Rural Development And Panchayats Department has published Renovation Of Ponds And Ooranies Under State Finance Commission Grant In Musiri Block In Tiruchirappalli District For The Year 2019-20 Phase Ii Package No . 27. Submission Date for this Tender is 15-09-2020. Lake Development Tenders in Tiruchirappalli Tamil Nadu. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 11-Aug-2020 | Date | Date | 19-08-2020 |
2 | 19-Aug-2020 | Date4 | Date | 26-08-2020 |
3 | 26-Aug-2020 | Date5 | Date | 04-09-2020 |
4 | 04-Sep-2020 | Date6 | Date | 09-09-2020 |
5 | 09-Sep-2020 | Date7 | Date | 11-09-2020 |
6 | 11-Sep-2020 | Date8 | Date | 15-09-2020 |
Name of Scheme : State Finance Commission Grant 2019-20 Phase II | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | RENOVATION OF PERUMAL KUTTAI IN KOTTATHUR PANCHAYAT. Clearing the Scrub Jungle (without uprooting) | 3375 | Sqm | |
2 | 2 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. | 1373.3 | Cum | |
3 | 3 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. | 81 | Cum | |
4 | 4 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., | 14.63 | cum | |
5 | 5 | Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete | 5.58 | cum | |
6 | 6 | Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 7.47 | cum | |
7 | 7 | Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 14.76 | cum | |
8 | 8 | Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete | 21.3 | Sqm | |
9 | 9 | RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.8 | Sqm | |
10 | 10 | PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.23 | Sqm | |
11 | 11 | Supplying and fabrication of steel for all RCC items including all labour charges etc., complete | 0.3 | MT | |
12 | 12 | Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. | 27.45 | MT | |
13 | 13 | Provision for Name Board charges | 1 | Each | |
14 | 14 | RENOVATION OF POND @ SAVITHIRI KUTTAI IN PULIVALAM PANCHAYAT. Clearing the Scrub Jungle (without uprooting) | 4320 | Sqm | |
15 | 15 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. | 1543.5 | Cum | |
16 | 16 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. | 20.25 | Cum | |
17 | 17 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., | 14.63 | cum | |
18 | 18 | Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete | 5.58 | cum | |
19 | 19 | Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 7.47 | cum | |
20 | 20 | Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 14.76 | cum | |
21 | 21 | Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete | 21.3 | Sqm | |
22 | 22 | RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.8 | Sqm | |
23 | 23 | PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.23 | Sqm | |
24 | 24 | Supplying and fabrication of steel for all RCC items including all labour charges etc., complete | 0.3 | MT | |
25 | 25 | Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. | 27.45 | MT | |
26 | 26 | Provision for Name Board charges | 1 | Each | |
27 | 27 | RENOVATION OF ILUPPAIYUR KUTTAI @ ILUPPAIYUR IN SATHANUR PANCHAYAT. Clearing the Scrub Jungle (without uprooting) | 1815 | Sqm | |
28 | 28 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. | 1220 | Cum | |
29 | 29 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. | 1320 | Cum | |
30 | 30 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., | 11.03 | cum | |
31 | 31 | Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete | 4.76 | cum | |
32 | 32 | Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 6.52 | cum | |
33 | 33 | Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 8.01 | cum | |
34 | 34 | Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete | 20.25 | Sqm | |
35 | 35 | RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.8 | Cum | |
36 | 36 | PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.23 | Cum | |
37 | 37 | Supplying and fabrication of steel for all RCC items including all labour charges etc., complete | 0.5 | MT | |
38 | 38 | Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. | 28.35 | Sqm | |
39 | 39 | Provision for Name Board charges | 1 | Each | |
40 | 40 | RENOVATION OF POND @PAPPAN KULAM IN SUKKAMPATTI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) | 3570 | Sqm | |
41 | 41 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. | 2458.5 | Cum | |
42 | 42 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. | 40.5 | Cum | |
43 | 43 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., | 14.63 | cum | |
44 | 44 | Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete | 5.58 | cum | |
45 | 45 | Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 7.47 | cum | |
46 | 46 | Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 14.76 | cum | |
47 | 47 | Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete | 21.3 | Sqm | |
48 | 48 | RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.8 | Sqm | |
49 | 49 | PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.23 | Sqm | |
50 | 50 | Supplying and fabrication of steel for all RCC items including all labour charges etc., complete | 0.3 | MT | |
51 | 51 | Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. | 27.45 | MT | |
52 | 52 | Provision for Name Board charges | 1 | Each | |
53 | 53 | RENOVATION OF POND @VANNAN KUTTAI IN SUKKAMPATTI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) | 4050 | Sqm | |
54 | 54 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. | 1803.5 | Cum | |
55 | 55 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. | 20.25 | Cum | |
56 | 56 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., | 14.63 | cum | |
57 | 57 | Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete | 5.58 | cum | |
58 | 58 | Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 7.47 | cum | |
59 | 59 | Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 14.76 | cum | |
60 | 60 | Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete | 21.3 | Sqm | |
61 | 61 | RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.8 | Sqm | |
62 | 62 | PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.23 | Sqm | |
63 | 63 | Supplying and fabrication of steel for all RCC items including all labour charges etc., complete | 0.3 | MT | |
64 | 64 | Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. | 27.45 | MT | |
65 | 65 | Provision for Name Board charges | 1 | Each | |
66 | 66 | RENOVATION OF PORE KUTTAI IN SUKKAMPATTI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) | 240 | Sqm | |
67 | 67 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. | 1681.75 | Cum | |
68 | 68 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. | 94.5 | Cum | |
69 | 69 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., | 14.63 | cum | |
70 | 70 | Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete | 5.58 | cum | |
71 | 71 | Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 7.47 | cum | |
72 | 72 | Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 14.76 | cum | |
73 | 73 | Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete | 21.3 | Sqm | |
74 | 74 | RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.8 | Sqm | |
75 | 75 | PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.23 | Sqm | |
76 | 76 | Supplying and fabrication of steel for all RCC items including all labour charges etc., complete | 0.3 | MT | |
77 | 77 | Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. | 27.45 | MT | |
78 | 78 | Provision for Name Board charges | 1 | Each | |
79 | 79 | RENOVATION OF KALRANPATTI KUTTAIN SUKKAMPATTI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) | 240 | Sqm | |
80 | 80 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. | 1566.75 | Cum | |
81 | 81 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. | 94.5 | Cum | |
82 | 82 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., | 14.63 | cum | |
83 | 83 | Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete | 5.58 | cum | |
84 | 84 | Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 7.47 | cum | |
85 | 85 | Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 14.76 | cum | |
86 | 86 | Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete | 21.3 | Sqm | |
87 | 87 | RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.8 | Sqm | |
88 | 88 | PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.23 | Sqm | |
89 | 89 | Supplying and fabrication of steel for all RCC items including all labour charges etc., complete | 0.3 | MT | |
90 | 90 | Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. | 27.45 | MT | |
91 | 91 | Provision for Name Board charges | 1 | Each | |
92 | 92 | RENOVATION OF SEETHA KUTTAI IN SUKKAMPATTI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) | 240 | Sqm | |
93 | 93 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. | 2531.75 | Cum | |
94 | 94 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. | 108 | Cum | |
95 | 95 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., | 14.63 | cum | |
96 | 96 | Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete | 5.58 | cum | |
97 | 97 | Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 7.47 | cum | |
98 | 98 | Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 14.76 | cum | |
99 | 99 | Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete | 21.3 | Sqm | |
100 | 100 | RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.8 | Sqm | |
101 | 101 | PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.23 | Sqm | |
102 | 102 | Supplying and fabrication of steel for all RCC items including all labour charges etc., complete | 0.3 | MT | |
103 | 103 | Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. | 27.45 | MT | |
104 | 104 | Provision for Name Board charges | 1 | Each | |
105 | 105 | RENOVATION OF KATTALA KUTTAI IN SUKKAMPATTI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) | 240 | Sqm | |
106 | 106 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. | 2986.75 | Cum | |
107 | 107 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. | 94.5 | Cum | |
108 | 108 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., | 14.63 | cum | |
109 | 109 | Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete | 5.58 | cum | |
110 | 110 | Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 7.47 | cum | |
111 | 111 | Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 14.76 | cum | |
112 | 112 | Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete | 21.3 | Sqm | |
113 | 113 | RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.8 | Sqm | |
114 | 114 | PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.23 | Sqm | |
115 | 115 | Supplying and fabrication of steel for all RCC items including all labour charges etc., complete | 0.3 | MT | |
116 | 116 | Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. | 27.45 | MT | |
117 | 117 | Provision for Name Board charges | 1 | Each | |
118 | 118 | RENOVATION OF PENNAN KUTTAI IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) | 2700 | Sqm | |
119 | 119 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. | 2740.8 | Cum | |
120 | 120 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. | 108 | Cum | |
121 | 121 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., | 14.63 | cum | |
122 | 122 | Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete | 5.58 | cum | |
123 | 123 | Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 7.47 | cum | |
124 | 124 | Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 14.76 | cum | |
125 | 125 | Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete | 21.3 | Sqm | |
126 | 126 | RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.8 | Sqm | |
127 | 127 | PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.23 | Sqm | |
128 | 128 | Supplying and fabrication of steel for all RCC items including all labour charges etc., complete | 0.3 | MT | |
129 | 129 | Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. | 27.45 | MT | |
130 | 130 | Provision for Name Board charges | 1 | Each | |
131 | 131 | RENOVATION OF THATTAN KUTTAI IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) | 2700 | Sqm | |
132 | 132 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. | 2310.8 | Cum | |
133 | 133 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. | 94.5 | Cum | |
134 | 134 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., | 14.63 | cum | |
135 | 135 | Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete | 5.58 | cum | |
136 | 136 | Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 7.47 | cum | |
137 | 137 | Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 14.76 | cum | |
138 | 138 | Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete | 21.3 | Sqm | |
139 | 139 | RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.8 | Sqm | |
140 | 140 | PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.23 | Sqm | |
141 | 141 | Supplying and fabrication of steel for all RCC items including all labour charges etc., complete | 0.3 | MT | |
142 | 142 | Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. | 27.45 | MT | |
143 | 143 | Provision for Name Board charges | 1 | Each | |
144 | 144 | RENOVATION OF PARAIYAN KUTTAI IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) | 2940 | Sqm | |
145 | 145 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. | 2738.3 | Cum | |
146 | 146 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. | 99 | Cum | |
147 | 147 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., | 14.63 | cum | |
148 | 148 | Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete | 5.58 | cum | |
149 | 149 | Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 7.47 | cum | |
150 | 150 | Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 14.76 | cum | |
151 | 151 | Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete | 21.3 | Sqm | |
152 | 152 | RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.8 | Sqm | |
153 | 153 | PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.23 | Sqm | |
154 | 154 | Supplying and fabrication of steel for all RCC items including all labour charges etc., complete | 0.3 | MT | |
155 | 155 | Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. | 27.45 | MT | |
156 | 156 | Provision for Name Board charges | 1 | Each | |
157 | 157 | RENOVATION OF OOTHUKULI KUTTAI IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) | 2520 | Sqm | |
158 | 158 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. | 2930 | Cum | |
159 | 159 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. | 135 | Cum | |
160 | 160 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., | 14.63 | cum | |
161 | 161 | Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete | 5.58 | cum | |
162 | 162 | Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 7.47 | cum | |
163 | 163 | Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 14.76 | cum | |
164 | 164 | Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete | 21.3 | Sqm | |
165 | 165 | RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.8 | Sqm | |
166 | 166 | PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.23 | Sqm | |
167 | 167 | Supplying and fabrication of steel for all RCC items including all labour charges etc., complete | 0.3 | MT | |
168 | 168 | Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. | 27.45 | MT | |
169 | 169 | Provision for Name Board charges | 1 | Each | |
170 | 170 | RENOVATION OF ARIYAN KUTTAI IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) | 3375 | Sqm | |
171 | 171 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. | 2244.8 | Cum | |
172 | 172 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. | 94.5 | Cum | |
173 | 173 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., | 14.63 | cum | |
174 | 174 | Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete | 5.58 | cum | |
175 | 175 | Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 7.47 | cum | |
176 | 176 | Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 14.76 | cum | |
177 | 177 | Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete | 21.3 | Sqm | |
178 | 178 | RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.8 | Sqm | |
179 | 179 | PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.23 | Sqm | |
180 | 180 | Supplying and fabrication of steel for all RCC items including all labour charges etc., complete | 0.3 | MT | |
181 | 181 | Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. | 27.45 | MT | |
182 | 182 | Provision for Name Board charges | 1 | Each | |
183 | 183 | RENOVATION OF SETTI KUTTAI IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) | 1815 | Sqm | |
184 | 184 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. | 1738.3 | Cum | |
185 | 185 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. | 94.5 | Cum | |
186 | 186 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., | 14.63 | cum | |
187 | 187 | Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete | 5.58 | cum | |
188 | 188 | Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 7.47 | cum | |
189 | 189 | Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 14.76 | cum | |
190 | 190 | Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete | 21.3 | Sqm | |
191 | 191 | RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.8 | Sqm | |
192 | 192 | PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.23 | Sqm | |
193 | 193 | Supplying and fabrication of steel for all RCC items including all labour charges etc., complete | 0.3 | MT | |
194 | 194 | Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. | 27.45 | MT | |
195 | 195 | Provision for Name Board charges | 1 | Each | |
196 | 196 | RENOVATION OF KOTTAN KULAM IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) | 2940 | Sqm | |
197 | 197 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. | 3027.3 | Cum | |
198 | 198 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. | 63 | Cum | |
199 | 199 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., | 14.63 | cum | |
200 | 200 | Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete | 5.58 | cum | |
201 | 201 | Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 7.47 | cum | |
202 | 202 | Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 14.76 | cum | |
203 | 203 | Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete | 21.3 | Sqm | |
204 | 204 | RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.8 | Sqm | |
205 | 205 | PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.23 | Sqm | |
206 | 206 | Supplying and fabrication of steel for all RCC items including all labour charges etc., complete | 0.3 | MT | |
207 | 207 | Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. | 27.45 | MT | |
208 | 208 | Provision for Name Board charges | 1 | Each | |
209 | 209 | RENOVATION OF OORANI KUTTAI IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) | 2700 | Sqm | |
210 | 210 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. | 2310.8 | Cum | |
211 | 211 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. | 94.5 | Cum | |
212 | 212 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., | 14.63 | cum | |
213 | 213 | Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete | 5.58 | cum | |
214 | 214 | Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 7.47 | cum | |
215 | 215 | Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 14.76 | cum | |
216 | 216 | Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete | 21.3 | Sqm | |
217 | 217 | RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.8 | Sqm | |
218 | 218 | PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.23 | Sqm | |
219 | 219 | Supplying and fabrication of steel for all RCC items including all labour charges etc., complete | 0.3 | MT | |
220 | 220 | Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. | 27.45 | MT | |
221 | 221 | Provision for Name Board charges | 1 | Each | |
222 | 222 | RENOVATION OF CHINNAN KUTTAI IN VENGAIMANDALAM PANCHAYAT. Clearing the Scrub Jungle (without uprooting) | 240 | Sqm | |
223 | 223 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. | 2811.75 | Cum | |
224 | 224 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. | 94.5 | Cum | |
225 | 225 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., | 14.63 | cum | |
226 | 226 | Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete | 5.58 | cum | |
227 | 227 | Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 7.47 | cum | |
228 | 228 | Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete | 14.76 | cum | |
229 | 229 | Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete | 21.3 | Sqm | |
230 | 230 | RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.8 | Sqm | |
231 | 231 | PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete | 1.23 | Sqm | |
232 | 232 | Supplying and fabrication of steel for all RCC items including all labour charges etc., complete | 0.3 | MT | |
233 | 233 | Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. | 27.45 | MT | |
234 | 234 | Provision for Name Board charges | 1 | Each | |
235 | 235 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}\n | BI01010001010000000000000515BI01000011120 | 1 | No |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail