Public Health Engineering Department-PHED has published Survey Investigation And Necessary Construction Work Required For Retrofitting Of Existing Piped Water Supply Scheme Of Various Village In Block Athnair Distt Betul Including Cost Of All Material And Labour With 90 Days Trial Run Period Of Entire. Submission Date for this Tender is 24-08-2020. Soil Survey Tenders in BETUL Madhya Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 17-Aug-2020 | Other | Other | 24-08-2020 |
Name of Work:Survey, Investigation, and Necessary Construction work required for Retrofitting of Existing piped water supply scheme of Various village in Block –ATHNAIR Distt. BETUL including cost of all material and labour with 90 Days Trial Run period of entire scheme | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Survey, Investigation, and Necessary Construction work required for Retrofitting of Existing piped water supply scheme of Various village in Block –ATHNAIR Distt. BETUL including cost of all material and labour with 90 Days Trial Run period of entire scheme | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | Survey, Investigation, and Necessary Construction work required for Retrofitting of Existing piped water supply scheme of Various village in Block –ATHNAIR Distt. BETUL including cost of all material and labour with 90 Days Trial Run period of entire scheme | BI01010001010000000000000515BI0100001113 | 1 | Nos |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail