State Infrastructure And Industrial Development Corporation Of Uttarakhand Limited-SIIDCUL has published Operational And Maintenance Work Of Electrical Infra At Iie Haridwar Street Light Generator Transformer Servo Pump House Etc. Submission Date for this Tender is 25-08-2020. Coats and Jackets Tenders in IIE Haridwar Uttarakhand. Bidders can get complete Tender details and download the document.
Name of Work: Annual Operation & Maintenance of Electrical Infrastructure of Street Lights and Water Supply at IIE-Haridwar | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Street Light Maintenance, Pump House Maintenace with AMC for Electrical items | |||
2 | 1.01 | Lifting Vehical / Hydra required for Overhead street lights Maintenance purpose ( On hire Basis) (05days /month) ( as per the requirement) | item1 | 40 | Days |
3 | 1.02 | Repair of 60watt LED street lights by replacement of damaged/diffused drivers 60Watt Make-C&S., Phillips, Havells, Bajaj ( as per the site requirement) including material charges but excluding labour charges. DLP 6 month. | item2 | 160 | Nos |
4 | 1.03 | Repair of 60watt LED street lights by replacement of damaged/diffused PCB plates 60Watt Make-C&S., Phillips, Havells, Bajaj ( as per the site requirement) including material charges but excluding labour charges. DLP 6 month. | item3 | 64 | Nos |
5 | 1.04 | Repair of 150watt LED High Mast Lights by replacement of damaged /diffused drivers 150watt Make -C&S., Phillips, Havells, Bajaj ( as per the site requirement ) including material charges but excluding labour. DLP 6 month. | item4 | 28 | Nos |
6 | 1.05 | Repair of LED High Mast Lights replacing damaged/diffused PCB plates 150 Watt Make -C&S., Phillips, Havells, Bajaj ( as per the site requirement ) including material charges but excluding labour. DLP 6 month. | item5 | 18 | Nos |
7 | 1.06 | Repairing of street lights / High Mast Electrical Control panel replacing 3Pole power contactor type MNX-70 CAT PT No. CS97076 including material charges but excluding labour. One in each, total 03 panels ( as per the requirement raised by Engineer-IN charge) | item6 | 3 | Nos |
8 | 1.07 | Repairing of street lights / High Mast Electrical Control panel replacing Timer Auto Light, Cat pt.No. TA916422 including material charges but excluding labour. One in each, total 03 panels ( as per the requirement raised by Engineer-IN charge) | item7 | 3 | Nos |
9 | 1.08 | Repairing of street lights / High Mast Electrical Control panel replacing 3pole MCCB,100Amp Type DNO100C including material charges but excluding labour. One in each, total 03 panels ( as per the requirement raised by Engineer-IN charge) | item8 | 3 | Nos |
10 | 1.09 | Repairing of street lights / High Mast Electrical Control panel replacing Isolator 4way 40 Amps including material charges but excluding labour. Six in each, total 03 panels ( as per the requirement raised by Engineer-IN charge) | item9 | 18 | Nos |
11 | 1.1 | Replacing the burnt/damage pvc 1.5 sqmm single core wire by required size of weather proof cable excluding labour. ( as per the requirement) | item10 | 2500 | RM |
12 | 1.11 | Supply of PVC xlpe power cable 1.1 kv grade 4x 35 sqmm excluding labour ( as per the requirement) | item11 | 500 | RM |
13 | 1.12 | Laying of one number PVC insulated and PVC sheathed / xlpe power cable 1.1 kv grade of size up to 35 sqmm direct in ground including excavation , sand cushioning , protective covering and refilling the trench etc as required . (DSR no. 7.1.1) | item12 | 500 | RM |
14 | 1.13 | Supply of Aerial Bunch Cable 4x35 sqmm( as per the site requirement) including material for laying of the cables on poles excluding labour charges. ( as per the requirement raised by Engineer-IN charge) | item13 | 500 | RM |
15 | 1.14 | Erection of metallic pole 8mtr to 11 mtr (10mtrs)Height, in cement concrete 1:3:6 foundation including excavation and refilling etc Including labour and Material. ( DSR 11.3.3) ( as per the requirement raised by Engineer-IN charge) | item14 | 10 | Nos |
16 | 1.15 | Pole Painting (inclduing surface cleaning and primer coat) with Numbering on Poles ( As per the site requirement ) including material and labour charges | item15 | 250 | Nos |
17 | 1.16 | Wages /Labour charges for Electricians to be depute at respective Industrial estates of SIIDCUL for O&M work (for 8months) | item16 | 2 | Nos |
18 | 1.17 | Wages /Labour charges for Helpers to be depute at respective Industrial estates of SIIDCUL for O&M work | item17 | 2 | Nos |
19 | 1.18 | Annual Maintenance of Transformer installed for Main supply of Street Lights inclduing Dehydration of transformer Oil, OTI / WTI Calibration etc.( once in year ) | item18 | 1 | Job |
20 | 1.19 | Annual Maintenance of DG sets installed at SIIDCUL offices or for street light's Back Up energy inclduing material and Labour. ( 02 services per year ) | item19 | 1 | Job |
21 | 1.2 | Annual Maintenance of Servo / APFC Panel / Breaker installed at SIIDCUL offices or for street light's Back Up energy inclduing material and Labourand Labour.( Once in year) | item20 | 1 | Job |
22 | 1.21 | Annual Maintenance / Servicing of Air Conditioners ( Ductable / Window/Split ) installed at SIIDCUL offices including labour and material by repair of 2nos of PCB card on each of 2.5T & 5.5 / 8.5T ( total 02nos ) ,by replacement of compressor one each of 2.5T & 5.5T and 8.5T ( total 3nos) , repair of total 03nos of Fan Motor one each of 2.5t & 5.5T and 8.5T ( total 3nos)with R-22 Gas refill ( Total AC capacity is 78.8 TR) | item21 | 1 | Job |
23 | 1.22 | Comprehensive Annual Maintenance of 20KVA UPS (Eaton Make) installed at SIIDCUL Offices including labour and material. ( including replacement of 12V, 18AH total 28nos battery with buy back, card reapair etc.) | item22 | 1 | Nos |
24 | 1.23 | Repairing and Rewinding of 25HP submersibile tubewell motor complete in all respect including lowering and lifting , labour & Material ( as per requirement ) | item23 | 4 | Nos |
25 | 1.24 | Repairing of 25HP, 8stage submersibile pump by repair/ replacement of pump-bush, sleeves, necking etc. complete in all respect inclduing labour & material. ( as per requirement ) | item24 | 4 | Nos |
26 | 1.25 | Repairing of Submericible Motor Electrical Control panel replacing 3Pole power contactor type MNX-70 CAT PT No. CS97076 including material charges but excluding labour. One in each, total 03 panels ( as per the requirement raised by Engineer-IN charge) | item25 | 3 | Nos |
27 | 1.26 | Repairing of Submericible Motor Electrical Control panel replacing Timer Auto Light, Cat pt.No. TA916422 including material charges but excluding labour. One in each, total 03 panels ( as per the requirement raised by Engineer-IN charge) | item26 | 3 | Nos |
28 | 1.27 | Repairing of Submericible Motor Electrical Control panel replacing 3pole MCCB,100Amp Type DNO100C including material charges but excluding labour. One in each, total 03 panels ( as per the requirement raised by Engineer-IN charge) | item27 | 3 | Nos |
29 | 1.28 | Repairing of Submericible Motor Electrical Control panel replacing Isolator 4way 40 Amps including material charges but excluding labour. Six in each, total 03 panels ( as per the requirement raised by Engineer-IN charge) | item28 | 18 | Nos |
30 | 1.29 | Replacement of electric cable for power supply to submersibile motor pump complete in all respect including material & labour charges. ( size 3X6mm2) ( as per requirement ) | item29 | 200 | RM |
31 | 1.3 | Rewinding & Repairing of water supply 40HP Motor with taking out and fixing in position complete in all respect inclduing material and Labour charges. | ite30 | 2 | Nos |
32 | 1.31 | Repairing of Water Supply Motor Electrical Control panel replacing 3Pole power contactor type MNX-70 CAT PT No. CS97076 including material charges but excluding labour. One in each, total 03 panels ( as per the requirement raised by Engineer-IN charge) | item31 | 3 | Nos |
33 | 1.32 | Repairing of Water Supply Motor Electrical Control panel replacing Timer Auto Light, Cat pt.No. TA916422 including material charges but excluding labour. One in each, total 03 panels ( as per the requirement raised by Engineer-IN charge) | item32 | 3 | Nos |
34 | 1.33 | Repairing of Water Supply Motor Electrical Control panel replacing 3pole MCCB,100Amp Type DNO100C including material charges but excluding labour. One in each, total 03 panels ( as per the requirement raised by Engineer-IN charge) | item33 | 3 | Nos |
35 | 1.34 | Repairing of Water Supply Motor Electrical Control panel replacing Isolator 4way 40 Amps including material charges but excluding labour. Six in each, total 03 panels ( as per the requirement raised by Engineer-IN charge) | item34 | 18 | Nos |
36 | 1.35 | Replacement of electric cable for power supply to submersibile motor pump complete in all respect including material & labour charges. ( size 3X6mm2) ( as per requirement ) | item35 | 200 | RM |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail