APSS No. 402 & SS 4 of PS to APSS 1528.80 Cum 5694.50 8705752.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
9 19.Construction of Check Dam Anicut across Palair Vagu at Gangamma Ene Kinda, Makthakothagudem(V) APSS No. 402 & SS 4 of PS to APSS 991.70 Cum 5146.80 5104082.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum) for plain concrete works etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
10 19.Construction of Check Dam Anicut across Palair Vagu at Gangamma Ene Kinda, Makthakothagudem(V) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 1565.60 Cum 267.90 419424.00
Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
11 19.Construction of Check Dam Anicut across Palair Vagu at Gangamma Ene Kinda, Makthakothagudem(V) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 28865.00 Cum 102.70 2964436.00
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
12 19.Construction of Check Dam Anicut across Palair Vagu at Gangamma Ene Kinda, Makthakothagudem(V) APSS No. 201 of PS to APSS 934.00 Each 18.50 17279.00
Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and including burning or disposing off the materials etc., complete for the finished item of work as directed by the Engineer-in-Charge.
13 19.Construction of Check Dam Anicut across Palair Vagu at Gangamma Ene Kinda, Makthakothagudem(V) APSS No. 201 of PS to APSS 37350.00 Sqm 2.90 108315.00
Clearing thick jungle growth ( less than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same etc., complete for the finished item of work as directed by the Engineer-in-Charge.
14 18.Construction of Check Dam Anicut across Palair Vagu near Kothagudem to Mujahidpurambata, Special Specification 195.00 Each 961.80 187551.00
Providing and fixing 25 mm dia 3 m long cold twisted deformed steel dowel bars with one end driven into 45 to 50 mm diameter 1.50 m deep hole drilled in bed rock and other end provided with L-bend for embedding in concrete / masonry of over flow / non-over flow blocks and other appertenant works including cost of drilling and cleaning hole, filling hole with cement mortar 1 : 1 proportion, driving anchor rod, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
15 18.Construction of Check Dam Anicut across Palair Vagu near Kothagudem to Mujahidpurambata, SS 9.8 & Special Specification 1356.60 Rmt 430.80 584423.00
Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
16 18.Construction of Check Dam Anicut across Palair Vagu near Kothagudem to Mujahidpurambata, APSS No. 201, 303 & SS 3.2 15684.00 Cum 153.60 2409062.00
Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
17 18.Construction of Check Dam Anicut across Palair Vagu near Kothagudem to Mujahidpurambata, APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 1080.00 Cum 58.90 63612.00
Excavation in all kinds of soil including boulders upto 0.30 m dia for field channels, seating of embankment for field channels etc., including dressing of bed and sides to required profile, cost of all materials, machinery, labour, placing the excavated stuff for formation of service road / embankment etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
18 18.Construction of Check Dam Anicut across Palair Vagu near Kothagudem to Mujahidpurambata, APSS No. 106, 619 & SS 9.2 2157.00 Sqm 425.10 916941.00
Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing (with no pin headers)( rubble stones : 0.33 cum/sqm) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
19 18.Construction of Check Dam Anicut across Palair Vagu near Kothagudem to Mujahidpurambata, Special Specification 66.00 Rmt 682.10 45019.00
Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
20 18.Construction of Check Dam Anicut across Palair Vagu near Kothagudem to Mujahidpurambata, APSS No. 402 & SS 4 of PS to APSS 284.40 Cum 5310.80 1510392.00
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
21 18.Construction of Check Dam Anicut across Palair Vagu near Kothagudem to Mujahidpurambata, APSS No. 402 & SS 4 of PS to APSS 1118.00 Cum 5700.00 6372600.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
22 18.Construction of Check Dam Anicut across Palair Vagu near Kothagudem to Mujahidpurambata, APSS No. 402 & SS 4 of PS to APSS 2060.90 Cum 5152.30 10618375.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum) for plain concrete works etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
23 18.Construction of Check Dam Anicut across Palair Vagu near Kothagudem to Mujahidpurambata, APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 270.00 Cum 267.90 72333.00
Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
24 18.Construction of Check Dam Anicut across Palair Vagu near Kothagudem to Mujahidpurambata, APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 14692.80 Cum 102.70 1508951.00
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
25 18.Construction of Check Dam Anicut across Palair Vagu near Kothagudem to Mujahidpurambata, APSS No. 201 of PS to APSS 933.00 Each 18.50 17261.00
Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and including burning or disposing off the materials etc., complete for the finished item of work as directed by the Engineer-in-Charge.
26 18.Construction of Check Dam Anicut across Palair Vagu near Kothagudem to Mujahidpurambata, APSS No. 201 of PS to APSS 14000.00 Sqm 2.90 40600.00
Clearing thick jungle growth ( less than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same etc., complete for the finished item of work as directed by the Engineer-in-Charge.
27 17.Construction of Check Dam Anicut across Palair Vagu at Gangamma temple, Midtanapally (V), Special Specification 195.00 Each 961.80 187551.00
Providing and fixing 25 mm dia 3 m long cold twisted deformed steel dowel bars with one end driven into 45 to 50 mm diameter 1.50 m deep hole drilled in bed rock and other end provided with L-bend for embedding in concrete / masonry of over flow / non-over flow blocks and other appertenant works including cost of drilling and cleaning hole, filling hole with cement mortar 1 : 1 proportion, driving anchor rod, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
28 17.Construction of Check Dam Anicut across Palair Vagu at Gangamma temple, Midtanapally (V), SS 9.8 & Special Specification 1356.60 Rmt 430.70 584288.00
Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
29 17.Construction of Check Dam Anicut across Palair Vagu at Gangamma temple, Midtanapally (V), APSS No. 201, 303 & SS 3.2 16576.00 Cum 153.60 2546074.00
Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
30 17.Construction of Check Dam Anicut across Palair Vagu at Gangamma temple, Midtanapally (V), APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 1080.00 Cum 58.90 63612.00
Excavation in all kinds of soil including boulders upto 0.30 m dia for field channels, seating of embankment for field channels etc., including dressing of bed and sides to required profile, cost of all materials, machinery, labour, placing the excavated stuff for formation of service road / embankment etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
31 17.Construction of Check Dam Anicut across Palair Vagu at Gangamma temple, Midtanapally (V), APSS No. 106, 619 & SS 9.2 2157.00 Sqm 415.90 897096.00
Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing (with no pin headers)( rubble stones : 0.33 cum/sqm) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
32 17.Construction of Check Dam Anicut across Palair Vagu at Gangamma temple, Midtanapally (V), Special Specification 66.00 Rmt 682.10 45019.00
Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
33 17.Construction of Check Dam Anicut across Palair Vagu at Gangamma temple, Midtanapally (V), APSS No. 402 & SS 4 of PS to APSS 319.90 Cum 5282.30 1689808.00
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
34 17.Construction of Check Dam Anicut across Palair Vagu at Gangamma temple, Midtanapally (V), APSS No. 402 & SS 4 of PS to APSS 1464.30 Cum 5669.50 8301849.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
35 17.Construction of Check Dam Anicut across Palair Vagu at Gangamma temple, Midtanapally (V), APSS No. 402 & SS 4 of PS to APSS 2328.60 Cum 5121.80 11926623.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum) for plain concrete works etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
36 17.Construction of Check Dam Anicut across Palair Vagu at Gangamma temple, Midtanapally (V), APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 270.00 Cum 267.90 72333.00
Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
37 17.Construction of Check Dam Anicut across Palair Vagu at Gangamma temple, Midtanapally (V), APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 15672.00 Cum 102.70 1609514.00
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
38 17.Construction of Check Dam Anicut across Palair Vagu at Gangamma temple, Midtanapally (V), APSS No. 201 of PS to APSS 933.00 Each 18.50 17261.00
Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and including burning or disposing off the materials etc., complete for the finished item of work as directed by the Engineer-in-Charge.
39 17.Construction of Check Dam Anicut across Palair Vagu at Gangamma temple, Midtanapally (V), APSS No. 201 of PS to APSS 14000.00 Sqm 2.90 40600.00
Clearing thick jungle growth ( less than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same etc., complete for the finished item of work as directed by the Engineer-in-Charge.
40 16.Construction of Check Dam Anicut across Palair Vagu at Gundeboina Gangaiah Kolu (BopparamTanda to Special Specification 78.00 Each 961.80 75020.00
Providing and fixing 25 mm dia 3 m long cold twisted deformed steel dowel bars with one end driven into 45 to 50 mm diameter 1.50 m deep hole drilled in bed rock and other end provided with L-bend for embedding in concrete / masonry of over flow / non-over flow blocks and other appertenant works including cost of drilling and cleaning hole, filling hole with cement mortar 1 : 1 proportion, driving anchor rod, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
41 16.Construction of Check Dam Anicut across Palair Vagu at Gundeboina Gangaiah Kolu (BopparamTanda to SS 9.8 & Special Specification 1356.60 Rmt 430.80 584423.00
Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
42 16.Construction of Check Dam Anicut across Palair Vagu at Gundeboina Gangaiah Kolu (BopparamTanda to APSS No. 201, 303 & SS 3.2 13303.00 Cum 153.60 2043341.00
Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
43 16.Construction of Check Dam Anicut across Palair Vagu at Gundeboina Gangaiah Kolu (BopparamTanda to APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 1080.00 Cum 58.90 63612.00
Excavation in all kinds of soil including boulders upto 0.30 m dia for field channels, seating of embankment for field channels etc., including dressing of bed and sides to required profile, cost of all materials, machinery, labour, placing the excavated stuff for formation of service road / embankment etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
44 16.Construction of Check Dam Anicut across Palair Vagu at Gundeboina Gangaiah Kolu (BopparamTanda to APSS No. 106, 619 & SS 9.2 2285.00 Sqm 402.20 919027.00
Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing (with no pin headers)( rubble stones : 0.33 cum/sqm) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
45 16.Construction of Check Dam Anicut across Palair Vagu at Gundeboina Gangaiah Kolu (BopparamTanda to Special Specification 66.00 Rmt 682.10 45019.00
Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
46 16.Construction of Check Dam Anicut across Palair Vagu at Gundeboina Gangaiah Kolu (BopparamTanda to APSS No. 402 & SS 4 of PS to APSS 284.40 Cum 5255.20 1494579.00
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
47 16.Construction of Check Dam Anicut across Palair Vagu at Gundeboina Gangaiah Kolu (BopparamTanda to APSS No. 402 & SS 4 of PS to APSS 1290.40 Cum 5637.50 7274630.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
48 16.Construction of Check Dam Anicut across Palair Vagu at Gundeboina Gangaiah Kolu (BopparamTanda to APSS No. 402 & SS 4 of PS to APSS 2101.00 Cum 5089.80 10693670.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum) for plain concrete works etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
49 16.Construction of Check Dam Anicut across Palair Vagu at Gundeboina Gangaiah Kolu (BopparamTanda to APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 117.00 Cum 267.90 31344.00
Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
50 16.Construction of Check Dam Anicut across Palair Vagu at Gundeboina Gangaiah Kolu (BopparamTanda to APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 14568.00 Cum 102.70 1496134.00
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
51 16.Construction of Check Dam Anicut across Palair Vagu at Gundeboina Gangaiah Kolu (BopparamTanda to APSS No. 201 of PS to APSS 1140.00 Each 18.50 21090.00
Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and including burning or disposing off the materials etc., complete for the finished item of work as directed by the Engineer-in-Charge.
52 16.Construction of Check Dam Anicut across Palair Vagu at Gundeboina Gangaiah Kolu (BopparamTanda to APSS No. 201 of PS to APSS 17100.00 Sqm 2.90 49590.00
Clearing thick jungle growth ( less than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same etc., complete for the finished item of work as directed by the Engineer-in-Charge.
53 15.Construction of Check Dam Anicut across Palair Vagu near Bopparam to Lingampally Bata, Yerpur (V) Special Specification 195.00 Each 961.80 187551.00
Providing and fixing 25 mm dia 3 m long cold twisted deformed steel dowel bars with one end driven into 45 to 50 mm diameter 1.50 m deep hole drilled in bed rock and other end provided with L-bend for embedding in concrete / masonry of over flow / non-over flow blocks and other appertenant works including cost of drilling and cleaning hole, filling hole with cement mortar 1 : 1 proportion, driving anchor rod, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
54 15.Construction of Check Dam Anicut across Palair Vagu near Bopparam to Lingampally Bata, Yerpur (V) SS 9.8 & Special Specification 1356.60 Rmt 430.80 584423.00
Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
55 15.Construction of Check Dam Anicut across Palair Vagu near Bopparam to Lingampally Bata, Yerpur (V) APSS No. 201, 303 & SS 3.2 19850.00 Cum 153.60 3048960.00
Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
56 15.Construction of Check Dam Anicut across Palair Vagu near Bopparam to Lingampally Bata, Yerpur (V) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 1080.00 Cum 58.90 63612.00
Excavation in all kinds of soil including boulders upto 0.30 m dia for field channels, seating of embankment for field channels etc., including dressing of bed and sides to required profile, cost of all materials, machinery, labour, placing the excavated stuff for formation of service road / embankment etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
57 15.Construction of Check Dam Anicut across Palair Vagu near Bopparam to Lingampally Bata, Yerpur (V) APSS No. 106, 619 & SS 9.2 2157.00 Sqm 402.20 867545.00
Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing (with no pin headers)( rubble stones : 0.33 cum/sqm) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
58 15.Construction of Check Dam Anicut across Palair Vagu near Bopparam to Lingampally Bata, Yerpur (V) Special Specification 66.00 Rmt 682.10 45019.00
Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
59 15.Construction of Check Dam Anicut across Palair Vagu near Bopparam to Lingampally Bata, Yerpur (V) APSS No. 402 & SS 4 of PS to APSS 284.40 Cum 5255.20 1494579.00
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
60 15.Construction of Check Dam Anicut across Palair Vagu near Bopparam to Lingampally Bata, Yerpur (V) APSS No. 402 & SS 4 of PS to APSS 1281.20 Cum 5637.50 7222765.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
61 15.Construction of Check Dam Anicut across Palair Vagu near Bopparam to Lingampally Bata, Yerpur (V) APSS No. 402 & SS 4 of PS to APSS 2081.90 Cum 5089.80 10596455.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum) for plain concrete works etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
62 15.Construction of Check Dam Anicut across Palair Vagu near Bopparam to Lingampally Bata, Yerpur (V) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 270.00 Cum 267.90 72333.00
Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
63 15.Construction of Check Dam Anicut across Palair Vagu near Bopparam to Lingampally Bata, Yerpur (V) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 16244.30 Cum 102.70 1668290.00
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
64 15.Construction of Check Dam Anicut across Palair Vagu near Bopparam to Lingampally Bata, Yerpur (V) APSS No. 201 of PS to APSS 1083.00 Each 18.50 20036.00
Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and including burning or disposing off the materials etc., complete for the finished item of work as directed by the Engineer-in-Charge.
65 15.Construction of Check Dam Anicut across Palair Vagu near Bopparam to Lingampally Bata, Yerpur (V) APSS No. 201 of PS to APSS 16250.00 Sqm 2.90 47125.00
Clearing thick jungle growth ( less than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same etc., complete for the finished item of work as directed by the Engineer-in-Charge.
66 14.Construction of Check Dam Anicut across Palair Vagu at Chakali banda, Yerpur (V), Atmakur S(M) Special Specification 334.00 Each 958.40 320106.00
Providing and fixing 25 mm dia 3 m long cold twisted deformed steel dowel bars with one end driven into 45 to 50 mm diameter 1.50 m deep hole drilled in bed rock and other end provided with L-bend for embedding in concrete / masonry of over flow / non-over flow blocks and other appertenant works including cost of drilling and cleaning hole, filling hole with cement mortar 1 : 1 proportion, driving anchor rod, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
67 14.Construction of Check Dam Anicut across Palair Vagu at Chakali banda, Yerpur (V), Atmakur S(M) SS 9.8 & Special Specification 1297.80 Rmt 430.80 559092.00
Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
68 14.Construction of Check Dam Anicut across Palair Vagu at Chakali banda, Yerpur (V), Atmakur S(M) APSS No. 201, 303 & SS 3.2 28331.70 Cum 153.60 4351749.00
Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
69 14.Construction of Check Dam Anicut across Palair Vagu at Chakali banda, Yerpur (V), Atmakur S(M) APSS No. 106, 619 & SS 9.2 2505.00 Sqm 383.80 961419.00
Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing (with no pin headers)( rubble stones : 0.33 cum/sqm) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
70 14.Construction of Check Dam Anicut across Palair Vagu at Chakali banda, Yerpur (V), Atmakur S(M) Special Specification 42.00 Rmt 682.10 28648.00
Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
71 14.Construction of Check Dam Anicut across Palair Vagu at Chakali banda, Yerpur (V), Atmakur S(M) APSS No. 402 & SS 4 of PS to APSS 195.60 Cum 5217.00 1020445.00
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
72 14.Construction of Check Dam Anicut across Palair Vagu at Chakali banda, Yerpur (V), Atmakur S(M) APSS No. 402 & SS 4 of PS to APSS 1503.74 Cum 5593.50 8411170.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
73 14.Construction of Check Dam Anicut across Palair Vagu at Chakali banda, Yerpur (V), Atmakur S(M) APSS No. 402 & SS 4 of PS to APSS 914.18 Cum 5045.30 4612312.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum) for plain concrete works etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
74 14.Construction of Check Dam Anicut across Palair Vagu at Chakali banda, Yerpur (V), Atmakur S(M) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 2386.28 Cum 267.90 639284.00
Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
75 14.Construction of Check Dam Anicut across Palair Vagu at Chakali banda, Yerpur (V), Atmakur S(M) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 24051.07 Cum 102.70 2470045.00
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
76 14.Construction of Check Dam Anicut across Palair Vagu at Chakali banda, Yerpur (V), Atmakur S(M) APSS No. 201 of PS to APSS 36000.00 Sqm 2.90 104400.00
Clearing thick jungle growth ( less than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same etc., complete for the finished item of work as directed by the Engineer-in-Charge.
77 13.Construction of Check Dam Anicut across Palair Vagu near Yepur to Nuthanakal Bata, Yerpur (V), Special Specification 358.00 Each 961.90 344360.00
Providing and fixing 25 mm dia 3 m long cold twisted deformed steel dowel bars with one end driven into 45 to 50 mm diameter 1.50 m deep hole drilled in bed rock and other end provided with L-bend for embedding in concrete / masonry of over flow / non-over flow blocks and other appertenant works including cost of drilling and cleaning hole, filling hole with cement mortar 1 : 1 proportion, driving anchor rod, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
78 13.Construction of Check Dam Anicut across Palair Vagu near Yepur to Nuthanakal Bata, Yerpur (V), SS 9.8 & Special Specification 1297.80 Rmt 431.20 559611.00
Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
79 13.Construction of Check Dam Anicut across Palair Vagu near Yepur to Nuthanakal Bata, Yerpur (V), APSS No. 201, 303 & SS 3.2 28780.20 Cum 153.60 4420639.00
Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
80 13.Construction of Check Dam Anicut across Palair Vagu near Yepur to Nuthanakal Bata, Yerpur (V), APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 1620.00 Cum 58.90 95418.00
Excavation in all kinds of soil including boulders upto 0.30 m dia for field channels, seating of embankment for field channels etc., including dressing of bed and sides to required profile, cost of all materials, machinery, labour, placing the excavated stuff for formation of service road / embankment etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
81 13.Construction of Check Dam Anicut across Palair Vagu near Yepur to Nuthanakal Bata, Yerpur (V), APSS No. 106, 619 & SS 9.2 3000.00 Sqm 388.40 1165200.00
Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing (with no pin headers)( rubble stones : 0.33 cum/sqm) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
82 13.Construction of Check Dam Anicut across Palair Vagu near Yepur to Nuthanakal Bata, Yerpur (V), Special Specification 42.00 Rmt 682.10 28648.00
Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
83 13.Construction of Check Dam Anicut across Palair Vagu near Yepur to Nuthanakal Bata, Yerpur (V), APSS No. 402 & SS 4 of PS to APSS 163.80 Cum 5240.60 858410.00
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
84 13.Construction of Check Dam Anicut across Palair Vagu near Yepur to Nuthanakal Bata, Yerpur (V), APSS No. 402 & SS 4 of PS to APSS 1020.30 Cum 5616.60 5730617.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
85 13.Construction of Check Dam Anicut across Palair Vagu near Yepur to Nuthanakal Bata, Yerpur (V), APSS No. 402 & SS 4 of PS to APSS 788.00 Cum 5068.90 3994293.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum) for plain concrete works etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
86 13.Construction of Check Dam Anicut across Palair Vagu near Yepur to Nuthanakal Bata, Yerpur (V), APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 1952.80 Cum 267.90 523155.00
Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
87 13.Construction of Check Dam Anicut across Palair Vagu near Yepur to Nuthanakal Bata, Yerpur (V), APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 38424.00 Cum 102.70 3946145.00
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
88 13.Construction of Check Dam Anicut across Palair Vagu near Yepur to Nuthanakal Bata, Yerpur (V), APSS No. 201 of PS to APSS 881.00 Each 18.50 16299.00
Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and including burning or disposing off the materials etc., complete for the finished item of work as directed by the Engineer-in-Charge.
89 13.Construction of Check Dam Anicut across Palair Vagu near Yepur to Nuthanakal Bata, Yerpur (V), APSS No. 201 of PS to APSS 35250.00 Sqm 2.90 102225.00
Clearing thick jungle growth ( less than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same etc., complete for the finished item of work as directed by the Engineer-in-Charge.
90 12.Construction of Check Dam Anicut across Musi River near Chenu Mohan Reddy field, Dosapahad (V) APSS No. 106, 619 & SS 9.2 3594.00 Sqm 315.50 1133907.00
Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing (with no pin headers)( rubble stones : 0.33 cum/sqm) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
91 12.Construction of Check Dam Anicut across Musi River near Chenu Mohan Reddy field, Dosapahad (V) APSS No. 201, 303 & SS 3.2 12635.00 Cum 241.30 3048826.00
Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
92 12.Construction of Check Dam Anicut across Musi River near Chenu Mohan Reddy field, Dosapahad (V) APSS No. 402 18450.00 Kg 63.90 1178955.00
Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
93 12.Construction of Check Dam Anicut across Musi River near Chenu Mohan Reddy field, Dosapahad (V) Special Specification 244.15 Rmt 2220.80 542208.00
Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
94 12.Construction of Check Dam Anicut across Musi River near Chenu Mohan Reddy field, Dosapahad (V) SS 9.8 & Special Specification 1188.60 Rmt 414.20 492318.00
Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
95 12.Construction of Check Dam Anicut across Musi River near Chenu Mohan Reddy field, Dosapahad (V) APSS No. 402 & SS 4 of PS to APSS 1248.30 Cum 5200.60 6491909.00
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
96 12.Construction of Check Dam Anicut across Musi River near Chenu Mohan Reddy field, Dosapahad (V) APSS No. 402 & SS 4 of PS to APSS 4900.89 Cum 5585.20 27372451.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
97 12.Construction of Check Dam Anicut across Musi River near Chenu Mohan Reddy field, Dosapahad (V) APSS No. 402 & SS 4 of PS to APSS 4693.83 Cum 4998.40 23461640.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum) for plain concrete works etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
98 12.Construction of Check Dam Anicut across Musi River near Chenu Mohan Reddy field, Dosapahad (V) Special Specification 1398.00 Rmt 205.30 287009.00
Drilling 45 to 50 mm dia holes vertical or inclined upto 10 degrees to vertical in rock /masonry / concrete by percussion drilling using waggon drill or any other suitable equipment including cost of all materials, machinery, labour, redrilling through partially set grout wherever required etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
99 12.Construction of Check Dam Anicut across Musi River near Chenu Mohan Reddy field, Dosapahad (V) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 2246.11 Cum 262.10 588705.00
Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
100 12.Construction of Check Dam Anicut across Musi River near Chenu Mohan Reddy field, Dosapahad (V) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 16101.42 Cum 101.30 1631074.00
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
101 12.Construction of Check Dam Anicut across Musi River near Chenu Mohan Reddy field, Dosapahad (V) APSS No. 201 of PS to APSS 3690.00 Each 17.70 65313.00
Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and including burning or disposing off the materials etc., complete for the finished item of work as directed by the Engineer-in-Charge.
102 12.Construction of Check Dam Anicut across Musi River near Chenu Mohan Reddy field, Dosapahad (V) APSS No. 201 of PS to APSS 73800.00 Sqm 1.80 132840.00
Clearing thick jungle growth ( more than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same etc., complete for the finished item of work as directed by the Engineer-in-Charge.
103 11.Construction of Check Dam Anicut across Musi River near Pandiri Durgaiah field, Dosapahad (V), APSS No. 106, 619 & SS 9.2 3594.00 Sqm 315.50 1133907.00
Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing (with no pin headers)( rubble stones : 0.33 cum/sqm) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
104 11.Construction of Check Dam Anicut across Musi River near Pandiri Durgaiah field, Dosapahad (V), APSS No. 201, 303 & SS 3.2 15200.50 Cum 213.90 3251387.00
Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
105 11.Construction of Check Dam Anicut across Musi River near Pandiri Durgaiah field, Dosapahad (V), APSS No. 402 17500.00 Kg 63.90 1118250.00
Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
106 11.Construction of Check Dam Anicut across Musi River near Pandiri Durgaiah field, Dosapahad (V), Special Specification 244.15 Rmt 2220.80 542208.00
Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
107 11.Construction of Check Dam Anicut across Musi River near Pandiri Durgaiah field, Dosapahad (V), SS 9.8 & Special Specification 1188.60 Rmt 414.80 493031.00
Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
108 11.Construction of Check Dam Anicut across Musi River near Pandiri Durgaiah field, Dosapahad (V), APSS No. 402 & SS 4 of PS to APSS 1096.20 Cum 5200.70 5701007.00
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
109 11.Construction of Check Dam Anicut across Musi River near Pandiri Durgaiah field, Dosapahad (V), APSS No. 402 & SS 4 of PS to APSS 4888.17 Cum 5585.20 27301407.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
110 11.Construction of Check Dam Anicut across Musi River near Pandiri Durgaiah field, Dosapahad (V), APSS No. 402 & SS 4 of PS to APSS 4126.59 Cum 4997.90 20624284.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum) for plain concrete works etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
111 11.Construction of Check Dam Anicut across Musi River near Pandiri Durgaiah field, Dosapahad (V), Special Specification 1278.00 Rmt 205.30 262373.00
Drilling 45 to 50 mm dia holes vertical or inclined upto 10 degrees to vertical in rock /masonry / concrete by percussion drilling using waggon drill or any other suitable equipment including cost of all materials, machinery, labour, redrilling through partially set grout wherever required etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
112 11.Construction of Check Dam Anicut across Musi River near Pandiri Durgaiah field, Dosapahad (V), APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 10291.19 Cum 262.10 2697321.00
Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
113 11.Construction of Check Dam Anicut across Musi River near Pandiri Durgaiah field, Dosapahad (V), APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 36695.61 Cum 101.30 3717265.00
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
114 11.Construction of Check Dam Anicut across Musi River near Pandiri Durgaiah field, Dosapahad (V), APSS No. 201 of PS to APSS 4655.00 Each 17.70 82394.00
Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and including burning or disposing off the materials etc., complete for the finished item of work as directed by the Engineer-in-Charge.
115 11.Construction of Check Dam Anicut across Musi River near Pandiri Durgaiah field, Dosapahad (V), APSS No. 201 of PS to APSS 93100.00 Sqm 1.80 167580.00
Clearing thick jungle growth ( more than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same etc., complete for the finished item of work as directed by the Engineer-in-Charge.
116 10.Construction of Check Dam Anicut across Musi River near Konda Nagamma field, Narayanagudem (V) APSS No. 106, 619 & SS 9.2 3594.00 Sqm 315.50 1133907.00
Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing (with no pin headers)( rubble stones : 0.33 cum/sqm) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
117 10.Construction of Check Dam Anicut across Musi River near Konda Nagamma field, Narayanagudem (V) APSS No. 201, 303 & SS 3.2 17476.70 Cum 184.20 3219208.00
Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
118 10.Construction of Check Dam Anicut across Musi River near Konda Nagamma field, Narayanagudem (V) APSS No. 402 19000.00 Kg 63.90 1214100.00
Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
119 10.Construction of Check Dam Anicut across Musi River near Konda Nagamma field, Narayanagudem (V) Special Specification 244.15 Rmt 2220.80 542208.00
Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
120 10.Construction of Check Dam Anicut across Musi River near Konda Nagamma field, Narayanagudem (V) SS 9.8 & Special Specification 1188.60 Rmt 415.80 494220.00
Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
121 10.Construction of Check Dam Anicut across Musi River near Konda Nagamma field, Narayanagudem (V) APSS No. 402 & SS 4 of PS to APSS 1267.20 Cum 5200.60 6590200.00
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
122 10.Construction of Check Dam Anicut across Musi River near Konda Nagamma field, Narayanagudem (V) APSS No. 402 & SS 4 of PS to APSS 5154.37 Cum 5585.20 28788187.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
123 10.Construction of Check Dam Anicut across Musi River near Konda Nagamma field, Narayanagudem (V) APSS No. 402 & SS 4 of PS to APSS 4608.47 Cum 4998.40 23034976.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum) for plain concrete works etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
124 10.Construction of Check Dam Anicut across Musi River near Konda Nagamma field, Narayanagudem (V) Special Specification 1438.00 Rmt 205.30 295221.00
Drilling 45 to 50 mm dia holes vertical or inclined upto 10 degrees to vertical in rock /masonry / concrete by percussion drilling using waggon drill or any other suitable equipment including cost of all materials, machinery, labour, redrilling through partially set grout wherever required etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
125 10.Construction of Check Dam Anicut across Musi River near Konda Nagamma field, Narayanagudem (V) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 4911.04 Cum 262.10 1287184.00
Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
126 10.Construction of Check Dam Anicut across Musi River near Konda Nagamma field, Narayanagudem (V) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 68140.00 Cum 101.30 6902582.00
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
127 10.Construction of Check Dam Anicut across Musi River near Konda Nagamma field, Narayanagudem (V) APSS No. 201 of PS to APSS 5318.00 Each 17.70 94129.00
Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and including burning or disposing off the materials etc., complete for the finished item of work as directed by the Engineer-in-Charge.
128 10.Construction of Check Dam Anicut across Musi River near Konda Nagamma field, Narayanagudem (V) APSS No. 201 of PS to APSS 106350.00 Sqm 1.80 191430.00
Clearing thick jungle growth ( more than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same etc., complete for the finished item of work as directed by the Engineer-in-Charge.
129 9.Construction of CheckDam Anicut across Musi River near Parisaboina Narayana field, Narayanagudem(V APSS No. 106, 619 & SS 9.2 3594.00 Sqm 315.50 1133907.00
Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing (with no pin headers)( rubble stones : 0.33 cum/sqm) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
130 9.Construction of CheckDam Anicut across Musi River near Parisaboina Narayana field, Narayanagudem(V APSS No. 201, 303 & SS 3.2 14950.50 Cum 241.30 3607556.00
Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
131 9.Construction of CheckDam Anicut across Musi River near Parisaboina Narayana field, Narayanagudem(V APSS No. 402 17980.00 Kg 63.90 1148922.00
Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
132 9.Construction of CheckDam Anicut across Musi River near Parisaboina Narayana field, Narayanagudem(V Special Specification 244.15 Rmt 2220.80 542208.00
Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
133 9.Construction of CheckDam Anicut across Musi River near Parisaboina Narayana field, Narayanagudem(V SS 9.8 & Special Specification 1188.60 Rmt 416.50 495052.00
Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
134 9.Construction of CheckDam Anicut across Musi River near Parisaboina Narayana field, Narayanagudem(V APSS No. 402 & SS 4 of PS to APSS 1207.20 Cum 5211.60 6291444.00
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
135 9.Construction of CheckDam Anicut across Musi River near Parisaboina Narayana field, Narayanagudem(V APSS No. 402 & SS 4 of PS to APSS 4957.55 Cum 5597.60 27750382.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
136 9.Construction of CheckDam Anicut across Musi River near Parisaboina Narayana field, Narayanagudem(V APSS No. 402 & SS 4 of PS to APSS 4460.46 Cum 5010.70 22350027.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum) for plain concrete works etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
137 9.Construction of CheckDam Anicut across Musi River near Parisaboina Narayana field, Narayanagudem(V Special Specification 1358.00 Rmt 205.30 278797.00
Drilling 45 to 50 mm dia holes vertical or inclined upto 10 degrees to vertical in rock /masonry / concrete by percussion drilling using waggon drill or any other suitable equipment including cost of all materials, machinery, labour, redrilling through partially set grout wherever required etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
138 9.Construction of CheckDam Anicut across Musi River near Parisaboina Narayana field, Narayanagudem(V APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 12458.20 Cum 262.10 3265294.00
Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
139 9.Construction of CheckDam Anicut across Musi River near Parisaboina Narayana field, Narayanagudem(V APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 29765.55 Cum 101.30 3015250.00
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
140 9.Construction of CheckDam Anicut across Musi River near Parisaboina Narayana field, Narayanagudem(V APSS No. 201 of PS to APSS 4985.00 Each 17.70 88235.00
Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and including burning or disposing off the materials etc., complete for the finished item of work as directed by the Engineer-in-Charge.
141 9.Construction of CheckDam Anicut across Musi River near Parisaboina Narayana field, Narayanagudem(V APSS No. 201 of PS to APSS 99700.00 Sqm 1.80 179460.00
Clearing thick jungle growth ( more than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same etc., complete for the finished item of work as directed by the Engineer-in-Charge.
142 8.Construction of Check Dam Anicut across Musi River near Meroni Dubba, Annajipuram(V), Penphad (M) APSS No. 106, 619 & SS 9.2 3594.00 Sqm 315.50 1133907.00
Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing (with no pin headers)( rubble stones : 0.33 cum/sqm) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
143 8.Construction of Check Dam Anicut across Musi River near Meroni Dubba, Annajipuram(V), Penphad (M) APSS No. 201, 303 & SS 3.2 13870.50 Cum 213.90 2966900.00
Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
144 8.Construction of Check Dam Anicut across Musi River near Meroni Dubba, Annajipuram(V), Penphad (M) APSS No. 402 17980.00 Kg 63.90 1148922.00
Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
145 8.Construction of Check Dam Anicut across Musi River near Meroni Dubba, Annajipuram(V), Penphad (M) Special Specification 244.15 Rmt 2220.80 542208.00
Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
146 8.Construction of Check Dam Anicut across Musi River near Meroni Dubba, Annajipuram(V), Penphad (M) SS 9.8 & Special Specification 1188.60 Rmt 412.40 490179.00
Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
147 8.Construction of Check Dam Anicut across Musi River near Meroni Dubba, Annajipuram(V), Penphad (M) APSS No. 402 & SS 4 of PS to APSS 1304.40 Cum 5178.70 6755096.00
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
148 8.Construction of Check Dam Anicut across Musi River near Meroni Dubba, Annajipuram(V), Penphad (M) APSS No. 402 & SS 4 of PS to APSS 5371.71 Cum 5560.60 29869931.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
149 8.Construction of Check Dam Anicut across Musi River near Meroni Dubba, Annajipuram(V), Penphad (M) APSS No. 402 & SS 4 of PS to APSS 4541.00 Cum 4973.22 22583392.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum) for plain concrete works etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
150 8.Construction of Check Dam Anicut across Musi River near Meroni Dubba, Annajipuram(V), Penphad (M) Special Specification 1358.00 Rmt 205.30 278797.00
Drilling 45 to 50 mm dia holes vertical or inclined upto 10 degrees to vertical in rock /masonry / concrete by percussion drilling using waggon drill or any other suitable equipment including cost of all materials, machinery, labour, redrilling through partially set grout wherever required etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
151 8.Construction of Check Dam Anicut across Musi River near Meroni Dubba, Annajipuram(V), Penphad (M) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 4726.85 Cum 262.10 1238907.00
Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
152 8.Construction of Check Dam Anicut across Musi River near Meroni Dubba, Annajipuram(V), Penphad (M) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 14839.28 Cum 101.30 1503219.00
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
153 8.Construction of Check Dam Anicut across Musi River near Meroni Dubba, Annajipuram(V), Penphad (M) APSS No. 201 of PS to APSS 4605.00 Each 17.70 81509.00
Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and including burning or disposing off the materials etc., complete for the finished item of work as directed by the Engineer-in-Charge.
154 8.Construction of Check Dam Anicut across Musi River near Meroni Dubba, Annajipuram(V), Penphad (M) APSS No. 201 of PS to APSS 92100.00 Sqm 1.80 165780.00
Clearing thick jungle growth ( more than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same etc., complete for the finished item of work as directed by the Engineer-in-Charge.
155 7.Construction of Check Dam Anicut across Musi River near Gangammatemple, Annajipuram(V),Penpahad(M) APSS No. 106, 619 & SS 9.2 3594.00 Sqm 315.50 1133907.00
Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing (with no pin headers)( rubble stones : 0.33 cum/sqm) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
156 7.Construction of Check Dam Anicut across Musi River near Gangammatemple, Annajipuram(V),Penpahad(M) APSS No. 201, 303 & SS 3.2 24255.00 Cum 197.90 4800065.00
Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
157 7.Construction of Check Dam Anicut across Musi River near Gangammatemple, Annajipuram(V),Penpahad(M) APSS No. 402 18000.00 Kg 63.90 1150200.00
Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
158 7.Construction of Check Dam Anicut across Musi River near Gangammatemple, Annajipuram(V),Penpahad(M) Special Specification 244.15 Rmt 2220.80 542208.00
Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
159 7.Construction of Check Dam Anicut across Musi River near Gangammatemple, Annajipuram(V),Penpahad(M) SS 9.8 & Special Specification 1188.60 Rmt 412.40 490179.00
Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
160 7.Construction of Check Dam Anicut across Musi River near Gangammatemple, Annajipuram(V),Penpahad(M) APSS No. 402 & SS 4 of PS to APSS 1202.70 Cum 5178.70 6228422.00
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
161 7.Construction of Check Dam Anicut across Musi River near Gangammatemple, Annajipuram(V),Penpahad(M) APSS No. 402 & SS 4 of PS to APSS 5245.80 Cum 5560.60 29169795.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
162 7.Construction of Check Dam Anicut across Musi River near Gangammatemple, Annajipuram(V),Penpahad(M) APSS No. 402 & SS 4 of PS to APSS 4324.20 Cum 4973.70 21507274.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum) for plain concrete works etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
163 7.Construction of Check Dam Anicut across Musi River near Gangammatemple, Annajipuram(V),Penpahad(M) Special Specification 1358.00 Rmt 205.30 278797.00
Drilling 45 to 50 mm dia holes vertical or inclined upto 10 degrees to vertical in rock /masonry / concrete by percussion drilling using waggon drill or any other suitable equipment including cost of all materials, machinery, labour, redrilling through partially set grout wherever required etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
164 7.Construction of Check Dam Anicut across Musi River near Gangammatemple, Annajipuram(V),Penpahad(M) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 4056.40 Cum 262.10 1063182.00
Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
165 7.Construction of Check Dam Anicut across Musi River near Gangammatemple, Annajipuram(V),Penpahad(M) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 54914.60 Cum 101.30 5562849.00
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
166 7.Construction of Check Dam Anicut across Musi River near Gangammatemple, Annajipuram(V),Penpahad(M) APSS No. 201 of PS to APSS 5335.00 Each 17.70 94430.00
Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and including burning or disposing off the materials etc., complete for the finished item of work as directed by the Engineer-in-Charge.
167 7.Construction of Check Dam Anicut across Musi River near Gangammatemple, Annajipuram(V),Penpahad(M) APSS No. 201 of PS to APSS 106700.00 Sqm 1.80 192060.00
Clearing thick jungle growth ( more than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same etc., complete for the finished item of work as directed by the Engineer-in-Charge.
168 6.Construction of Check Dam Anicut across Musi River near Masid, Kasarabad(V), Suryapet(M)(D) APSS No. 106, 619 & SS 9.2 3594.00 Sqm 315.50 1133907.00
Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing (with no pin headers)( rubble stones : 0.33 cum/sqm) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
169 6.Construction of Check Dam Anicut across Musi River near Masid, Kasarabad(V), Suryapet(M)(D) APSS No. 201, 303 & SS 3.2 14479.50 Cum 241.30 3493903.00
Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
170 6.Construction of Check Dam Anicut across Musi River near Masid, Kasarabad(V), Suryapet(M)(D) APSS No. 402 18800.00 Kg 63.90 1201320.00
Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
171 6.Construction of Check Dam Anicut across Musi River near Masid, Kasarabad(V), Suryapet(M)(D) Special Specification 244.15 Rmt 2220.80 542208.00
Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
172 6.Construction of Check Dam Anicut across Musi River near Masid, Kasarabad(V), Suryapet(M)(D) SS 9.8 & Special Specification 1188.60 Rmt 407.90 484830.00
Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
173 6.Construction of Check Dam Anicut across Musi River near Masid, Kasarabad(V), Suryapet(M)(D) APSS No. 402 & SS 4 of PS to APSS 1304.25 Cum 5069.10 6611374.00
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
174 6.Construction of Check Dam Anicut across Musi River near Masid, Kasarabad(V), Suryapet(M)(D) APSS No. 402 & SS 4 of PS to APSS 5820.95 Cum 5437.30 31650251.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
175 6.Construction of Check Dam Anicut across Musi River near Masid, Kasarabad(V), Suryapet(M)(D) APSS No. 402 & SS 4 of PS to APSS 4532.95 Cum 4849.90 21984354.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum) for plain concrete works etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
176 6.Construction of Check Dam Anicut across Musi River near Masid, Kasarabad(V), Suryapet(M)(D) Special Specification 1398.00 Rmt 205.30 287009.00
Drilling 45 to 50 mm dia holes vertical or inclined upto 10 degrees to vertical in rock /masonry / concrete by percussion drilling using waggon drill or any other suitable equipment including cost of all materials, machinery, labour, redrilling through partially set grout wherever required etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
177 6.Construction of Check Dam Anicut across Musi River near Masid, Kasarabad(V), Suryapet(M)(D) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 727.39 Cum 262.10 190649.00
Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
178 6.Construction of Check Dam Anicut across Musi River near Masid, Kasarabad(V), Suryapet(M)(D) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 27883.34 Cum 101.30 2824582.00
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
179 6.Construction of Check Dam Anicut across Musi River near Masid, Kasarabad(V), Suryapet(M)(D) APSS No. 201 of PS to APSS 5033.00 Each 17.70 89084.00
Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and including burning or disposing off the materials etc., complete for the finished item of work as directed by the Engineer-in-Charge.
180 6.Construction of Check Dam Anicut across Musi River near Masid, Kasarabad(V), Suryapet(M)(D) APSS No. 201 of PS to APSS 100650.00 Sqm 1.80 181170.00
Clearing thick jungle growth ( more than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same etc., complete for the finished item of work as directed by the Engineer-in-Charge.
181 5.Construction of Check Dam Anicut across Musi River near Pasham Bonda, Kasarabad(V), Suryapet(M) APSS No. 106, 619 & SS 9.2 3594.00 Sqm 315.50 1133907.00
Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing (with no pin headers)( rubble stones : 0.33 cum/sqm) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
182 5.Construction of Check Dam Anicut across Musi River near Pasham Bonda, Kasarabad(V), Suryapet(M) APSS No. 201, 303 & SS 3.2 16819.50 Cum 241.30 4058545.00
Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
183 5.Construction of Check Dam Anicut across Musi River near Pasham Bonda, Kasarabad(V), Suryapet(M) APSS No. 402 16600.00 Kg 63.90 1060740.00
Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
184 5.Construction of Check Dam Anicut across Musi River near Pasham Bonda, Kasarabad(V), Suryapet(M) Special Specification 244.15 Rmt 2220.80 542208.00
Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
185 5.Construction of Check Dam Anicut across Musi River near Pasham Bonda, Kasarabad(V), Suryapet(M) SS 9.8 & Special Specification 1188.60 Rmt 407.90 484830.00
Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
186 5.Construction of Check Dam Anicut across Musi River near Pasham Bonda, Kasarabad(V), Suryapet(M) APSS No. 402 & SS 4 of PS to APSS 1080.96 Cum 5069.10 5479494.00
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
187 5.Construction of Check Dam Anicut across Musi River near Pasham Bonda, Kasarabad(V), Suryapet(M) APSS No. 402 & SS 4 of PS to APSS 4864.97 Cum 5437.30 26452301.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
188 5.Construction of Check Dam Anicut across Musi River near Pasham Bonda, Kasarabad(V), Suryapet(M) APSS No. 402 & SS 4 of PS to APSS 3938.42 Cum 4849.90 19100943.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum) for plain concrete works etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
189 5.Construction of Check Dam Anicut across Musi River near Pasham Bonda, Kasarabad(V), Suryapet(M) Special Specification 1198.00 Rmt 205.30 245949.00
Drilling 45 to 50 mm dia holes vertical or inclined upto 10 degrees to vertical in rock /masonry / concrete by percussion drilling using waggon drill or any other suitable equipment including cost of all materials, machinery, labour, redrilling through partially set grout wherever required etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
190 5.Construction of Check Dam Anicut across Musi River near Pasham Bonda, Kasarabad(V), Suryapet(M) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 4496.51 Cum 262.10 1178535.00
Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
191 5.Construction of Check Dam Anicut across Musi River near Pasham Bonda, Kasarabad(V), Suryapet(M) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 27964.00 Cum 101.30 2832753.00
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
192 5.Construction of Check Dam Anicut across Musi River near Pasham Bonda, Kasarabad(V), Suryapet(M) APSS No. 201 of PS to APSS 3990.00 Each 17.70 70623.00
Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and including burning or disposing off the materials etc., complete for the finished item of work as directed by the Engineer-in-Charge.
193 5.Construction of Check Dam Anicut across Musi River near Pasham Bonda, Kasarabad(V), Suryapet(M) APSS No. 201 of PS to APSS 79800.00 Sqm 1.80 143640.00
Clearing thick jungle growth ( more than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same etc., complete for the finished item of work as directed by the Engineer-in-Charge.
194 4.Construction of Check Dam Anicut across Musi River near Dubba, Rayanigudem (V), Suryapet (M)(D) APSS No. 106, 619 & SS 9.2 3730.00 Sqm 315.50 1176815.00
Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing (with no pin headers)( rubble stones : 0.33 cum/sqm) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
195 4.Construction of Check Dam Anicut across Musi River near Dubba, Rayanigudem (V), Suryapet (M)(D) APSS No. 201, 303 & SS 3.2 17552.04 Cum 241.30 4235307.00
Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
196 4.Construction of Check Dam Anicut across Musi River near Dubba, Rayanigudem (V), Suryapet (M)(D) APSS No. 402 17200.00 Kg 63.90 1099080.00
Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
197 4.Construction of Check Dam Anicut across Musi River near Dubba, Rayanigudem (V), Suryapet (M)(D) Special Specification 244.15 Rmt 2220.80 542208.00
Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
198 4.Construction of Check Dam Anicut across Musi River near Dubba, Rayanigudem (V), Suryapet (M)(D) SS 9.8 & Special Specification 1273.30 Rmt 404.80 515432.00
Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
199 4.Construction of Check Dam Anicut across Musi River near Dubba, Rayanigudem (V), Suryapet (M)(D) APSS No. 402 & SS 4 of PS to APSS 1119.60 Cum 5189.70 5810388.00
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
200 4.Construction of Check Dam Anicut across Musi River near Dubba, Rayanigudem (V), Suryapet (M)(D) APSS No. 402 & SS 4 of PS to APSS 4224.15 Cum 5572.90 23540766.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
201 4.Construction of Check Dam Anicut across Musi River near Dubba, Rayanigudem (V), Suryapet (M)(D) APSS No. 402 & SS 4 of PS to APSS 3849.00 Cum 4985.50 19189190.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum) for plain concrete works etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
202 4.Construction of Check Dam Anicut across Musi River near Dubba, Rayanigudem (V), Suryapet (M)(D) Special Specification 1246.00 Rmt 205.30 255804.00
Drilling 45 to 50 mm dia holes vertical or inclined upto 10 degrees to vertical in rock /masonry / concrete by percussion drilling using waggon drill or any other suitable equipment including cost of all materials, machinery, labour, redrilling through partially set grout wherever required etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
203 4.Construction of Check Dam Anicut across Musi River near Dubba, Rayanigudem (V), Suryapet (M)(D) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 13314.44 Cum 262.10 3489715.00
Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
204 4.Construction of Check Dam Anicut across Musi River near Dubba, Rayanigudem (V), Suryapet (M)(D) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 58343.78 Cum 101.30 5910225.00
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
205 4.Construction of Check Dam Anicut across Musi River near Dubba, Rayanigudem (V), Suryapet (M)(D) APSS No. 201 of PS to APSS 4095.00 Each 17.70 72482.00
Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and including burning or disposing off the materials etc., complete for the finished item of work as directed by the Engineer-in-Charge.
206 4.Construction of Check Dam Anicut across Musi River near Dubba, Rayanigudem (V), Suryapet (M)(D) APSS No. 201 of PS to APSS 81900.00 Sqm 1.80 147420.00
Clearing thick jungle growth ( more than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same etc., complete for the finished item of work as directed by the Engineer-in-Charge.
207 3.Construction of Check Dam Anicut across Musi River near Nandhyalagudem,Ho Rayanigudem(V), Suryapet APSS No. 106, 619 & SS 9.2 3850.00 Sqm 315.50 1214675.00
Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing (with no pin headers)( rubble stones : 0.33 cum/sqm) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
208 3.Construction of Check Dam Anicut across Musi River near Nandhyalagudem,Ho Rayanigudem(V), Suryapet APSS No. 201, 303 & SS 3.2 18435.00 Cum 241.30 4448366.00
Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
209 3.Construction of Check Dam Anicut across Musi River near Nandhyalagudem,Ho Rayanigudem(V), Suryapet APSS No. 402 17200.00 Kg 63.90 1099080.00
Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
210 3.Construction of Check Dam Anicut across Musi River near Nandhyalagudem,Ho Rayanigudem(V), Suryapet Special Specification 244.15 Rmt 2220.80 542208.00
Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
211 3.Construction of Check Dam Anicut across Musi River near Nandhyalagudem,Ho Rayanigudem(V), Suryapet SS 9.8 & Special Specification 1188.60 Rmt 404.80 481145.00
Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
212 3.Construction of Check Dam Anicut across Musi River near Nandhyalagudem,Ho Rayanigudem(V), Suryapet APSS No. 402 & SS 4 of PS to APSS 1096.20 Cum 5189.70 5688949.00
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
213 3.Construction of Check Dam Anicut across Musi River near Nandhyalagudem,Ho Rayanigudem(V), Suryapet APSS No. 402 & SS 4 of PS to APSS 4148.01 Cum 5572.90 23116445.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
214 3.Construction of Check Dam Anicut across Musi River near Nandhyalagudem,Ho Rayanigudem(V), Suryapet APSS No. 402 & SS 4 of PS to APSS 4268.48 Cum 4985.50 21280507.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum) for plain concrete works etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
215 3.Construction of Check Dam Anicut across Musi River near Nandhyalagudem,Ho Rayanigudem(V), Suryapet Special Specification 1238.00 Rmt 205.30 254161.00
Drilling 45 to 50 mm dia holes vertical or inclined upto 10 degrees to vertical in rock /masonry / concrete by percussion drilling using waggon drill or any other suitable equipment including cost of all materials, machinery, labour, redrilling through partially set grout wherever required etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
216 3.Construction of Check Dam Anicut across Musi River near Nandhyalagudem,Ho Rayanigudem(V), Suryapet APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 9639.14 Cum 262.10 2526419.00
Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
217 3.Construction of Check Dam Anicut across Musi River near Nandhyalagudem,Ho Rayanigudem(V), Suryapet APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 61473.16 Cum 101.30 6227231.00
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
218 3.Construction of Check Dam Anicut across Musi River near Nandhyalagudem,Ho Rayanigudem(V), Suryapet APSS No. 201 of PS to APSS 2900.00 Each 17.70 51330.00
Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and including burning or disposing off the materials etc., complete for the finished item of work as directed by the Engineer-in-Charge.
219 3.Construction of Check Dam Anicut across Musi River near Nandhyalagudem,Ho Rayanigudem(V), Suryapet APSS No. 201 of PS to APSS 87000.00 Sqm 1.80 156600.00
Clearing thick jungle growth ( more than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same etc., complete for the finished item of work as directed by the Engineer-in-Charge.
220 2.Construction of CheckDam Anicut across Musi River near NH65 Bridge at Tekumatla(V), Suryapet APSS No. 106, 619 & SS 9.2 3330.00 Sqm 315.50 1050615.00
Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing (with no pin headers)( rubble stones : 0.33 cum/sqm) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
221 2.Construction of CheckDam Anicut across Musi River near NH65 Bridge at Tekumatla(V), Suryapet APSS No. 201, 303 & SS 3.2 12502.50 Cum 241.30 3016853.00
Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
222 2.Construction of CheckDam Anicut across Musi River near NH65 Bridge at Tekumatla(V), Suryapet APSS No. 402 21000.00 Kg 63.90 1341900.00
Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
223 2.Construction of CheckDam Anicut across Musi River near NH65 Bridge at Tekumatla(V), Suryapet Special Specification 244.15 Rmt 2220.80 542208.00
Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
224 2.Construction of CheckDam Anicut across Musi River near NH65 Bridge at Tekumatla(V), Suryapet SS 9.8 & Special Specification 1273.30 Rmt 403.70 514031.00
Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
225 2.Construction of CheckDam Anicut across Musi River near NH65 Bridge at Tekumatla(V), Suryapet APSS No. 402 & SS 4 of PS to APSS 1562.58 Cum 5222.60 8160730.00
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
226 2.Construction of CheckDam Anicut across Musi River near NH65 Bridge at Tekumatla(V), Suryapet APSS No. 402 & SS 4 of PS to APSS 5734.59 Cum 5609.90 32170476.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
227 2.Construction of CheckDam Anicut across Musi River near NH65 Bridge at Tekumatla(V), Suryapet APSS No. 402 & SS 4 of PS to APSS 5456.93 Cum 5022.50 27407431.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum) for plain concrete works etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
228 2.Construction of CheckDam Anicut across Musi River near NH65 Bridge at Tekumatla(V), Suryapet Special Specification 1606.00 Rmt 205.30 329712.00
Drilling 45 to 50 mm dia holes vertical or inclined upto 10 degrees to vertical in rock /masonry / concrete by percussion drilling using waggon drill or any other suitable equipment including cost of all materials, machinery, labour, redrilling through partially set grout wherever required etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
229 2.Construction of CheckDam Anicut across Musi River near NH65 Bridge at Tekumatla(V), Suryapet APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 819.31 Cum 262.10 214741.00
Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
230 2.Construction of CheckDam Anicut across Musi River near NH65 Bridge at Tekumatla(V), Suryapet APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 8131.45 Cum 101.30 823716.00
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
231 2.Construction of CheckDam Anicut across Musi River near NH65 Bridge at Tekumatla(V), Suryapet APSS No. 201 of PS to APSS 1875.00 Each 17.70 33188.00
Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and including burning or disposing off the materials etc., complete for the finished item of work as directed by the Engineer-in-Charge.
232 2.Construction of CheckDam Anicut across Musi River near NH65 Bridge at Tekumatla(V), Suryapet APSS No. 201 of PS to APSS 37500.00 Sqm 1.80 67500.00
Clearing thick jungle growth ( more than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same etc., complete for the finished item of work as directed by the Engineer-in-Charge.
233 1.Construction of CheckDam Anicut across Musi River near Saibaba Temple at Tekumatla(V), Suryapet(D) APSS No. 106, 619 & SS 9.2 2790.00 Sqm 315.50 880245.00
Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing (with no pin headers)( rubble stones : 0.33 cum/sqm) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
234 1.Construction of CheckDam Anicut across Musi River near Saibaba Temple at Tekumatla(V), Suryapet(D) APSS No. 201, 303 & SS 3.2 12190.50 Cum 241.30 2941568.00
Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
235 1.Construction of CheckDam Anicut across Musi River near Saibaba Temple at Tekumatla(V), Suryapet(D) APSS No. 402 21000.00 Kg 63.90 1341900.00
Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
236 1.Construction of CheckDam Anicut across Musi River near Saibaba Temple at Tekumatla(V), Suryapet(D) Special Specification 244.15 Rmt 2220.80 542208.00
Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
237 1.Construction of CheckDam Anicut across Musi River near Saibaba Temple at Tekumatla(V), Suryapet(D) SS 9.8 & Special Specification 1188.60 Rmt 403.90 480076.00
Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
238 1.Construction of CheckDam Anicut across Musi River near Saibaba Temple at Tekumatla(V), Suryapet(D) APSS No. 402 & SS 4 of PS to APSS 1427.40 Cum 5244.50 7485999.00
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
239 1.Construction of CheckDam Anicut across Musi River near Saibaba Temple at Tekumatla(V), Suryapet(D) APSS No. 402 & SS 4 of PS to APSS 5214.70 Cum 5634.60 29382749.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
240 1.Construction of CheckDam Anicut across Musi River near Saibaba Temple at Tekumatla(V), Suryapet(D) APSS No. 402 & SS 4 of PS to APSS 5010.76 Cum 5047.20 25290308.00
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing (Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum) for plain concrete works etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
241 1.Construction of CheckDam Anicut across Musi River near Saibaba Temple at Tekumatla(V), Suryapet(D) Special Specification 1558.00 Rmt 205.30 319857.00
Drilling 45 to 50 mm dia holes vertical or inclined upto 10 degrees to vertical in rock /masonry / concrete by percussion drilling using waggon drill or any other suitable equipment including cost of all materials, machinery, labour, redrilling through partially set grout wherever required etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
242 1.Construction of CheckDam Anicut across Musi River near Saibaba Temple at Tekumatla(V), Suryapet(D) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 2118.10 Cum 262.10 555154.00
Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
243 1.Construction of CheckDam Anicut across Musi River near Saibaba Temple at Tekumatla(V), Suryapet(D) APSS No. 201,301, 308 & SS 3.1, 34 of PS to APSS 17466.70 Cum 101.30 1769377.00
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-Charge.
244 1.Construction of CheckDam Anicut across Musi River near Saibaba Temple at Tekumatla(V), Suryapet(D) APSS No. 201 of PS to APSS 2438.00 Each 17.70 43153.00
Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and including burning or disposing off the materials etc., complete for the finished item of work as directed by the Engineer-in-Charge.
245 1.Construction of CheckDam Anicut across Musi River near Saibaba Temple at Tekumatla(V), Suryapet(D) APSS No. 201 of PS to APSS 97500.00 Sqm 1.80 175500.00
Clearing thick jungle growth ( more than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same etc., complete for the finished item of work as directed by the Engineer-in-Charge.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail