}

Renovation Of Ponds And Ooranies Under State Finance Commission Grant In Musiri Block In Tiruchirappalli District For The Year 2019-20 Phase Ii Package No . 27, Tiruchirappalli-Tamil Nadu

Rural Development And Panchayats Department has published Renovation Of Ponds And Ooranies Under State Finance Commission Grant In Musiri Block In Tiruchirappalli District For The Year 2019-20 Phase Ii Package No . 27. Submission Date for this Tender is 15-09-2020. Lake Development Tenders in Tiruchirappalli Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

25108824
Corrigendum : Renovation Of Ponds And Ooranies Under State Finance Commission Grant In Musiri Block In Tiruchirappalli District For The Year 2019-20 Phase Ii Package No . 27
Open Tender
Indian
Tamil Nadu
Tiruchirappalli
15-09-2020

Tender Details

Renovation Of Ponds And Ooranies Under State Finance Commission Grant In Musiri Block In Tiruchirappalli District For The Year 2019-20 Phase Ii Package No . 27

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 11-Aug-2020 Date Date 19-08-2020
2 19-Aug-2020 Date4 Date 26-08-2020
3 26-Aug-2020 Date5 Date 04-09-2020
4 04-Sep-2020 Date6 Date 09-09-2020
5 09-Sep-2020 Date7 Date 11-09-2020
6 11-Sep-2020 Date8 Date 15-09-2020

Key Value

Document Fees
Refer document
EMD
INR 55000.0 /-
Tender Value
INR 54.49 Lakhs /-

BOQ Items

Name of Scheme : State Finance Commission Grant 2019-20 Phase II
Sl. No. Item Description Item Code / Make Quantity Units
1 1 RENOVATION OF PERUMAL KUTTAI IN KOTTATHUR PANCHAYAT. Clearing the Scrub Jungle (without uprooting) 3375 Sqm
2 2 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. 1373.3 Cum
3 3 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. 81 Cum
4 4 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., 14.63 cum
5 5 Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete 5.58 cum
6 6 Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 7.47 cum
7 7 Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 14.76 cum
8 8 Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete 21.3 Sqm
9 9 RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.8 Sqm
10 10 PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.23 Sqm
11 11 Supplying and fabrication of steel for all RCC items including all labour charges etc., complete 0.3 MT
12 12 Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. 27.45 MT
13 13 Provision for Name Board charges 1 Each
14 14 RENOVATION OF POND @ SAVITHIRI KUTTAI IN PULIVALAM PANCHAYAT. Clearing the Scrub Jungle (without uprooting) 4320 Sqm
15 15 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. 1543.5 Cum
16 16 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. 20.25 Cum
17 17 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., 14.63 cum
18 18 Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete 5.58 cum
19 19 Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 7.47 cum
20 20 Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 14.76 cum
21 21 Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete 21.3 Sqm
22 22 RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.8 Sqm
23 23 PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.23 Sqm
24 24 Supplying and fabrication of steel for all RCC items including all labour charges etc., complete 0.3 MT
25 25 Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. 27.45 MT
26 26 Provision for Name Board charges 1 Each
27 27 RENOVATION OF ILUPPAIYUR KUTTAI @ ILUPPAIYUR IN SATHANUR PANCHAYAT. Clearing the Scrub Jungle (without uprooting) 1815 Sqm
28 28 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. 1220 Cum
29 29 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. 1320 Cum
30 30 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., 11.03 cum
31 31 Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete 4.76 cum
32 32 Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 6.52 cum
33 33 Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 8.01 cum
34 34 Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete 20.25 Sqm
35 35 RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.8 Cum
36 36 PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.23 Cum
37 37 Supplying and fabrication of steel for all RCC items including all labour charges etc., complete 0.5 MT
38 38 Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. 28.35 Sqm
39 39 Provision for Name Board charges 1 Each
40 40 RENOVATION OF POND @PAPPAN KULAM IN SUKKAMPATTI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) 3570 Sqm
41 41 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. 2458.5 Cum
42 42 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. 40.5 Cum
43 43 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., 14.63 cum
44 44 Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete 5.58 cum
45 45 Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 7.47 cum
46 46 Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 14.76 cum
47 47 Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete 21.3 Sqm
48 48 RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.8 Sqm
49 49 PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.23 Sqm
50 50 Supplying and fabrication of steel for all RCC items including all labour charges etc., complete 0.3 MT
51 51 Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. 27.45 MT
52 52 Provision for Name Board charges 1 Each
53 53 RENOVATION OF POND @VANNAN KUTTAI IN SUKKAMPATTI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) 4050 Sqm
54 54 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. 1803.5 Cum
55 55 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. 20.25 Cum
56 56 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., 14.63 cum
57 57 Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete 5.58 cum
58 58 Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 7.47 cum
59 59 Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 14.76 cum
60 60 Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete 21.3 Sqm
61 61 RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.8 Sqm
62 62 PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.23 Sqm
63 63 Supplying and fabrication of steel for all RCC items including all labour charges etc., complete 0.3 MT
64 64 Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. 27.45 MT
65 65 Provision for Name Board charges 1 Each
66 66 RENOVATION OF PORE KUTTAI IN SUKKAMPATTI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) 240 Sqm
67 67 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. 1681.75 Cum
68 68 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. 94.5 Cum
69 69 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., 14.63 cum
70 70 Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete 5.58 cum
71 71 Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 7.47 cum
72 72 Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 14.76 cum
73 73 Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete 21.3 Sqm
74 74 RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.8 Sqm
75 75 PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.23 Sqm
76 76 Supplying and fabrication of steel for all RCC items including all labour charges etc., complete 0.3 MT
77 77 Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. 27.45 MT
78 78 Provision for Name Board charges 1 Each
79 79 RENOVATION OF KALRANPATTI KUTTAIN SUKKAMPATTI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) 240 Sqm
80 80 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. 1566.75 Cum
81 81 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. 94.5 Cum
82 82 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., 14.63 cum
83 83 Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete 5.58 cum
84 84 Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 7.47 cum
85 85 Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 14.76 cum
86 86 Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete 21.3 Sqm
87 87 RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.8 Sqm
88 88 PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.23 Sqm
89 89 Supplying and fabrication of steel for all RCC items including all labour charges etc., complete 0.3 MT
90 90 Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. 27.45 MT
91 91 Provision for Name Board charges 1 Each
92 92 RENOVATION OF SEETHA KUTTAI IN SUKKAMPATTI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) 240 Sqm
93 93 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. 2531.75 Cum
94 94 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. 108 Cum
95 95 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., 14.63 cum
96 96 Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete 5.58 cum
97 97 Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 7.47 cum
98 98 Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 14.76 cum
99 99 Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete 21.3 Sqm
100 100 RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.8 Sqm
101 101 PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.23 Sqm
102 102 Supplying and fabrication of steel for all RCC items including all labour charges etc., complete 0.3 MT
103 103 Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. 27.45 MT
104 104 Provision for Name Board charges 1 Each
105 105 RENOVATION OF KATTALA KUTTAI IN SUKKAMPATTI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) 240 Sqm
106 106 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. 2986.75 Cum
107 107 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. 94.5 Cum
108 108 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., 14.63 cum
109 109 Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete 5.58 cum
110 110 Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 7.47 cum
111 111 Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 14.76 cum
112 112 Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete 21.3 Sqm
113 113 RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.8 Sqm
114 114 PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.23 Sqm
115 115 Supplying and fabrication of steel for all RCC items including all labour charges etc., complete 0.3 MT
116 116 Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. 27.45 MT
117 117 Provision for Name Board charges 1 Each
118 118 RENOVATION OF PENNAN KUTTAI IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) 2700 Sqm
119 119 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. 2740.8 Cum
120 120 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. 108 Cum
121 121 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., 14.63 cum
122 122 Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete 5.58 cum
123 123 Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 7.47 cum
124 124 Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 14.76 cum
125 125 Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete 21.3 Sqm
126 126 RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.8 Sqm
127 127 PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.23 Sqm
128 128 Supplying and fabrication of steel for all RCC items including all labour charges etc., complete 0.3 MT
129 129 Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. 27.45 MT
130 130 Provision for Name Board charges 1 Each
131 131 RENOVATION OF THATTAN KUTTAI IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) 2700 Sqm
132 132 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. 2310.8 Cum
133 133 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. 94.5 Cum
134 134 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., 14.63 cum
135 135 Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete 5.58 cum
136 136 Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 7.47 cum
137 137 Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 14.76 cum
138 138 Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete 21.3 Sqm
139 139 RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.8 Sqm
140 140 PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.23 Sqm
141 141 Supplying and fabrication of steel for all RCC items including all labour charges etc., complete 0.3 MT
142 142 Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. 27.45 MT
143 143 Provision for Name Board charges 1 Each
144 144 RENOVATION OF PARAIYAN KUTTAI IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) 2940 Sqm
145 145 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. 2738.3 Cum
146 146 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. 99 Cum
147 147 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., 14.63 cum
148 148 Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete 5.58 cum
149 149 Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 7.47 cum
150 150 Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 14.76 cum
151 151 Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete 21.3 Sqm
152 152 RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.8 Sqm
153 153 PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.23 Sqm
154 154 Supplying and fabrication of steel for all RCC items including all labour charges etc., complete 0.3 MT
155 155 Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. 27.45 MT
156 156 Provision for Name Board charges 1 Each
157 157 RENOVATION OF OOTHUKULI KUTTAI IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) 2520 Sqm
158 158 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. 2930 Cum
159 159 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. 135 Cum
160 160 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., 14.63 cum
161 161 Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete 5.58 cum
162 162 Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 7.47 cum
163 163 Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 14.76 cum
164 164 Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete 21.3 Sqm
165 165 RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.8 Sqm
166 166 PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.23 Sqm
167 167 Supplying and fabrication of steel for all RCC items including all labour charges etc., complete 0.3 MT
168 168 Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. 27.45 MT
169 169 Provision for Name Board charges 1 Each
170 170 RENOVATION OF ARIYAN KUTTAI IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) 3375 Sqm
171 171 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. 2244.8 Cum
172 172 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. 94.5 Cum
173 173 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., 14.63 cum
174 174 Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete 5.58 cum
175 175 Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 7.47 cum
176 176 Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 14.76 cum
177 177 Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete 21.3 Sqm
178 178 RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.8 Sqm
179 179 PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.23 Sqm
180 180 Supplying and fabrication of steel for all RCC items including all labour charges etc., complete 0.3 MT
181 181 Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. 27.45 MT
182 182 Provision for Name Board charges 1 Each
183 183 RENOVATION OF SETTI KUTTAI IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) 1815 Sqm
184 184 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. 1738.3 Cum
185 185 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. 94.5 Cum
186 186 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., 14.63 cum
187 187 Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete 5.58 cum
188 188 Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 7.47 cum
189 189 Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 14.76 cum
190 190 Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete 21.3 Sqm
191 191 RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.8 Sqm
192 192 PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.23 Sqm
193 193 Supplying and fabrication of steel for all RCC items including all labour charges etc., complete 0.3 MT
194 194 Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. 27.45 MT
195 195 Provision for Name Board charges 1 Each
196 196 RENOVATION OF KOTTAN KULAM IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) 2940 Sqm
197 197 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. 3027.3 Cum
198 198 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. 63 Cum
199 199 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., 14.63 cum
200 200 Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete 5.58 cum
201 201 Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 7.47 cum
202 202 Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 14.76 cum
203 203 Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete 21.3 Sqm
204 204 RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.8 Sqm
205 205 PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.23 Sqm
206 206 Supplying and fabrication of steel for all RCC items including all labour charges etc., complete 0.3 MT
207 207 Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. 27.45 MT
208 208 Provision for Name Board charges 1 Each
209 209 RENOVATION OF OORANI KUTTAI IN THIRUTHIYAMALAI PANCHAYAT. Clearing the Scrub Jungle (without uprooting) 2700 Sqm
210 210 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. 2310.8 Cum
211 211 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. 94.5 Cum
212 212 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., 14.63 cum
213 213 Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete 5.58 cum
214 214 Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 7.47 cum
215 215 Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 14.76 cum
216 216 Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete 21.3 Sqm
217 217 RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.8 Sqm
218 218 PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.23 Sqm
219 219 Supplying and fabrication of steel for all RCC items including all labour charges etc., complete 0.3 MT
220 220 Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. 27.45 MT
221 221 Provision for Name Board charges 1 Each
222 222 RENOVATION OF CHINNAN KUTTAI IN VENGAIMANDALAM PANCHAYAT. Clearing the Scrub Jungle (without uprooting) 240 Sqm
223 223 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete. 2811.75 Cum
224 224 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. 94.5 Cum
225 225 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., 14.63 cum
226 226 Filling in fountain & basement with good river sand including cost and conveyance of al lbour charges, snad slacking ramming etc., complete 5.58 cum
227 227 Cement Concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 7.47 cum
228 228 Cement Concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials tosite and labour charges , cement which woll be supplied by depth shoting shuttering balingout water etc., complete 14.76 cum
229 229 Supplying and erecting centring for sides & Bsofits unluding necesssary supports upto 3.29M Height including all labour charges etc., complete 21.3 Sqm
230 230 RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.8 Sqm
231 231 PCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour charges etc., complete 1.23 Sqm
232 232 Supplying and fabrication of steel for all RCC items including all labour charges etc., complete 0.3 MT
233 233 Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext.Emul.Paint for 1 Sqm. 27.45 MT
234 234 Provision for Name Board charges 1 Each
235 235 GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}\n BI01010001010000000000000515BI01000011120 1 No
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail