Competitive E-Bidding For Fabrication, Erection And Dismantling From Reputed Contractors, Hasanpur Amroha-Uttar Pradesh

Uttar Pradesh Cooperative Sugar Factories Federation Limited-UPCSFFL has published Competitive E-Bidding For Fabrication, Erection And Dismantling From Reputed Contractors. Submission Date for this Tender is 20-07-2020. Garden Tools Tenders in Hasanpur Amroha Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

24874604
Competitive E-Bidding For Fabrication, Erection And Dismantling From Reputed Contractors
Open Tender
Indian
Uttar Pradesh
Hasanpur Amroha
20-07-2020

Tender Details

Competitive E-Bidding For Fabrication, Erection And Dismantling From Reputed Contractors-2 General Work 3 Dismantling Of M.S. Pipe 2 Cm To 35 Cm Size. 4 Erection Of M.S. Pipe 2 Cm To 35 Cm Size. 5 Dismantling , Fabrication And Erection Of Pipe Fitting Size 2Cm To 35 Cm 6 Bend 7 Flange 8 Nipple 9 Cross / Tee 10 Valve 11 Reducer 12 Dismantling Of M.S. Pipe Above To 35 Cm Size & Shifting It To Scrap Yard. 13 Fabrication And Erection Of M.S. Pipe Above To 35 Cm Size By 6 / 8 / 10 Mm Plate. 14 Dismantling , Fabrication And Erection Of Pipe Fitting Above 35 Cm Size. 15 Bend 16 Reducer 17 Nipple 18 Cross / Tee 19 Valve 20 Dismantling Of Old Bed And Fabrication, Erection, Alignment & Trial Of New Bed Of Motor, Pump Or R / G Box. 21 10 Hp To 20 Hp 22 25 Hp To 60 Hp 23 75 Hp To 125 Hp 24 150 Hp To 250 Hp 25 Patching Work In Different Type Of Rectanglur, Square & Ciruler Old Equipments By New / Old Plate As Available. 26 Dismantling Of Old Rectangular / Circular Tank And Shifting Them To Scrap Yard. 27 Fabrication And Erection Of New Rectangular / Circular Tank By New / Old Plate. 28 Flat Bottom 29 Conical Bottom 30 Dismantling Of Light Structure 31 Fabrication And Erection Of Light Structure. 32 Dismantling Of Heavy Structure. 33 Fabrication And Erection Of Heavy Structure. 34 Replacement Of Old Worn-Out Platform By New Or Old Plate. 35 Fabrication And Fitting Of Shed By Old G.I. Sheet For Db, Motor Etc In Different Places. 36 Repairing Of Trusses Of Mill House, Boiling House Etc By Welding Or Fitting Missing Or Worn-Out Nut And Bolts. 37 Straightening Bent M.S. Plates For Reuse. 38 Dismantling Fabrication And Erection Of Header With Flange And Nipple Etc. 39 Size 2.5 Cm To 12.5 Cm 40 Size 15 Cm To 30 Cm 41 Replacement Of Cone Of Different Equipments By Old / New M.S. Plate. 42 Up To 1 Meter Dia 43 Above 1 Meter Dia 44 Repairing Of M.S. Gutter At Different Places. 45 Fabrication And Erection Of New Gutter In Place Of Worn-Out Gutters By Old / New Plates. 46 Fabrication And Erection Of New Gutter By Old / New M.S. Plate. 47 Repairing Of Worn-Out Column And Beam In Mill 48 Dismantling Of Worn-Out Coils And Fabrication Erection Of New Coil By New Pipe. 49 Fabrication Of Electric Pole Up To 27 Long With Base By 4, 6, 8 Old Or New Pipes. Cross Arm To Be Fitted. 50 Fabrication And Erection Of Step Type Stairs With Railing Etc For Different Places. 51 Mill House 52 Forzing Of Cane Carrier / Bagasse Carrier Side Links As Per Required Size. 53 Dismantling And Erection Of Worn-Out Runner Of Cane Carrier / Src / Rake Carrier / Bagasse Elevator / Rbc. 54 Repairing Of Old Rakes Of S.R.C. / Inter Rake Carrier. 55 Repairing Of R.B.C. And Bagasse Elevator Slates 56 Fabrication Of New Rakes For Src / Inter Rake Carrier By M.S. Plate 57 Replacement Of Worn Out Side Plate Of Rake Carrier / Bagasse Elevator / Rbc / Up To 300 Mm Height By New / Old Plate. 58 Replacement Of Worn Out Side Plate Of Cane Carrier By New / Old Plate And Strengthening Of Its Lower Side Support. 59 Dismantling And Erection Of Side & Bottom Plate Of Src / Rake Carrier / Bagasse Elevator & Rbc Above To 300 Mm Size. Flat And Angle To Be Fitted Out Side Of Bottom Plate For Strengthening. 60 Fabrication & Erection Of Guide In Cane Carrier / Src / Bagasse Elevator And Rbc By Bending Angle And Plate. 61 Dismantling Of Worn-Out Box Of Src / Rake Carrier And Erection Of New Box In Place Of It. 62 150 X 150 Mm 63 200 X 200 Mm 64 Replacement Of Weak Side And Top Plate From Cane Chopper To Fibrizer By Old / New Plate. 65 Fabrication And Erection Of Juice Distribution Chute. 66 Dismantling Of Worn Out Rail Of Cane Unloader And Erection Of New Rail At Its Place. 67 Dismantling Of Worn-Out Squire Bar Of Unloader And Erecting Of New Squire Bar At Its Place. 68 Dismantling Of Bottom And Side Worn Out Portion Of D.S.M. Screen And Fitting Of New Plate In Its Place. 69 Dismantling Of Old Screw Conveyor And Fabrication And Erection Of New Screw Conveyor In Its Place According To Size 70 Replacement Of Worn Out Portion Of Bottom Trough Of Screw Conveyor By New / Old Plate 71 Half Circumference Portion 72 Hole Type Half Circumference Portion By M.S. Plate 73 Hole Type Half Circumference Portion By S.S. Plate 74 Repairing Of Defective Tawas Of Mill Screw Conveyor. 75 Hard Facing Work Of Mill Roller Crown Pinion Teethes. 76 Replacemen Of Worn-Out Angle / Channel / Beam Of Cane Carrier / Rake Carrier / Bagasse Elevator And Rbc. 77 Angle 78 Chanel 79 Beam 80 Fabrication And Erection Of Trpf Rollers Top & Bottom Cover By New / Old M.S. Plate 81 Hard Facing Work Of Trpf Rollers Shell And Teeth. 82 Dismantling Of Mill Head Stock And Its Erection Accordingly With All Accessories. 83 Line Level Of Inter Rake Carrier And Worn Out Side Plates Of Tail And Driving End Shafts Guides To Be Replace By M.S. Plate. Erection After Line Alignment With Satisfactory Trial. 84 Fabrication And Erection Of Mill Pressure Chute By New M.S. Plate. Lining Of S.S. Plate To Be Fitted On It And Strengthening Of Top And Bottom Plate To Be Done. Fitting Accordingly As Per Old Chute To Be Done. 85 Replacement Of Old S.S. Lining Of Pressure Chute . New S.S. Lining To Be Fitted Accordingly As Per Old Chute. Assembly And Strengthening To Be Done. 86 Bagacilo Screens Of Bagasse Elevator To Be Taken Out And Their Fitting To Proper Place After Repairing / Setting Them Straight / Right. 87 Checking Of Mill Juice Tray, Replacement Of Worn Out Portion, Arresting Of Leakages With Welding Of S.S. / M.S. Electrodes With Satisfactory Trial. 88 Repairing Work Of Worn Out Blades Of Bagacillo Blower With Satisfactory Trial. 89 Fabrication Erection And Satisfactory Trial Work Of New Bagacillo Blower. 90 Dismantling Of Worn-Out Deflector Plate Of Fibrizer With Beam. Fabrication And Erection Of New Deflector Plate Accordingly As Perold Plate. 91 Cane Carriers All Three Runners Beams Line Alignment And Level To Be Set Right And Satisfactory Trial Work To Be Done. 92 Line Alignment Work Of Head And Tail End Shaft Of Secondary Rake Carrier / Irc To Be Done. Its Worn Out Runner And Angle To Be Replaced And Satisfactory Trial To Be Done. 93 Boiler House 94 Fabrication Of New Rakes For Rbc And Bagasse Elevator. Approximate Weight Of 01 Rake Is 12 Kg. 95 Repairing Of Old Rakes Of Rbc And Bagasse Elevator. 96 Replacement Of Worn Out Portion Of Boiler Flue Gas / Air Heater Ducting By Old / New Plate. 97 Patching Work Over Worn Out Portion Of Boiler Flue Gas Ducting By Old / New Plate. 98 After Dismantling Of Old Flue Gas Ducting Damper, New Damper To Be Fabricated And Erected. 99 After Dismantling Of Old F.D. Fan Air Ducting Damper, New Damper To Be Fabricated And Erected. 100 Repairing Of Bagasse Feeding Sliding Gate Of Boilers . 101 Erection Of Id Fan Casing After Replacement Or Patching Of Worn Out Portion Of It By Old / New Plate. 102 Fabrication And Erection Of Worn Out Bagasse Feeding Chute Of Boilers By Old / New Plates. 103 Repairing / Replacing Of Old Worn Out Fins Of 20 Ton Boilers Economizer Tube. 104 Dismantling , Modification And Erection Of Boiler Flue Gas Ducting As Per Instruction. 105 After Dismantling Worn Out Wear Plate Of Id Fan Impeller Vain, New Plate To Be Fitted And Hard Faced As Per Instruction. 106 Fabrication And Erection Of New Suction Cone Of Boiler Id Fan By Old / New Plate. 107 Worn-Out Portion Of Boiler Ash Discharge Chute To Be Taken Out. Fabrication And Erection Of New Ash Discharge Chute Of Boilers. 108 Replacement Of Old Tubes Of Air Heater By New Tubes. 109 Fabrication Of Old Tubes Of Boilers According To The Size Of Air Heater Tubes And Their Erection To Air Heater. 110 Dismantling Of Old I.D. Fan With Casing Of Boilers And Shifting It To Scrap Yard And Erection Of New I.D. Fan With Casing And Inlet , Outlet Connections In Its Place And Satisfactory Trial To Be Done. 111 Dismantling Of Old I.D. Fan And Erection Of New I.D. Fan Inplace Of Old One With Satisfactory Trial. 112 Boiling House 113 Old Brass / Ss Tubes Of Quad / Juice Heater / Pans To Be Taken Out And Depositing Them To Store. New Tubes To Be Fitted, Expended And To Be Trialed At 80 Lbs Pressure. 114 Juice Heater / Semikestner 115 Vapor Shell / Quad / Pan 116 Weak Save All Of Quad / Pans To Be Repaired By New / Old Plate And To Fit / Erect Them. 117 Fabrication And Erection Work Of Save-All By 8 Mm M.S. Plate In Place Of Quad / Pans Worn-Out Save-All According To Instructions. Satisfactory Trial Is Needed. 118 Fabrication And Erection Of Steiner With Nipple In Place Of Raw Juice / Sulphited Juice / Syrup / Melter Pumps Worn Out / Old Strainers. 119 Weak Catchers Worn Out Portion Of Quad / Pan To Be Taken Out. Repairing To Be Done By Provided Plates. Fins To Be Prepared And Fitted To Them. 120 Top And Bottom Portion Worn-Out Partition Plate Of Juice Heater / Vapor Line Juice Heater Dismantling And New Partition Plate Fabrication Erection Work To Be Done . 121 For Fitting Of Rubber Strip On Partition Plate Of Juice Heater / Vapor Line Juice Heater, Flat Iron To Be Fitted According To Instruction And Rubber Strip To Be Fitted And Trial To Be Done. 122 Dismantling, Fabrication And Erection Of Worn Out Condenser Of Vacuum Filter Along With All Connections And Satisfactory Trial. 123 Dismantling Fabrication Erection Of Condensate Bottle Of Quad / Semekestner / Vapor Cell / Juice Heater Along With All Connections. Dismantled Material To Be Shifted To Scrap Yard. 124 Repairing Work Of Aerator Of Effluent Treatment Plant. 125 C.I.Cross 6 Size Dismantling Fabrication And Erection Work At Sulphur Station. Blinds To Be Fitted To Both End Of Cross. 126 Dismantling Fabrication And Erection Work Of Steiner For Spray / Injection Pump Suction Pipe. 127 Dismantling Of Worn-Out Portion Of Vacuum Filter Trough . Plate To Be Bend According To Size And To Be Fitted In Trough. 128 Dismantling Fabrication And Erection Of Channel And Beam Of Condenser. 129 Quad / Pan Entrainment Catcher Inside Worn-Out Channel, Angle Dismantling And New Channel, Angle Erection Work. 130 6 Size Worn Out Coils Of Clarifier Dismantling, New Fabricating Erection With Nipple And Trial To Be Done. 131 Dismantling Of Worn-Out Down Take Of Semikestner, Vapor Cell, Quad, Pan And Fabrication Erection Of New Down Take By 6 / 8 Mm Plate With Trial. 132 Crystallizers Broken / Tilted Arms To Be Taken Out. After Repairing Them Or Making New To Be Fitted To Proper Place And Trial To Be Given. 133 40 / 60 Ton Pan Discharge Valves Worn Out Body / Chute Dismantling Work And Fabrication Erection Work Of New Body / Chute. 134 Weak Catcher Of Quad And Pans Dismantling Work And Fabrication Erection Work Of New Catcher According To Instructions. 135 Crystallizers Worn-Out Gland, Bush, Replacing Work, Shaft Repairing Work , Worm Wheel Opening And Fitting Work And Satisfactory Trial To Be Given. 136 Spray System Pipe Line Blinds To Be Opened, Cleaned And To Be Fitted After Cleaning With Satisfactory Trial. 137 Spray System Worn Out Branch Pipe Line Dismantling And New Branch Line Erection Work And Satisfactory Trial To Be Done. 138 Quad / Pan Worn-Out Umbrella Dismantling And New Umbrella Fabrication Erection Work To Be Done. 139 Weak Syrup / Molasses Tanks Of Pan Station To Be Taken Out .New Tanks To Be Fabricate And Erect By 6 / 8 Mm Thick Plate. Braising Of Angles To Be Provided Along With Necessary Connection To Tanks. 140 Vapor Shell / Semikestner / Quad Pans Worn Out Ammonia Coil Dismantling And New Ammonia Coil Fabrication Erction Work With Trial. 141 Sugar Hopper Weak And Worn Out Driving Unit / Trough To Be Dismantled. Fabrication And Erection Of New Drive Unit / Trough With Angle . Trial To Be Done. 142 Fabrication And Erection Of New Chute Of S.D. Machine Pug Mill Gate. 143 A Machines Old Hood Dismantling And New Hood Fabrication Erection Work . 144 Fabrication Of New Bucket As Per Sample For Dry Seed Elevator / Sugar Elevator. 145 Fabrication And Erection Of Stirrer To Molasses Condenser Of Pan Station. By Making Bed Plate , Motor Reduction Gear To Be Fitted For Operating Stirrer. Satisfactory Trial To Be Done. 146 Fabrication And Erection Of New Coil By Pipe For Super Heated Wash Water System. Hydraulic Testing To Be Done. 147 Broken Shaft Of Pug Mill Drive To Be Linked To Proper Place. New Flange Type Coupling To Be Made Fit To Fit In It . Rib To Be Provided According To Instruction. 148 New Belt Conveyor Is To Be Fabricated And Fitted On 8 X 16 Vacuum Filter With Satisfactory Trial. 149 New Coil For D Super Heater Is To Be Fabricated And To Be Fitted As Directed With Nozzles And Satisfactory Trial Is To Be Given. 150 Fabrication, Erection With Shaft And Satisfactory Trial Of Screw Conveyor For Vacuum Filter Mud Mixture. 151 Dismantling, Fabrication And Erection Of Vacuum Filter Mud Mixture With Satisfactory Trial. 152 Vacuum Crystallizer Weak And Worn-Out Shell Dismantling Work And Fabrication Erection Of New Shell In Its Place. 153 Dismantling And Erection Of Worn-Out Beam / Channel Of Centrifugal Machine . 154 Clarifier Top And Flocculaty Chamber Worn Out Plate Dismantling Work And Fabrication Erection By New Plate. Leak Proof Trial To Be Done. 155 Sulphur Furnace Weak And Worn Out Body Shell With Water Jacket To Be Dismantled And Shift To Scrap Yard. Fabrication Erection Of New Shell And Water Jacket Alongwith All Necessary Connections. Leak Proof Trial To Be Done. 156 Vacuum Filter Weak And Worn Out Filtrate Bottle To Be Dismantled And Shift To Scrap Yard. Fabrication And Erection Of New Bottle Along With All Connections. Leak Proof Trial To Be Done. 157 Sulphur Furnace Cooler Worn Out Coil Pipe To Be Taken Out , New Pipe To Be Fitted And Leak Proof Trial To Be Done. 158 Worn Out Quad / Juice Heater Condensate Bottle To Be Dismantled And Shift To Scrap Yard. Fabrication And Erection Of New Bottle With Partition Plate In Its Place. Trial To Be Given. 159 Replacement Of Partition Plate Of Quad / Juice Heater Condensate Bottle. 160 Junction Box Of Spray Pipe Line To Be Opened, Taken Out, Their Pipes And Nozzles To Be Cleaned And O Fit Them Again After Necessary Repairing . 161 Weak And Worn Out Portion Of Spray / Injection Pump Suction Pipe To Be Taken Out And To Repair By New / Old Plates. 162 Weak And Worn-Out Duck Foot Bend Of Pan / Quad Tail Pipe To Be Dismantled. Fabrication And Erection Of New Duck Foot Bend In Its Place. 163 Agitator Of Vacuum Filter To Be Repaired. 164 For Hydraulic Testing Of Vapor Line Juice Heater M.S. Pipe Blinds Be Provided Inside Suction And Delivery Vapor Pipe Of V.L.J.H. And Blinds Be Taken Out After Hydraulic Testing. 165 Exhaust Vapor Valve To Be Opened Its Weak Portion To Be Patched By 8 / 10 Mm Thick Plate. Assembled After Patching And Leak Proof Trial To Be Done. 166 Juice / Syrup Sulphiter Recovery Tower Worn Out Shell Size 1 Meter Dia X 3 Meter Height To Be Dismantled And To Shift Scrap Yard . Fabrication And Erection Of Above Shell By Old / New Plate According To Drawing. Leak Proof Trial To Be Done. 167 Dismantling Of Worn Out Melter Of Sulphur Furnace, Shifting It To Scrap Yard. Fabrication And Erection Of New Melter By 8 / 10 Mm Plate. Coils To Be Made And To Erect It By New Pipe. Trial To Be Done. 168 Dismantling Of Worn Out Circular Tank Of Juice / Water / Molasses Weighing Scale. Fabrication And Erection Of New Tank By Provided Old / New Plates. Its Valve Seat Work To Be Done And Trial To Be Done. 169 Dismantling Of Worn Out Spruzer Of Juiced Sulphiter. Fabrication And Erection Of Spruzer By New Pipe. Leak Proof Trial To Be Done. 170 Dismantling Of Worn Out Mud Distribution Box Of Clarifier. Fabrication And Erection Of New Mud Distribution Box By New Plate. Trial To Be Done. 171 Worn-Out Agitator Of Vacuum Filter Is To Be Taken Out And New Is To Be Fabricated And Fitted. Satisfactory Trial Is To Be Given. 172 Partition Plate Of Compartment Of Clarifier To Be Replaced 173 Dismantling Of Clarifier Flash Tank. New To Be Erected. Its Worn-Out Pipe To Be Replaced And Leak Proof Trial To Be Done. 174 Dismantling Of Weak Shell And Top Of 40 Ton Cap Pan And Shifting It To Scrap Yard. Fabrication And Erection Of New Shall And Top. 175 Dismantling Of Weak Shell And Top 60 Ton Cap Pan And Shifting It To Scrap Yard. Fabrication And Erection Of New Shell And Top By New / Old Plate. 176 Dismantling Of Save-All Of Top Cone Of 60 Ton Pan And Shifting It To Scrap Yard. Fabrication And Erection Of New Save-All Top Cone In Its Place. Trial To Be Done. 177 Dismantling Of Save-All Of Top Cone Of 40 Ton Pan And Shifting It To Scrap Yard. Fabrication And Erection Of New Save-All Top Cone In Its Place. Trial To Be Done. 178 60 / 40 Ton Pans Discharge Valve Bearing Housings Plate To Be Replaced By New Plate And Trial To Be Done. 179 60 / 40 Ton Pans Condensers Tail Pipes Duck Foot Bend To Be Dismantled And Fabrication Erection Of New Duck Foot Bend To Be Done By New Plate And Trial To Be Done. 180 Dismantling Of Worn Out Shell And Bottom Of Juice Sulphiter. Fabrication And Erection Of New Shell And Bottom By 8 / 10 Mm Thick Plate With Juice, Gas And Lime Line Connection .Partition Plate And Stirrer To Be Fitted To Proper Place In Side Sulphiter. Satisfactory Trial To Be Done. 181 Dismantling Of Worn Out Coolers Of Sulphur Furnace. Fabrication And Erection Of Coolers By 8 Mm M.S. Plate. Cooling Pipe, Gas Pipe Connection To Be Done. Satisfactory Trial To Be Done. And Dismantled Material To Be Shifted In Scrap Yard. 182 Weak Lower Portion Of Shell Of Sulphur Furnace Coolers To Be Dismantled. Fabrication Erection To Be Done. Worn-Out Cooler Pipes To Be Replaced. 183 Dismantling Fabrication Erection Of Weak Roof Of Clarifier By 8 Mm Thick Plate. Weak Tray Of Dorr To Be Taken Out And 6Mm Thick Plate To Be Patched In Its Place. 184 Dismantling Of Worn Out Catcher Bottle Of Vacuum Filter. Fabrication And Erection Of New Catcher Bottle In Its Place. All Connections And Trials To Be Done. 185 Dismantling Of Worn Out Cyclone Of Vacuum Filter Station. Fabrication And Erection Of New Cyclones By 3 / 5 Mm Thick Plate With Satisfactory Trial. 186 800 M² Old Semikestner Worn Out Roof, Bottom And 30 % Shall To Be Dismantled. Fabrication And Erection To Be Done By 10 Mm Thick Plate And Trial To Be Done. 187 Quad Body Weak Bottom To Be Dismantled. Fabrication And Erection To Be Done By Old Or New Plate. All Connections To Be Done . Trial To Be Done. 188 Spray / Injection Pumps Delivery Headers Weak Portion To Be Dismantled. New To Be Fabricated By New / Old Plates And Erected With Satisfactory Trial. 189 Dismantling Of 3 Size Worn Out Steam Coil Of B Heavy Molasses Conditioner And Fabrication Erection Of New Coil With Its Trial. 190 Fabrication And Erection Of Sulphur Furnace Melter Coil In Place Of Worn-Out Coil With All Connections And Satisfactory Trial. 191 Dismantling Of Old Worn Out Air Plate Of Hopper . Fabrication And Erection Of New Plate By 3Mm New M.S. Plate In Its Place. 192 Old Tank Of A Light And A Molasses To Be Dismantled. New To Be Fabricated By 6 / 8 Mm M.S. Plate And Erected In Its Place. Satisfactory Trial To Be Done. 193 All 04 No Fins Of Pan No. 7 Mechanical Circulator To Be Taken Out. New Fins With Housing To Be Erected In Its Place. Trial To Be Done. 194 Worn Out Bottom Portion Of B Heavy Molasses Conditioner To Be Dismantled. New To Be Fabricated By 6 / 8 Mm M.S. Plate And Erected In Its Place. 195 Worn Out Circular Bottom Plate Of Crystallizer To Be Dismantled. New To Be Fabricated By New M.S. Plate And Erected In Its Plate. Leek Proof Trial To Be Done. 196 Dismantling Of Complete Shell Of 60 Ton Pan And Shift It To Scrap Yard. Fabrication And Erection Of Complete Shell Of 60 Ton Pan By 10 / 12 Mm Thick Plate. Satisfactory Water And Vacuum Trial To Be Given. 197 Dismantling Of Save-All Dome Of 60 Ton Pan And Shift It To Scrap Yard. Fabrication And Erection Of Save-All Dome Of 60 Ton Pan By 10 / 12 Mm Thick Plate. Satisfactory Water And Vacuum Trial To Be Given. 198 Syrup Sulphiter Weak And Worn Out Portion Of Shell To Be Dismantled And Shift It To Scrap Yard. Fabrication And Erection Of Above Shell By Provided New Plate Of 8 Mm Thick. Satisfactory Trial To Be Given. 199 Dismantling Of Weak Old Hot Water Overhead Tank And Condensate Water Receiving Tank Of Pan And Shift Them To Scrap Yard. Fabrication And Erection Of New Tanks By 8 / 10 Mm Thick Plate With All Necessary Connections. 200 Dismantling Of Worn-Out Baffle Plate Of Juice Sulphiter And Shifting It To Scrap Yard. Fabrication And Erection Of New Baffle Plate In Its Place. 201 Dismantling Of Worn-Out Dorr Clear Juice Distribution Box And Shifting It To Scrap Yard. Fabrication And Erection Of New Clear Juice Distribution Box In Its Place With All Connections. 202 Dismantling Of Old Trough Of Hoppers And Shifting Them To Scrap Yard. Fabrication And Erection Of New Trough With Support Angle And Fitting Of Wooden Strip. Satisfactory Trial To Be Given. 203 Erection Of Magma Mixture For B Or C C / F M / C With Its Drive System, Bed And All Pipe Line Connection. Satisfactory Trial Is To Be Given. 204 Dismantling Of All 03 Sulphur Furnaces With Their Auxiliary Equipments, Accessories And Pipe Lines From Old Plate Farm And Shift Them To Directed Place And Their Erection At New Platform Along With All Equipments, Connections And Satisfactory Trial. 205 Dismantling Of Clarifier Central Shaft With Stirrer Arms And R.G. Box. Fabrication And Erection Of New Central Shaft With All Accessories. Satisfactory Trial To Be Given. 206 Dismantling Of Old Juice Sulphiter / Clear Juice / Syrup Receiving Bottle And Shifting Them To Scrap Yard. Fabrication And Erection Of New Bottle With All Connections. Satisfactory Trial To Be Given. 207 Fabrication And Erection Of B And C C / F M / C Top Cover By Provided New / Old M.S. Plate With Satisfactory Trial. 208 Fabrication And Erection Of B And C C / F M / C Molasses Separator By Provided New / Old M.S. Plate And Satisfactory Trial To Be Given. 209 Fitting Of Diffusers In Aeration Tank With All Connections And Satisfactory Trial To Be Given. 210 Fabrication Of M.S. Perforated Box Of Size 1½ ?X 1 X 2 ? And Fitting It In Mgf / Acf 211 Dismantling Of A Centrifugal Machine Size Kcp 32 ? X 49 ? With Its Pug Mill, Column And Structure And Sift It To Directed Place. 212 Repairing Of Pugmill With Drive Arms By Providing Plates And Angle. Satisfactory Trial To Be Given. 213 Dismantling Of Old Trough Of Hopper And Shifting Them To Scrap Yard. Fabrication And Erection Of New Trough With Dubbing Plate, And Wooden Connecting Rod Housing In Those Places. Satisfactory Trial To Be Given.

Key Value

Document Fees
INR 590 /-
EMD
INR 25000.0 /-
Tender Value
INR 13 Lakhs /-

BOQ Items

Name of Work: COMPETITIVE e-bidding FOR Fabrication, Erection and dismantling from reputed Contractors
Sl. No. Particulars Item Code / Make Quantity Units
1 1 Febrication
2 1.01 General Work item1 1 do not write in this line
3 1.02 Dismantling of M.S. pipe 2 cm to 35 cm size. item2 1 P CM dia P mtr
4 1.03 Erection of M.S. pipe 2 cm to 35 cm size. item3 1 P CM dia P mtr
5 1.04 Dismantling ,fabrication and erection of Pipe fitting size 2cm to 35 cm item4 1 do not write in this line
6 1.05 Bend item5 1 per cm dia per no
7 1.06 Flange item6 1 per cm dia per no
8 1.07 Nipple item7 1 per cm dia per no
9 1.08 Cross/Tee item8 1 per cm dia per no
10 1.09 Valve item9 1 per cm dia per no
11 1.1 Reducer item10 1 per cm dia per no
12 1.11 Dismantling of M.S. pipe above to 35 cm size & shifting it to scrap yard. item11 1 Per Ton
13 1.12 Fabrication and erection of M.S. Pipe above to 35 cm size by 6/8/10 mm plate. item12 1 Per Ton
14 1.13 Dismantling ,fabrication and erection of Pipe fitting above 35 cm size. item13 1 do not write in this line
15 1.14 Bend item14 1 Per Ton.
16 1.15 Reducer item15 1 Per Ton.
17 1.16 Nipple item16 1 Per Ton.
18 1.17 Cross/Tee item17 1 Per Ton.
19 1.18 Valve item18 1 per cm \ per no
20 1.19 Dismantling of old bed and fabrication, erection, alignment & trial of new bed of Motor, Pump or R/G box. item19 1 do not write in this line
21 1.2 10 HP to 20 HP item20 1 per Bed
22 1.21 25 HP to 60 HP item21 1 per Bed
23 1.22 75 HP to 125 HP item22 1 per Bed
24 1.23 150 HP to 250 HP item23 1 per Bed
25 1.24 Patching work in different type of rectanglur,Square & ciruler old equipments by new/old plate as available. item24 1 per m²
26 1.25 dismantling of old Rectangular/circular tank and shifting them to scrap yard. item25 1 Per ton
27 1.26 Fabrication and erection of new Rectangular/circular tank by new/old Plate. item26 1 do not write in this line
28 1.27 Flat Bottom item27 1 Per ton
29 1.28 Conical Bottom item28 1 Per ton
30 1.29 Dismantling of light structure item29 1 per ton
31 1.3 Fabrication and erection of light structure. item30 1 per ton
32 1.31 Dismantling of Heavy structure. item31 1 per ton
33 1.32 Fabrication and erection of heavy structure. item32 1 Per ton
34 1.33 Replacement of old worn-out platform by new or old plate. item33 1 per m²
35 1.34 Fabrication and fitting of Shed by old G.I. Sheet for DB, Motor etc in different places. item34 1 per m²
36 1.35 Repairing of trusses of Mill House, Boiling House etc by welding or fitting missing or worn-out nut and bolts. item35 1 Per Trush
37 1.36 Straightening bent M.S. Plates for reuse. item36 1 per m²
38 1.37 dismantling fabrication and erection of header with flange and nipple etc. item37 1 do not write in this line
39 1.38 Size 2.5 cm to 12.5 cm item38 1 per cm dia per m
40 1.39 Size 15 cm to 30 cm item39 1 Per no
41 1.4 Replacement of cone of different equipments by old/new M.S. Plate. item40 1 do not write in this line
42 1.41 Up to 1 meter dia item41 1 Per cone
43 1.42 Above 1 meter dia item42 1 Per meter dia per cone
44 1.43 Repairing of M.S. Gutter at different places. item43 1 Per R.Meter
45 1.44 Fabrication and erection of new gutter in place of worn-out gutters by old /new plates. item44 1 per m²
46 1.45 Fabrication and erection of new gutter by old / new M.S. plate. item45 1 per m²
47 1.46 Repairing of worn-out column and beam in mill item46 1 Per R.Meter
48 1.47 Dismantling of worn-out coils and fabrication erection of new coil by new pipe. item47 1 P CM dia P mtr
49 1.48 Fabrication of electric pole up to 27' long with base by 4",6",8" old or new pipes. Cross arm to be fitted. item48 1 Per no
50 1.49 Fabrication and erection of Step type stairs with railing etc for different Places. item49 1 per m
51 1.5 MILL HOUSE item50 1 do not write in this line
52 1.51 Forzing of Cane Carrier/Bagasse Carrier side links as per required size. item51 1 per link
53 1.52 Dismantling and erection of worn-out runner of Cane carrier/SRC/Rake Carrier/Bagasse Elevator /RBC. item52 1 Per Running meter
54 1.53 Repairing of Old rakes of S.R.C./Inter Rake carrier. item53 1 per rake
55 1.54 Repairing of R.B.C. and Bagasse Elevator Slates item54 1 Per Slate
56 1.55 Fabrication of new rakes for SRC/Inter rake carrier by M.S. plate item55 1 per rake
57 1.56 Replacement of worn out side plate of Rake Carrier/Bagasse Elevator/RBC/up to 300 mm height by new / old plate. item56 1 Per Running meter
58 1.57 Replacement of worn out side plate of cane carrier by new /old plate and strengthening of its lower side support. item57 1 per m²
59 1.58 Dismantling and erection of side & bottom plate of SRC/Rake Carrier/Bagasse elevator & RBC above to 300 mm size. Flat and angle to be fitted out side of bottom plate for strengthening. item58 1 per m²
60 1.59 Fabrication & erection of guide in Cane Carrier/SRC/Bagasse elevator and RBC by bending angle and plate. item59 1 per meter
61 1.6 Dismantling of worn-out box of SRC/Rake Carrier and erection of new box in place of it. item60 1 do not write in this line
62 1.61 150 x 150 mm item61 1 per meter
63 1.62 200 x 200 mm item62 1 per meter
64 1.63 Replacement of weak side and top plate from Cane chopper to Fibrizer by old / new plate. item63 1 per m²
65 1.64 Fabrication and Erection of Juice distribution Chute. item64 1 Per chute
66 1.65 Dismantling of worn out rail of cane unloader and erection of new rail at its place. item65 1 Per meter
67 1.66 Dismantling of worn-out squire bar of unloader and erecting of new squire bar at its place. item66 1 Per meter
68 1.67 Dismantling of bottom and side worn out portion of D.S.M. Screen and fitting of new plate in its place. item67 1 per m²
69 1.68 Dismantling of old screw conveyor and fabrication and erection of new screw conveyor in its place according to size item68 1 Per Screw conveyor
70 1.69 Replacement of worn out portion of bottom trough of Screw Conveyor by new/old plate item69 1 do not write in this line
71 1.7 Half Circumference portion item70 1 per meter
72 1.71 Hole type half circumference portion by M.S. Plate item71 1 per meter
73 1.72 Hole type half circumference portion by S.S. Plate item72 1 per meter
74 1.73 Repairing of Defective Tawas of Mill Screw Conveyor. item73 1 Per Tawas
75 1.74 Hard facing work of Mill roller crown pinion teethes. item74 1 per pinion
76 1.75 Replacemen of Worn-out Angle/Channel/Beam of Cane Carrier/Rake Carrier/Bagasse Elevator and RBC. item75 1 do not write in this line
77 1.76 Angle item76 1 Per meter
78 1.77 Chanel item77 1 per 100mm per M
79 1.78 Beam item78 1 per 100mm per M
80 1.79 Fabrication and erection of TRPF Rollers top & bottom cover by new/old M.S. Plate item79 1 per cover
81 1.8 Hard facing work of TRPF roller's Shell and teeth. item80 1 Per roller
82 1.81 Dismantling of mill head stock and its erection accordingly with all accessories. item81 1 Per head stock
83 1.82 Line level of Inter Rake Carrier and worn out side plates of Tail and driving end shafts guides to be replace by M.S. Plate. Erection after line alignment with satisfactory trial. item82 1 Per Rake Carrier
84 1.83 Fabrication and erection of Mill pressure chute by new M.S. Plate. Lining of S.S. plate to be fitted on it and strengthening of top and bottom plate to be done. Fitting accordingly as per old chute to be done. item83 1 Per Chute
85 1.84 Replacement of old S.S. lining of Pressure Chute . New S.S. lining to be fitted accordingly as per old chute. Assembly and strengthening to be done. item84 1 Per Chute
86 1.85 Bagacilo screens of Bagasse elevator to be taken out and their fitting to proper place after repairing/setting them straight/right. item85 1 Per screen
87 1.86 Checking of Mill Juice tray, replacement of worn out portion, arresting of leakages with welding of S.S./M.S. Electrodes with satisfactory trial. item86 1 Per Tray
88 1.87 Repairing work of worn out Blades of Bagacillo blower with satisfactory trial. item87 1 Per blower
89 1.88 Fabrication erection and satisfactory trial work of new Bagacillo blower. item88 1 Per blower
90 1.89 Dismantling of Worn-out deflector plate of Fibrizer with beam. Fabrication and erection of new deflector plate accordingly as perold plate. item89 1 per m²
91 1.9 Cane Carrier's all three runners beams line alignment and level to be set right and satisfactory trial work to be done. item90 1 per meter
92 1.91 Line alignment work of head and tail end shaft of secondary rake carrier/ IRC to be done. Its worn out runner and angle to be replaced and satisfactory trial to be done. item91 1 01 job LS
93 1.92 BOILER HOUSE item92 1 do not write in this line
94 1.93 Fabrication of new rakes for RBC and Bagasse elevator. Approximate weight of 01 rake is 12 Kg. item93 1 Per Rake
95 1.94 Repairing of old rakes of RBC and Bagasse Elevator. item94 1 Per Rake
96 1.95 Replacement of worn out portion of Boiler flue gas/Air heater ducting by old /new plate. item95 1 per m²
97 1.96 Patching work over worn out portion of Boiler flue gas ducting by old /new plate. item96 1 per m²
98 1.97 After dismantling of old flue gas ducting damper, new damper to be fabricated and erected. item97 1 per damper
99 1.98 After dismantling of old F.D. Fan air ducting damper, new damper to be fabricated and erected. item98 1 per damper
100 1.99 Repairing of Bagasse feeding sliding gate of Boilers . item99 1 Per gate
101 2 Erection of ID Fan casing after replacement or patching of worn out portion of it by old/ new plate. item100 1 per casing
102 2.01 Fabrication and erection of worn out Bagasse feeding chute of boilers by old/ new plates. item101 1 per chute
103 2.02 Repairing/replacing of old worn out fins of 20 ton boilers economizer tube. item102 1 per tube
104 2.03 Dismantling ,modification and erection of Boiler flue gas ducting as per instruction. item103 1 per m²
105 2.04 After dismantling worn out wear plate of ID fan impeller vain, new plate to be fitted and hard faced as per instruction. item104 1 Per vain
106 2.05 Fabrication and erection of new suction cone of Boiler ID Fan by old/new plate. item105 1 Per cone
107 2.06 Worn-out portion of Boiler Ash discharge chute to be taken out. Fabrication and erection of new Ash discharge chute of boilers. item106 1 per m²
108 2.07 Replacement of old tubes of Air heater by new tubes. item107 1 per tube
109 2.08 Fabrication of old tubes of boilers according to the size of Air heater tubes and their erection to Air heater. item108 1 per tube
110 2.09 Dismantling of old I.D. Fan with casing of Boilers and shifting it to scrap yard and erection of new I.D. Fan with casing and inlet , outlet connections in its place and satisfactory trial to be done. item109 1 Per no
111 2.1 Dismantling of Old I.D. Fan and erection of New I.D. Fan inplace of old one with satisfactory trial. item110 1 Per no
112 2.11 BOILING HOUSE item111 1 do not write in this line
113 2.12 Old Brass/SS Tubes of Quad/ Juice Heater/Pans to be taken out and depositing them to Store. New tubes to be fitted, expended and to be trialed at 80 lbs pressure. item112 1 do not write in this line
114 2.13 Juice Heater/ Semikestner item113 1 Per tube
115 2.14 Vapor Shell/ Quad /Pan item114 1 per tube
116 2.15 Weak save all of Quad /Pans to be repaired by new/old plate and to fit/erect them. item115 1 per ton
117 2.16 Fabrication and erection work of Save-all by 8 mm M.S. Plate in place of Quad/Pans worn-out Save-all according to instructions. Satisfactory trial is needed. item116 1 Per Save-all
118 2.17 Fabrication and erection of Steiner with nipple in place of Raw Juice/Sulphited Juice/Syrup/Melter pump's worn out/old strainers. item117 1 Per Steiner
119 2.18 Weak Catchers worn out portion of Quad /Pan to be taken out. Repairing to be done by provided plates. Fins to be prepared and fitted to them. item118 1 Per catcher
120 2.19 Top and bottom portion Worn-out Partition Plate of Juice heater/ Vapor line juice heater dismantling and new partition plate fabrication erection work to be done . item119 1 Per Juice heater
121 2.2 For fitting of rubber strip on partition plate of Juice heater/vapor line juice heater, Flat Iron to be fitted according to instruction and rubber strip to be fitted and trial to be done. item120 1 Per Juice heater
122 2.21 Dismantling, fabrication and erection of worn out condenser of vacuum filter along with all connections and satisfactory trial. item121 1 Per no.
123 2.22 Dismantling fabrication erection of Condensate bottle of Quad / Semekestner / Vapor cell / Juice heater along with all connections. Dismantled material to be shifted to scrap yard. item122 1 Per bottle
124 2.23 Repairing work of Aerator of Effluent treatment plant. item123 1 Per no
125 2.24 C.I.Cross 6" size dismantling fabrication and erection work at Sulphur station. Blinds to be fitted to both end of cross. item124 1 Per Cross
126 2.25 Dismantling fabrication and erection work of Steiner for Spray/ Injection pump suction pipe. item125 1 Per strainer
127 2.26 Dismantling of worn-out portion of Vacuum filter trough . Plate to be bend according to size and to be fitted in trough. item126 1 per m²
128 2.27 Dismantling fabrication and erection of Channel and beam of condenser. item127 1 per no.
129 2.28 Quad /Pan entrainment catcher inside worn-out Channel, angle dismantling and new channel, angle erection work. item128 1 Per catcher
130 2.29 6" size worn out coils of Clarifier dismantling, new fabricating erection with nipple and trial to be done. item129 1 per no
131 2.3 Dismantling of worn-out down take of Semikestner, Vapor cell, Quad, Pan and fabrication erection of new down take by 6/8 mm plate with trial. item130 1 Per no
132 2.31 Crystallizers broken/tilted arms to be taken out. After repairing them or making new to be fitted to proper place and trial to be given. item131 1 Per Cryst
133 2.32 40/60 Ton Pan Discharge valves worn out Body / chute dismantling work and fabrication erection work of new body/chute. item132 1 Per Pan
134 2.33 Weak Catcher of Quad and Pans dismantling work and fabrication erection work of new catcher according to instructions. item133 1 Per ton
135 2.34 Crystallizers worn-out gland, bush, replacing work, Shaft repairing work , worm wheel opening and fitting work and satisfactory trial to be given. item134 1 Per Cryst
136 2.35 Spray system Pipe line blinds to be opened, cleaned and to be fitted after cleaning with satisfactory trial. item135 1 Per Set
137 2.36 Spray system worn out branch pipe line dismantling and new branch line erection work and satisfactory trial to be done. item136 1 Per set
138 2.37 Quad/Pan worn-out umbrella dismantling and new umbrella fabrication erection work to be done. item137 1 Per no
139 2.38 Weak Syrup/ Molasses tanks of Pan station to be taken out .New tanks to be fabricate and erect by 6/8 mm thick plate. Braising of angles to be provided along with necessary connection to tanks. item138 1 Per ton
140 2.39 Vapor Shell/ Semikestner/Quad Pans worn out Ammonia coil dismantling and new ammonia coil fabrication erction work with trial. item139 1 Per coil
141 2.4 Sugar hopper Weak and worn out driving unit / trough to be dismantled. Fabrication and erection of new drive unit/trough with angle . Trial to be done. item140 1 per m²
142 2.41 Fabrication and erection of new chute of S.D. Machine Pug mill gate. item141 1 Per no
143 2.42 A Machines Old hood dismantling and new hood fabrication erection work . item142 1 Per no
144 2.43 Fabrication of new bucket as per sample for Dry seed elevator/Sugar Elevator. item143 1 Per no
145 2.44 fabrication and erection of stirrer to Molasses condenser of Pan station. By making bed plate , motor reduction gear to be fitted for operating stirrer. Satisfactory trial to be done. item144 1 Per set
146 2.45 Fabrication and erection of new coil by pipe for super heated wash water system. Hydraulic testing to be done. item145 1 per coil
147 2.46 Broken shaft of Pug mill drive to be linked to proper place. New flange type coupling to be made fit to fit in it . Rib to be provided according to instruction. item146 1 Per no
148 2.47 New belt conveyor is to be fabricated and fitted on 8' x 16' vacuum filter with satisfactory trial. item147 1 Per no
149 2.48 New coil for D super heater is to be fabricated and to be fitted as directed with nozzles and satisfactory trial is to be given. item148 1 Per coil
150 2.49 Fabrication, erection with shaft and satisfactory trial of screw conveyor for vacuum filter mud mixture. item149 1 Per conveyor
151 2.5 Dismantling, fabrication and erection of vacuum filter mud mixture with satisfactory trial. item150 1 per no
152 2.51 Vacuum crystallizer weak and worn-out Shell dismantling work and fabrication erection of new shell in its place. item151 1 per m²
153 2.52 Dismantling and erection of worn-out Beam/Channel of Centrifugal machine . item152 1 per meter
154 2.53 Clarifier top and flocculaty chamber worn out plate dismantling work and fabrication erection by new plate. Leak proof trial to be done. item153 1 per m²
155 2.54 Sulphur furnace weak and worn out body shell with water jacket to be dismantled and shift to scrap yard. Fabrication erection of new shell and water jacket alongwith all necessary connections. Leak proof trial to be done. item154 1 Per furnace
156 2.55 Vacuum filter weak and worn out filtrate bottle to be dismantled and shift to scrap yard. Fabrication and erection of new bottle along with all connections. Leak proof trial to be done. item155 1 Per ton
157 2.56 Sulphur furnace cooler worn out coil pipe to be taken out , new pipe to be fitted and leak proof trial to be done. item156 1 per cooler.
158 2.57 Worn out Quad/Juice heater condensate bottle to be dismantled and shift to scrap yard. Fabrication and erection of new bottle with partition plate in its place. Trial to be given. item157 1 Per ton
159 2.58 Replacement of Partition plate of Quad/ Juice Heater condensate bottle. item158 1 1 job L.S.
160 2.59 Junction box of spray pipe line to be opened, taken out, their pipes and nozzles to be cleaned and o fit them again after necessary repairing . item159 1 Per box
161 2.6 Weak and worn out portion of Spray /Injection pump suction pipe to be taken out and to repair by new /old plates. item160 1 Per suction pipe
162 2.61 Weak and worn-out duck foot bend of Pan / quad tail pipe to be dismantled. Fabrication and erection of new duck foot bend in its place. item161 1 per no.
163 2.62 Agitator of Vacuum filter to be repaired. item162 1 Per no.
164 2.63 For hydraulic testing of vapor line juice heater m.s. Pipe blinds be provided inside suction and delivery vapor pipe of V.L.J.H. And blinds be taken out after hydraulic testing. item163 1 L.S. 1 job.
165 2.64 Exhaust vapor valve to be opened its Weak portion to be patched by 8/10 mm thick plate. Assembled after patching and leak proof trial to be done. item164 1 Per valve.
166 2.65 Juice/Syrup sulphiter recovery tower worn out shell size 1 meter dia x 3 meter height to be dismantled and to shift scrap yard . Fabrication and erection of above shell by old/ new plate according to drawing. Leak proof trial to be done. item165 1 Per ton
167 2.66 Dismantling of worn out Melter of sulphur furnace, shifting it to scrap yard. Fabrication and erection of new Melter by 8/10 mm plate. Coils to be made and to erect it by new pipe. Trial to be done. item166 1 Per Melter
168 2.67 Dismantling of worn out Circular tank of Juice/ Water/Molasses weighing scale. Fabrication and erection of new tank by provided old/ new plates. Its valve seat work to be done and trial to be done. item167 1 Per ton
169 2.68 Dismantling of worn out spruzer of juiced sulphiter. Fabrication and erection of spruzer by new pipe. Leak proof trial to be done. item168 1 L.S. 1 job.
170 2.69 Dismantling of worn out mud distribution box of Clarifier. Fabrication and erection of new mud distribution box by new plate. Trial to be done. item169 1 Per no.
171 2.7 Worn-out Agitator of Vacuum filter is to be taken out and new is to be fabricated and fitted. Satisfactory trial is to be given. item170 1 Per no.
172 2.71 Partition Plate of Compartment of Clarifier to be replaced item171 1 per m²
173 2.72 Dismantling of Clarifier flash tank. New to be erected. Its worn-out pipe to be replaced and leak proof trial to be done. item172 1 L.S. 1 job.
174 2.73 Dismantling of weak shell and top of 40 ton cap pan and shifting it to scrap yard. Fabrication and erection of new shall and top. item173 1 per m²
175 2.74 Dismantling of weak shell and top 60 ton cap pan and shifting it to scrap yard. Fabrication and erection of new shell and top by new/old plate. item174 1 per m²
176 2.75 Dismantling of save-all of top cone of 60 ton Pan and shifting it to scrap yard. Fabrication and erection of new save-all top cone in its place. Trial to be done. item175 1 per m²
177 2.76 Dismantling of save-all of top cone of 40 ton Pan and shifting it to scrap yard. Fabrication and erection of new save-all top cone in its place. Trial to be done. item176 1 per m²
178 2.77 60/40 ton pan's discharge valve bearing housing's plate to be replaced by new plate and trial to be done. item177 1 Per no.
179 2.78 60/40 ton pan's condenser's tail pipe's duck foot bend to be dismantled and fabrication erection of new duck foot bend to be done by new plate and trial to be done. item178 1 Per no.
180 2.79 Dismantling of worn out shell and bottom of juice sulphiter. Fabrication and erection of new shell and bottom by 8/10 mm thick plate with Juice, gas and lime line connection .Partition plate and stirrer to be fitted to proper place in side sulphiter. satisfactory trial to be done. item179 1 Per ton
181 2.8 Dismantling of worn out coolers of sulphur furnace. Fabrication and erection of coolers by 8 mm m.s. Plate. Cooling pipe, gas pipe connection to be done. Satisfactory trial to be done. And dismantled material to be shifted in scrap yard. item180 1 Per no.
182 2.81 Weak lower portion of shell of sulphur furnace coolers to be dismantled. Fabrication erection to be done. Worn-out cooler pipes to be replaced. item181 1 per m²
183 2.82 Dismantling fabrication erection of weak roof of Clarifier by 8 mm thick plate. Weak tray of Dorr to be taken out and 6mm thick plate to be patched in its place. item182 1 Per ton
184 2.83 Dismantling of worn out catcher bottle of vacuum filter. Fabrication and erection of new catcher bottle in its place. All connections and trials to be done. item183 1 Per no.
185 2.84 Dismantling of worn out cyclone of vacuum filter station. Fabrication and erection of new cyclones by 3/5 mm thick plate with satisfactory trial. item184 1 Per no.
186 2.85 800 m² old semikestner worn out roof, bottom and 30 % shall to be dismantled. Fabrication and erection to be done by 10 mm thick plate and trial to be done. item185 1 per ton
187 2.86 Quad body weak bottom to be dismantled. Fabrication and erection to be done by old or new plate. All connections to be done . Trial to be done. item186 1 per ton
188 2.87 Spray/ Injection pump's delivery header's weak portion to be dismantled. New to be fabricated by new /old plates and erected with satisfactory trial. item187 1 per ton
189 2.88 Dismantling of 3" size worn out steam coil of B heavy molasses conditioner and fabrication erection of new coil with its trial. item188 1 Per coil
190 2.89 Fabrication and erection of Sulphur Furnace Melter coil in place of worn-out coil with all connections and satisfactory trial. item189 1 Per Coil
191 2.9 Dismantling of old worn out Air plate of Hopper . Fabrication and erection of new plate by 3mm new M.S. plate in its place. item190 1 per plate.
192 2.91 Old tank of A light and A molasses to be dismantled. New to be fabricated by 6/8 mm M.S. plate and erected in its place. Satisfactory trial to be done. item191 1 per ton
193 2.92 All 04 no fins of Pan no. 7 Mechanical circulator to be taken out. New fins with housing to be erected in its place. Trial to be done. item192 1 L.S. 1 job.
194 2.93 Worn out bottom portion of B heavy molasses conditioner to be dismantled. New to be fabricated by 6/8 mm M.S. plate and erected in its place. item193 1 Per ton
195 2.94 Worn out circular bottom plate of Crystallizer to be dismantled. New to be fabricated by new M.S. plate and erected in its plate. Leek proof trial to be done. item194 1 Per ton
196 2.95 Dismantling of complete Shell of 60 ton Pan and shift it to scrap yard. Fabrication and erection of complete shell of 60 ton pan by 10/12 mm thick plate. Satisfactory water and vacuum trial to be given. item195 1 per ton
197 2.96 Dismantling of Save-all Dome of 60 ton Pan and shift it to scrap yard. Fabrication and erection of Save-all Dome of 60 ton pan by 10/12 mm thick plate. Satisfactory water and vacuum trial to be given. item196 1 per ton
198 2.97 Syrup Sulphiter weak and worn out portion of Shell to be dismantled and shift it to Scrap yard. Fabrication and erection of above Shell by provided new plate of 8 mm thick. Satisfactory trial to be given. item197 1 per ton
199 2.98 Dismantling of weak old hot water overhead tank and condensate water receiving tank of pan and shift them to scrap yard. Fabrication and erection of new tanks by 8/10 mm thick plate with all necessary connections. item198 1 per ton
200 2.99 Dismantling of Worn-out Baffle plate of Juice sulphiter and shifting it to scrap yard. Fabrication and erection of new baffle plate in its place. item199 1 per ton
201 3 Dismantling of worn-out Dorr clear juice distribution box and shifting it to scrap yard. Fabrication and erection of new clear juice distribution box in its place with all connections. item200 1 per ton
202 3.01 Dismantling of old trough of hoppers and shifting them to scrap yard. Fabrication and erection of new trough with support Angle and fitting of wooden strip. Satisfactory trial to be given. item201 1 per trough
203 3.02 Erection of Magma mixture for 'B' or 'C' C/F M/C with its drive system, bed and all pipe line connection. Satisfactory trial is to be given. item202 1 L.S. 1 job.
204 3.03 Dismantling of all 03 Sulphur Furnaces with their auxiliary equipments, accessories and pipe lines from old plate farm and shift them to directed place and their erection at new Platform along with all equipments, connections and satisfactory trial. item203 1 L.S. 1 job.
205 3.04 Dismantling of Clarifier central shaft with stirrer arms and R.G. Box. Fabrication and erection of new central shaft with all accessories. Satisfactory trial to be given. item204 1 L.S. 1 job.
206 3.05 Dismantling of old Juice Sulphiter/ Clear juice/Syrup receiving bottle and shifting them to scrap yard. Fabrication and erection of New Bottle with all connections. Satisfactory trial to be given. item205 1 Per Ton
207 3.06 Fabrication and erection of B and C C/F M/C top cover by provided new /old M.S. Plate with satisfactory trial. item206 1 Per No
208 3.07 Fabrication and erection of B and C C/F M/C Molasses Separator by provided new /old M.S. Plate and satisfactory trial to be given. item207 1 Per no.
209 3.08 Fitting of Diffusers in Aeration tank with all connections and satisfactory trial to be given. item208 1 Per Tank
210 3.09 Fabrication of M.S. perforated box of size 1½ ?x 1' x 2 ? and fitting it in MGF/ACF item209 1 Per box
211 3.1 Dismantling of A Centrifugal Machine size KCP 32 ? x 49 ? with its pug mill,column and structure and sift it to directed place. item210 1 per no
212 3.11 Repairing of Pugmill with drive arms by providing plates and Angle. Satisfactory trial to be given. item211 1 L.S. 1 job.
213 3.12 Dismantling of old trough of hopper and shifting them to scrap yard. Fabrication and erection of new trough with dubbing plate, and wooden connecting rod housing in those places. Satisfactory trial to be given. item212 1 per trough
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail